The Essential Building Product Review 2016 3

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 35

review

August 2016 - Issue 3


www.ebpr.co.uk

The Essential Building Product

Modelling Abet’s Laminates ArmourFX Panels Create Glass And Glazing Systems Metal Technology Specified In
Page 21 Social Media Backdrop for Transform Media Centre Award-Winning Regeneration
Linq Spa, Las Vegas Page 34 Project
Page 24 Page 63
Contents
6 ProjectView
Project of the month - Aluprof On
Prestigious North West Project

11 InsideView
A closer look at two key building product
groups and industry news

32 The Product Review


News, developments, product and project
information for the building designer

68 RearView

Front cover:
Aluprof On Prestigious North West Project
Full story on pages 6-9 Visit www.aluprof.eu

Page 2/3 photo:


Metal Technology Specified In Award-Winning
Regeneration Project
Full story on page 63 Visit www.metaltechnology.com

Reader Enquiry E-Service


If you would like to receive further information about any of
the products and services featured in this issue, just email
us at info@link2media.co.uk, type ‘EBPR16/3’ in the email
title, include the enquiry numbers of interest and your
contact details. If you’d prefer to fax the information, it’s
0845 862 8639, or you can even post it to us!)

Some of the colour photography used in The Essential Building


Product Review is provided and paid for by contributors. The
publishers do not accept liability for errors that may appear in
the publication. The views expressed are not necessarily the
views of the publisher. Published in association, always, with
Jasper, Muz and little Ken. Food parcels gratefully accepted.
No part of this publication may be reproduced or transmitted
in any form or by any means, electronic or mechanical, without
the consent of the publisher.

Published by: Link2Media Limited

Editorial Office: Kingfisher’s Retreat, Dunston Business Village,


Stafford Road, Dunston, Stafford ST18 9AB

Tel: 01785 711591 Fax: 0845 862 8639

info@link2media.co.uk www.link2media.co.uk

@Link2Media www.link2media.co.uk/facebook
www.pinterest.com/link2media
www.issuu.com/link2media
THE SHOP LOS ANGELES

THE SHOP: CURVE x TOM DIXON LOS ANGELES


Located in Platform, Culver City's new 7,000 sq ft
indoor-outdoor urban oasis - also designed and
illuminated by Tom Dixon - Tom Dixon's first physical
LA location fuses fashion, food and furnishing
retail. Tom Dixon has fostered a collaboration with
multi-city fashion boutique CURVE - founded by
Nevena Borissova - alongside enlightened real estate
developer, The Runyon Group, to provide a more
engaging and active way of showcasing goods.
THE SHOP NEW YORK
For more details check out
www.tomdixon.net/shop-la-curve

Tom
Following the success of the inaugural Tom Dixon THE SHOP NEW YORK
showroom in New York City this past year, Tom Dixon Tom Dixon occupies a four-storey building on Howard St. in SoHo, an area currently
has decided to upscale commitment to the United
Dixon's
in the midst of a Renaissance and revitalisation that has become an epicentre for
States via bi-coastal expansion! Tom Dixon will be likeminded food, hospitality, fashion and interiors ventures. The space allows the
opening 2 new locations; his first retail presence in Los showcasing of Tom Dixon's latest wares and innovations in addition to offering

American Angeles, CA and a larger-scale showroom on Howard


Street in NYC's SoHo neighbourhood.
spaces for the passing consumer, professional contract and wholesale business and
a basement space for interior designers that will be chock full of material samples,

Adventure In a landscape dominated by professional showrooms


prototypes and decorative items on a consistently rotating schedule.

and multi-brand retailing chains, Tom Dixon has made The space is a living representation of the Tom Dixon mission, to manufacture
the choice to evade the status quo and offer to the US products that are tough enough for the professional market and attractive enough
intriguing retail concepts that will bring to life the Tom for the home. The raw and unfinished interiors of this temporary showroom provide
Dixon experience and offer consumers a new way to a fittingly theatrical backdrop as Tom Dixon highlights futuristic lamps, heavyweight
interact with the brand. The Los Angeles and New York furniture and extraordinary accessories. The New York store is located at 19 Howard
stores are now open. St, New York, NY 10013, USA www.tomdixon.net

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


6 I 7

Aluprof On One New Bailey is a new office development in Salford on the north bank of
the River Irwell, situated next to Spinningfields and close the Lowry Hotel. The

Prestigious
development is part of New Bailey, a new business and leisure hub within the
growing area of Salford Central and offers 125,000 sq ft of prime commercial
space adjacent to Manchester's central business district.
North West Aluprof’s “cap-less” curtain wall system, the advanced MB-SR50N EFEKT was

Project used on all elevations of the new build and the fabrication and installation of
the curtain wall was undertaken by CSi, Commercial Systems International,
of Humberside. Stuart Green, Managing Director of CSi comments on the
installation: “We are proud to be a part of such a prestigious project in the
heart of Salford’s new central business district. Our installation team completed
a top notch installation and we are looking forward to working with contractor
Bowmer & Kirkland on future projects”.
>>>>>

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


8 I 9

One New Bailey, was developed by English Cities Fund (ECf),


working closely with Salford Council and is funded and is owned
by Legal & General. The building was designed by Aedas RHWL
architects, who also are responsible for the masterplan of the
area. With large, regular and efficient floorplates, averaging
over 17,000 sq ft (net), designed specifically for flexibility and
to facilitate split tenancies, the One New Bailey development
has achieved a Grade A, BREEAM 'Excellent' rating. Leading
international law firm Freshfields Bruckhaus Deringer has
announced that it will be leasing 80,000 sq ft within the
building as the long term base for its Global Centre.

The highly anticipated Menagerie restaurant will occupy one of


the ground floor units, making this a truly mixed use scheme.
ECf is a joint venture between Muse Developments, Legal &
General and the Homes and Communities Agency.

Aluprof systems are increasingly being specified on a wide


range of residential and commercial projects across the UK.
Systems are designed, fabricated and installed by selected,
specially trained companies, to ensure each fabricated product
meets the Aluprof exacting standards. Further information
is available on the company website at www.aluprof.eu and
specialist advice is available directly from Aluprof’s UK offices
on 0161 941 4005.

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


10 E 11

2 Flat Roof Manufacturer Bauder Launches Solar PV Design 5 VinylPlus: Championing PVC In European Sports Stadiums
Guide
The impressive Allianz Riviera Stadium in Nice, France features on the
Solar photovoltaic (PV) is currently the most popular renewable energy front cover of a new brochure from VinylPlus celebrating the prominent
in the UK and its deployment is rising rapidly across the globe. Despite role played by PVC in the construction
recent UK Government policy changes, the number of large, flat roof of modern sports venues. Published
installations should still rise as local authorities and businesses look to by VinylPlus, the European PVC
reduce their carbon footprint and gain energy security for the future. sustainability programme, ‘Vinyl in
All too often within European Stadiums’ charts the path
the construction to sustainable development for PVC
industry, photovoltaic and how the use of vinyl combines
specifications focus environmental responsibility and
on energy efficiencies architectural greatness in sports
and outputs of the complexes. More information on the brochure can be found at
solar panels, omitting www.vinylplus.eu/uploads/Modules/Documents/vinyl-in-european-
to give the same stadiums-180416.pdf
focus to ensuring
the rooftop array is
installed with methods 6 Protect Your Wood In The Sun 8
that have as little
Future
Osmo UK, the eco-friendly wood and finishes expert has developed a Formed in 2007, Spire Healthcare has grown to become The third phase has recently been completed and this
impact on the building finish to protect, maintain and restore exterior wood. Protection of the second largest provider of private healthcare in the focused on Spire Healthcare’s National Distribution
and its waterproofing exterior wood is of the utmost importance as UK. Now with a network of 38 private hospitals, 12 Centre. Based in Droitwich, this 100,000ft² facility
as possible and that the array works to its maximum potential for
its entire lifespan rather than just becoming a ‘tick box’ exercise to
it can fade if untreated due to the extreme
weather conditions. Osmo UV-Protection-Oil
Energy clinics and two specialist centres for the treatment of
cancer, the organisation undertakes a wide variety of
provides a platform to procure and supply goods and
services to the company on a daily basis through its
achieve sustainability credits.
To help combat this issue flat roof manufacturer Bauder has launched a
delays the greying process by shielding the
wood against harmful UV rays, and algae and Solutions activities and offers a full range of integrated surgical,
medical and diagnostic services. Corporate social
internal logistics network. Commenting on the reasons
for the change, Marcus Brodin says, ‘The importance

