date Ok/No jobs to be done

12/27/2023 Ok mist line


12/27/2023 Ok/No agitator
12/26/2023 Ok caterpillar N°6
12/27/2023 No dumpner mud pump N°3
12/27/2023 No hydraulic air winch
12/27/2023 No Lobestar Shear/Mixer, Single Suction
12/27/2023 No Run and test all Caterpillar engines
12/27/2023 No fire line
12/27/2023 No there is leak in HPU substructures
12/27/2023 No HPU of rig floor needs oil
water cooler of mud pump 3 should
12/27/2023
install
install the iron roughneck after coming
12/26/2023 OK
back
cause phone number

Complet Installing the agitator


Change the oil cover gasket and complete
the electrical installation
Waiting for nitrogen gas to be brought

waiting for parts from Gulf International

waiting for making hoses


sabarai s

waiting for water cooler

iron roughneck in dubai to repair