Round Report Summary: iSURE Project Information Drilled Holes, Navigation Plane

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 22

Project: - 1/22

Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

ROUND REPORT SUMMARY


iSURE Project Information Drilled Holes, Navigation Plane
File 75139.1.dcl
Project -
Tunnel Plan -
Constructor -
Customer -
Round Information
Started 25-12-2023 09:44:45
Finished 25-12-2023 09:51:49
Time Used [h] 00:07:04
Gross Drilling Capacity
56.22
[m/h]
Drilled Meters [m] 7.69
Rig Information
Serial Number 5063-1
Nick Name Rig Data Missing
Type Rig Data Missing
Drill Plan
Drill Plan
Bolt Plan ET B3 (09 Holes).bp
Face Area 0
Planned: 0
Length [m]
Realized: -9999.9
Planned: 0
Face Drilling Holes
Realized: 0
Planned: 9
Bolting
Realized: 2

Round Time
Boom 1 Boom 2 Sum
Before Drilling [h] 0:00 0:04 0:05
Boom Movements [h] 0:01 0:01 0:02
Drilling [h] 0:01 0:02 0:03
Idle [h] 0:00 0:00 0:00
After Drilling [h] 0:06 0:00 0:06
Sum [h] 0:08 0:08 0:16

Round Time Navigation


Operator
Curve Table TUNNEL-11 (ET).tl
Auxiliary ID
PEG Number 75139.10 m
Excavation Direction Growing PEG Numbers

Comments

Total 0:08 h

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 2/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

Table of Contents

ROUND REPORT SUMMARY.................................................................................................................... 1


NAVIGATION.............................................................................................................................................. 3
DRILLING EFFICIENCY............................................................................................................................. 4
Round Counters....................................................................................................................................... 4
General................................................................................................................................................. 4
Round Time.......................................................................................................................................... 4
Drilling Time......................................................................................................................................... 5
Boom Movement Time......................................................................................................................... 6
User Counters.......................................................................................................................................... 6
General................................................................................................................................................. 6
Round Time.......................................................................................................................................... 7
Drilling Time......................................................................................................................................... 7
Boom Movement Time......................................................................................................................... 8
Service Counters..................................................................................................................................... 8
General................................................................................................................................................. 8
Round Time.......................................................................................................................................... 9
Drilling Time....................................................................................................................................... 10
Boom Movement Time....................................................................................................................... 11
Total Counters....................................................................................................................................... 11
General............................................................................................................................................... 11
Round Time........................................................................................................................................ 12
Drilling Time....................................................................................................................................... 12
Boom Movement Time....................................................................................................................... 13
HOLE TYPES............................................................................................................................................ 14
FACE DRILLING HOLES.......................................................................................................................... 15
Navigation Plane.................................................................................................................................... 15
Blast Plane............................................................................................................................................. 16
Sequences and Roll-Over Angles.......................................................................................................... 17
Hole Information Table........................................................................................................................... 17
BOLTING HOLES..................................................................................................................................... 18
Bolting Fan 1.......................................................................................................................................... 18
MWD......................................................................................................................................................... 19
Face Drilling Holes................................................................................................................................. 19
Bolting Fan............................................................................................................................................. 20
Bolting Fan 1...................................................................................................................................... 20

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 3/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

NAVIGATION
1. Navigation
Time 25-12-2023 09:44:38
Navigation Type Bolt Plan Navigation
Fan Distance from Navgation Plane 0.00 m
Operator
Curve Table TUNNEL-11 (ET).tl
Auxiliary ID
Method Tachymeter
Laser ID
PEG Number 75139.10 m
Excavation Direction Growing PEG Numbers
Navigation Boom 0
Camber Angle 0.0°
Pivot Point Drill Plan Coordinates X: 0.00 m; Z: 0.00 m
Pivot Point Site Coordinates X: 0.00 m; Z: 0.00 m
Carrier Swing 0.1°
Carrier Tilt 0.6°
Rig front prism point X: 287544.15 m; Y: 3344521.04 m; Z: 565.80 m
Rig rear prism point X: 287543.01 m; Y: 3344522.28 m; Z: 566.30 m
Rig prism measurement side Right

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 4/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

DRILLING EFFICIENCY
ROUND COUNTERS
General
Hours [h]
Basket Boom 0:00
Compressor 0:07
Water Pump 0:07

