Carpentry Institutional
Carpentry Institutional
Qualification: CARPENTRYNC II
Unit Competency: INSTALL FRAMING WORKS
Instruction: - Read the questions in the left hand column of the chart
- Place a check mark in the appropriate box opposite each question to indicate
your answers.
Can I….? Yes No
Select PPE according to job requirements and OSH standards
Interpret related plans and details according to job requirements
Select and prepare materials power and hand tools and
equipment consistent with requirements
Re- check and stage materials according to job requirement and
report defective materials to immediate superior following
standard operating procedures
Lay-out post and girts according to working drawings and
specifications with required tolerance on all dimensions
Erect and assemble post girts and supports floor joists in
accordance with working drawing and specifications
Trim and fix floor opening fastening according to working
drawing and specifications
Lay-out/install floor joist with required tolerance on dimensions
Identify and install wall studs base on working drawing and
specifications with required tolerance on dimensions
Fabricate lay-out and install types of roof and other components
according to working drawing and specifications with required
tolerance on dimensions
Install roof components according to working drawing and
specifications
Lay-out/ install ceiling joist/ frame according to working drawing
and specifications with required tolerance on dimensions
Perform good housekeeping according to OSH standards
Accomplish daily work report in accordance with company rules
and regulations
Trainee’s Name and Signature Date:
RATING SHEET FOR DEMONSTRATION
Trainee’s Name:
Trainer’s Name:
Qualification CARPENTRY NC II
Unit of Competency INSTALLL FORMWORKS
Date of Institutional Assessment
Yes No N/A
Name of Competency
Training Center:
Date of Assessment:
2.
3.
4.
5.
6.
7.
8.
9.
10.
Evidence Plan
QUALIFICATION CARPENTRY NC II
Unit of competency: INSTALL FRAMING WORKS
Ways in which evidence will be collected:
Demonst
Written
Portfoli
questio
Report
Party
ration
Third
Test
o
The evidence must show that the trainee…
Select PPE according to job requirements and OSH
standards
Interpret related plans and details according to job
requirements
Select and prepare materials power and hand tools
and equipment consistent with requirements
Re- check and stage materials according to job
requirement and report defective materials to
immediate superior following standard operating
procedures
Lay-out post and girts according to working
drawings and specifications with required
tolerance on all dimensions
Erect and assemble post girts and supports floor
joists in accordance with working drawing and
specifications
Trim and fix floor opening fastening according to
working drawing and specifications
Lay-out/install floor joist with required tolerance
on dimensions
Identify and install wall studs base on working
drawing and specifications with required tolerance
on dimensions
Fabricate lay-out and install types of roof and other
components according to working drawing and
specifications with required tolerance on
dimensions
Install roof components according to working
drawing and specifications
Evidence Plan
QUALIFICATION CARPENTRY NC II
Unit of competency: INSTALL FORMWORKS
Ways in which evidence will be collected:
[tick the column]
Written Test
Portfolio
The evidence must show that the trainee…
Prepare materials for stake-out building lines
Select appropriate PPE in accordance with the job
requirements and OSHC standards
Interpret plan drawings in accordance in job
requirements
Set batter boards***
Lay-out dimension of form sheating and
stiffeners***
Assemble form panels***
Lay out/assemble scaffolds and braces***
Set and fix form panels of building components***
Qualification: CARPENTRYNC II
Unit Competency: INSTALL FORMWORKS
Instruction: - Read the questions in the left hand column of the chart
- Place a check mark in the appropriate box opposite each question to indicate
your answers.
Can I….? Yes No
Prepare materials for stake-out building lines
Select appropriate PPE in accordance with the job requirements
and OSHC standards
Interpret plan drawings in accordance in job requirements
Set batter boards***
Lay-out dimension of form sheating and stiffeners***
Assemble form panels***
Lay out/assemble scaffolds and braces***
Set and fix form panels of building components***
Strip formworks of building components
Dismantle scaffolds and braces in line with company rules and
regulations
Prepare staging area tools and equipment following standard
operating procedures
Trainee’s Name and Signature Date:
RATING SHEET FOR DEMONSTRATION
Trainee’s Name:
Trainer’s Name:
Qualification CARPENTRY NC II
Unit of Competency INSTALLL FRAMING WORKS
Date of Institutional Assessment
Yes No N/A
Qualification CARPENTRY NC II
General Instruction:
Given the necessary tools, materials and equipment, you are required to lay and prepare wall tiles in
accordance with accepted institutional/industry standard for 1 hour
Specific Instruction:
1. The assessment shall be based on the unit of competency in the Training Regulation and the evidence
plan and shall focus on the following evidence gathering methods:
- Demonstration
- Oral Questioning
- Written Test
2. You shall be given 10 minutes to prepare the needed materials, tools and equipment for the
performance of tasks.
3. You shall be required to perform the following tasks for one (4) hour:
5. After the performance of tasks, answer the questions about your demonstration to be asked by the
trainor/.assessor.
6. You have to answer other questions to probe the underpinning knowledge about the unit of
competency
7. After the oral questioning portion, answer carefully the written test about the unit of competency.
Please write your answer on a separate sheet of paper to be provided by the assessor.
