Professional Documents
Culture Documents
Ac Ups System
Ac Ups System
TOTAL 4572.275
Sign.
Name
Date
DATE:25/02/2022
visual of
on joints
REMARKS
TUNA
L
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR : M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FREC/01/002
SHEET NO.: 1 OF 1
Tightening of Agency / Scope of Weld v
Aignment / Deviation
Reference Fit-Up & Bolts / Inspection erectio
SR. No DRAWING NO DRG NO. ELEVATION QTY Weight (Kg)
Welding Report No. Locking of
Longitudinal Transverse SIL TUNA SIL
Sim-Plate
1 TUNA-IN-01DDM-07-0201 BEAM FOR ABSORBER FLOOR 0.02 REPORT NO.SIL/FAB/02 1 4327.900
TOTAL 4569.100
Sign.
Name
Date
DATE:10/03/2022
visual of
on joints
REMARKS
TUNA
L
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR : M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 2 REPORT NO.SIL/FREC/01/003
SHEET NO.: 1 OF 1
Agency / Scope of Weld v
Aignment / Deviation
Reference Fit-Up & Inspection erectio
SR. No DRAWING NO MEMBER DESCRIPTION ELEVATION QTY Weight (Kg) Welder no.
Welding Report No.
Longitudinal Transverse SIL TUNA SIL
Sign.
Name
Date
DATE:20/03/2022
visual of
on joints
REMARKS
TUNA
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 2 REPORT NO.SIL/FREC/004
SHEET NO.: 1 OF 1
Agency / Scope of Weld v
Aignment / Deviation
Reference Fit-Up & Welding Welder Inspection erectio
SR. No DRAWING NO MEMBER DESCRIPTION ELEVATION QTY Weight (Kg)
Report No. no.
Longitudinal Transverse SIL TUNA SIL
Sign.
Name
Date
DATE:24/03/2022
visual of
on joints
REMARKS
TUNA
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR : M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FREC/01/005
SHEET NO.: 1 OF 1
Agency / Scope of Weld v
Aignment / Deviation
Reference Fit-Up & Inspection erectio
SR. No DRAWING NO MEMBER DESCRIPTION ELEVATION QTY Weight (Kg) Welder no.
Welding Report No.
Longitudinal Transverse SIL TUNA SIL
Sign.
Name
Date
DATE:29/03/2022
visual of
on joints
REMARKS
TUNA
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FREC/006
SHEET NO.: 1 OF 1
Agency / Scope of Weld v
Aignment / Deviation
Reference Fit-Up & Welding Welder Inspection erectio
SR. No DRAWING NO MEMBER DESCRIPTION ELEVATION QTY Weight (Kg)
Report No. no.
Longitudinal Transverse SIL TUNA SIL
TUNA-IN-01DDM-07-0301-
1 RING STIFFENER 31.85 REPORT NO. SIL/FAB/22 1 4742.800
R-0
TUNA-IN-01DDM-07-0301-
2 RIBBED PLATE 31.85 REPORT NO. SIL/FAB/22 36 100.800
R-0
TOTAL 4843.600
Sign.
Name
Date
DATE:14/04/2022
visual of
on joints
REMARKS
TUNA
R-6
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 2 REPORT NO.SIL/FREC/007
SHEET NO.: 1 OF 1
Agency / Scope of Weld v
Aignment / Deviation
Reference Fit-Up & Welding Welder Inspection erectio
SR. No DRAWING NO MEMBER DESCRIPTION ELEVATION QTY Weight (Kg)
Report No. no.
Longitudinal Transverse SIL TUNA SIL
TUNA-IN-01DDM-07-0302-
1 RING STIFFENER 31.85 REPORT NO. SIL/FAB/14 1 4742.800 1
R-0
TUNA-IN-01DDM-07-0302-
2 RIBBED PLATE 31.85 REPORT NO. SIL/FAB/14 36 100.800 1
R-0
TOTAL 4843.600
Sign.
