Month Wise Work Done
Month Wise Work Done
Month Wise Work Done
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
1 Road Works
Cutting of Trees, including Cutting of Trunks, Branches and Removal
(Cutting of trees, including cutting of trunks, branches and removal of
stumps, roots, stacking of serviceable material with all lead and lifts and
earth/sand filling in the depression/pit created as per Technical
specifications Clause No.201)
a) Girth from 300 mm to 600 mm
each 200.00 0.000
2 Cutting of Trees, including Cutting of Trunks, Branches and Removal
(Cutting of trees, including cutting of trunks, branches and removal of
stumps, roots, stacking of serviceable material with all lead and lifts and
earth/sand filling in the depression/pit created as per Technical
specifications Clause No.201)
b) Girth from 600 mm to 900 mm
each 300.00 0.000
3 Cutting of Trees, including Cutting of Trunks, Branches and Removal
(Cutting of trees, including cutting of trunks, branches and removal of
stumps, roots, stacking of serviceable material with all lead and lifts and
earth/sand filling in the depression/pit created as per Technical
specifications Clause No.201)
c) Girth from 900 mm to 1800 mm
each 400.00 0.000
4 Cutting of Trees, including Cutting of Trunks, Branches and Removal
(Cutting of trees, including cutting of trunks, branches and removal of
stumps, roots, stacking of serviceable material with all lead and lifts and
earth/sand filling in the depression/pit created as per Technical
specifications Clause No.201)
d) Girth above 1800 mm
each 500.00 0.000
5 Removal of stumps of trees left behind after cutting of trees by other
agency with all lifts and lead and earth filling in the depression / pit as per
Technical specifications Clause No.201
Girth from 300 mm to 600 mm
each 200.00 0.000
6 Removal of stumps of trees left behind after cutting of trees by other
agency with all lifts and lead and earth filling in the depression / pit as per
Technical specifications Clause No.201
Girth from 600 mm to 900 mm
each 200.00 0.000
7 Removal of stumps of trees left behind after cutting of trees by other
agency with all lifts and lead and earth filling in the depression / pit as per
Technical specifications Clause No.201
Girth from 900 mm to 1800 mm
each 300.00 0.000
Page 1 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
Page 2 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
Page 3 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
Page 4 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
28 Tack Coat
Providing and applying tack coat with bitumen emulsion as per Technical
specifications clause 503 by using emulsion pressure distributor on the
prepared bituminous surface cleaned with mechanical broom at rate of
spread approved by Engineer.
Sqm 12.00 0.000
29 Dense Bituminous Macadam
Providing and laying dense bituminous macadam Grading II (19mm
nominal aggregate size) using VG 30 grade bitumen with 100-120 TPH
batch type hot mix plant producing an average output of 75 tonnes per
hour using materials as per mix design, transporting the hot mix to work
site, laying with a hydrostatic paver finisher with sensor control to the
required grade and alignment, compacting to achieve the desired
compaction and complete in all respects as per Technical specification
clause .505 .
106.190
164.460
suitable for embankment/subgrade at other location). As per
Clause.301.3 technical specification)
Cum 70.00 270.650
Page 5 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
1.486
Foundation complete as per Drawing and Technical Specification section
1600 tonne 75000.00 1.486
35 Drain/ Retaining wall/ Toe wall
Supplying, fitting and placing HYSD bar reinforcement in sub-structure
2.164
complete as per drawing and Technical Specifications section 1600
tonne 78000.00 2.164
36 Drain/ Retaining wall/ Toe wall
Providing weep holes in Brick masonry/ Plain/Reinforced concrete
abutment, wing wall/return wall with 100 mm dia AC pipe, extending
124.000
through the full width of the structure with slope of 1V :20H towards
64.000
42.000
drawing foce. Complete as per drawing and Technical specification
Clause No.2706 each 100.00 230.000
37
Retaining wall/ Toe wall
Providing and laying Plain cement concrete mechanically mixed and
compacted, including centring and shuttering all complete as per clause
1500, 1700 & 2100 drawings and Technical specifications and as directed
by the Engineer-in-charge.
