SELF-ASSESSMENT GUIDE

Qualification: CARPENTRYNC II
Unit Competency: INSTALL FRAMING WORKS
Instruction: - Read the questions in the left hand column of the chart
- Place a check mark in the appropriate box opposite each question to indicate
your answers.
Can I….? Yes No
 Select PPE according to job requirements and OSH standards
 Interpret related plans and details according to job requirements
 Select and prepare materials power and hand tools and
equipment consistent with requirements
 Re- check and stage materials according to job requirement and
report defective materials to immediate superior following
standard operating procedures
 Lay-out post and girts according to working drawings and
specifications with required tolerance on all dimensions
 Erect and assemble post girts and supports floor joists in
accordance with working drawing and specifications
 Trim and fix floor opening fastening according to working
drawing and specifications
 Lay-out/install floor joist with required tolerance on dimensions
 Identify and install wall studs base on working drawing and
specifications with required tolerance on dimensions
 Fabricate lay-out and install types of roof and other components
according to working drawing and specifications with required
tolerance on dimensions
 Install roof components according to working drawing and
specifications
 Lay-out/ install ceiling joist/ frame according to working drawing
and specifications with required tolerance on dimensions
 Perform good housekeeping according to OSH standards
 Accomplish daily work report in accordance with company rules
and regulations
Trainee’s Name and Signature Date:
RATING SHEET FOR DEMONSTRATION
Trainee’s Name:
Trainer’s Name:
Qualification CARPENTRY NC II
Unit of Competency INSTALLL FORMWORKS
Date of Institutional Assessment

Time of Institutional Assessment


Instructions for Demonstration:
Given the necessary materials, tools and equipment, the trainee must be able to perform
the following within 4 hours as per performance criteria
 Prepare/stake-out building lines
 Fabricate formworks
 Install formworks components
 Strip formworks components
Materials and Equipment
Facilities, equipment, supplies and materials relevant to the unit of competency
Materials Tools Equipment
 Tanguile rough  hardhat  scaffold
 Tanguile  safety belt
 C.W nails  safety hat
 Transparent hose  safety shoes
 Nylon cord  working gloves
 Plywood  working clothes
 Pencil  dust mask
 broom  goggles
 claw hammer
 hand saw
 pull push rule
 sledge hammer
 steel/fiber glass
tape
 steel tape
 steel square
 try square
 bolo axe
 plumb bob
 chalk line
 chisel
 level hose
 marking gauge
 spirit level
 crow bar

OBSERVATION To show if evidence is


During the demonstration of skills, did the candidate demonstrated

Yes No N/A

 Select PPE according to job requirements and OSH standards


 Interpret related plans and details according to job
requirements
 Select and prepare materials power and hand tools and
equipment consistent with requirements
 Re- check and stage materials according to job requirement
and report defective materials to immediate superior
following standard operating procedures
 Lay-out post and girts according to working drawings and
specifications with required tolerance on all dimensions
 Erect and assemble post girts and supports floor joists in
accordance with working drawing and specifications
 Trim and fix floor opening fastening according to working
drawing and specifications
 Lay-out/install floor joist with required tolerance on
dimensions
 Identify and install wall studs base on working drawing and
specifications with required tolerance on dimensions
 Fabricate lay-out and install types of roof and other
components according to working drawing and specifications
with required tolerance on dimensions
 Install roof components according to working drawing and
specifications
 Lay-out/ install ceiling joist/ frame according to working
drawing and specifications with required tolerance on
dimensions
 Perform good housekeeping according to OSH standards
 Accomplish daily work report in accordance with company
rules and regulations
ATTENDANCE SHEET
CARPENTRY NC II
(Title of Qualification)

Name of Competency
Training Center:
Date of Assessment:

No. CANDIDATE’S NAME SIGNATURE ASSESSMENT RESULTS


1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

Trainer: Training Director:

Signature Over Printed Name Signature Over Printed Name

Evidence Plan

QUALIFICATION CARPENTRY NC II
Unit of competency: INSTALL FRAMING WORKS
Ways in which evidence will be collected:
Demonst

Written
Portfoli
questio

Report
Party
ration

Third

[tick the column]


ning
Oral

Test
o
The evidence must show that the trainee…
 Select PPE according to job requirements and OSH   
standards
 Interpret related plans and details according to job   
requirements
 Select and prepare materials power and hand tools   
and equipment consistent with requirements
 Re- check and stage materials according to job   
requirement and report defective materials to
immediate superior following standard operating
procedures
 Lay-out post and girts according to working   
drawings and specifications with required
tolerance on all dimensions
 Erect and assemble post girts and supports floor   
joists in accordance with working drawing and
specifications
 Trim and fix floor opening fastening according to   
working drawing and specifications
 Lay-out/install floor joist with required tolerance   
on dimensions
 Identify and install wall studs base on working   
drawing and specifications with required tolerance
on dimensions
 Fabricate lay-out and install types of roof and other   
components according to working drawing and
specifications with required tolerance on
dimensions
 Install roof components according to working   
drawing and specifications
Evidence Plan

