Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Transition to SAP S/4HANA – Version 16Q4

DISCOVER PREPARE QG1 EXPLORE QG2 REALIZE QG3 DEPLOY QG4 RUN QG5

Init Planning Execution / Monitoring / Controlling Closing


Project Mgmt.
Team Enablement Organizational Change Management (OCM)

Application:
Enablement Charter Enablement Analysis Enablement Realization
Solution Adopt.

Activate Solution Fit Gap / Delta Design *) Configuration *)

Handover to Support Organization


Application Value and Scoping
Gap Design
Product Enhancements
Validation Review
Application:
Design &
Data Volume Planning Data Volume Design Cleanup / Archive Data Aging Config.
Configuration
Security Design Security Implementation

Integration Validation
Prototype

Production Cutover
Analytics Analytics Design Analytics Configuration
Transition Preparation

Custom Code
Transition Planning
Strategic Planning

CC. Cleanup & Improve CC. Impact Analysis CC. Management Execution
Extensions

Hyper Care
Application: Test Planning Test Preparation Test Execution
Testing
Trial System

Project Delivery
Provisioning

Sandbox System Setup DEV Setup QAS Setup


Platform Setup Dress
System & Data Cutover Preparation
Data Migration & Rehearsal
Migration Data Migration Design
Verification

Sizing Sizing & Scalability Verification


Technical
Architecture & Technical Architecture Definition Technical IT Infrastructure
IT Infrastructure Setup & Test
Design Service Finalization
Infrastructure IT Infrastructure Definition

Transition to
Operations Impact Evaluation Operations Implementation Operations Readiness
Operations
© 2015 SAPgates
Quality SE or an SAP affiliate type:
Task/activity company. All rights reserved.
functional technical and functional technical Project Management Internal
*) Summary node – relates to multiple activities 1

You might also like