Boom 1 Boom 2 Sum Average


Percussion Hours [h] 0:01 0:02 0:03 0:02
Auxiliary Drilling Time [h] 0:00 0:00 0:00 0:00
Powerpack Hours [h] 0:07 0:07 0:14 0:07
Power Extractor Hours [h] 0:00 0:00 0:00 0:00
Drilled Meters [m] 4.08 3.52 7.60 3.80
Gross Drilling Capacity [m/h] 31.05 25.18 56.22 28.11
Average Drilling Capacity
233.09 96.87 164.98
[m/h]
Net Penetration [m/min] 2.29 1.61 1.95

Round Time
Boom 1 Boom 2 Sum Average
Before Drilling [h] 0:00 0:04 0:05 0:02
Boom Movements [h] 0:01 0:01 0:02 0:01
Drilling [h] 0:01 0:02 0:03 0:02
Idle [h] 0:00 0:00 0:00 0:00
After Drilling [h] 0:06 0:00 0:06 0:03
Sum [h] 0:08 0:08 0:16 0:08

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 5/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

Drilling Time
Boom 1 Boom 2 Sum Average
Approach [h] 0:00 0:00 0:00 0:00
Effective [h] 0:01 0:02 0:03 0:02
Finishing [h] 0:00 0:00 0:00 0:00
Disturbance [h] 0:00 0:00 0:00 0:00
Manual [h] 0:00 0:00 0:00 0:00
Rod Handling Hours[h] 0:00 0:00 0:00 0:00
Sum [h] 0:01 0:02 0:03 0:02

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 6/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

Boom Movement Time


Boom 1 Boom 2 Sum Average
Automatic [h] 0:00 0:00 0:00 0:00
Manual [h] 0:01 0:01 0:02 0:01
Sum [h] 0:01 0:01 0:02 0:01

USER COUNTERS
General
Hours [h]
Basket Boom 0:00
Compressor 2218:37
Water Pump 2222:03

Boom 1 Boom 2 Sum Average


Percussion Hours [h] 638:39 937:02 1575:41 787:50
Auxiliary Drilling Time [h] 95:53 101:43 197:35 98:48
Powerpack Hours [h] 2737:06 2613:35 5350:41 2675:21
Power Extractor Hours [h] 0:00 0:00 0:00 0:00
Drilled Meters [m] 78187.30 77168.00 155355.30 77677.65
Gross Drilling Capacity [m/h] 30.36 36.19 66.55 33.28
Average Drilling Capacity
125.83 84.74 105.29
[m/h]
Net Penetration [m/min] 2.03 1.35 1.69

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 7/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

Round Time
Boom 1 Boom 2 Sum Average
Before Drilling [h] 777:39 441:52 1219:32 609:46
Boom Movements [h] 339:30 390:49 730:19 365:09
Drilling [h] 621:22 910:39 1532:01 766:00
Idle [h] 0:00 0:00 0:00 0:00
After Drilling [h] 836:36 388:52 1225:28 612:44
Sum [h] 2575:08 2132:12 4707:19 2353:40

Drilling Time
Boom 1 Boom 2 Sum Average
Approach [h] 17:44 15:06 32:50 16:25
Effective [h] 603:39 895:32 1499:11 749:35
Finishing [h] 0:00 0:00 0:00 0:00
Disturbance [h] 0:00 0:00 0:00 0:00
Manual [h] 0:00 0:00 0:00 0:00
Rod Handling Hours[h] 0:00 0:00 0:00 0:00
Sum [h] 621:22 910:38 1532:01 766:01

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 8/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

Boom Movement Time


Boom 1 Boom 2 Sum Average
Automatic [h] 0:00 0:00 0:00 0:00
Manual [h] 339:30 390:49 730:19 365:09
Sum [h] 339:30 390:49 730:19 365:10

SERVICE COUNTERS
General
Hours [h]
Basket Boom 0:00
Compressor 2218:37
Water Pump 2222:03

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 9/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

Boom 1 Boom 2 Sum Average


Percussion Hours [h] 638:39 937:02 1575:41 787:50
Auxiliary Drilling Time [h] 95:53 101:43 197:35 98:48
Powerpack Hours [h] 2737:06 2613:35 5350:41 2675:21
Power Extractor Hours [h] 0:00 0:00 0:00 0:00
Drilled Meters [m] 78190.31 77168.00 155358.31 77679.16
Gross Drilling Capacity [m/h] 30.36 36.19 66.56 33.28
Average Drilling Capacity
125.84 84.74 105.29
[m/h]
Net Penetration [m/min] 2.03 1.35 1.69

Round Time
Boom 1 Boom 2 Sum Average
Before Drilling [h] 777:39 441:52 1219:32 609:46
Boom Movements [h] 339:30 390:49 730:19 365:09
Drilling [h] 621:22 910:39 1532:01 766:00
Idle [h] 0:00 0:00 0:00 0:00
After Drilling [h] 836:36 388:52 1225:28 612:44
Sum [h] 2575:08 2132:12 4707:19 2353:40