Name
Date
DATE:06/04/2022
visual of
on joints
REMARKS
TUNA
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FREC/008
SHEET NO.: 1 OF 1
Agency / Scope of Weld v
Aignment / Deviation
Reference Fit-Up & Welding Welder Inspection erectio
SR. No DRAWING NO MEMBER DESCRIPTION ELEVATION QTY Weight (Kg)
Report No. no.
Longitudinal Transverse SIL TUNA SIL
TUNA-IN-01DDM-07-0301- 29.000 TO
1 ABSORBER SHELL PLATE REPORT NO. SIL/FAB/03 5 10361.058 1
R-0 32.000
TUNA-IN-01DDM-07-0301- ABSORBER SHELL PLATE 29.000 TO REPORT NO. SIL/FAB/03
2 5 10361.058 1
R-0 32 000
TOTAL 20722.116
Sign.
Name
Date
DATE:06/04/2022
visual of
on joints
REMARKS
TUNA
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FREC/009 DATE:2
SHEET NO.: 1 OF 1
Agency / Scope of Weld visual of
Aignment / Deviation
Reference Fit-Up & Welding Welder Inspection erection joints
SR. No DRAWING NO MEMBER DESCRIPTION ELEVATION QTY Weight (Kg)
Report No. no.
Longitudinal Transverse SIL TUNA SIL TUNA
TUNA-IN-01DDM-07-0301- 25.000 TO
1 ABSORBER SHELL PLATE REPORT NO. SIL/FAB/15 8 27126.772
R-0 29.000
TUNA-IN-01DDM-07-0301- 25.000 TO
2 ABSORBER SHELL PLATE REPORT NO. SIL/FAB/25 2 4091.484
R-0 29.000
TUNA-IN-01DDM-07-0301-
3 RING STIFFENER 28.8 REPORT NO. SIL/FAB/22 1 4742.800
R-0
TUNA-IN-01DDM-07-0301-
2 RIBBED PLATE 31.85 REPORT NO. SIL/FAB/14 36 100.800 1
R-0
TOTAL 35961.056
Sign.
Name
Date
29/04/2022
REMARKS
P-1.P-2(18MM)
P-1.P-2(18MM)
R-5
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FREC/010 DATE:2
SHEET NO.: 1 OF 1
Agency / Scope of Weld visual of
Aignment / Deviation
Reference Fit-Up & Welding Welder Inspection erection joints
SR. No DRAWING NO MEMBER DESCRIPTION ELEVATION QTY Weight (Kg)
Report No. no.
Longitudinal Transverse SIL TUNA SIL TUNA
TUNA-IN-01DDM-07-0301-
1 RIBBED PLATE 31.85 REPORT NO. SIL/FAB/14 36 100.800 1
R-0
TOTAL 100.800
Sign.
Name
Date
29/04/2022
REMARKS
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 2 REPORT NO.SIL/FREC/011 DATE:2
SHEET NO.: 1 OF 1
Agency / Scope of Weld visual of
Aignment / Deviation
Reference Fit-Up & Welding Welder Inspection erection joints
SR. No DRAWING NO MEMBER DESCRIPTION ELEVATION QTY Weight (Kg)
Report No. no.
Longitudinal Transverse SIL TUNA SIL TUNA
TUNA-IN-01DDM-07-0302-
1 RIBBED PLATE 31.85 REPORT NO. SIL/FAB/14 36 100.800 1
R-0
TOTAL 100.800
Sign.
Name
Date
29/04/2022
REMARKS
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FREC/012 DATE:26/05/2022
SHEET NO.: 1 OF 1
Agency / Scope of Weld visual of
FITU-UP DATE
Welding Inspection erection joints
SR. No DRAWING NO MEMBER DESCRIPTION QTY Unit WT Weight (Kg) Welder no. REMARKS
Date
SIL TUNA SIL TUNA
Sign.
