Ref. No. AHEC/2017-20/258/0668 17 December 2020
To MIS. INTERMASS ENGG. & CONT. CO. LLC
P.O. BOX: 341, SHARJAH ~ UAE
TEL: 04-2861595; TEL: 06-5583003
ATTN : MR. MHANNA KHAMIS (enovecr onecrom
PROJECT =: PROPOSED 38+G+16+R HOTEL TOWER ON PLOT
NO. JVC13RMRHO006, JUMEIRAH VILLAGE CIRCLE,
DUBAI, U.A.E. FOR M/S, SIGMA LIMITED.
SUBJECT: TAKING OVER CERTIFICATE
In reference to the aforementioned subject and project we are pleased to issue the Taking Over Certificate
dated 5 December 2020 relevant to the agreement made between your company and our Esteemed Client
for the construction and completion of the “3B+G+16+R Hotel Tower" on Plot No. JVC13RMRHOO6 at
Jumeirah Village Circle, Dubai, United Arab Emirates.
‘We hereby certify that your company has fulfilled your obligations in completing the prescribed construction
works and that all other activities and handing-over procedures, except those specified in the Taking Over
Certificate, have been executed in accordance with the conditions of contract to the satisfaction of the
Consultant and Client.
This if for your information and record,
Best regards,
AMIR REZA GOLESTANEH | /SEREE IEE. cass orco ions
BEng, MSc, PMP, Ph.D {
(Managing Director / Partner)
Pde VEANY ca ll Syke LPN OVO 2 nS c oLPITANde > Gola
‘Dubal : Tel: 04-3328010, Fax: 04-3291525, PO. Box: 74821, Dubal- Untied Arab Emirates
Aman: Te: 06-7424498, Fax: 06-7424498, PO.Box: 18880, Alman - United Arab Emiratos
‘Website : www.cihawrac-engg.com , Email: injo@alhawrac-engg.com , allhawiaa2002@yahoo.comAL HAWRAA ENGINEERING CONSULTANTS
ARCHITECURE, ENGINEERING, INTERIOR DESIGN & PROJECT MANAGEMENT
(fice 260%, Latta Towar, Sha ayuda TL 4-228010, Fx 4291825, 0x: 74821 Dube
Ref AHEC/2017-20/258/MC-TOC Date: 05 December 2020
ne “AVALON TOWER” 35+G+16+ROOF HOTEL TOWER ON PLOT NO.
JVCI3RMRHOOG AT JUMEIRAH VILLAGE CIRCLE, DUBAI, UAC.
Developer / Owner: SIGMA UMITED
Consultant: 'AL HAWRAA ENGINEERING CONSULTANTS
Main Contractor: INTERMASS ENGINEERING & CONTRACTING CO. LLC.
Contractual Starting Date: o1/os/2018
Contractual Completion Date: 31/01/2020
Revised Completion Date: 15/11/2020
‘Actual Completion Date: (05/12/2020
‘Trakhees Completion Certificate Date: 05/11/2020
Date of Taking Over Certificate: 05/12/2020
‘Start Date of Defects Liability Period: (05/12/2020
Expiry Date of Defects Liability Period: oa/nz/2021
Certification of the Engineer:
‘The Taking Over Certificate is issued in relation to the agreement made on 03" November 2017 entered into between the
Employer and the Contractor for the Construction, Completion and Maintenance of the Main Contract Works for the above
mentioned project, namely, “AVALON TOWER” 35+G+16+ROOF HOTEL TOWER on Plot No. JVCL3RMRHO06 at Jumeirah
Village Circle, Dubal. UAE.
In accordance with Clause 48.1 Part 1 of the FIDIC Conditions of Contract for Works of Civil Engineering Construction (Fourth
Edition 1987) reprinted in 1992 with further amendments applicable for the above project, we hereby certify that on
(05/12/2020, the Contractor has completed his obligations to execute and complete the works therein.
Please note the following general points and further note that the pending activities as indicated below shall be fulfilled by
the Main Contractor in accordance with the conditions of contract within 60 days4roin the date of this TOC.
‘All works have been completed in accordance with the Contract Agreement, Specifications and Drawings.
All snag items have been completed to the satisfaction of the Owner and Consultant, except for those indicated below.
{All MEP works have been tested and commissioned satisfactorily, except for those indicated below.
All relevant as-built drawings and associated catalogues as well as guarantees and maintenance certificates must be
‘Submitted by the Contractor as per operator and authority requirements
Particular Conditions:
‘Any waterproofing defects or seepage issues at Basement Level including floors and walls to be rectified by the
Contractor within 14 days of notice by the Employer/Consultant.
‘The Contractor shall cooperate with the Employer forall pending snag items, within the Contractors SHope"of Contract
Works, as notified by the Employer within the Defects Liability Period (DLP).
Final coat of paint to be applied at guest rooms subject to mutual agreement between the Employer and the Contractor
within the OLP.
Deep Cleaning to be conducted subject to mutual agreement between the
UESGWa PROVE MANAGEMENT
[AL HAWRAA ENGINEERING CONSULTANTS eargjenes
Lanta TOWER » OFFICE 204
[AMIR REZA GOLESTANEH SHAH ATED ROAD. DUBNA