Karachi Port - Demolition Replacement and Construction Works
Bill Of Quantities and Prices
S. NO. ITEM DESCRIPTION UNIT QTY RATE AMOUNT (PKR)
1 Mobilization / Demobilization of equipment,
Office, workshops etc. L.S. 1 5,000,000 5,000,000
Removel of paver blocks, Demolition of lean
concrete and excavation up to +2.75 m kptd and 2 relocation of existing underground utilities Storm Water Drain, Elecrical conduit, Telephone conduit, Fire Fighting etc. Sq.M. 1200 13,035 15,641,400 RCC bored cast Piles 1.5m dia with length 30.0 m including grade 60 steel reinforcement, casing 3 driving, boring, reinforcement fixing and 40 MPA concrete pouring, Pile head cutting complete. Permanent steel liner 11.00 and TH=12mm may be used. No. 96 12,147,330 1,166,143,680
In situ RCC crane rail beam including grade 60 steel
4 reinforcement 40 MPA concrete and forming crane rail slot, galvanized steel angle, installation of embedded parts etc. LM 200 583,021 116,604,200
Reconstruction of pavement including sub-base,
5 backfilling and compaction of special granular fill, lean concrete and fixing of concrete envicrete paver blocks. Sq.M. 640 62,371 39,917,120
Construction of Test Pile (RCC) of 1.5m dia, 30.0 m
6 length including permanent steel liner, steel driving, boring, grade 60 steel fixing and 40 MPA concrete pouring, Pile head cutting complete. Permanent steel liner 11.00 and TH=12mm may be used. No. 1 12,147,330 12,147,330 Conduct Static Pile Load Test upto 1500t using 7 kentledge loaded with Concrete Blocks. No. 1 11,000,000 11,000,000 SUM: 1,366,453,730 Add 13% S.S.T: 177,638,985 TOTAL AMOUNT: 1,544,092,715