Prescribes
new design guide aimed at designers considering the inclusion of a PV fungal decay. responsibility (CSR) and sustainable operating practices of good quality lighting is often overlooked within
array on new build flat roof construction projects, which outlines the The oil allows the surface to remain healthy are very important to the company, with energy warehousing and distribution based operations. This
key elements to be mindful of sustainable design, protects the building and elastic, preventing it from drying and
LED
conservation guidelines available on Spire’s intranet for should not be the cas, as numerous studies have found
and meets lifespan expectations. Download the design guide at becoming brittle, and will not crack, flake, peel all its hospitals to minimise the amount of electricity and that light has a profound effect on our physical and
www.bauder.co.uk/technical-centre/design-guides/pv-flat-roof-design- or blister. Ideal for exterior decking, it provides gas consumed. emotional health and wellbeing. Poor lighting can cause
considerations a satin-matt, clear finish that protects the wood surface and can enhance
it’s natural look. www.osmouk.com
Lighting Nigel Sharp, National Engineering and Estates Manager at
eyestrain, migraines and headaches, in addition to
lethargy, irritability and poor concentration.’

3 Ten Years With Halo And A New Website For Patios South 7 Sika® Multi Stick - The Multi-Talented Grab Adhesive You
For Spire Spire Healthcare states, ‘As part of our ongoing process
of improvement, we recognised the need to reduce our There are no statutory workplace lighting levels in the
West
Patios South West Ltd, a specialist trade
Need In Your Tool Box
Healthcare’s lighting related energy spend and also maintain good
levels of illumination in our external car parking areas for
UK and Regulation 8 of the Workplace (Health, Safety
and Welfare) Regulations simply requires that lighting

National
Sika® Multi-Stick is a new generation in hybrid polymer the benefit of staff, patients and visitors. LED technology at work is ‘suitable and sufficient’. However, the Health
fabricator of patio door systems, is grab adhesive from Everbuild – A Sika Company, also provides us with Health and Safety benefits with & Safety Executive’s (HSE) Lighting at Work booklet
celebrating ten years of working with Halo, designed especially for the trade with the ability to the reduction of maintenance activities at height due to (HSG 38) sets out minimum recommended safe lighting
an industry-leading PVC-U profile brand
of national market leaders, The VEKA UK
bond virtually anything to everything.
Distribution the longevity of the product. So, in 2014 we began an
extensive programme of upgrading 1,400 luminaires to
levels and the Chartered Institution of Building Services
Engineers’ (CIBSE) offers guidelines regarding light levels

Centre
Group. The family-run company was started Solvent free and based on new SPUR technology, Sika® light emitting diode (LED) technology.’ required in correlation to workplace activities, stating that
in 2003 and now produces, on average, 120 Multi Stick boasts incredible initial grab, high bonding warehouses should have 150-200 Lux at floor level and
patio door systems per week, from a 4,500 strength and excellent slip resistance and is capable FES won the original tender and since then has 300 Lux in task areas.
sq. ft. factory in Paignton. It will relocate into an 8,000 sq. ft. factory of bonding almost all materials, both porous and non- completed two phases of the project. In order to
to meet growing demand. Patios South West is now looking to bolster porous including glass, marble, brick, concrete, metals maximise return on investment on the designated capital As with the previous phases of the project, FES
its reputation for impeccable customer service with a new website, and hard plastics. Suitable for both interior and exterior expenditure budget, the first comprised 21 of the largest undertook a comprehensive a feasibility study to scope
complete with an online quote facility. www.patiossouthwest.co.uk applications, Sika® Multi Stick is completely waterproof energy consuming sites, which achieved in excess of 73 the objectives and to determine the optimal LED lighting
and weatherproof and can even be applied to wet per cent energy savings from a simple point-for-point solution for the offices, mezzanine and warehouse areas.
surfaces, underwater or in the rain. replacement, while providing 25 per cent better light It decided to replace 339 116W batten and 400W high
4 Stertil Girls Complete Colour Rush To Combat Domestic output. bay luminaires with 59W LED battens and 178W high bay
Abuse Available in 350ml plastic cartridges and packaged into luminaires. These state-of-the-art products provide high
eye catching printed boxes, this product is sure to fly The second phase concentrated on 12 further sites and efficacy of >110lm/W, low luminous decline, excellent
An intrepid trio of girls from loading
off the shelves and into toolboxes everywhere. Marcus Brodin, Commercial Director at FES, comments, colour rendering and unrivalled uniformity.
bay equipment specialist Stertil
‘We calculated that Spire Healthcare will save in excess of
Dock Products recently completed a
For further information on Sika® Multi Stick or any £700,000 over a 10-year period thanks to lower energy By incorporating zone based lighting sensors and daylight
5K Colour Rush to raise money for
other product from the Everbuild and Sika brands, costs, reduced maintenance, environmental tax savings harvesting, this installation will achieve energy savings
SafeLives – a UK-based charity that
contact your sales representative, call the sales office related to its inclusion in the CRC Energy Efficiency of over 75 per cent, with a 732kW saving per day, while
aims to help victims of domestic abuse.
on 0113 240 2424 or visit www.everbuild.co.uk. Scheme, and additional resource savings. The effect on providing improved light levels. Also, since the rated life
If the 5K Colour Rush, which took place
the environment will also be significant as carbon dioxide of the new devices are well in excess of the previous
at Abington Park in Northampton,
(CO2) emissions will be reduced by 11,928lbs per annum, luminaires, Spire Healthcare will make a 90 per cent
wasn’t demanding enough, the participating runners were also pelted
mono-nitrogen oxide (NOx) will be lowered by 28lbs and saving on its ongoing maintenance spend. With a 10-year
with multi-coloured powdered paint by enthusiastic ‘supporters’ around
sulphur dioxide (SO2) by 68lbs over the same period – gross energy saving of £338,000, the environment will
the course. The girls would be delighted to receive any contributions via
this is the equivalent of four acres of forest being saved benefit, with over 1,200 tonnes of CO2 saved over the
the JustGiving website at www.justgiving.com/5kcolourrush
or two cars being removed from the road.’ duration of the business case. www.feslighting.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


