JSA 01 (Mechanical Excavation and Soil Loading Unloading, Night Shift)

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

RISK RISK

Work Activity Hazard Factor & Control Measure & Detailed In Charge Correction Date

GRADE

GRADE
No.
information Environmental impact JAFURAH
L S T COGENERATION
management Plan POWER PROJECT L S T
JCP JOB SAFETY ANALYSIS
All personnel have attended the project
Safety Orientation and relevant safety
awareness training prior to site mobilization.
Contractor / Specific Date of Risk
Sinohydro The field supervisor or foreman shall be a 11-05-2023
Subcontractor Location
certified permit receiver and to coordinate Assessment
for permit approval to Doosan const. & Duration of
Work Discipline Civil No. ofteam.
Works
safety Work
Activity Mechanical Excavation and Soil Loading
The field Unloading
supervisor shall perform a daily
tool box talk addressing the site hazard and
Non-compliance to project
discussing risk control to all crew member
procedure & permit system
Risk Assessment Risk level A Risk Level B Risk Level C Risk Level D Risk Level E
Everyone must know the emergency
Standard Unawareness of emergency
16 – 25 10- 15 5- 9
assembly point and emergency contact 3-4 1-2
procedures
Likelihood x Severity Unacceptable Severe
numbersRisk
to be posted atThrough
work area. review required Acceptable Level Acceptable Level
Area Assessment Permit
1 & Preparation
Incompetent Personnel 2 2 4 D
Ensure that competency of all personnel is Supervisor
2 1 2 E
Review
verified prior perform the operation and
Uninspected use of
ensure that the operators are having the and
equipment and tools.
valid third-party certification with them. Approval
All equipment & tools shall be declared
upon entry of project gate and be
coordinated with Doosan Safety team for
Subcon Permit inspection and approval
Signature Subcon Dept Signature Subcon Site Signature Subcon HSE Signature
Reciever / Heavy equipment shall have safety function
Head Manager Manager
Supervisor device, fire extinguisher and first aid kit in
place.
Name Nametools are not allowed to be use
Homemade Name Name
in the project.

Use of leather or cut resistance hand


gloves to eliminated or prevent hand injury
for handling sharp objects.

Sharp edges Where an object requires two or more


employees to handle it, one employee
Carrying of heavy items should give the direction for lifting and
lowering the object in unison.
2 Manual Handling Repetitive lifting 2 3 6 C Work Crew 2 2 4 D
Never attempt to lift beyond your capacity
Lifting and carrying on (20 Kg). If in doubt test the objects’ weight
uneven and / or slippery before handling it: if it appears too heavy or
ground conditions bulky, obtain a mechanical lifting aid.

The work area shall be in good condition


and free from slips. Ensure clear access is
available.
Repetitive lifting Wherever possible, a reduction in the
amount of heavy manual handling must be
In adequate access sought by providing adequate mechanical
means.
Sharp Edges
Rotate tasks between workers.
Lifting and carrying on
uneven and / or slippery Practice routine and repetitive breaks.
ground conditions