Name
Date
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 2 REPORT NO.SIL/FREC/013 DATE:27/05/2022
SHEET NO.: 1 OF 1
Agency / Scope of Weld visual of
FITU-UP DATE
Welding Inspection erection joints
SR. No DRAWING NO MEMBER DESCRIPTION QTY Unit WT Weight (Kg) Welder no. REMARKS
Date
SIL TUNA SIL TUNA
Sign.
Name
Date
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJEC FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT :M/S D B POWER LIMITED
CUSTO M/S TUNA ENVIROTECH PVT LIMITED
CONTR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FREC/014
SHEET NO.: 1 OF 1
Agency / Scope of Weld visu
FITU-UP DATE
Inspection erection j
SR. No DRAWING NO MEMBER DESCRIPTION QTY Unit WT Weight (Kg) Welder no. Welding Date
SIL TUNA SIL
Sign.
Name
Date
DATE:31/05/2022
ual of
joints
REMARKS
TUNA
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJEC FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT :M/S D B POWER LIMITED
CUSTO M/S TUNA ENVIROTECH PVT LIMITED
CONTR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FREC/015
SHEET NO.: 1 OF 1
Agency / Scope of Weld visu
FITU-UP DATE
Inspection erection j
SR. No DRAWING NO MEMBER DESCRIPTION QTY Unit WT Weight (Kg) Welder no. Welding Date
SIL TUNA SIL
Sign.
Name
Date
DATE:27/06/2022
ual of
joints
REMARKS
TUNA
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMERM/S TUNA ENVIROTECH PVT LIMITED
CONTRACT M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 2 REPORT NO.SIL/FREC/016 DATE:16/06/2022
SHEET NO.: 1 OF 1
Agency / Scope of Weld visual of
FITU-UP DATE
Inspection erection joints
SR. No DRAWING NO MEMBER DESCRIPTION QTY Unit WT Weight (Kg) Welder no. Welding Date REMARKS
SIL TUNA SIL TUNA
Sign.
Name
Date
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMERM/S TUNA ENVIROTECH PVT LIMITED
CONTRACT M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 2 REPORT NO.SIL/FREC/017 DATE:30/06/2022
SHEET NO.: 1 OF 1
Agency / Scope of Weld visual of
FITU-UP DATE
Inspection erection joints
SR. No DRAWING NO MEMBER DESCRIPTION QTY Unit WT Weight (Kg) Welder no. Welding Date REMARKS
SIL TUNA SIL TUNA
Sign.
Name
Date
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJEC FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT :M/S D B POWER LIMITED
CUSTO M/S TUNA ENVIROTECH PVT LIMITED
CONTR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FREC/018
SHEET NO.: 1 OF 1
Agency / Scope of Weld visu
FITU-UP DATE
Inspection erection j
SR. No DRAWING NO MEMBER DESCRIPTION QTY Unit WT Weight (Kg) Welder no. Welding Date
SIL TUNA SIL
Sign.