12 E 13

9 V850 Gate Valves Open Up a Plethora of Opportunities 10 Intelligent Home Air Solutions From Polypipe Ventilation
Pegler Yorkshire continues its drive to further enhance its valve portfolio Polypipe Ventilation has announced its next generation of Mechanical
and support its customers’ objectives of system optimisation. The new Ventilation with Heat
V850 ductile iron gate valve has been introduced Recovery appliances - the
to the company’s commercial valve offering and Silavent HRX-aQ, which
adds a solution for potable water applications. intelligently manages air
Gate valves, primarily used to allow the flow of conditions for maximum
liquids, ensure very low friction loss and provide a homeowner comfort.
high flow path when in the fully opened position. The HRX-aQ matches
The new V850 is characterised as having a non- ventilation rates to the
rising stem which supports ease if operation in internal environment and
confined spaces. The WRAS approved V850 from occupants’ requirements
Pegler Yorkshire is ideal for isolating pipelines that transport potable for maximum comfort,
water. www.pegleryorkshire.co.uk whilst also being the quietest and most compact Silavent MVHR unit
available. www.polypipe.com/ventilation

11

City Multi Helps Out Underneath The Arches


An artisan pizza restaurant under railway arches in central Newcastle has
solved the problem of summer overheating with the installation of a heat
recovery VRF air conditioning system. The Herb Garden is one of Newcastle’s
quirkiest fine food restaurants, specialising in fresh, stone baked pizzas and
rustic Italian salads and sharers.

Siting a pizza oven inside a metal-clad railway arch had previously caused
problems with a build-up of heat in the summer and the site had limited
space for any plant, alongside restrictions on internal fittings because of
the metal cladding. Tyne and Wear-based ADS Air Con Ltd, who operate
throughout the UK, were called in to install a system whilst working around
14
the restaurant’s opening hours. “The arches are listed and owned by Network

Omnie
Rail and there were restrictions on the type of solution that we could install”, Exeter based Timóleon has provided a heating and the Omnie equipment. The LWD 70 ASX ASHP is ideal for
said David Short, Director of ADS Air Con. “That’s why the two-pipe solution ventilation solution for a self-builder to achieve his installations where there are other properties within close
ambition of creating a new home, with a very low level of proximity; generating as it does a noise level of just 45
Systems
from Mitsubishi Electric has worked so well”.
environmental impact and running costs. This results in dB at a distance of one metre. This single phase machine
A single City Multi outdoor unit has been installed in an empty space to a property with high standards of indoor air quality and is very efficient, with a typical Coefficient of Performance
the rear of the building and this can send simultaneous heating and cooling to the indoor units installed throughout the restaurant to maximise the
efficiency of the whole system. The arches are metal-clad to prevent water from the brickwork entering the building, so it was not possible to fix
Help Self- comfort. The dwelling has been constructed as a single
storey, deep plan structure within a walled garden in the
(COP) of 4.24 at design conditions A7/W35 which ensure
low running costs whilst also qualifying for the domestic
the internal air conditioning to this. The first floor VIP area in particular proved a real challenge due to the curvature of the building. A ducted fan
coil mounted on the roof of a storage room was finally selected as it offered easy installation and better air movement for the occupants. For the Builder village of Bradninch in Devon. Renewable Heat Incentive (RHI).

Achieve
ground floor restaurant, cassettes were hung from the structure for the first floor, however, it also required a unique solution that could cope with The ultra-sustainable design features not just an Omnie Representing the latest in heat pump technology from
the decorative lighting and herb racks. A ducted unit mounted on the top rack above the herbs provided a solution which didn’t affect the décor and 7kW Air Source Heat Pump (ASHP), delivering domestic renowned German specialist, Alpha InnoTec, the unit
provided comfortable air movement. www.mitsubishielectric.co.uk hot water and warmth via the manufacturer’s Omnie can achieve flow temperatures of up to 70 degrees

Low Energy Foilboard Floating UFH System, but also an Omnie


Compact 185 Heat Recovery Unit (HRU), supplying pre-
centigrade using a low Global Warming Potential
refrigerant (R290). The LWD70 ASX has a corrosion proof

Profile warmed air throughout. coating, which prolongs the life of the heat pump making
it suitable for coastal areas, all Omnie heat pumps come
Now with the rural retreat completed the Omnie with a 5 year parts warranty as standard.
12 Panasonic Moves Into The Cloud With New Aquarea 13 Vent-Axia’s Prestigious Royal Warrant is Renewed
equipment is fulfilling on all of the design intentions, as
Control System the owner of the property commented: “I wanted to build Timóleon supported its design & supply with technical
Sussex-based British fan manufacturer Vent-Axia,
Panasonic has launched a new a leader in low-carbon ventilation, is delighted a home that was as low energy as possible and to take a assistance at the specification stage, plus full installation
internet-connected control system to announce that its prestigious Royal Warrant responsible approach to the specification of its building drawings & heating schematics identifying information
for the Aquarea H Series heat pumps. has been renewed. Vent-Axia was originally services so that it would not only provide peace of mind such as ideal positions for the manifolds for the UFH
The Aquarea Smart Cloud enables granted the warrant by HM the Queen in 1985 for myself in terms of future running costs, but also make and the location for the HRU distribution using 75
users to manage and monitor their as ‘Suppliers of Unit Ventilation Equipment to a positive contribution in respect of concerns over carbon mm diameter air ducts Additional technical support is
heating and hot water with an easy the Royal Households’ and has held it ever since. reduction and our energy security.” provided with every heat pump with final commissioning
to use interface. This can be accessed The company is now celebrating having held this and the 1 year back up (Gold) support service, which
via any web-enabled device. The Aquarea Smart Cloud has a simple, high status honour for over 30 years. Providing The accommodation comprises a spacious lounge-dining includes remote access package making it easy to
intuitive user-friendly interface that enables installers and maintenance the sector’s most comprehensive choice from any area orientated to a courtyard garden with two bedrooms monitor the performance of the heat pump.
operators to control a number of functions of the Aquarea H Generation single manufacturer, Vent-Axia’s range covers not just air movement and plus a further office/third bedroom. There is also a main www.omnie.co.uk
heat pump. ventilation technologies but heat recovery, electric heating, cooling and bathroom with shower and bath, a separate cloakroom
hygiene products. www.vent-axia.com close to the kitchen and a plant room containing all of

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


14 E

15

RINNAI: A
Gas-Fired
Range Of
Space Heaters
Ideal For All Sites - Churches,
Schools, Offices And All The
More….

Rinnai’s Energysaver range of fanned


convection powered flue gas-fired space 16
heaters are designed specifically for use
in schools, community centres, libraries,
conservatories and churches and other LG Air
large spaces, where they have earned
themselves great popularity with end-
users and installers.
Conditioning
Now, with a new super energy efficient
Equipment
addition to the range in the form of
the Rinnai Energysaver 559FT with
Selected For
sleek good looks, and a matching
new streamlined look for the popular Bodyholiday,
St Lucia
Energysaver 309FT, Rinnai is leading the
field in large interior space convector
heating.