8.176
PCC M15 grade (Without plasticiser)
Cum 6000.00 8.176
38
Retaining wall/ Toe wall
Providing and laying Reinforced cement concrete mechanically mixed
and compacted, including centring and shuttering all complete as per
clause 1500, 1700 & 2200 drawings and Technical specifications and as
directed by the Engineer-in-charge.
RCC M25 grade (Without plasticiser)
Cum 8480.00 0.000
39
Retaining wall/ Toe wall
Providing and laying Reinforced cement concrete mechanically mixed
and compacted, including centring and shuttering all complete as per
clause 1500, 1700 & 2200 drawings and Technical specifications and as
53.600
directed by the Engineer-in-charge.
RCC M30 grade (Without plasticiser)
Cum 8500.00 53.600
40 Back filling with granular material behind wing walls and return walls
complete as per drawing and Technical Specification and as per clause
305 Cum 700.00 0.000
41 Kilometre Stone: Reinforced cement concrete M15grade kilometre
stone of standard design as per IRC:8-1980, fixing in position including
painting and printing etc.as per technical specification IRC: 8 -1980 Type
Designs of Highway Kilometer Stone (Second revision)
5th kilometre stone (precast)
each 4000.00 0.000
Page 6 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
Page 7 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
Page 8 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
Page 9 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
55 Direction and Place Identification Signs with size more than 0.9 sqm
size Board.
Providing and erecting direction and place identification retro-
reflectrorised sign as per IRC :67 made of high intensity grade sheeting
vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area
exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75
mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly
designed foundation with M 15 grade cement concrete45 cm x 45 cm x
60 cm, 60 cm below ground level as per approved drawing and Clause
No.801.3
Sqm 13000.00 0.000
56 Overhead Signs of including Truss, Two Vertical Post, concrete
foundation all complete
Providing and erecting overhead signs with a corrosion resistant 2mm
thick aluminium alloy sheet reflectrorised with high intensity retro-
reflective sheeting of encapsulated lense type with vertical and lateral
clearance given in Technical specification clause 802.2 and 802.3 and
installed as per Technical specification clause 802.6 over a designed
support system of aluminium alloy or galvanised steel trestles and trusses
of sections and type as per structural design requirements and approved
drawing and plans and Technical specifications complete and Technical
specification Clause No.802
Page 10 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
Page 11 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
63 Supply & installation of solar street light proposed at Major & Minor
Junction Location, Bus Bay & Bus Shelter Location as per drawing and
Clause No. 12.4 of IRC SP 73 :2018 "Manual of Specifications and
Standards for Two Laning of Highways with Paved Shoulder (Second
Revision)
each 24000.00 0.000
64 Construction of R.C.C Bus shelter at Village Portion as per drawing
and Technical specifications Clause No. 12.6 of IRC SP 73 :2018
"Manual of Specifications and Standards for Two Laning of Highways with
Paved Shoulder (Second Revision)
each 150000.00 0.000
65 Bus Bay
Construction of Bus Bay at Village Portion as per drawing and
Technical specifications each 600000.00 0.000
66 Supply and Installation of 300 mm Solar Blinker. LED - 216 Solar
Panel 30 Watt Battery - 12 AH Fitting, Fixing and all complete Job.
each 18000.00 0.000
67 Box Culvert
Excavation for Structures (Earth work in excavation of foundation of
structures as per drawing and technical specification Clause No 304,
including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides and bottom and
137.736
214.070
backfilling with approved material.
72.550
Depth upto 3 m
Cum 70.00 424.356
68 Box Culvert
Plain/Reinforced cement concrete, in foundation complete as per drawing
and technical specification including steel shuttering formwork and
Technical specification Section 2100
RCC Grade M30
31.980
39.360
Using Batching Plant, Transit Mixer and Concrete Pump
Cum 8000.00 71.340
69 Box Culvert
Reinforced cement concrete, in sub structure complete as per drawing
and technical specification Section.2200 and steel shuttering formwork
RCC Grade M30
16.080
22.500
Using Batching Plant, Transit Mixer and Concrete Pump
Cum 8500.00 38.580
70 Box Culvert
Furnishing and Placing Reinforced/ Prestressed cement concrete in
superstructure as per drawing and Technical Specification’ Section 2300
including steel shuttering formwork.