Name
Date
DATE:29/06/2022
ual of
joints
REMARKS
TUNA
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTOR : M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FREC
SHEET NO.: 1 OF 1
Agency / Scope of
FITU-UP DATE
SR. No DRAWING NO MEMBER DESCRIPTION QTY Unit WT Weight (Kg) Welder no. Welding Date Inspection
SIL TUNA
TUNA-IN-01DDM-07-0202-
1 BOLT CHAIR TOP PLATE 57 17.69 1007.190 25.07.2022 1,2 29.07.2022
R-0
TUNA-IN-01DDM-07-0202-
2 BOLT CHAIR GUSSET PLATE 114 20.84 2375.760 25.07.2022 1,2 29.07.2022
R-0
TUNA-IN-01DDM-07-0301- RING STIFFENER -
3 5 4742.8 2019.996 25.07.2022 1,2 29.07.2022
R-0 (H400X250X10X14)
TUNA-IN-01DDM-07-0301- RING STIFFENER -
4 1 8350.5 8350.500 26.07.2022 12,13,7 30.07.2022
R-0 (HS400X300X20)
TUNA-IN-01DDM-07-0301- RING STIFFENER -
5 1 3390.5 3390.500 26.07.2022 12,13,7 30.07.2022
R-0 (HS400X300X20)
TUNA-IN-01DDM-07-0301-
6 RIBBED PLATE 16 2.8 44.800 26.07.2022 12,13,7 30.07.2022
R-0
TUNA-IN-01DDM-07-0301- ABSORBER SHELL PLATE -1
7 1 5704.000 5704.000 22.07.2022 W-1,2,3,4 27.07.2022
R-0 (Thik 22mm)
TUNA-IN-01DDM-07-0301- ABSORBER SHELL PLATE - 2
8 1 19013.233 19013.233 15.07.2022 W-1,2,3,4 18.07.2022
R-0 (Thik 22mm)
TUNA-IN-01DDM-07-0301- ABSORBER SHELL PLATE - 3
9 1 19013.233 19013.233 13.07.2022 W-1,2,3,4 16.07.2022
R-0 (Thik 22mm)
TUNA-IN-01DDM-07-0301- ABSORBER SHELL PLATE - 4
10 1 19013.233 19013.233 08.07.2022 W-1,2,3,4 12.07.2022
R-0 (Thik 22mm)
TOTAL 79932.445
Sign.
Name
Date
C/019 DATE:30/07/2022
Weld visual of
erection joints REMARKS
SIL TUNA
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMER : M/S TUNA ENVIROTECH PVT LIMITED
CONTRACTO M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FRE
SHEET NO.: 1 OF 1
Agency / Scope of
FITU-UP DATE
Inspection
SR. No DRAWING NO MEMBER DESCRIPTION QTY Unit WT Weight (Kg) Welder no. Welding Date
SIL TUNA
Sign.
Name
Date
EC/020 DATE:16/07/2022
Weld visual of
erection joints
REMARKS
SIL TUNA
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJEC FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT :M/S D B POWER LIMITED
CUSTO M/S TUNA ENVIROTECH PVT LIMITED
CONTR M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 2 REPORT NO.SIL/FREC/021
SHEET NO.: 1 OF 1
Agency / Scope of Weld visu
FITU-UP DATE
Inspection erection j
SR. No DRAWING NO MEMBER DESCRIPTION QTY Unit WT Weight (Kg) Welder no. Welding Date
SIL TUNA SIL
Sign.
Name
Date
DATE:27/07/2022
ual of
joints
REMARKS
TUNA
LCS ERECTION VISUAL INSPECTION
VJR Technologies
REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/s D B POWER LIMITED
CUSTOMER : M/s TUNA ENVIROTECH PVT LIMITED
CONTRACTOR : M/s VJR Technologies
UNIT : Electrical building
Sign.
Name
ERECTION ALLIGNMENT AND WELD VISUAL INSPECTION REPORT
PROJECT : FGD SYSTEM-2X600 MW THERMAL POWER PROJECT
CLIENT : M/S D B POWER LIMITED
CUSTOMERM/S TUNA ENVIROTECH PVT LIMITED
CONTRACT M/S SIMAR INFRASTRUCTERS LIMITED
UNIT : ABSORBER # 1 REPORT NO.SIL/FREC/023 DATE:28/07/2022
SHEET NO.: 1 OF 1
Agency / Scope of Weld visual of
FITU-UP DATE
Inspection erection joints
SR. No DRAWING NO MEMBER DESCRIPTION QTY Unit WT Weight (Kg) Welder no. Welding Date REMARKS
SIL TUNA SIL TUNA
TUNA-
1 BOLT CHAIR TOP PLATE 5 17.670 88.350 27.07.2022 W-13 29.07.2022
IN-01DDM-07-0301-R-0
TUNA- BOLT CHAIIR GUSSET
2 10 20.840 208.400 27.07.2022 W-13 29.07.2022
IN-01DDM-07-0301-R-0 PLATE
TOTAL 296.750
COMPANY M/S SIL M/S TUNA
Sign.
Name
Date