SPECIEFIC TASK METHOD STATEMENT

Contractor’s Company Golden well Project/ contract BOC TRAIN BK9-


Date of the work scheduled: August 18, 2023 name number 0755

Facility/Area/Location EWTU-2 Extended Area for BOC Separator Train


SAP Work Order №: 4400000115
General Work Title: Drain Tank Installation

Equipment Info/№: Equipment Info, Mobile Crane, tightening hand Tools.


 If Applicable: ✔

Type of Permit: CWP. SPWP. HWP.


Type of Certificate: CSEC. EXC. RC. Scaffolding Cert. N/A

Type of Isolation: EIC. MIC. N/A.


 PO & PA confirm that the task will be carried out as per the defined steps in this MS
Permit Originator Mohammed Khamees
/ Performing Authority Name Signature
 IA accepts and endorses steps of work defined in this MS
Issuing Authority Signature
Name

 Breck down the job steps:


№ Main steps of the work process Equipment / Tools Required
1 Inform area authority and other authorities before starting the task.
2 Obtain valid PTW
3 Carry out TBT before starting the activities and explain all the hazards of working for the staff who carries out the
task.
4 Check that all person that will carry out this work understand all the hazard of this work and wearing proper PPE.

5 Visual inspection of work area, equipment, tools and make sure that all in good condition and inspected.
6 Installation of barriers around the work area & warning signs & fire extinguisher in work site.
7 Inspection of the condition and certificate of Equipment and lifting equipment accessories and engage only the
competent personnel to do the task.
8 Site ground level Inspection.
9 Confirming the weather condition Anemometer
10 Attaching the lifting gears or accessories to the designated lifting points or lugs Hand tools
11 Attaching the rigger robs to the drain tank in order to have load orientation and stability and avoid load swinging Hand tools
while lifting.
12 Lifting the drain tank for almost half meter to ensure the stability of load over Mobile Crane
13 Load stability must be maintained as rotating to its location. Operator & Banksman
14 Settlement of the drain tank to the final destination Operator & Banksman
15 Dimentling the lifting accessories from the drain tank by riggers upon load location & orientation confirmation Hand tools
16 Tightening the bolts or nuts to the tank basement Hand Tools
17 In case of any emergency or call, evacuation plan shall be followed up to the assembly point
18 Maintained proper housekeeping around working area.
19 Close the PTW after finished the job.