QUALIFICATION CARPENTRY NC II
Unit of competency: INSTALL FORMWORKS
Ways in which evidence will be collected:
[tick the column]

Third Party Report


Oral questioning
Demonstration

Written Test
Portfolio
The evidence must show that the trainee…
 Prepare materials for stake-out building lines   
 Select appropriate PPE in accordance with the job   
requirements and OSHC standards
 Interpret plan drawings in accordance in job   
requirements
 Set batter boards***   
 Lay-out dimension of form sheating and   
stiffeners***
 Assemble form panels***   
 Lay out/assemble scaffolds and braces***   
 Set and fix form panels of building components***   

 Strip formworks of building components   

 Dismantle scaffolds and braces in line with   


company rules and regulations
 Prepare staging area tools and equipment   
following standard operating procedures
SELF-ASSESSMENT GUIDE

Qualification: CARPENTRYNC II
Unit Competency: INSTALL FORMWORKS
Instruction: - Read the questions in the left hand column of the chart
- Place a check mark in the appropriate box opposite each question to indicate
your answers.
Can I….? Yes No
 Prepare materials for stake-out building lines
 Select appropriate PPE in accordance with the job requirements
and OSHC standards
 Interpret plan drawings in accordance in job requirements
 Set batter boards***
 Lay-out dimension of form sheating and stiffeners***
 Assemble form panels***
 Lay out/assemble scaffolds and braces***
 Set and fix form panels of building components***
 Strip formworks of building components
 Dismantle scaffolds and braces in line with company rules and
regulations
 Prepare staging area tools and equipment following standard
operating procedures
Trainee’s Name and Signature Date:
RATING SHEET FOR DEMONSTRATION
Trainee’s Name:
Trainer’s Name:
Qualification CARPENTRY NC II
Unit of Competency INSTALLL FRAMING WORKS
Date of Institutional Assessment

Time of Institutional Assessment


Instructions for Demonstration:
Given the necessary materials, tools and equipment, the trainee must be able to perform
the following within 4 hours as per performance criteria
 Prepare materials for framing works
 Lay-out/erect and assemble post girts and supports
 Lay-out/install floor joist
 Lay out/install wall studs
 Lay out/fabricate/install roof frames
 Lay out/install ceiling joist frames
Materials and Equipment
Facilities, equipment, supplies and materials relevant to the unit of competency
Materials Tools Equipment
 Tanguile s4s  Safety hat
 Tanguile rough  Safety shoes
 C.W nails  Google’s
 Nylon string  Working gloves
 CW nails (2”,3”,4”)  Rope (lifeline)
 Dust mask
 Safety belt
 Working clothes
 Hand saw
 Claw hammer
 Chalk line
 Crow bar
 Plumb bob
 Level hose
 Push pull rule
 Spirit level
 Chisel
 Try square
 Steel square
 plane
OBSERVATION To show if evidence is
During the demonstration of skills, did the candidate demonstrated

Yes No N/A

 Select PPE according to job requirements and OSH standards


 Interpret related plans and details according to job
requirements
 Select and prepare materials power and hand tools and
equipment consistent with requirements
 Re- check and stage materials according to job requirement
and report defective materials to immediate superior
following standard operating procedures
 Lay-out post and girts according to working drawings and
specifications with required tolerance on all dimensions
 Erect and assemble post girts and supports floor joists in
accordance with working drawing and specifications
 Trim and fix floor opening fastening according to working
drawing and specifications
 Lay-out/install floor joist with required tolerance on
dimensions
 Identify and install wall studs base on working drawing and
specifications with required tolerance on dimensions
 Fabricate lay-out and install types of roof and other
components according to working drawing and specifications
with required tolerance on dimensions
 Install roof components according to working drawing and
specifications
 Lay-out/ install ceiling joist/ frame according to working
drawing and specifications with required tolerance on
dimensions
 Perform good housekeeping according to OSH standards
Performance Test

Specific Instruction for the Candidate

Qualification CARPENTRY NC II

Unit of Competency INSTALL FORMWORKS

General Instruction:

Given the necessary tools, materials and equipment, you are required to lay and prepare wall tiles in
accordance with accepted institutional/industry standard for 1 hour

Specific Instruction:

