Download as pdf
Download as pdf
You are on page 1of 2
wale, egos * oe te Cor Ref. No. AHEC/2017-20/258/0668 17 December 2020 To MIS. INTERMASS ENGG. & CONT. CO. LLC P.O. BOX: 341, SHARJAH ~ UAE TEL: 04-2861595; TEL: 06-5583003 ATTN : MR. MHANNA KHAMIS (enovecr onecrom PROJECT =: PROPOSED 38+G+16+R HOTEL TOWER ON PLOT NO. JVC13RMRHO006, JUMEIRAH VILLAGE CIRCLE, DUBAI, U.A.E. FOR M/S, SIGMA LIMITED. SUBJECT: TAKING OVER CERTIFICATE In reference to the aforementioned subject and project we are pleased to issue the Taking Over Certificate dated 5 December 2020 relevant to the agreement made between your company and our Esteemed Client for the construction and completion of the “3B+G+16+R Hotel Tower" on Plot No. JVC13RMRHOO6 at Jumeirah Village Circle, Dubai, United Arab Emirates. ‘We hereby certify that your company has fulfilled your obligations in completing the prescribed construction works and that all other activities and handing-over procedures, except those specified in the Taking Over Certificate, have been executed in accordance with the conditions of contract to the satisfaction of the Consultant and Client. This if for your information and record, Best regards, AMIR REZA GOLESTANEH | /SEREE IEE. cass orco ions BEng, MSc, PMP, Ph.D { (Managing Director / Partner) Pde VEANY ca ll Syke LPN OVO 2 nS c oLPITANde > Gola ‘Dubal : Tel: 04-3328010, Fax: 04-3291525, PO. Box: 74821, Dubal- Untied Arab Emirates Aman: Te: 06-7424498, Fax: 06-7424498, PO.Box: 18880, Alman - United Arab Emiratos ‘Website : www.cihawrac-engg.com , Email: injo@alhawrac-engg.com , allhawiaa2002@yahoo.com AL HAWRAA ENGINEERING CONSULTANTS ARCHITECURE, ENGINEERING, INTERIOR DESIGN & PROJECT MANAGEMENT (fice 260%, Latta Towar, Sha ayuda TL 4-228010, Fx 4291825, 0x: 74821 Dube Ref AHEC/2017-20/258/MC-TOC Date: 05 December 2020 ne “AVALON TOWER” 35+G+16+ROOF HOTEL TOWER ON PLOT NO. JVCI3RMRHOOG AT JUMEIRAH VILLAGE CIRCLE, DUBAI, UAC. Developer / Owner: SIGMA UMITED Consultant: 'AL HAWRAA ENGINEERING CONSULTANTS Main Contractor: INTERMASS ENGINEERING & CONTRACTING CO. LLC. Contractual Starting Date: o1/os/2018 Contractual Completion Date: 31/01/2020 Revised Completion Date: 15/11/2020 ‘Actual Completion Date: (05/12/2020 ‘Trakhees Completion Certificate Date: 05/11/2020 Date of Taking Over Certificate: 05/12/2020 ‘Start Date of Defects Liability Period: (05/12/2020 Expiry Date of Defects Liability Period: oa/nz/2021 Certification of the Engineer: ‘The Taking Over Certificate is issued in relation to the agreement made on 03" November 2017 entered into between the Employer and the Contractor for the Construction, Completion and Maintenance of the Main Contract Works for the above mentioned project, namely, “AVALON TOWER” 35+G+16+ROOF HOTEL TOWER on Plot No. JVCL3RMRHO06 at Jumeirah Village Circle, Dubal. UAE. In accordance with Clause 48.1 Part 1 of the FIDIC Conditions of Contract for Works of Civil Engineering Construction (Fourth Edition 1987) reprinted in 1992 with further amendments applicable for the above project, we hereby certify that on (05/12/2020, the Contractor has completed his obligations to execute and complete the works therein. Please note the following general points and further note that the pending activities as indicated below shall be fulfilled by the Main Contractor in accordance with the conditions of contract within 60 days4roin the date of this TOC. ‘All works have been completed in accordance with the Contract Agreement, Specifications and Drawings. All snag items have been completed to the satisfaction of the Owner and Consultant, except for those indicated below. {All MEP works have been tested and commissioned satisfactorily, except for those indicated below. All relevant as-built drawings and associated catalogues as well as guarantees and maintenance certificates must be ‘Submitted by the Contractor as per operator and authority requirements Particular Conditions: ‘Any waterproofing defects or seepage issues at Basement Level including floors and walls to be rectified by the Contractor within 14 days of notice by the Employer/Consultant. ‘The Contractor shall cooperate with the Employer forall pending snag items, within the Contractors SHope"of Contract Works, as notified by the Employer within the Defects Liability Period (DLP). Final coat of paint to be applied at guest rooms subject to mutual agreement between the Employer and the Contractor within the OLP. Deep Cleaning to be conducted subject to mutual agreement between the UESGWa PROVE MANAGEMENT [AL HAWRAA ENGINEERING CONSULTANTS eargjenes Lanta TOWER » OFFICE 204 [AMIR REZA GOLESTANEH SHAH ATED ROAD. DUBNA BEng, MSc, PMP, Ph.D & sexeonmenievran oats (Managing Director / Partner) Pooox reat - una us Suatsnrogsnmanenes com Website: www. alhawraa-engg.com, Em wal oan

You might also like