Professional Documents
Culture Documents
BAN0007EN12 CS Tabriz 1
BAN0007EN12 CS Tabriz 1
Major polystyrene capacity of 10,5 million tons, it is with data collection capability were
the second largest producer of then added shortly after together
exporter petrochemicals in the Middle East. with two operators and a diagnosis
specialist. Today, more than 3000
The Tabriz Petrochemical The state-owned Petrochemical rotating machines are monitored
Company (TPC), commissioned in Commercial Company (PCC) is by the group.
1997, produces almost 450,000 Iran’s major exporter of
tons of olefin, polyolefin and other petrochemical products. The condition monitoring
chemical products each year in the department is still expanding and
Islamic Republic of Iran. Using Because petrochemical exports long-term projects include
naphtha and LPG from the nearby account for one of the top foreign upgrading to an on-line system
Tabriz Oil Refinery, A wide range exchange earnings in Iran, over 30 and extending the monitoring
of raw material products are made projects have been started in strategy to include thermal
for use in domestic downstream NPC’s strategic development plans analysis, sound intensity
plants, such as styrene, to modernize existing plants and
polyethylene (linear low density double production capacity by
and high density), propylene, 2005. Plans are also underway to
ethylene as well as other privatize these plants. Therefore
petrochemical products. there is considerable demand for
Polystyrene (general purpose, the plant as well as the others to
high-impact and expandable operate competitively in order to
grades) is the primary export attract international private
product. investment and joint ventures.
The importance of
effective diagnosis Figure 1. Motor-driven centrifugal pump in water pre-treatment plant.
A large number of faults have For several months the vibration these did not have to be replaced
already been detected and velocity RMS value for this pump or even checked.
diagnosed in the span of only a was within the VDI 2056 limits
couple of years using the off-line (maximum of 1.98 mm/s), but The Maintenance group quickly
system. Diagnosis plays an during a routine monitoring round, corrected the misalignment, but
important role in the condition there was a sudden increase to put the pump back into operation
monitoring strategy and some of 7.8 mm/s. Diagnostic without checking the coupling.
the important considerations, listed measurements were then Shaft vibrations were less after
below, are demonstrated in the immediately done using FFT measurements were done again
following case story: spectra and BCS (bearing (from 7.8 mm/s to 3.2 mm/s), but
condition signature/selective this was still too high for this
• Diagnoses have to be done for envelope detection) to find out the particular pump. FFT spectra was
several faults that sometimes cause of the high vibrations. done afterwards (Figure 3) and
occur at the same time indicated the misalignment
It was immediately obvious that problem had been corrected but
• Diagnosis is not only necessary there was severe misalignment by there were still high vibrations at
for determining which looking at the first few harmonics the coupling frequencies.
components have to be in Figure 2. Although not apparent
repaired, but also which because of the plot scaling, there After disassembly, it was observed
components should NOT be was also indication in the plot that that rubber pads of the coupling
touched. something was wrong with the were damaged. After replacement,
coupling as shown by the measurements were done again
• Diagnosis should be complete increased vibration energy in the and the overall vibration decreased
enough to find out how to avoid 600 to 1000 Hz range. to 1.8 mm/s, which was
that the fault occurs again acceptable. The FFT
A work order was issued to measurements also looked better
Case study - Multiple Maintenance to immediately align (Figure 4). Although the pump was
the pump shaft and check the now fully operational, further
faults condition of the coupling. An investigation was still needed to
envelope spectra suggested that determine what caused the
A 55kW motor-driven centrifuge although there was severe misalignment and damaged
pump (2985 rpm) in the water pre- misalignment, there was no coupling.
treatment plant is off-line apparent consequential damage to
monitored once a month. the rolling-element bearings so
Application Note | Case study– Effective off-line machine fault detection and diagnosis at the Tabriz Petrochemical Complex 3
MAINTENANCE TRANS. MEASUREMENT POINT ON
Investigations revealed that a 2” ACTIVITY PUMP
line was welded from the suction A B C D
end of the pump to discharge
Before Horiz. 3.20 3.70 7.81 4.23
header to satisfy process
requirements two weeks earlier. alignment
Vert. 3.72 6.81 5.76 3.11
This caused piping strain that
misaligned the shaft and later Axial 7.20 6.55 3.63 -
damaged the coupling. If this After Horiz. 1.80 1.35 3.70 2.18
situation was not corrected in time, alignment
severe damage could have Vert. 0.88 1.75 2.62 1.78
occurred to the motor and/or pump
that could have resulted in both Axial 1.50 1.38 2.21 -
lost production and expensive After replacing Horiz. 1.11 1.28 1.75 1.25
spares. Since this problem was coupling pads
corrected, the pump has been Vert. 0.45 0.92 1.22 1.18
functioning well the last eight
Axial 0.85 0.75 0.79 -
months.
Conclusion
The Brüel & Kjær Vibro data
collectors have proven to be
simple to learn and use by the
technicians in the relatively new
condition monitoring group, yet
very effective. Not only has there
been improved machine availability
and reduced maintenance
expenses during the last two
years, it is also apparent the
condition monitoring expertise has
greatly improved. There is much
better machine awareness and
understanding of machine faults.
Application Note | Case study– Effective off-line machine fault detection and diagnosis at the Tabriz Petrochemical Complex 4
Figure 3. Spectrum at point C (in Figure 1) after alignment.
BAN 0007-EN-12
Date: 08-06-2015
Application Note | Case study– Effective off-line machine fault detection and diagnosis at the Tabriz Petrochemical Complex 5