8. After the assessment, the assessor shall provide you feedback on the assessment result. The
feedback shall indicate whether you are :
- COMPETENT
- NOT YET COMPETENT
Name:
Qualification: CARPENTRY NC II
Unit of INSTALL FORM WORKS
Competency:
QUESTIONING TOOLS
Satisfactory
Questions to probe the candidate’s underpinning knowledge
response
Extension/Reflection Questions – additional questions Yes No
Overall Performance:
Satisfactory Not Satisfactory
Trainee Signature: Date:
Trainer Signature: Date:
Name:
Qualification: CARPENTRY NC II
Unit of Competency: INSTALL FRAMING WORKS
ANSWER KEYS TO QUESTIONING TOOLS
Questions to probe the candidate’s underpinning knowledge Satisfactory Responses
Extension/Reflection Questions – additional questions Yes No
1. What precaution must you take when you layout and
erect a post?
Check properly the layout position and secure braces
rigidly after testing the alignment and plumbness
2. What are the procedures or steps in installing girts?
Install the column /post first and then followed by the
girt as per plans and specifications
3. How do you avoid the sagging of a plane ceiling
joist/frame?
Always have an accurate reference lines longitudinal
and latitudinal and in other strategic places
4. How do you avoid the irregularity of the floor joist in
terms of levelness and elevation?
Always have an accurate reference lines longitudinal
and in other strategic places
5. What would you do in the event the wall studs, which is
designed for single walling, was suddenly changed to
double walling?
Check studs that are not in conformity with the
dimensions /width and do remedial actions
The Trainee’s underpinning knowledge about the demonstration of tasks was:
Overall Performance:
Satisfactory Not Satisfactory
Trainee Signature: Date:
Trainer Signature: Date:
Templates for Inventory of Training Resources
Films
Video tapes
Projector 1 unit 1 unit
LCD/Monitor
Audio video I unit
Whiteboard 1 unit 2 units
Resources for Skills practice of Competency
Supplies and Materials As per TR As per Remarks
Inventory
Glazed wall tiles (20 cm x 20 cm) 25 boxes 30 boxes
Vitrified floor tiles (20 cm x 20 cm) 25 boxes 30 boxes
Mosaic tiles (12” x 12”) 150 pcs. 200 pcs
Tile adhesive 30 kilos 40 kilos
Tile plastic spacer 1 bag 1 bag
Carburandum 5 pcs. 5 pcs
Pencil 25 pcs 30 pcs
Tile grout 5 kilos 25 kilos
Foam 25 pcs. 30 kilos
Tile trim 10 pcs. 10 pcs
Nylon string 5 rolls 5 rolls
Cotton rags 1 kilo 1 kilo
Water pail 5 pcs. 5 pcs
Tools As per TR As per Remarks
Inventory
Notched trowel 5 pcs. 20 pcs
Tile cutter 5 pcs. 10 pcs
Metal tape 25 pcs. 30 pcs
Nipper 5 pcs. 1o pcs
Plumb bob 5 pcs. 10 pcs
Spirit level 5 pcs. 10 pcs
Tri-square 5 pcs. 10 pcs
Plier 5 pcs. 10 pcs
Rubber squeegee 5 pcs. 10 pcs
Rubber mallet 5 pcs. 10 pcs
Equipment As per TR As per Remarks
Inventory
Angle grinder 5 pcs.
PPE 25 sets
Note: In the remarks section, remarks may include for repair, for replenishment, for reproduction, for
maintenance etc.
Name:
Qualification: CARPENTRY NC II
Unit of INSTALL FORMWORKS
Competency:
2. Can you use spirit level instead of leveling hose in getting horizontal
elevation?
Yes, it can be used on getting horizontal elevation
3. How do you avoid miss alignment of form panels during installation?
Always check the plan during lay-out stretch the nylon tightly and check the
accuracy of your instrument or secure bases properly
Safety Questions---to prevent accidents
10. What will you do if you found bubbles in your leveling hose
Place the water immediately and clean the hose
10. What will do if the connector, lock and screws do not fits in the scaffold,
Report to the immediate superior and don’t use the scaffold
Job/ Role Environment Questions
11. What is tool box meeting?
It is the meeting where in safety orientation where done to force the
project progress
12. What would you do if the materials you’re going to use is substandard?
Report to the immediate superior and do not use the materials
Rules and Regulations
13. Why do we need to follow OSHS instruction?
This is for our own good and to prevent accident
14. What regulation or principles covers the checking of measurement and
sureness of the building line??
Accomplish report and father instruction from the supervisor or foreman
Qualification CARPENTRY NC II
General Instruction:
Given the necessary tools, materials and equipment, you are required to lay and prepare wall tiles in
accordance with accepted institutional/industry standard for 1 hour
Specific Instruction:
The assessment shall be based on the unit of competency in the Training Regulation and the
evidence plan and shall focus on the following evidence gathering methods:
Demonstration
Oral Questioning
Written Test
2. You shall be given 10 minutes to prepare the needed materials, tools and equipment for the
performance of tasks.
3. You shall be required to perform the following tasks for one (4) hour:
Prepare materials for framing works
Lay-out/erect and assemble post girts and supports
Lay-out/install floor joist
Lay out/install wall studs
Lay out/fabricate/install roof frames
Lay out/install ceiling joist frames
4. After the performance of tasks, answer the questions about your demonstration to be asked
by the trainer/.assessor.
5. You have to answer other questions to probe the underpinning knowledge about the unit of
competency
6. After the oral questioning portion, answer carefully the written test about the unit of
competency. Please write your answer on a separate sheet of paper to be provided by the assessor.
7. After the assessment, the assessor shall provide you feedback on the assessment result. The
8. feedback shall indicate whether you are :
COMPETENT
NOT YET COMPETENT