Risk Assessment Risk level A Risk Level B Risk Level C Risk Level D Risk Level E
Standard 16 – 25 10- 15 5- 9 3-4 1-2
Likelihood x Severity Unacceptable Severe Risk Through review required Acceptable Level Acceptable Level
Subcon Permit Signature Subcon Dept Signature Subcont Site Signature Subcon HSE Signature
Reciver Head manager Manager
Name Name Name Name
Doosan Permit Signature Doosan Dept Signature Doosan Gen. Signature Doosan Gen. HSE Signature
Issuer Manager Manager Manager
Changyeol Song
Name Name Name Name
No. Work Activity Hazard Factor & E Type of Damage & RISK Control Measure & Detailed RISK Correcti
TUWAIQ CASTING & FORGING FACILTY PROJECT
TUWAIQ C&F Continuous (Baseline) Risk Assessment Register
GRADE
GRADE
H
information Environmental impact S Env. Impact L S T management Plan L S T In Charge on Date
S
3 Well bore by Mechanical failure S Project Violation 4 4 16 A Obtain work permit from DOOSAN 3 4 12 B Work
the use Crew
excavator Uninspected/ Defective Highlight the existing utility in the plot plan
tools/ equipment and attached to the work permit Operator
mounted Earth
Auger drill Struck/hit by excavator to Co-workers keep the body parts away from
men or any object while on the line of fire
motion.
Prior to start the activity conduct routine
Unauthorized entry excavator inspection as per the checklist
and ensure the equipment is fit for the
Noise work.
procedure leads to accident Wear safety glass & face shield (double
eye protection) as per situation.
Bodily injury due to contact
to the sharp end of rebars Only the trained and competent person
Fall injury allow to do the activity.
All protruding rebars should capped for the
protection.