PLANT TN PN
TRUE NORTH
0
NORTH
22.96118 1
DOMINANT WIND 1 - BOT EL+7.250 P/S
270 90
A A
SECONDARY
WIND
1
"S72" ML DWG NO. MS-DD-4810-ICS-DWG-0208
"S51" 850
180

"S51" "S72"

A
_
1 "S55" 275 300 275

650
EFLEX FP150
KEY PLAN

ML DWG NO. MS-DD-4810-ICS-DWG-0215


STUB UP (FO / S) (FO)
"S55" (S) (P)
NOTES:
B B
1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE MENTIONED.
ALL LEVELS AND COORDINATES ARE IN METERS.

100
UP 2. BEFORE INSTALLATION, THE ACTUAL ROUTE AND POSITION SHALL BE
TRENCH EFLEX FP150 CAREFULLY DECIDED BY CHECKING THE FIELD CONDITION AND
(P) SECTION "S51" - "S51" , "S55" - "S55" AVOIDING THE FOLLOWING PLACES:
SCALE : 1:10 -WHERE THE PROCESS AND UTILITY PIPING WILL BE INSTALLED.
1

36000
-MAINTENANCE / OPERATION FOR EQUIPMENT AND WALKWAY.
3. INSTRUMENT CABLE ARRANGEMENT IN ELECTRICAL CABLE TRAY SHALL BE

38750
650
FINALIZED BY ELECTRICAL.
200 250 200

A
_
DETAIL ML DWG NO. MS-DD-4810-ICS-DWG-0212 "S56" "S56"
C SCALE : 1:50 C

200
(FO) (P)

250
650
1 L60-4810-GJ-521-A-FC-S1 BOT EL+11.525 P/S,FO

TRENCH (S) (-)


CABLE TRAY DESIGN
CABLE TRAY DESIGN

200
STUB UP BY VENDOR J2
BY ELECTRICAL
J1

PLC
"S79" B
RIB
_ 1H1P-P100
4811-CVR-0001
SECTION "S56" - "S56"
D "S57" "S57" SCALE : 1:10 D
EFLEX FP150 WALK WAY
EFLEX FP150 "S90" "S90" 175 175

10000
4500

(P) (FO / S)
WALK WAY
150 150
"S79" 2X24C-P100 600
JB J3
CABLE TRAY DESIGN
1L2C+E/1M2C+E-P100 (FO)
BY VENDOR (P) (FO)
(S) (P)
(S)
(SEE NOTE 3)

B
_
DETAIL 4810-CTT-0001
SECTION "S79" - "S79" SECTION "S57" - "S57"
SCALE : 1:50 SCALE : NONE SCALE : 1:10
1 L60-4810-GJ-521-A-FC-S1 BOT EL+12.410 P/S,FO

E E

ML DWG NO. MS-DD-4810-ICS-DWG-0216


JUNCTION BOX TABLE
150 ELEVATION
REF NO. TAG NUMBER LOC REMARKS
75 75 (EL+)
J1 4810-F-RIB-110 5.340 D2
J2 4810-F-PLC-001 10.780 D6
150

(S) (P) J3 5972-JXC-510 14.157 D7


36250

33500
SECTION "S72" - "S72"
SCALE : 1:10 600
400 200
F F
(FO)
(P)
(S)

SECTION "S90" - "S90"


SCALE : 1:10

P.N 0.000 PATROL ROAD PERIMETER WALL WITH LIGHING AND CCTV
P.E 852.500

G
FOR CONSTRUCTION G
CWA : 481B
6800 10000 23690 10000

0 2 4 6 8 10 20m

ALL RIGHTS RESERVED


PROJECT
SCALE 1:200 (METERS) THIS DOCUMENT WAS PREPARED FOR THE EXCLUSIVE USE OF PT FREEPORT INDONESIA (PTFI) AND CHIYODA GROUP
PURSUANT TO THE ENGINEERING, PROCUREMENT AND CONSTRUCTION AGREEMENT BETWEEN PTFI AND PT CHIYODA
MS PROJECT
INTERNATIONAL INDONESIA. THIS DOCUMENT IS THE PROPERTY OF PTFI, AND THIS DOCUMENT, DATA AND
INFORMATION MAY BE DISCLOSED TO THIRD PARTIES ONLY FOR THE MANYAR SMELTER PROJECT. CHIYODA GROUP TITLE
SHALL NOT BE LIABLE FOR USE OR RELIANCE ON THIS DRAWING BY ANY THIRD PARTY NOT UNDER THE DIRECTION OF
CHIYODA GROUP, UNLESS OTHERWISE AGREED IN WRITING.

MS-DD-4810-CIV-GA-0812 CABLE TRENCH LAYOUT PLAN DRAWING MATERIAL HANDLING AREA - 481B(U)-2(1) DRAWN CHECKED APPROVED DATE
INSTRUMENT MAIN CABLE LAYOUT
MS-DD-PHB05-MAT-GA-2057 CONCENTRATE STORAGE TRIPPER CONVEYOR GENERAL ASSEMBLY FOR MATERIAL HANDLING
H H
MS-DD-4810-ELE-DWG-0214 CABLE TRAY LAYOUT / SECTION DRAWING - CU CONCENTRATE STORAGE (6)
S.AKIYAMA H.NOSHO T.TSUBOTA MAY 29, 2023
FINAL SLAG STORAGE &
1 S.AKIYAMA H.NOSHO T.TSUBOTA MAY 29, 2023 ISSUED FOR CONSTRUCTION MS-DD-4810-ICS-DWG-0313 INSTRUMENT MAIN CABLE WAY LAYOUT FOR MATERIAL HANDLING FINAL SLAG STORAGE & ACID TRUCK LOADING (1)
0 T.KIZAWA N.IWATA T.TSUBOTA NOV. 29, 2022 ISSUED FOR CONSTRUCTION MS-DD-4810-ICS-DWG-0023 INSTRUMENT LAYOUT DRAWING FOR MATERIAL HANDLING FINAL SLAG STORAGE & ACID TRUCK LOADING (1) JOB NO. SIZE SCALE ACID TRUCK LOADING (1)
T.KIZAWA N.IWATA T.TSUBOTA JUN. 10, 2022 ISSUED FOR OWNER APPROVAL MS-DD-3000-ICS-DWG-0001 SYMBOLS AND LEGENDS FOR INSTRUMENT CONSTRUCTION DRAWING ANX17 A1 1:200
E
A T.KIZAWA N.IWATA T.TSUBOTA APR. 22, 2022 ISSUED FOR INTERNAL REVIEW MS-DD-3000-ICS-STA-0151~0165 TYPICAL INSTRUMENT INSTALLATION DETAIL FOR CABLING VENDOR DRAWING NO. REV. DRAWING NO. REV.
NO. DRAWN CHECKED APPROVED DATE DESCRIPTION DWG NO. REFERENCE DRAWINGS - - MS-DD-4810-ICS-DWG-0213 1