Professional Documents
Culture Documents
Tos Profile 31.3.21
Tos Profile 31.3.21
OFFSHORE SERVICES
JOINT STOCK COMPANY
THIEN NAM
OFFSHORE JSC (TOS)
PROFILE
THIEN NAM
OFFSHORE SERVICES
PTSC OFFSHORE
JOINT STOCK COMPANY
SERVICES
JOINT STOCK COMPANY
Contents
Thien Nam Offshore Services JSC. is a Trusted name in the Offshore sector with the suitable Solutions for
our value Clients. Established since 2008, we are a leading offshore & subsea service company in
provision of Inspection, Maintenance & Repair, Subsea Construction, and Project Management &
Engineering services to Oil & Gas industry, Renewable industry with a presence in Vietnam and S.E.A
region.
ABOUT US
Thien Nam Offshore Services Joint Stock Company (TOS) is one of the most prestigious experienced providers
of offshore services in the energy industry in Viet Nam and S.E.A region. TOS has been recognized by almost
major O&G companies in S.E.A region with +200 successful completed projects through the decades.
Le Thanh Ha
(CEO)
Nguyen T. Lan
Huong
(CFO)
Le Xuan Hao Nguyen Duy Hiep Than Manh Ha Nguyen Hoai Nam
(Deputy Director) (Deputy Director) (Deputy Director) (Commercial Manager)
Thien Nam Offshore JSC. base is located in Vung Tau City – Capital of
O&G industry in Viet Nam.
Fabrication Yard
• Address: No. 15D Le Quang Dinh street – Vung tau
• Total square meter: 7,000m²
• 01 building: 1510 m2
• 01 Workshop: 4500 m2
• Gantry Crane: 7.5 Ton
PLB “TOS Ha Long”, ex. “Swiber Concorde” Diving Support & Pipelay Barge
Barge Specification:
• Built: 2008
• Classed by: ABS - A1 Barge
• Clear Deck: 960 m2
• Deck strength: 10mt/m2
• Pipe Diameter: 4” to 60”
• Tensioner: 2 x 60T SAS
• A&R Winch: 1 x 120T SAS
• SAT system: 1 x SAT 10, 12 men
• Deck Crane : 1 x 60.5mt Seatrax
1 x 72mT Kobelco 7450 Crawler
• Accommodation: 260 berth
General Specification:
• Design type: Portable, Modular, Deck
• Built: 2010
• Classed by: ABS
• Maximum Working Depth: 200 m
• Manning Capacity: 12 Divers
• Bell Safe Launch limits: Hs = 4m
“SAT 10” & “K-SAT 3” Modular Saturation Diving System (02 Sets)
“15T Tensioner”
Specification:
• Tension Rating: 15 Te;
• Type: 2 tracks;
• Dimension: 5.4m x 1.55m x 2.95m
• Weight: 10Te;
• Maximum Lay Speed: 1200 m/h;
• Product OD: 50 ~ 250 mm
• Maximum Track Opening: 400 mm
• Contact Length: 2500 mm
• Maximum Tension Grip: 45 Te
• Design friction coefficient: 0.1
• Control Mode: Remote/Local
Specification:
• Max reel weight: 200 Te;
• Max reel diameter: 7m
• Max board reel: 5m
• Min reel diameter: 4m
• Reel speed (1 tower running): 1 rpm/min ~ 1200 m/h
• Reel speed (2 towers running): 0.5 rpm/min ~ 600 m/h
• Drive mode: Remote
• Dimension: 7.6m x 5.0m x 4.72m
• Weight: 20 Te/ each
WROV Specification:
• Built: 2006
• Classed by: ABS/IMCA
• Depth Rating: 2,000 – 3,000 m
• Capacity: 125 HP
• Tether: 500m x 35mm or 900m x 27mm
Tools “Quantum 4”
• CP equipment: Contact, proximity, gradient
• UT Probe: Cygnus 3000
• Profiler: Super SeaKing DFP Profiler
• Torque Tool: Class 1-4 Torque Tool
• Water Jet: 0-500 bar high pressure jet
• Pipe tracker: TSS 440
“T1000 Stev-tensioner”
10%
10%
OFFSHORE CONSTRUCTION
OFFSHORE SUBSEA SURVEY
50% OPERATIONS & MAINTENANCE
FABRICATION
30%
SERVICES
JOINT STOCK COMPANY
Contents
01 02 03 04 05
OFFSHORE
ENGINEERING CONSTRUCTION OFFSHORE SUBSEA OPERATIONS & FABRICATION
SURVEY
MAINTENANCE
THIEN NAM
ENGINEERING SOFTWARE OFFSHORE SERVICES
JOINT STOCK COMPANY
SERVICES
JOINT STOCK COMPANY
Contents
01 02 03 04 05
OFFSHORE
ENGINEERING CONSTRUCTION OFFSHORE SUBSEA OPERATIONS & FABRICATION
SURVEY
MAINTENANCE
THIEN NAM
OFFSHORE CONSTRUCTION OFFSHORE SERVICES
JOINT STOCK COMPANY
Subsea Well Plug and Abandon (P&A) FPU/ CALM Buoy Disconnection/ Installation
Project SOW:
• Pre-trench/ Trench for pipeline route
• Shore pull and laying the 26” PL from LFP to KP. 294 (approx.
30.5km)
• Pigging (flushing, gauging & cleaning) from LFS to KP. 207
• Install PLEM No.2 at KP. 227.5
• Hydrotest for 26” Pipeline
• Installation of the Subsea PLEM No. 1 at KP207.5.
• Install spool to connect PLEM No. 1 to end of pipeline.
