Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

ATOP PRODUCTS PVT.

LTD
TECHNICAL FEASIBILITY & MANAGEMENT APPROVAL
Customer : Date :
Part Number: Part Name:
Feasibility Considerations :
Our product quality planning team has considered the following questions , not intended to be all-inclusive in performing a feasibility
evaluation. The drawings and /or specifications provided have been used as a basis for analysing the ability to meet all specified
requirements . All " no" answers are supported with attached comments identifying our concerns and /or proposed changes to
unable us to meet the specified requirements.

YES NO CONSIDERATION
Is product adequately defined ( application requirement e.tc.) to enable feasibility evaluation
?

Can engineering performance specifications be met as written ?

Can product be manufactured to tolerance specified on drawing?

Can product be manufactured with Cpk's that meet requirements?

Is there adequate capacity to produce product ?

Does the design allow to use of efficient material handling technique?

Can the product be manufactured without incurring any unusual :

Cost of capital equipments

Costs for tooling?

Alternative manufaturing methods?

Is statistical process control required on product ?

Where statistical process control is used on similar products:

Are the process in control and stable

Are Cpk's greater than 1.33?


Conclusion
Feasible Product can be produced as specified with no revisions
Feasible Changes recommended (see attached)
Not Feasibility Design revision required to product within the specified requirements.
CFT TEAM AND TOP MANAGEMENT APPROVEL
CFT TEAM Signature

FM-NPD-03 EFFECTIVE DATE:-05/03/2018 REV NO.01 Page 1 of 2


ATOP PRODUCTS PVT. LTD
TECHNICAL FEASIBILITY & MANAGEMENT APPROVAL
Customer : Date :
Part Number: Part Name:
Feasibility Considerations :

Product
Product Reason Actions /
S.No. Specification Feasible Remarks
Characteristics (If Not feasible) Recommendations
/Tolerance (Yes/No)

CFT TEAM AND TOP MANAGEMENT APPROVEL


CFT TEAM Signature

FM-NPD-03 EFFECTIVE DATE:-05/03/2018 REV NO.01 Page 2 of 2


ng a feasibility
specified
nges to

Page 1 of 2
Remarks

Page 2 of 2
ATOP PRODUCTS PVT. LTD
TECHNICAL FEASIBILITY & MANAGEMENT APPROVAL
Customer : Date :
Part Number: Part Name:
Feasibility Considerations :
Our product quality planning team has considered the following questions , not intended to be all-inclusive in performing a feasibility
evaluation. The drawings and /or specifications provided have been used as a basis for analysing the ability to meet all specified
requirements . All " no" answers are supported with attached comments identifying our concerns and /or proposed changes to
unable us to meet the specified requirements.

YES NO CONSIDERATION
Is product adequately defined ( application requirement e.tc.) to enable feasibility evaluation
?

Can engineering performance specifications be met as written ?

Can product be manufactured to tolerance specified on drawing?

Can product be manufactured with Cpk's that meet requirements?

Is there adequate capacity to produce product ?

Does the design allow to use of efficient material handling technique?

Can the product be manufactured without incurring any unusual :

Cost of capital equipments

Costs for tooling?

Alternative manufaturing methods?

Is statistical process control required on product ?

Where statistical process control is used on similar products:

Are the process in control and stable

Are Cpk's greater than 1.33?


Conclusion
Feasible Product can be produced as specified with no revisions
Feasible Changes recommended (see attached)
Not Feasibility Design revision required to product within the specified requirements.
CFT TEAM AND TOP MANAGEMENT APPROVEL
CFT TEAM Signature
Mr. Jai Gopal
Mr. Ravinder Dixit
Mr. Govind Dass

FM-NPD-03 EFFECTIVE DATE:-20/11/2009 REV NO.00