Sporting a modern, sleek casing, the


heaters simply blend into the background
in line with modern demands for
modern interior aesthetics while offering Like the Energysaver 559FT and 309FT, the 1004T heater is also suitable for You meet LG air conditioning equipment in all the nicest places! BodyHoliday of sulphur and salt which can have a rapid and detrimental effect on the
exceptionally high efficiencies in operation and reduced running costs. central timer control. This feature allows the building manager to run any - St Lucia resort offers an experience of a lifetime in the Caribbean. This metal exposed to the outside air. Being warm and humid all year round also
number of Rinnai space heaters off a central time clock providing heat to the 32 acre property, situated on its own cove on St Lucia’s northwest coast contributes to the acceleration of the deterioration of the units unless they
Changes have been made to the operation board which is now an easy to use largest of spaces. The Energysaver Multi controller is not limited to single claims it offers guests an all-inclusive have this additional protection.
touch control pad sited conveniently and discreetly on top of the appliance, Energysavers as the flexibility of the system guarantees units can be mixed and resort experience that provides an
(rather than on the front with a flip up cover). The unit is also supplied with a matched to satisfy even the most unique of buildings. experience of health, wellbeing, John Haffenden, from installation specialists Freshcold said: “This was
child lock to eliminate any problem of small hands tampering with the controls. relaxation and a fun filled action a great project to be involved in and we were happy to be installing LG
Rinnai Energysaver range delivers energy-efficient and consistent warm air packed beach vacation. The resort equipment out there. Not surprisingly, the controls are an important
Added to these advantages are the timer function and eco mode which are powered by Natural Gas and LPG options and is built with fully modulating caters for every taste in food part of the system and LG’s expertise in electronic controls is a major
combined with the new unit’s ability to heat spaces fast. burners so heat output and energy input is reduced as the space warms up. and drink with five restaurants factor in selecting their kit. Most of the rooms are controlled by individual
and relaxing bars. A $20 million remote controls, but we installed one of LG’s AC Smart Premium Touch
The 559FT has an input of 6.4kW and output of 5.2kW. The streamlined unit The Rinnai Energysaver range comprises fanned convection-powered flue models renovation, completed in 2011, added Screen Central Controls for the larger areas of the site. This provides
measures 554mm x 750mm x 250mm. that exceed seasonal thermal heating guidance under Building Regs Part L. an infinity pool and a boardwalk and excellent immediate control but importantly provides a wealth of additional
expanded the water sports centre. On-going improvements have seen LG air information including statistics such as power consumption or actual usage
The Rinnai Energysaver 309FT, like the 559FT, sports a similar sleek casing and conditioning installed to add to the levels of comfort in the 33 spa rooms, of air conditioners in real time, as well as reports on issues such as errors
turns in net efficiencies of 88%. In a building with high vaulted ceilings, with conventional convector heaters the gym and the offices at the complex. in the functioning of the units, and allows you to control and monitor the
the heat will immediately rise to the ceiling. With the Energysaver range Rinnai system from a central unit.”
It has an input of 3.4kW and output of 2.92kW. The streamlined unit measures has successfully come up with a solution that heats from the floor up and by The equipment supplied is a mix of 33 of LG’s popular ARTCOOL Gallery wall
695mm x 465mm x 257mm. Natural Gas usage has been pegged at 0.31m3 modulating gas usage in relation to room temperature, provides unparalleled mounted fan coil units and 14 of LG’s Multi V Four-Way Cassette fan coil The LG air conditioning was installed in November. Luckily for those living
while LPG consumption is 0.26kg/hr. levels of comfort combined with efficiency. www.rinnaiuk.com units - cassette units that sit in the ceiling voids above the rooms supplied. on this idyllic island, the climate in St. Lucia is fairly constant throughout the
The energy efficient installation has cut the hotel’s energy consumption year, so there is no big temperature difference between different times of
Also available is the Energysaver 1004T with its impressive input of 11.6kW and considerably – by in the region of 33%, year on year. And it’s a robust the year. As a direct comparison of the effectiveness of the LG equipment
outputs 10.23kW. Its measurements are 670mm x 930mm x 315mm and it has installation to boot. It’s the first installation overseen by LG in the UK to installed the hotel reports that there is a 33.5% cost saving between
energy efficiencies of 96% under the guidance of Part L 2014. This puts it in the feature the addition of BLACK FIN Multi IV outdoor units. These units are February 2015, before the equipment was installed and February 2016 –
top rank of space heaters in its class. specifically designed for applications where the environment is particularly after it was installed. Go to http://partner.lge.com/uk for more information
corrosive. St Lucia is a volcanic island and the air carries a significant amount on the extensive range of LG equipment and services.

enquire online at www.ebpr.co.uk/card


16 E 17

17 High Efficiency Small Circulators 18 The Easiest Route To Energy Savings


High efficiency small circulating pumps play a key role in all wet Effective heating controls are a Morley-IAS Crosses The Divide At 22
heating systems, whether as standalone pumps, integrated pumps in vital part of an efficient central The Humber Bridge
combi and system boilers or in under heating system. Heating controls
floor heating and renewable heating One of the most spectacular structures in the whole of the UK,
manufacturer ESi says it makes
systems. Modern small circulators the Humber Bridge is a 2,220m single span suspension bridge.
huge sense to look more closely
are simpler than ever to install and It contains a surprisingly complex infrastructure that is primarily
at the options. ESI offers a range
offer huge savings compared to housed in the two towers.
of programmers from a simple
old uncontrolled pumps simply in Its Maintenance Manager, John Williams, explains, ‘These
1 channel to a 3 channel multi-
terms of the lower energy costs substations contain a plethora of mechanical and electrical
purpose programmer which
they have associated with them. The plant and machinery’. Within these areas there is a need for
enables a housing provider to
latest small Wilo pumps use around 90% less energy than their older fire detection and Beverley based Fire Protection Supplies has
comply with Part L of the Building Regulations by providing separate
counterparts. All Wilo small circulators comply with ErP requirements. used its expertise to provide solutions to the Humber Bridge
timed heating control for living and sleeping zones in a home, whilst also
www.wilo.co.uk over a number of years. Trevor Campbell, the company’s
providing timed control of hot water. www.esicontrols.co.uk
Director, states, ‘John contacted us to discuss upgrading
the fire detection control panels and graphics system at
the Humber Bridge, which involved installing industry leading ZX products and the innovative Visualeyez Graphics Workstation from Morley-IAS by
Honeywell.’
Seven panels were replaced overall and these are sited in a variety of locations including the administration offices, where a central control room that
19 contains all the servers and IT related technology is used to ensure that everything is running smoothly. Here the ZX5Se panels were installed, while at
the other plant areas across the Humber Bridge saw a combination of ZX1Se and ZX2Se products used. The panels have been configured to report back
Geberit Helps Stately Home Go Green to a new Visualeyez Graphics Workstation. Explaining the benefits of this technology, Ben Fothergill, Business Manager North & Scotland at Morley-IAS by
Honeywell, says, ‘In an emergency situation, information and control are both paramount. Visualeyez is designed to present the information in a simple,
Geberit Mapress Carbon Steel has been chosen for clear and user-friendly way, allowing rapid comprehension of the situation.’
its ease of installation and no hot works credentials Visualeyez also offers the ability to record and analyse both alarms and non-alarm events. ‘Visualeyez has provided the Humber Bridge with much more
to install a biomass system at Saltram House, a than just an alarm monitoring package,’ comments Trevor Campbell, ‘We have configured it so that it operates as a building management system, so the
magnificent National Trust owned Stately Home in plant rooms are monitored via I/O devices and can send alerts about any issues affecting the equipment. It also has an events page that can generate
Plymouth. Saltram an automatic report about any situation and can also control, start and test the system remotely, as well as switching on cameras to provide images of a
now enjoys heating location where an alarm has been activated. ’ www.morley-ias.co.uk
and hot water
courtesy of a biomass
system, consisting
of 220kW and 95kW
boilers fuelled by
pellets.
A district heating
system services the main house and the majority of
23
other buildings on the site.
The installers' choice - "We use Geberit Mapress on
95% of our jobs," said James Howard, from Dunster
Biomass, which installed the system at Saltram House.
"It's quick to install, easy to use and reliable. The fact there's no need for hot works makes it ideal for historic buildings. At Saltram House, the new biomass RINNAI Gives Heating And Hot
system had to be installed within the confines of the existing building and its heating system, while ensuring that it could be easily removed if required.
Water To New Office Block
Faced with narrow doorways and cramped spaces, Geberit Mapress was the ideal solution. The age of the building and cramped environment also meant
that solder was just not an option because of the fire risk. Geberit Mapress and its press fit assembly is particularly well-suited to jobs of this nature." Rinnai, manufacturer of the energy efficient range of
www.geberit.co.uk Infinity continuous flow water heaters and a complete
range of gas fired wall heaters, is providing a brand
new heating and hot water solution to offices in
Merthyr Tydfil, South Wales.

