ERECTION

Total
SL. Type of Tower Extns Excavation in M-20 M-10 Tower Erection
No. Cum

1 E0 6 73.775 14.250 1.750 12.802


2 E60 10 47.950 8.955 0.990 5.697
Total quantity/KM 121.725 23.205 2.740 18.499
Rate/Qty ₹ 350.00 ₹ 12,000.00 ₹ 7,500.00 ₹ 10,000.00
Total Amount/Qty ₹ 42,603.75 ₹ 278,460.00 ₹ 20,550.00 ₹ 184,990.00

185.64 12.056
197.696
51598.656
N

Single Suspension Double


Stringing Re-inforcement Tower Weight N&B H/W Suspension H/W
(set) (set)

2.500 0.917 12.550 0.753 7.500


0.500 0.528 5.683 0.236
3.000 1.445 18.233 0.989 7.500 0.000
₹ 113,300.00 ₹ 90,000.00 ₹ 133,300.00 ₹ 160,000.00 ₹ 1,825.00
₹ 339,900.00 ₹ 130,050.00 ₹ 2,430,458.90 ₹ 158,240.00 ₹ 13,687.50 ₹ -
SUPPLY

Double Tension Phase Plate


Single Tension H/W H/W 70KN 90KN VD (set of 3)
(set) (set) (Nos,) (Nos,) (Nos,)

7.500 2.500
3.000 3.000 3.000 0.500
3.000 0.000 7.500 3.000 3.000 3.000
₹ 2,350.00 ₹ 4,000.00 ₹ 4,500.00 ₹ 500.00 ₹ 375.00
₹ 7,050.00 ₹ - ₹ 30,000.00 ₹ 13,500.00 ₹ 1,500.00 ₹ 1,125.00
ACSR Panther
Danger Board Earthing Set ACD Number Conductor
(Nos,) (set of 4) (Nos.) plate (KM)

2.500 2.500 2.500 2.500 2.500


0.500 0.500 0.500 0.500 0.500
3.000 3.000 3.000 3.000 3.000
₹ 190.00 ₹ 9,360.00 ₹ 8,300.00 ₹ 140.00 ₹ 300,000.00
₹ 570.00 ₹ 28,080.00 ₹ 24,900.00 ₹ 420.00 ₹ 900,000.00 ₹ 4,606,085.15