1. The assessment shall be based on the unit of competency in the Training Regulation and the evidence
plan and shall focus on the following evidence gathering methods:
- Demonstration
- Oral Questioning
- Written Test

2. You shall be given 10 minutes to prepare the needed materials, tools and equipment for the
performance of tasks.

3. You shall be required to perform the following tasks for one (4) hour:

 Prepare/stake-out building lines


 Fabricate formworks
 Install formworks components
 Strip formworks components
4. Present your finished product/work to your trainor/assessor

5. After the performance of tasks, answer the questions about your demonstration to be asked by the
trainor/.assessor.

6. You have to answer other questions to probe the underpinning knowledge about the unit of
competency

7. After the oral questioning portion, answer carefully the written test about the unit of competency.
Please write your answer on a separate sheet of paper to be provided by the assessor.

8. After the assessment, the assessor shall provide you feedback on the assessment result. The
feedback shall indicate whether you are :
- COMPETENT
- NOT YET COMPETENT
Name:
Qualification: CARPENTRY NC II
Unit of INSTALL FORM WORKS
Competency:

QUESTIONING TOOLS
Satisfactory
Questions to probe the candidate’s underpinning knowledge
response
Extension/Reflection Questions – additional questions Yes No

1. How many centimeter in 1 meter ?  


2. Can you use spirit level instead of leveling hose in getting horizontal
invitation?  

3. How do you avoid miss alignment of form panels during installation?  


Safety Questions---to prevent accidents

4. What PPE you will use to protect your eyes?  


5. How would you avoid falling debris  
6. How would you do in the event your co-workers hit by fallen object  
Contingency Questions

9. What will you do if you found bubbles in your leveling hose  


10. What will do if the connector, lock and screws do not fits in the scaffold  
Job/ Role Environment Questions  
11. What is tool box meeting 1?  
12. What would you do if the materials you’re going to use is substandard?  
Rules and Regulations  
13. Why do we need to follow OSHS instruction?  
14. What regulation or principles covers the checking of measurement and  
sureness of the building line??

The candidate’s underpinning knowledge was:  Satisfactory  Not Satisfactory


Trainee Signature: Date:
Trainer Signature: Date:
Name:
Qualification: CARPENTRY NC II
Unit of INSTALL FRAMING WORKS
Competency:
QUESTIONING TOOLS
Satisfactory
Questions to probe the candidate’s underpinning knowledge
Responses
Extension/Reflection Questions – additional questions Yes No
1. What precaution must you take when you layout and erect a
post?
2. What are the procedures or steps in installing girts?
3. How do you avoid the sagging of a plane ceiling joist/frame?
4. How do you avoid the irregularity of the floor joist in terms of
levelness and elevation?
5. What would you do in the event the wall studs, which is
designed for single walling, was suddenly changed to double
walling?
The Trainee’s underpinning knowledge about the demonstration of tasks was:

Satisfactory Not Satisfactory


Feedback to the Trainee:

Overall Performance:
Satisfactory Not Satisfactory
Trainee Signature: Date:
Trainer Signature: Date:
Name:
Qualification: CARPENTRY NC II
Unit of Competency: INSTALL FRAMING WORKS
ANSWER KEYS TO QUESTIONING TOOLS
Questions to probe the candidate’s underpinning knowledge Satisfactory Responses
Extension/Reflection Questions – additional questions Yes No
1. What precaution must you take when you layout and
erect a post?
Check properly the layout position and secure braces
rigidly after testing the alignment and plumbness
2. What are the procedures or steps in installing girts?
Install the column /post first and then followed by the
girt as per plans and specifications
3. How do you avoid the sagging of a plane ceiling
joist/frame?
Always have an accurate reference lines longitudinal
and latitudinal and in other strategic places
4. How do you avoid the irregularity of the floor joist in
terms of levelness and elevation?
Always have an accurate reference lines longitudinal
and in other strategic places
5. What would you do in the event the wall studs, which is
designed for single walling, was suddenly changed to
double walling?
Check studs that are not in conformity with the
dimensions /width and do remedial actions
The Trainee’s underpinning knowledge about the demonstration of tasks was:

Satisfactory Not Satisfactory


Feedback to the Trainee:

Overall Performance:
Satisfactory Not Satisfactory
Trainee Signature: Date:
Trainer Signature: Date:
Templates for Inventory of Training Resources

Resources for presenting instruction


 Print Resources As per TR As per Remarks
Inventory
CBLM 25
Title of books
Journals
Magazines
Manuals
 Non Print Resources As per TR As per Remarks
Inventory
Slides