CST Renewables - the building services engineers -


20 New AC EZ Touch Controller Launched By LG 21 Arden Dies Secure Under Citylock And Securikey
were keen to get to grips with installing a new system.
LG has launched a new controller for its commercial air conditioning and Physical security supplier, Securikey, has recently teamed up with City This included a bespoke boiler and hot water heating
heating products. The new AC EZ Touch offers Smart management with Lock And Safe Ltd to supply their high quality products and expertise package. The first UK installation of the Rinnai system
a 5” colour LCD touch screen for small sites to Stockport based manufacturer Arden Dies & Tooling Ltd. Arden Dies was at a large office building where CST had been
and provides Group and individual control. recently invested £430,000 to expand called to assess the best energy efficient replacement
It has a total or partial individual controller their production facilities. During these for a failing forced draught, flued modular boiler set
lock. There’s a power consumption monitor improvements, Managing Director Martin up. The old system was low efficiency and costing the client, a property leasing company, a substantial amount in repair bills annually.
with Pdi, an ‘emergency stop’ and total ‘on/ Poynter decided that improved physical
off’ control. Users can control each space assets should be matched by improved The building is rented to a variety of organisations and businesses such as call and administration centre businesses. Mark Hillier-Rees of CST says: “This
efficiently through an IP network, but access security in order to protect this recent new Rinnai system is highly efficient - and due to its lack of moving parts and easy maintenance has very low annual service costs.” The large 100kW
via Smartphones is not available with this investment. Securikey Ltd supplied two 48 Capacity Key Vaults, two 100 condensing heating boilers are ideal for providing heating to buildings such as the Merthyr Tydfil office block and are extremely flexible as they can also
unit. Statistics of operational status are Capacity Key Vaults and Two Size 2 Mini Vaults. The Securikey safes provide hot water when placed in a cylinder. The Rinnai boilers are also available in 50kW and 75kW sizes. Chris Goggin, Associate Director, Rinnai UK
provided to help make system operation decisions. The Alarm Indicator and key cabinets were chosen specifically for their high quality and comments: “There are clear benefits in terms of efficiencies, when considering heating and hot water as two separate systems. I am pleased that we can
operates when there are errors, or if it’s time to change the oil or filters. durability. www.securikey.co.uk provide two high efficiency market leading products in one simple turnkey solution.” www.rinnaiuk.com
www.partner.lge.com/uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


18 E 19

24
26

Rinnai Makes Major Investment In London And South East


With Appointment Of Sales Team

Rinnai, the UK’s leading manufacturing supplier of high efficiency continuous Fire Safety,
Smoke Control
flow hot water heating and delivery units, has announced a major investment
in London and the South East with the formation of a dedicated sales team
covering the whole region. This major investment follows the opening of a
London office also dedicated to serving the region. The new sales team will
work in tandem with the Rinnai UK sales centre and technical support at the
And Compliance.
company’s Runcorn, Cheshire HQ.
Charting A Path
“The new premises have been set up in response to high demand for Rinnai
product and expertise. Specifiers and installers in the London area now have
a direct line to the Rinnai sales force which is ready to offer advice on the latest technologies
Through The
and legislation and will be a vehicle to inform the industry of new developments, new
technologies and new ways,” says Managing Director Tony Gittings.
Regulations.
The team and their areas are, as follows: Scott Amass will look after North London and the By Nelson Godinho –
associated Home Counties; Steve Richards will be heading sales in West London and associated Fire Engineer with SE Controls
Home Counties; Kim Wullf will be looking after South London and their Home Counties. All
three have extensive experience and track records in the hot water delivery business.
Rinnai’s comprehensive range of A rated energy efficient products for hot water solutions
qualify for additional energy efficiency points, boosting building energy performance. The
product range far exceeds energy efficiencies in current Building Regulations (Conservation of
fuel and power) and legislation. For owners of existing commercial buildings, the use of Rinnai Infinity condensing and high efficiency water
heaters qualifies for extra heating efficiency credits. www.rinnaiuk.com

25

Firex Low Energy Smoke & Heat Alarms


Kidde’s Firex range now offers safety plus sustainability, with low energy mains-powered
smoke and heat alarms that cost less than £1 a year to run. The legislative environment governing the smoke control and fire safety with even more key information. Alongside this, BS 9991:2015, which covers ‘Fire
Interconnected, mains-powered smoke and heat alarms with reliable power back-up industry is, unsurprisingly, complex, far-reaching and absolutely vital to safety in the design, management and use of residential buildings - code of
should now be the norm for most housing to satisfy Building Regulations requirements ensure that these systems not only operate faultlessly when they’re needed, practice’ is also a vital reference when addressing fire safety specification and
and Code of Practice recommendations. To meet demands for sustainable, low-energy but also provide effective safety protection and allow people to escape. requirements.
products, the latest Firex range provides much lower maximum mains consumption, with
substantial energy savings over previous models and significantly lower running costs. Even so, you would probably be surprised by the number of construction However, if you’re seeking a signpost to provide an effective route to
Based on current energy tariffs (March 2016 average kWh cost from the UK’s top 5 companies that contact us after they have completed a block of apartments achieving compliance, then, arguably, the best start point is the BS7346
suppliers, between £0.099/kWh and £0.109/kWh), it now costs less than £1 per year to and find that Building Control has rejected the structure due to the omission – Part 8 Code of Practice. Prior to this, no single document existed that
operate a Firex alarm. of a smoke ventilation system, which is required by law for any residential provided guidance for the industry from initial design, through installation to
Firex alarms can be interlinked to create a low-energy network for protection throughout building of 3 storeys and above. maintenance. The core benefit of BS7346-8 is that by adhering to its guidelines;
the home. But they can also interconnect with Kidde’s 4MCO and 4MDCO mains-powered designers, installers, commissioning engineers and maintenance teams can
carbon monoxide alarms, using the unique ‘Smart Interconnect’ feature. Here, all the Clearly, there’s no suggestion that designers, specifiers and building create, install and operate a fully compliant smoke control system.
alarms sound when one is triggered with different, distinct alarm sounder patterns for companies are brazenly flouting the regulations, but it is apparent that the
carbon monoxide or fire – an essential facility. This is supported by different display main issue is ignorance of the complex and essential regulatory framework Clearly, providing any definitive guidance in the space available is impossible,
messages on the 4MDCO model indicating ‘Fire’ or ‘CO’. that governs this sector. But, as is often quoted, “Ignorance is no defence.” but as the penalties for non-compliance are punitive and can involve
So, without the need for any further operation of the system or remote switches, Smart imprisonment, it is always advisable to seek professional specialised input
Interconnect automatically alerts occupants throughout the property of the specific Navigating the maze - Building Regulations Approved Document B, The from organisations such as SE Controls, that work with the regulations on
hazard that confronts them. Machinery Directive and The Construction Product Regulations, via the a daily basis. The main things to remember is that you have obligations for
Another important Firex innovation is the introduction of long-life lithium battery back-up various parts of the European EN12101 standard, provide a tight and far- safety, design and construction, which cannot be avoided.
options for all three sensing technologies (ionisation, optical and heat), alongside the reaching regulatory framework. Yet, this is only part of the story. www.secontrols.com
usual loose battery and integral rechargeable battery versions. This innovation enables
reliable back-up throughout the whole alarm life, without the need to change batteries, The Smoke Control Association’s (SCA) ‘Guidance on Smoke Control to
at a much lower price than rechargeable products. www.kiddesafetyeurope.co.uk common escape routes in apartment buildings’ quickly became the default
reference document for many designers, installers and approving authorities
throughout the UK, when first published in 2012 and has since been updated

