Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Doc No.

MKH BERHAD MKH/PMD/CSOP/SHE/20/04/F020

INFRA WAY CONSTRUCTION SDN BHD


Safety, Health, and Environment Observation
Report
Project Manager Name Issued by: SHA’RANI
LIM HOI MING
Position: SHO
Main Contractor INFRA WAY CONSTRUCTION

*Doc / No. 0001 Date Of Issuance 30/09/2023


Contractor’s SHO Name: N/A
Site: MKH KAJANG 2 Contractor’s SSS Name: VIKKNES

Comment Action
Photo taken
Date
NO

Before After

Comment:
1 Grinder machine without
guarding. 19/09/2023
Action to be taken:
Grinder machine has been
provided guarding.

Comment:
2 Excavated area at STP 27/09/2023
requires barricade and
signages.

Action to be taken:
Excavated area at STP has
been barricade and signages
have been provided
Comment:
3 Excavated area requires
barricade. (Behind MH5D) 20/09/2023

Action to
be taken:
Barricade has been
installed at excavated area

Comment:
4 Water ponding 20/09/2023
inside chemical
drum. Might have
larval breeding.

Action to betaken:
Water ponding
inside chemical
drum has been
cleared.

5 Comment:
Need to carry out 29/09/2023
housekeeping at
CLQ.

Action to be
taken:
CLQ housekeeping
has been carried
out.

6. Comment:
Poor workplace
housekeeping at 21/09/2023
STP.

Action to be
taken:
Debris at
workplace has
been cleared (STP)
7. Comment: 29/09/2023
Debris at concrete
mixer did not
dispose properly.

Action to be
taken:
Debris at concrete
mixer area has
been disposed.

Remarks if any:

Agreed by: (Project Manager) Verified by: (Client representative)

……………………….. . . ……………………………. …………………………………..

Note: Evidence shall be provided in order to close the observation report e.g. photographs including time and date.

(1)

You might also like