Professional Documents
Culture Documents
D21c17a 1 WLP R 01 - F
D21c17a 1 WLP R 01 - F
D21c17a 1 WLP R 01 - F
42°
1 4200
(TYP) 2000
(TYP)
F3 1300
C5 750
W-1176.939
S-325.892
F1 F2 F2 F2 F4
C1 C2 C3 C4 C6
(TYP)
(TYP)
(TYP)
(TYP)
4400
6000
4400
2000
1500
1500
1500
A 750
1300 1500
4
4200
(TYP)
X = W-1176.939 3
6000 Y = S- 325.892
1 (TYP)
10100
2
X = W-1166.839
Y = S- 368.132
OF TRACK
3550
F1 F2 F2 F2 F3 F4
C7 C8 C9 C10 C11 C12
B
W-1166.839
S-368.132
4313
FOUNDATION PLAN
+14.000M +14.000M +14.000M OF EXISTING
TRACK
750
KEY PLAN
24-D20
D8
750
LINKS
D8@200 C/C
D8@200 C/C
+9.500M +9.500M
D8@200 C/C
(1a) (1a) SECTION 4a
(2a) (2a)
1300
D8@200 C/C
(3a) (3a) (4a) (4a) 48-D32 THIS DRAWING SUPERSEDED THE EXCAVATION DRAWING
D21C17A-2-WLP-K-01
NOTES:
+6.500M +6.500M +6.500M +6.500M D8 1. ALL DIMENSIONS IN MILLIMETRES & LEVELS IN METER
LINKS
UNLESS NOTED OTHERWISE.
1500
2. CONCRETE GRADE = M30
REINFORCEMENT GRADE = Fe500
3. 50T/SQM NET BEARING CAPACITY, -3.000M BELOW N.G.L.
4. DISCREPENCY IN DRAWINGS IF ANY, SHALL BE BROUGHT
TO THE NOTICE OF CONCERNED ENGINEER.
5. THE DRAWING SHOULD NOT BE SCALED OFF ONLY WRITTEN
DIMENSIONS TO BE FOLLOWED.
6. T.O. RAIL ( FFL ) ±0.000M LVL. CORRESPONDS TO RL. 396.300M LVL.
SECTION 3a REFERENCES
1. FOR GENERAL NOTES AND SPECIFICATIONS
REFER DWG. NO. 1-GEN-G-01,1-GEN-G-02
D8@200 C/C
D8@200 C/C
D8@200 C/C
D8@200 C/C
1500
4
(4a) (4a) 3
48-D32
2
(1a) (1a) (2a) (2a) (3a) (3a)
1 SECMEC 1-WLP-M-01
NO. TITLE DRAWING NO.
REFERENCE DRAWINGS
D8 F 14.06.2023 REVISED AS MARKED JDT BKB PGK
1500
LINKS
E 07.06.2023 REVISED AS MARKED JDT BKB PGK
D 21.04.2023 REVISED AS MARKED JDT BKB PGK
T.O. RAIL T.O. RAIL T.O. RAIL T.O. RAIL C 28.02.2023 REVISED AS MARKED JDT BKB PGK
±0.000M ±0.000M ±0.000M ±0.000M
REV. DATE DESCRIPTION MADE CHECK APPR.
F.F.L F.F.L F.F.L F.F.L
REVISION
NATHDWARA CEMENT WORKS
N.G.L N.G.L N.G.L N.G.L SECTION 2a (UTCL)
D8@200 C/C
D8@200 C/C
D12@100 C/C
D8@200 C/C
1a 1a 2a 2a
(B/W) 1300
3a 3a
D12@150 C/C D12@150 C/C 4a 4a 601,B-Wing,Godrej Coliseum,
3000
3000
3000
3000
(B/W) (B/W) off Eastern Express Highway,
D8@200 C/C
44-D32 Chunabhatti,Sion,Mumbai-400 022
150
D12@300 C/C
150
150
1700
(B/W)
1200
1200
RELEASED FOR CONSTRUCTION
D8
600
LINKS NDCW, (RAJASTHAN)
1500
D16@200C/C
D16@200C/C
D16@200C/C
150
300 300 300 300
(E/F)
(E/F)
(E/F)
THK.
THK.
THK.
THK.
PCC PCC PCC PCC
75
75
75
75
(TYP) (1:4:8) (TYP) (1:4:8) (TYP) (1:4:8) (TYP) (1:4:8) WLP : WAGON LOADING BUILDING FOR CEMENT
D16@125 C/C D20@100 C/C D16@125 C/C D12@150 C/C
(B/W) (B/W) (B/W) (B/W) LAYOUT & RC DETAILS OF FOUNDATION & COLUMN
75 4400 75 6000 75 4400 75 2000
D21C17A-1-WLP-R-01_F
REINFORCEMENT
SECTION 1 SECTION 2 SECTION 3 SECTION 4 DESIGN: MADE: DATE: DWG. NO.: REV:
JOB NO
FOOTING F1 (2 NOS.) FOOTING F2 (6 NOS.) FOOTING F3 (2 NOS.) FOOTING F4 (2 NOS.) SECTION 1a ADS JDT 02.02.2023
COLUMN C1,C7 (2 NOS.) COLUMN C2,C3,C4,C8,C9,C10 (6 NOS.) COLUMN C5,C11 (2 NOS.) COLUMN C6,C12 (2 NOS.) D21C17A CHECK: APPR: REV.:
14.06.2023 1
PGK PGK WLP R 01 F