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


20 E 21

28 Kemmlit On Parade 29 A Must See Film


Interior Film from David Clouting is a self-adhesive film that can be
applied to almost any surface including: wood, metal, plaster board,
plastics and melamine.
This enables columns, feature walls, doors, furniture, skirting and
architrave to be quickly
Associated
transformed with
Architects were
minimum disruption and
commissioned
at low cost. Interior Film
to provide a
has been specified for
comprehensive
use in many projects
refurbishment of
including: hotels, offices,
6 East Parade,
cafes, airports and retail
Leeds, - a six
outlets.
storey, 45,000sq
Offering excellent
office building in
flexibility and adhesion,
the heart of city
Interior Film is resistant
centre. 30 Kemmlit Classic Cell floor to ceiling cubicles was specified
to impact, abrasions
for the washroom areas. Classic Cell is a design classic and features
and scratching. It
42mm thick smooth surfaced welted doors with special inlays which
is easy to clean and
guarantee a high degree of privacy and noise reduction.
maintain and remains
Concealed edges and recessed leg supports produce an elegant yet
stable if exposed to
functional design; its robust construction makes it the ideal choice
heat, humidity or low
for all types of washroom applications. For this project, the architects
temperatures.
selected Kemmlit’s innovative high quality aluminium ‘handle bars’
A bubble free finish is
for the systems’ door furniture which house LED vacant/occupied
achieved utilising air free technology. CE Certificated and IMO/MED
indicators. Classic Cell is available in a choice of colours including
certified for the marine sector, Interior Film is also available to view
27 a new solid black crystal coat varnish finish and is part of a wide
on BIMSTORE. www.davidclouting.co.uk
range of high performance cubicle and locker systems available from
5 More The latest home improvement report from Barclays
indicates that over half (53%) of UK homeowners would
Pimp a downstairs loo – you can transform a humble
downstairs loo or closet into an eyecatching visitor
Kemmlit UK. www.kemmlituk.com

Remodelling
choose to remodel their existing properties, rather cloakroom, wowing guests and letting your creativity
than move to a new house. The most desirable home run wild. Quality glass mosaic wallpaper can add drama,
improvement is a designer kitchen, with an ensuite especially with downlighters picking out reflective

Tips bathroom also high on the wish list. Remodelling homes


is my business, particularly kitchens and bathrooms, so
highlights, while lighter agglomerate floor tiles help
create an illusion of space. Modern corner sinks and
here are 5 more affordable tips for enhancing your living close-coupled WCs maximise the use of floorspace,
from Hayley Fenn, space and adding value to your property. while presenting a clean, clinical look.
30
UK head of Granite Modelling Abet’s Laminates
Transformations Add an ensuite – demand for ensuite facilities is What a shower – there’s definitely a trend toward Abet Laminati is delighted to announce that, as part of its ongoing drive to ensure ease of
on the rise, so you could turn an adjoining room or bigger, better showers, such as walk-in enclosures, specification, Building Information Modelling (BIM) is now available across its core ranges in the UK.
underutilised space into a walk-in bathroom adjacent double showers for convivial use, even complete
to a bedroom. Slimline agglomerate granite, quartz, wetrooms. Modern, water-resistant and virtually The BIM Objects are now available for the complete range of compact grade high pressure
recycled glass or porcelain water-repellent finishes and seamless shower liners, floor-to-ceiling wall cladding laminates. This includes the dedicated Cubicle, Locker and Labgrade Collections as well as MEG,
modern space-saving suites will enable remodelling even and feature floor tiles are all options in your makeover the exterior grade self-supporting laminate. All Objects are compatible with both Autodesk Revit®
a compact room, with large floor tiles visually linking the palette, together with large glass panels and shower and IFC programs.
adjoining areas. enclosures, china and acrylic base trays, and modern
user-friendly fixtures like hydromassage columns. Abet’s UK & Ireland compact grade solutions are
Explore magical mosaics – modern tile laying systems available in different thicknesses and a variety of
mean that genuine Italian glass mosaics are quicker and Perhaps the best thing about my remodelling tips is that sizes in a range of plain colours, speckled finishes,
easier to fit, adding an unmistakeable touch of luxury they can be mostly carried out within your existing room woodgrains and textured surfaces. The compact
in the kitchen, bathroom or dining room. Choose classic layouts, without re-siting the plumbing and electrical grade’s solid core construction, available from
subway styles, mix’n’match ‘mosaics on a mattress’, connections, and by simply overlaying the worktops, 6mm to 12mm thick, makes it a perfect choice for
exclusive designer patterns, even stained glass effects, tiles and bathroom surfaces that you want to replace. areas prone to high moisture and humidity. This
all non-porous, wipe clean, durable and beautifully That means less ripping out, less dust and debris, and particularly applies to leisure centres, swimming
textured. There’s even the option of your own custom less household disruption. pools and changing rooms and where there is no
mosaic design. risk of peeling, cracking or delamination. The fully
If I tell you also that most of our finishes are eco- self-supporting boards are also easy to work with
Go island style – in the kitchen or as a room divider friendly, made from recycled materials, then you’ll be for cutting and fabrication and are widely used in situations where high quality performance and
in a kitchen-diner, a standalone island unit offers extra happy that you won’t be damaging the environment design can be carefully crafted together to create an attractive visual experience.
storage and casual dining. The island countertop, with or contributing to unwanted landfill. What’s more, our
down-to-the-floor waterfall ends, can show off your Granite Transformations showrooms have all the experts The BIM Objects will shortly be available from the NBS National BIM Library at www.
main worktop finish or add colour with a contrasting, and installers to help plan your remodelling project and nationalbimlibrary.com and are also available direct from Abet at http://abetlaminati.com/en/
bold finish. A ‘dining island’, with cantilevered top and do all the work for you. Can’t be bad. For your nearest bim . Further information and support is also available from Abet on tel: 020 7473 6915 or via the
stylish stools, helps focus the kitchen area as the hub of showroom, visit www.granitetransformations.co.uk or website at www.abetuk.com
the home and family living generally. ring our hotline on 0800 044 5393.