RCC Grade M30
14.490
14.400
Using Batching Plant, Transit Mixer and Concrete Pump
Cum 8500.00 28.890
Page 12 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
71 Box Culvert
Reinforcement in Foundation (Supplying, fitting and placing TMT IS:1786
Fe500 D bar reinforcement in foundation complete as per drawing and
0.693
1.471
2.786
Technical specifications Section 1600)
tonne 78000.00 4.950
72 Box Culvert
Reinforcement in Sub Structure (Supplying, fitting and placing TMT
IS:1786 Fe500 D bar reinforcement in sub structure complete as per
2.087
2.685
drawing and Technical specifications Section 1600)
tonne 78000.00 4.772
73 Box Culvert
Reinforcement in Super Structure Supplying, fitting and placing TMT
conforming to IS:1786 Fe 500 D (reinforcement in super-structure
including splicing complete as per drawing and technical specification
1.116
1.352
Section 1600)
tonne 78000.00 2.468
74 Box Culvert
Plain cement concrete, in foundation complete as per drawing and
Technical specification section 2100 including steel shuttering formwork.
11.120
17.935
PCC Grade M15
Cum 6000.00 29.055
75 Box Culvert
Providing and laying of Filter media with granular materials/stone crushed
aggregates satisfying the requirements laid down in clause 2504.2.2. of
MoRTH specifications to a thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the wall and provided over
the entire surfaces behind the abutment, wing wall and return wall to the
full height compacted to firm condition complete as per drawing and
technical specification Section 2500
through the full width of the structure with slope of 1V :20H towards
42.000
84.000
drawing foce. Complete as per drawing and Technical specification
Clause 2706 each 100.00 244.000
77 Box Culvert
107.090
Backfilling behind abutment, wing wall and return wall complete as per
62.030
43.710
Page 13 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
79 Box Culvert
Plain cement concrete, in foundation complete as per drawing and
Technical specification 2507 including steel shuttering formwork. Curtain
wall/flexible Apron
PCC Grade M20 cum 6500.00 0.000
80 Box Culvert
Providing and laying Stone/Boulder Pitching on slopes laid over prepared
filter media including boulder apron laid dry in front of toe of embankment
complete as per drawing and Technical specifications Section 2500
Cum 1800.00 0.000
81 Box Culvert
Providing and laying Stone/Boulder apron on river bed for protection
against scour with stone boulders weighing not less than 40 kg each
complete as per drawing and Technical specification Section 2500
Cum 2000.00 0.000
82 Box Culvert
Rigid Apron: -Providing and laying Flooring complete as per drawing and
Technical specifications Section 2500 laid over cement concrete bedding.
Rubble stone laid in cement mortar 1:3
Cum 6000.00 0.000
83 Box Culvert
Construction of crash barrier, parapet,
coping beam with friction slab in M-30 grade
concrete complete as per technical
specification and drawing. metre 1700.00 0.000
84
Major Bridge
Excavation for Structures (Earth work in excavation of foundation of
structures as per drawing and technical specification clause 304,
including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides and bottom and
backfilling with approved material.) for ordinary soil
upto 3m depth
Page 14 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
87 Major Bridge
Plain/Reinforced Cement Concrete (PCC) M25 Grade , in Bottom Plug
of Well Foundation complete as per Drawing and Technical Specification
clause 1209 & Section 1700 With Batching Plant, Transit Mixer and
Concrete Pump
50.260
50.260
Cum 8000.00 100.520
88
Major Bridge
Sinking of 6 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
rock as shown against each case, complete as per drawing and technical
specifications.Clause No.1208.1 to Clause No.1208.7and Clause
No.1208.9 to Clause No. 1208.11. Depth of sinking is reckoned from bed
level.