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 10/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

Drilling Time
Boom 1 Boom 2 Sum Average
Approach [h] 17:44 15:06 32:50 16:25
Effective [h] 603:39 895:32 1499:11 749:35
Finishing [h] 0:00 0:00 0:00 0:00
Disturbance [h] 0:00 0:00 0:00 0:00
Manual [h] 0:00 0:00 0:00 0:00
Rod Handling Hours[h] 0:00 0:00 0:00 0:00
Sum [h] 621:22 910:38 1532:01 766:01

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 11/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

Boom Movement Time


Boom 1 Boom 2 Sum Average
Automatic [h] 0:00 0:00 0:00 0:00
Manual [h] 339:30 390:49 730:19 365:09
Sum [h] 339:30 390:49 730:19 365:10

TOTAL COUNTERS
General
Hours [h]
Basket Boom 0:00
Compressor 2220:56
Water Pump 2224:32

Boom 1 Boom 2 Sum Average


Percussion Hours [h] 639:21 937:52 1577:14 788:37
Auxiliary Drilling Time [h] 95:53 101:43 197:36 98:48
Powerpack Hours [h] 2753:09 2628:21 5381:30 2690:45
Power Extractor Hours [h] 0:00 0:00 0:00 0:00
Drilled Meters [m] 78283.59 77272.03 155555.62 77777.81
Gross Drilling Capacity [m/h] 30.34 36.15 66.50 33.25
Average Drilling Capacity
125.86 84.78 105.32
[m/h]
Net Penetration [m/min] 2.03 1.35 1.69

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 12/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

Round Time
Boom 1 Boom 2 Sum Average
Before Drilling [h] 777:39 441:52 1219:31 609:46
Boom Movements [h] 340:39 392:01 732:40 366:20
Drilling [h] 622:00 911:25 1533:25 766:43
Idle [h] 0:00 0:00 0:00 0:00
After Drilling [h] 839:40 391:57 1231:38 615:49
Sum [h] 2579:59 2137:16 4717:14 2358:37

Drilling Time
Boom 1 Boom 2 Sum Average
Approach [h] 17:52 15:17 33:09 16:35
Effective [h] 604:08 896:08 1500:16 750:08
Finishing [h] 0:00 0:00 0:00 0:00
Disturbance [h] 0:00 0:00 0:00 0:00
Manual [h] 0:00 0:00 0:00 0:00
Rod Handling Hours[h] 0:00 0:00 0:00 0:00
Sum [h] 622:00 911:25 1533:25 766:43

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 13/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

Boom Movement Time


Boom 1 Boom 2 Sum Average
Automatic [h] 0:00 0:00 0:00 0:00
Manual [h] 340:39 392:01 732:40 366:20
Sum [h] 340:40 392:01 732:40 366:20

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 14/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

HOLE TYPES
Number of holes
Hole Type
Total length in rock

Hole Type Boom 1 Boom 2 Sum


1 holes 1 holes 2 holes
Bolt
4.11 m 3.59 m 7.69 m

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 15/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

FACE DRILLING HOLES


NAVIGATION PLANE

, Drilled ( ) holes, Hole length in rock shown

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 16/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

BLAST PLANE

, Drilled ( ) holes, Hole length in rock shown

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 17/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

SEQUENCES AND ROLL-OVER ANGLES

, Drilled ( ) holes, Hole length in rock shown

HOLE INFORMATION TABLE


Hole ID Planned hole information Warning
Drilled hole information Note

Contr
Roll-
Depth Length Hole ol
Hole ID Boom Seq X [m] Y [m] Z [m] α [˚] β [˚] over
[m] [m] Type Metho
[˚]
d

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 18/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

BOLTING HOLES
BOLTING FAN 1

Bolting Fan Holes

ET B3 (09 Holes).bp, Drilled ( ) , Hole length in rock shown

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 19/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

MWD
FACE DRILLING HOLES

MWD Holes

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 20/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

BOLTING FAN
Bolting Fan 1

MWD Holes

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 21/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

Hole B2c (Only bars)

Hole B2c (All units except bars)

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2
Project: - 22/22
Tunnel Plan: -
PEG Number: 75139.1 Printed: 01/04/2008 05:06:00 AM

Hole EB1 (Only bars)

Hole EB1 (All units except bars)

Drill Plan:
Rig: 5063-1 (Round 2778)
Bolt Plan: ET B3 (09 Holes).bp
Round Started: 25-12-2023 09:44:45 Holes Drilled: 2