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


22 E
R

burning passion

Image credit Wates Construction

31

Mapei
A range of Mapei resilient floorcovering Ultrabond Eco 380 and Ultrabond
products have been used at Arnold Hill Eco Tack are part of Mapei’s popular
Academy, a new multi million pound Ultrabond Eco adhesive range comprises
Transforms state of the art school building, based in
Nottingham which aims to transform the
solvent-free, water dispersion, non-
flammable, non-staining and carries the

Arnold Hill education of 1,700 students. EC1 GEV Emicode labelling for ultra-low
emissions of volatile organic compounds.

Academy Pinnacle Special Projects carried out


the installation of the floorcoverings for This means, installers working in
Wates Construction Ltd. The new three close proximity aren’t subjected to
storey building at Arnold Hill Academy any harmful vapours and occupiers/
includes 57 work spaces, classrooms as visitors will not be subjected to harmful
well a theatre and sports hall. emissions once floor installations are
complete.
Mapei specified 2150m2 of Mapeproof
One Coat and 1250m2 Mapeproof ESM For more information on Mapei resilient
surface applied damp proof membranes, products, other products or training 32
both of which are solvent free with days, please visit www.mapei.co.uk,
extremely low odour making them email info@mapei.co.uk or tel. +44
ideal for use in inhabited areas such as (0)121 508 6970.
schools. Mapei’s 2 part cement based
levelling and smoothing compound,
Latexplan Trade was then applied to all
areas.

Some 3400m2 of vinyl flooring was


installed over the three storeys using
Mapei Utrabond Eco 380 acrylic
adhesive; 3600m2 of carpet tiles were
also installed onto Mapei Ultrabond Eco
Tack carpet tile tackifier.

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


24 E

33 34

Armourfx
ArmourFX Timber Effect panels were specified for pattern and wallcovering in the spa – the purpose
the renovation of the latest Las Vegas strip hotel of which was to create that ‘instagramable’
by Elkus Manfredi Architects. The Boston-based backdrop” she said.
Panels Create architects have converted the original Imperial
Palace hotel into a lavish property specifically Timber Effect panels are created from Douglas Fir

Social Media designed for a millennial guest. planks that are hand worked to achieve different
aesthetic qualities. The panels offer great design

Backdrop For The new Linq Hotel features 2,500 rooms,


casino, retail space, meeting centre, pool deck,
options, often replacing exotic or expensive timber
for commercial projects. ArmourFX Timber Effect

Linq Spa, Las


vortex roof and full service spa – featuring a panels have been used to replace or match Shou-
corridor of custom-finished ArmourFX panels. Sugi-Ban Japanese charred planks or, as in the
Elizabeth Lowrey, Principal and Director of Interior project, Mountain Pine Beetle blue-stain timber.

Vegas Architecture at Elkus Manfredi Architects explored


the idea of ‘instagramable’ backdrops within the Crafted especially for decorative wall cladding,
property. This was done to redefine the hotel’s ArmourFX Timber Effect panels are available in
purpose in the city, and also with the millennial four designs and colours. ‘Original’ and ‘Shuttered’
audience’s heavy use of social media in mind. highlight the elegant grain of the wood whilst
‘Rugged’ and ‘Cinder’ are further hand distressed
“The overall challenge for Elkus Manfredi Architects to give a more aged texture and surface patina. .co.uk
was to reinvent Caesar’s outdated Imperial Palace All panels are cast in a unique polymer-modified
hotel property in Las Vegas into an entirely new gypsum resin mix for added durability. In the USA,
experience that appeals to the next generation of country specific colours and finishes are available.

interior film
Las Vegas guests. From the murals on the walls, www.armourcoat.com Commercial use for walls, decorative panels, doors,
the thought bubbles in the meeting spaces, the
colour-changing 3535 bar, the carpet design in architrave and furniture. A range of superbly styled
the corridors, VIP area and ‘living room’, to the tile interior films which will bring any room to life

Call: +44 (0)1376 518037


enquire online at www.ebpr.co.uk/card
26 E 27

35 New Slimline Towel Rail From Stelrad 36 Keeping Up With The Jones’s
15 years ago, Intelli Heat invented new electric radiators with
individual temperature controls and timers and created their well-
known Thermodynamic Fluid Wireless Collection of Italian style
designer Electric Radiators. Now it is the interior design of the
rooms that can have that WOW factor with the brand new range
of LivingStone Heating. This brand new range of electric designer

Leading radiator manufacturer Stelrad has introduced a new addition to


its popular Aqua Series Range. The new Slimline Towel Rail is a modern, radiators are totally eco-friendly, and made from a recycled product –
chrome plated 22mm tubular design, targeted at the consumer and marble dust, agglomerated into beautiful natural stone pieces of art, in
one-off installer market. The new product is designed to help Stelrad 24 different colours, that don’t look like radiators at all. The radiators
compete more effectively in the commodity and replacement market come in a range of colours and styles that add drama and style to a
and comes with a two-year warranty. It’s very competitively priced room. Hang them above the bed, or on the wall as a set of pictures.
and offers a high quality chrome finish that will heat the bathroom In fact, you can have any famous painting printed onto the front of it,
and warm the towels – it’s a simple solution for specifiers looking for matching and coordinating with every style, enabling you to transform
38
affordable quality in the bathroom. www.stelrad.com your radiant electric heating into a beautiful piece of art, combining
the heating function with interior design. www.intelligentheat.co.uk
Wall To Wall
Rarely can we say that a new product, changes the face product and the advanced manufacturing technology
of interior design for professionals in the commercial used with the surface materials, allows Vicaima to
world. However with MATCH, that statement is entirely achieve unparalleled results. This is perhaps particularly
Inspiration true. This new designer panel range from Vicaima
removes the limitations experienced with more
illustrated in the use of surfaces utilizing natural
veneers, where the product is able to reproduce colors
37
With MATCH commonly used decorative finishes and allows limitless
design possibilities with multiple applications ranging
and original and unique designs to spectacular effect.

Vox Wins Gold For Style Partitions


Panels from wall panels to furniture. These new MATCH panels have been designed
to provide a flexible answer to a broad scope of
Style has won an eighth FIS Gold Contractors Award, on this occasion MATCH is a revolutionary commercial project requirements with an offering
for their moveable partitioning wall solution installed at the Vox, a decorative panel that that includes: choice of base materials including MDF,
first-class conferencing and banqueting facility that is part of the NEC uses innovative H2P Superpan and Plywood; selection of surface layers
Group. This annual award is given to companies that demonstrate the technology and advanced and coatings, all in a choice of industry applicable
highest levels of craftsmanship, with the FIS panel making onsite visits production processes dimensions. With outstanding performance, product
to judge the quality of work. to create tailor-made flexibility and the ability to create a truly unique space,
Part of the UK’s first Resorts World complex in Birmingham, the Vox graphic or pictorial MATCH introduces a new level for commercial interior
offers exceptional amenities in a unique location. Allowing the space solutions directly onto design. It’s the ideal inspiration for hotel and leisure
to be easily reconfigured to meet each client’s requirements, Style veneered and other applications, corporate environments, schools and
designed and installed a complex configuration of technologically base layers. In this way public places, industry display and exhibitions together
advanced moveable wall systems, ensuring the space is continuously a collection of décor with so much more.
maximised. elements can be brought
The final solution spans across rooms up to 30m wide and 5m high together to create For specifiers needing a little steer to spark their
and required four of Style’s revolutionary Skyfold vertical-rising synergy to a theme imagination and who may not wish to create
partitions, as well as two impressive DORMA sliding walls. Fully or chosen style, such as wall panels, integrated door a totally bespoke design, MATCH also provides
automatic, the four Skyfold partitions are housed in the ceiling cavity systems, displays and furniture, untethering creative a wealth of stimulus with some truly creative
when not in use, completely freeing up floor space for functions. With flair and removing the boundaries to realising unique collections. Containing 36 individual patterns within
fabric-covered sound absorption panels, the Skyfold walls offer a concepts. 6 contemporary and inventive themes, these include
54dB Rw acoustic rating, delivering excellent privacy between divided the opulence of Black Marble, the optically challenging
spaces. Depending upon the desired application, Vicaima Origami through to the traditional and authentic
The two DORMA Variflex systems have acoustic rating of 57dB Rw MATCH is available in a selection of panel types Portuguese Tile.
and incorporate four sets of double doors in a ‘T’ configuration, giving with differing physical and mechanical properties,
easy access to all areas. The Variflex panels park neatly within two appropriate to their desired performance and covered For further details about how Vicaima MATCH can
stacking zones at each end of the conference space, with an attractive by EN standards. These include plywood, MDF with inspire you, technical specifications or to download a
laminate finish on the main elevations. www.style-partitions.co.uk improved resistance to fire or moisture, among others. catalogue visit the Vicaima Match website today
The combination between the composition of the www.vicaimamatch.com