Depth below bed level upto 3.0 M
6.000
3.000
3.000
metre 15000.00 12.000
89
Major Bridge
Sinking of 6 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
rock as shown against each case, complete as per drawing and technical
specifications.Clause No.1208.1 to Clause No.1208.7and Clause
No.1208.9 to Clause No. 1208.11. Depth of sinking is reckoned from bed
14.000
level.
7.000
7.000
Beyond 3m upto 10m depth
metre 15000.00 28.000
90
Major Bridge
Sinking of 6 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
rock as shown against each case, complete as per drawing and technical
specifications.Clause No.1208.1 to Clause No.1208.7and Clause
No.1208.9 to Clause No. 1208.11. Depth of sinking is reckoned from bed
20.000
10.000
10.000
level.
Beyond 10m upto 20m depth
metre 15000.00 40.000
91
Major Bridge
Sinking of 6 m external diameter well ( other than pneumatic method of
sinking ) through all types of strata namely sandy soil, clayey soil and
rock as shown against each case, complete as per drawing and technical
specifications.Clause No.1208.1 to Clause No.1208.7and Clause
No.1208.9 to Clause No. 1208.11. Depth of sinking is reckoned from bed
level.
2.614
2.924
Beyond 20m upto 30m depth
metre 15000.00 5.538
Page 15 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
92
Major Bridge
Plain/Reinforced Cement Concrete M30 Grade, in Well Steining of Well
Foundation complete as per Drawing and Technical Specification clause
169.600
125.680
31.420
1207 & 1700 With Batching Plant, Transit Mixer and Concrete Pump
Cum 8000.00 326.700
93 Major Bridge
418.780
224.250
Sand Filling in Wells complete as per Drawing and Technical
Specification clause 1210
Cum 1200.00 643.030
94
Major Bridge
Providing and laying Plain cement concrete in Levelling Course,
mechanically mixed and compacted, including centring and shuttering all
complete as per clause 1500, 1700 & 2100 drawings and Technical
specifications and as directed by the Engineer-in-charge.
4.790
4.790
PCC M15 grade (Without plasticiser)
Cum 6200.00 9.580
95
Major Bridge
Plain/Reinforced Cement Concrete (PCC) M25 Grade , in Top/
Intermediarte Plug of Well Foundation complete as per Drawing and
12.568
12.568
Technical Specification clause 1211 & Section 1700 With Batching Plant,
Transit Mixer and Concrete Pump
Cum 8500.00 25.136
96 Major Bridge
Plain/Reinforced Cement Concrete M35 Grade , in Well cap of Well
117.207
Foundation complete as per Drawing and Technical Specification clause
56.556
1212, 1213 & Section 1700 using Batching Plant, Transit Mixer and
Concrete Pump Cum 8500.00 173.763
97 Major Bridge
Plain/reinforced cement concrete in substructure complete as per
drawings and technical specifications section 2200
With Batching Plant, Transit Mixer and Concrete Pump
R.C.C. grade M-35
Height upto 5m Cum 8500.00 0.000
98 Major Bridge
Plain/reinforced cement concrete in substructure complete as per
drawings and technical specifications section 2200
With Batching Plant, Transit Mixer and Concrete Pump
R.C.C. grade M-35
Height 5m and above Cum 9000.00 0.000
99 Major Bridge
Furnishing and Placing Reinforced/ Prestressed cement concrete in
super-structure including all lead and lifts as per drawing and Technical
Specification Section 2300
Sesmic Arrester and Pedestail
PSC Grade M-40, Using Batching plant Cum 9500.00 0.000
Page 16 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
100
Major Bridge
Supplying, fitting and fixing in position true to line and level Bearing
conforming to IRC: 83 (Part-III) section IX and clause no 2006 complete
including all accessories as per drawing and Technical Specifications.