Films
Video tapes
Projector 1 unit 1 unit
LCD/Monitor
Audio video I unit
Whiteboard 1 unit 2 units
Resources for Skills practice of Competency
 Supplies and Materials As per TR As per Remarks
Inventory
Glazed wall tiles (20 cm x 20 cm) 25 boxes 30 boxes
Vitrified floor tiles (20 cm x 20 cm) 25 boxes 30 boxes
Mosaic tiles (12” x 12”) 150 pcs. 200 pcs
Tile adhesive 30 kilos 40 kilos
Tile plastic spacer 1 bag 1 bag
Carburandum 5 pcs. 5 pcs
Pencil 25 pcs 30 pcs
Tile grout 5 kilos 25 kilos
Foam 25 pcs. 30 kilos
Tile trim 10 pcs. 10 pcs
Nylon string 5 rolls 5 rolls
Cotton rags 1 kilo 1 kilo
Water pail 5 pcs. 5 pcs
 Tools As per TR As per Remarks
Inventory
Notched trowel 5 pcs. 20 pcs
Tile cutter 5 pcs. 10 pcs
Metal tape 25 pcs. 30 pcs
Nipper 5 pcs. 1o pcs
Plumb bob 5 pcs. 10 pcs
Spirit level 5 pcs. 10 pcs
Tri-square 5 pcs. 10 pcs
Plier 5 pcs. 10 pcs
Rubber squeegee 5 pcs. 10 pcs
Rubber mallet 5 pcs. 10 pcs
 Equipment As per TR As per Remarks
Inventory
Angle grinder 5 pcs.
PPE 25 sets
Note: In the remarks section, remarks may include for repair, for replenishment, for reproduction, for
maintenance etc.
Name:
Qualification: CARPENTRY NC II
Unit of INSTALL FORMWORKS
Competency:

ANSWER KEY TO QUESTIONING TOOLS


Satisfactory
Questions to probe the candidate’s underpinning knowledge
response
Extension/Reflection Questions – additional questions Yes No

1. How many centimeter in 1 meter?


100cm  

2. Can you use spirit level instead of leveling hose in getting horizontal
elevation?  
Yes, it can be used on getting horizontal elevation
3. How do you avoid miss alignment of form panels during installation?
Always check the plan during lay-out stretch the nylon tightly and check the  
accuracy of your instrument or secure bases properly
Safety Questions---to prevent accidents

4. What PPE you will use to protect your eyes?  


Eye Google/safety Google
5. How would you avoid falling debris  
Secure the installation of the construction net and always use hard hat to
protect your head
6. How would you do in the event your co-workers hit by fallen object  
Ask the help of the immediate superior
Contingency Questions

10. What will you do if you found bubbles in your leveling hose  
Place the water immediately and clean the hose
10. What will do if the connector, lock and screws do not fits in the scaffold,  
Report to the immediate superior and don’t use the scaffold
Job/ Role Environment Questions  
11. What is tool box meeting?  
It is the meeting where in safety orientation where done to force the
project progress
12. What would you do if the materials you’re going to use is substandard?  
Report to the immediate superior and do not use the materials
Rules and Regulations  
13. Why do we need to follow OSHS instruction?  
This is for our own good and to prevent accident
14. What regulation or principles covers the checking of measurement and  
sureness of the building line??
Accomplish report and father instruction from the supervisor or foreman

The candidate’s underpinning knowledge was:  Satisfactory  Not Satisfactory


Trainee Signature: Date:
Trainer Signature: Date:
Performance Test

Specific Instruction for the Candidate

Qualification CARPENTRY NC II

Unit of Competency INSTALL FRAMING WORKS

General Instruction:

Given the necessary tools, materials and equipment, you are required to lay and prepare wall tiles in
accordance with accepted institutional/industry standard for 1 hour

Specific Instruction:

 The assessment shall be based on the unit of competency in the Training Regulation and the
evidence plan and shall focus on the following evidence gathering methods:
 Demonstration
 Oral Questioning
 Written Test

2. You shall be given 10 minutes to prepare the needed materials, tools and equipment for the
performance of tasks.

3. You shall be required to perform the following tasks for one (4) hour:
 Prepare materials for framing works
 Lay-out/erect and assemble post girts and supports
 Lay-out/install floor joist
 Lay out/install wall studs
 Lay out/fabricate/install roof frames
 Lay out/install ceiling joist frames

4. After the performance of tasks, answer the questions about your demonstration to be asked
by the trainer/.assessor.

5. You have to answer other questions to probe the underpinning knowledge about the unit of
competency

6. After the oral questioning portion, answer carefully the written test about the unit of
competency. Please write your answer on a separate sheet of paper to be provided by the assessor.

7. After the assessment, the assessor shall provide you feedback on the assessment result. The
8. feedback shall indicate whether you are :
 COMPETENT
 NOT YET COMPETENT

You might also like