• Removal of the Spool between two PLEMs at KP207.5.
• Installation of the Spool to connect Subsea PLEM (KP207.5)
to pipeline and existing PLEM.
• Dewatering
Project SOW:
• Load out and transport 07 mooring leg components from
onshore Vung Tau to offshore site.
• Disconnection the chains from DH01 FPU,
• Hook up chain cables and anchors, inspection the anchors
and renewal the chain cables,
• Drop the anchor and lay down chain cables
• Tensioning
• Reconnect the chain to DH01 FPU
• Offload and transport existing chain to PVEP POC base.
Client: VSP
Work location: Ca Tam oil field
Water depth: 50 – 60m
Offshore Time: Sept – Oct 2018
Vessel: Swiber Concorde, Ashico Lam Son
Equipment: SAT10, WROV Quantum 3 & Mixed
gas diving
Project SOW:
Firm Scope: Tie-in spools at CTC1 platform
• 02 nos. x 8” water injection spools
• 02 nos. x 8” gas lift spools
• 02 nos. x 12” production spools
• 02 nos. x 16” gas spools
• 03 nos. x 12” expansion loops at KP 3.8, KP 8.9 & KP 14
Project SOW:
Fabrication and installation of Clamps for conductors of 21XP
23XP wells on DH02 WHP:
• 02 nos. clamps at EL. – 62m
• 02 nos. clamps at EL. – 84m
Client: MODEC/POS
Work location: Rang Dong oil field
Water depth: 58m
Offshore Time: Sept 2018
Vessel: Pacific Diligence, PTSC Ha Long &
Tan Cang 89
Equipment: WROV Quantum 3 & Rigging gear
Project SOW:
• Load out and transport all mooring leg components from
onshore Vung Tau to offshore site.
• Receipt of existing Top Chain from FSO MV17, recover
existing mooring leg components.
• Pre-tension (soil cutting) for nine (09) Pile Chains and Anchor
Piles by OCV;
• Connect remaining components of new mooring legs to Pile
Chains and laying;
• Hold FSO MV17 during disconnection of existing mooring legs
and hook-up of new mooring legs using Heading Control Tug
• Transfer and handover new mooring legs to FSO MV17 Turret
and pull into Chain stopper and hang off;
• Dispose existing chain.
Project SOW:
• Provision of Engineering, Procurement, Construction,
Installation and Commissioning for repairing 10” pipeline
from DMDP-A to PLEM 4 at block 01&02, Offshore Viet Nam
Client: VSP
Work location: Ca Tam oil field
Water depth: 50m
Offshore Time: November 2018
Vessel: VT
Equipment: WROV & Tensioner and Spooler
Project SOW: Transportation, installation and commissioning of
subsea cable from CTC1 Platform to GTC1 platform
• 3x50mm2, (12/20)24kV
• Diameter is about 85mm, length about 11.7 km, unit weight
about 09kg/m.
• Maximum pulling force: 80 kN
• Minimum breaking load: 310 kN
Client: CLJOC
Work location: Su Tu Vang oil field
Water depth: 50m
Offshore Time: Oct 2013
Vessel: Pacific Excellent
Equipment: WROV & Tensioner and Spooler
Project SOW: Transportation, installation and commissioning of
subsea cable from CPP Platform to SVSW
• 3x70mm2, (12/20)24kV
• Diameter is about 85mm, length about 7.5 km, unit weight about
13kg/m.
• Minimum Bending Radius 1.7m
SERVICES
JOINT STOCK COMPANY
Contents
01 02 03 04 05
OFFSHORE
ENGINEERING CONSTRUCTION OFFSHORE SUBSEA OPERATIONS & FABRICATION
SURVEY
MAINTENANCE
THIEN NAM
OFFSHORE SUBSEA SURVEY OFFSHORE SERVICES
JOINT STOCK COMPANY
Free Span Correction/ Trenching & Back filling Seabed preparation for drilling, etc…
Project SOW: T
• Mooring System
• Marine Hull
• Riser System And PLEMS
Client: BDPOC
Location: Bien Dong field
Vessel: Hai An DP2 vessel
Equipment: Mass Flow Equipment, WROV
Project SOW: Provision of free span correction by trenching
and backfill for BDPOC’s sub-sea pipelines (20” and 12”
pipelines
Client: PV GAS
Location: PM3 – 18” Pipeline Ca Mau
Vessel: DP2 Vessel
Equipment: WROV, Grouting Equipment
SERVICES
JOINT STOCK COMPANY
Contents
01 02 03 04 05
OFFSHORE OPERATIONS &
ENGINEERING CONSTRUCTION OFFSHORE SUBSEA FABRICATION
SURVEY MAINTENANCE
ROUTINE INSPECTION AND MAINTENANCE OF THIEN NAM
SPM BINH SON REFINERY – ON SPM OFFSHORE SERVICES
JOINT STOCK COMPANY
Scope of work:
Base Line Inspection (BLI)
Scope of work:
Routine Inspection and Maintenance
Project SOW:
• Offloading hose disconnection from FSO/FPOS
• OCIMF for hose individual (cleaning, inspection, pressure
test, vacuum test and electrical test)
• Assembly hose string
• Pressure test for hose string
SERVICES
JOINT STOCK COMPANY
Contents
01 02 03 04 05
OFFSHORE
ENGINEERING CONSTRUCTION OFFSHORE SUBSEA OPERATIONS & FABRICATION
SURVEY
MAINTENANCE
THIEN NAM
FABRICATION ALL COMPONENTS
OFFSHORE SERVICES
JOINT STOCK COMPANY
FLOW CHART