tonne
a) Pot bearings
capacity 220.00 0.000
101 Major Bridge
Furnishing and Placing Reinforced/ Prestressed cement concrete in
super-structure including all lead and lifts as per drawing and Technical
Specification section 2300
PSC Grade M-40, Using Batching plant
Cum 9500.00 0.000
102
Major Bridge
PCC M15 Grade leveling course below approach slab complete as per
drawing and Technical specification Clause No 2704
Cum 6000.00 0.000
103 Major Bridge
Reinforced cement concrete approach slab including reinforcement and
formwork complete as per drawing and Technical specification Clause No
2704 Cum 10000.00 0.000
104 Major Bridge
Providing and laying of an strip seal expansion joint complete as per
drawing and Technical specification for road & bridge works Clause
No.2606 metre 12000.00 0.000
105 Major Bridge
Drainage Spouts complete as per drawing and Technical specification
Clause No.2705 each 5000.00 0.000
106 Major Bridge
Providing weep holes in Brick masonry/ Plain/Reinforced concrete
abutment, wing wall/return wall with 100 mm dia AC pipe, extending
through the full width of the structure with slope of 1V :20H towards
drawing foce. Complete as per drawing and Technical specification
Clause 2706 each 100.00 0.000
107 Major Bridge
Supplying, fitting and placing un-coated HYSD bar Reinforcement in
12.395
5.583
4.128
4.407
9.667
Foundation complete as per Drawing and Technical Specification section
1600 tonne 78000.00 36.180
108
Major Bridge
Supplying, fitting and placing HYSD bar reinforcement in sub-structure
complete as per drawing and Technical Specifications section 1600
tonne 78000.00 0.000
109
Major Bridge
Supplying, fitting and placing HYSD bar reinforcement in super-structure
complete as per drawing and technical specifications Section 1600
tonne 78000.00 0.000
Page 17 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
110
Major Bridge
Providing and Fixing Steel Girder for Superstructure including painting
complete as per drawing and technical specifications under Section 1900.
tonne 160000.00 0.000
111
Major Bridge
RCC Crash Barrier including reinforcement complete as per drawing and
Technical Specifications Clause No.2703.3 and Clause No.811.2 &
Clause No. 109.6. of IRC : 5 -2015 Standard Specifications and Code of
Practice for Road Bridges Section- I General Features of Design
metre 4500.00 0.000
112 Major Bridge
Bituminous Concrete
Providing and laying bituminous concrete complete as per drawing and
Technical Specifications Clause No.501.2.1
(i) with PMB-70 Grade Bitumen
(i) for grading 2 (13.2mm nominal size) Cum 10000.00 0.000
113 Major Bridge
Mastic Asphalt (Providing and laying 25 mm thick mastic asphalt
wearing course with paving grade bitumen meeting the requirements
given in table 500-29( binder having penetration as (15+/- 5) at 25 deg.
centigrade), prepared by using mastic cooker and laid to required level
and slope after cleaning the surface, including providing anti-skid surface
with bitumen pre coated fine grained hard stone ships of 13.2mm nominal
size at the rate of .005cum per 10 sqm. and at an approximate spacing of
10 cm centre to centre in both directions, pressed into surface when the
temperature of surfaces not less than 1000C, protruding 1mm to 4mm
over mastic surface, all complete as per Technical specification Clause
2702.
Page 18 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
Page 19 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
Page 20 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
Page 21 of 22
ASSAM SECONDARY ROAD NETWORK IMPROVEMENT PROJECT
Name of Road : Improvement and Upgradation of Sarthebari Pathsala Road from Km 0+000 to Km 17+653
Package no: ASRIP/A/RI-4
Employer : Chief Engineer (EAP), APWRD, Fatashil Ambari Guwahati-25
Engineer : Dohwa Engineering Co ltd in jv with MaRS Planning and Engineering Service Ltd
Contractor : M/s SHIVAM-BHARTIA (JV)
R A BILL NO - 03
Billing Period : Up to Nov'2023
Abstract of Work Done Month-wise
Aug-23
BoQ
May-23
Nov-23
Dec-22
Sep-23
Feb-23
Mar-23
Apr-23
Jun-23
Jan-23
Oct-23
Jul-23
Total Quantity
item Description of work Unit Rate Remarks
in this bill
no
25,29,020.00
14,42,066.00
32,52,840.00
34,63,607.00
3,54,021.00
1,32,363.00
4,35,597.00
8,07,706.00
9,14,819.00
11,800.00
-
Amount of Work done in this bill (Rs.) 13343839.000
Page 22 of 22