MECHANICAL WORK - FLOOR PLAN

PERI PLUS
010A 009 091 ORCHID KALLIS
STO 084 FLOWERS 93B BAKERY

093D
THE BODY SHOP 093C 093A
AHU
NATURAL
093 DOUGH LAB 058

8100
008A 008 FARM
083
006
BBC
007 082 094

REJUVE
058B GOLD NAILS
STO 081 095 i-001

8100
GUARDIAN
058C

L1
TO
080 079 078 077

UP

L1
OM
FR
DN
LV STORAGE

8100
95.10 Sqm
A DUCTING CORRIDOR
AHU 12 DWA-090
TRANE 663.000 BTU/H AHU 01 TRANE CLCP 035 618.000 BTU/H
SUPPLY AHU 12
AHU 12 CLCP 040 801.000
AHU 02 TRANE CLCP 035 618.000 BTU/H

DUCTING AHU 1
AHU 03 CLCP-035 SUPPLY

8100
AHU 1 CLCP 040 801.000

TRANE 618.000 BTU/H


AHU 2
AHU 05 CLCP-035 AHU3&5 AHU 2 CLCP 040 801.000
TRANE 618.000 BTU/H

8100
LOCKER
SECURITY

DUCTING DRIVER
R. TEKNISI GONDOLA
FRESH GD. KARPET
OFFICE
HYATT
31 sqm
& GUDANG
SECURITY CANTEEN

C SUPERMARKET
8100

TOTAL = 3076 SQM


8100

DUCTING
DUCTING
EXHAUST D EXHAUST
8100

AHU
4 RETURN
GRILL
AHU CLCP-035
8100

TRANE 618.000 BTU/H

E AHU 11 LIFT
HYATT
DUCTING
AHU DWA-090 FRESH
TRANE 663.000 BTU/H
8100

DUCTING
EXHAUST
8100

FAN
INSTALL NEW AHU IN
8100

RELOCATION AHU 8100 8100 8100 8100 8100 8100 8100 8100 8100 6900 8100 8100 8100 EXIT

INSTALLATION CLEAN WATER PIPE 1200

INSTALLATION WASTE WATER PIPE

INSTALL SUPPLY NEW DUCTING FOR CORRIDOR FLOOR LEVEL APPROVAL

INSTALL RETURN NEW DUCTING FOR CORRIDOR UNIT NUMBER DRAFTER HEAD - RFD HEAD - BM GM - RFD

INSTALL NEW DUCTING FRESH AIR INDONESIA