The document contains a work schedule for various jobs on different dates in December 2023, indicating whether each job was approved (Ok) or not approved (No). It lists jobs such as maintenance on mist lines, agitators, caterpillars, dumpner mud pumps, hydraulic air winches, Lobestar Shear/Mixers, and fire lines. It also notes issues like leaks that need repairing and part replacements needed for equipment like mud pumps and HPU systems.
The document contains a work schedule for various jobs on different dates in December 2023, indicating whether each job was approved (Ok) or not approved (No). It lists jobs such as maintenance on mist lines, agitators, caterpillars, dumpner mud pumps, hydraulic air winches, Lobestar Shear/Mixers, and fire lines. It also notes issues like leaks that need repairing and part replacements needed for equipment like mud pumps and HPU systems.
The document contains a work schedule for various jobs on different dates in December 2023, indicating whether each job was approved (Ok) or not approved (No). It lists jobs such as maintenance on mist lines, agitators, caterpillars, dumpner mud pumps, hydraulic air winches, Lobestar Shear/Mixers, and fire lines. It also notes issues like leaks that need repairing and part replacements needed for equipment like mud pumps and HPU systems.
12/27/2023 Ok/No agitator 12/26/2023 Ok caterpillar N°6 12/27/2023 No dumpner mud pump N°3 12/27/2023 No hydraulic air winch 12/27/2023 No Lobestar Shear/Mixer, Single Suction 12/27/2023 No Run and test all Caterpillar engines 12/27/2023 No fire line 12/27/2023 No there is leak in HPU substructures 12/27/2023 No HPU of rig floor needs oil water cooler of mud pump 3 should 12/27/2023 install install the iron roughneck after coming 12/26/2023 OK back cause phone number
Complet Installing the agitator
Change the oil cover gasket and complete the electrical installation Waiting for nitrogen gas to be brought