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


28 E

39

A Burning
The German premium manufacturer of firing Made And Tested In Germany - in order to provide
technology Spartherm proudly presents an an optimum of customer service, the expansive
exclusive range of bioethanol fireplaces branded range of ebios-fire® models comprises both
Passion ebios-fire® which are now also made available for
the discerning customer in Great Britain.
standard and made to measure built-in fireplace
models in almost any thinkable layout.

For Fire Great versatility, product safety and outstanding


German quality are key values at Spartherm's
production facilities where all ebios-fire® models
are originally designed, crafted and tested by
passionate, skilled craftsmen. Test certificates
issued by TÜV Germany further underline the
outstanding safety of ebios-fire® bioethanol
fires, which feature a wide choice of manual and
automatic bioethanol burners.
Versatility Is Key - The ebios-fire® range of
products is available in a vast variety of finishes
meeting the requirements of architects and
interior designers on an international level.

Please visit www.ebios-fire.com or write to info@


ebios-fire.com for further information.
Unique cabinet design & manufacture from Shopkit
Spartherm – The Fire Company
www.spartherm.com Great attention to detailing, using high quality materials and finishes
40
on all our custom and standard cabinet designs, produced in our
UK factory. Call for brochure or to discuss your current or future projects.

T. 01923 818282 . F. 01923 818280 . E. sales@shopkit.com . www.shopkit.com MADE IN THE UK


enquire online at www.ebpr.co.uk/card
30 E 31

41
Pendock Boosts Retail Environment At Booths
When an ambitious and enterprising grocer said in 1847 that his aim was “to sell the
best goods he could buy in shops staffed with first-class assistants,” it is not perhaps
surprising that this philosophy remains at the heart of a business that has survived
two wars and several recessions.

In fact, Booths has just relocated one of its stores to Poulton-le-Fylde – and the
supermarket’s ethos to be the very best can be seen reflected in the selection of
high quality column casings from Pendock for the interior fit-out. Ordinary steel
stanchions to support the roof at Booths were simply not considered to offer the
right impression and the main sub-contractor was tasked with sourcing columns that
were functional, and attractive.
44
The contractor immediately turned to Pendock Limited, knowing that the specialist
Yeoman Shield Is Hospital’s Guardian
supplier would come up with a solution that could offer both style and substance
to the new store. Pendock supplied nine column casings to surround the standard Yeoman Shield’s new Guardian Twin Handrail was installed as part
structural steel sections: three oval in appearance and the other six circular. For of the ward refurbishment project recently undertaken at Barnsley
continuity of style, both types are clad with attractive brushed finish aluminium Hospital, South Yorkshire. Serving a quarter of a million people in the
bonded to the plywood casings up to one metre in height, while above this a RAL Barnsley area, the hospital demands a constant regime of maintenance
7037 Dusty Grey shade of the company’s Mouse Laminate was specified, rising to throughout its premises.
ceiling height. Barnsley Hospital have improved the
surroundings and facilities in 6 of the
A 15 mm shadow gap marks the junction while ‘top hat’ feature joints with an hospital wards.
aluminium insert rise up the full length of the casings. The 150 mm high toe and 160 As part of the refurbishment project
mm head collars are also finished in the Dusty Grey laminate. www.pendock.co.uk Yeoman Shield were employed
to remove the old bump rail and
handrails and replace them with the
dual purpose Guardian Twin Handrail
to corridors and waiting areas throughout the 6 wards.
The twin handrail was supplied with a 50mm dia. PVCu upper handrail
Photo: ©Lendlease for support to those who need it and a lower 125mm deep protection
42 rail which standing slightly forward of the handrail, offers protection
Acoustic Ceiling Pops Up In World Famous to both the wall décor and the handrail itself, minimising on repair and
Restaurant replacement.
43 Supplied in a Pastel Blue colour with contrasting accessories in
The design of the NOMA Pop-up Restaurant at Barangaroo Antarctica Corian® Transforms Historic Manchester Office Pebble Grey the Guardian Twin Handrail from Yeoman Shield was
near Sydney in Australia was most unusual - unusual because complemented with matching 200mm protection strip and corner
it was designed to operate only 10 weeks, just like another Bluesky Design Interiors have transformed a former canalside protection angles. www.yeomanshield.com/handrails
temporary Japanese one which popped-up for a short time warehouse into an exciting and dynamic workspace for Well Pharmacy
in Tokyo. in Manchester.
It was the initiative of famous Chef Rene’ Redzepi and Combining the listed building's
his Danish team, designed and built in a few months by original features and character Crometta: Combining Water Efficiency And Premium
45
the Australian Design and Planning collaboration, led by with contemporary styling,
Design
Lendlease and principal architect Darren Kindrachuk. the team created a bespoke
The restaurant covered about 500 sqm including the main reception centrepiece in The latest Hansgrohe
kitchen, serveries and the dining area as well as an outdoor Antarctica Corian® from CDUK. Crometta range comprising of
preparation space and guest lounge. With space for only 56 Fabricated by Production overhead and hand showers,
diners, 27,000 disappointed visitors were left on the waiting- TM Ltd, the 14m² desk was shower sets and showerpipes
list! complemented by a matching has been developed in
The idea of the restaurant was to interpret Noma’s bespoke waiting bench in the landlord's collaboration with long
culinary creations and gave them a unique Australian identity. lobby. standing partner Phoenix
References to elements of the Australian landscape, as well The design concept is based on the building’s location. The shape of Design. Specially created for
as Rene’s in-depth investigation and sourcing of natural the desks reflects the ripples in the canal water, creating a simple desk the entry-level segment, it
Australian ingredients, also provided the foundation for the that has an organic form. Angles with softened corners were added to combines water efficiency, sustainable technologies and premium design
underlying design theme of Land and Water. References to Noma Copenhagen and the Danish origins of the restaurant and its Chef were graduate between the desk height and counter height sections of the at an attractive price. The new Crometta range is showcased at the
subtly incorporated in the restaurant design. desk and a similar detail followed in the lobby desk graduating from Water Studio, Clerkenwell, London. The Hansgrohe Project Team is on
In this context, the review of materials and furnishings included only a limited number of selected Danish sourced options, chosen for their desk height to seating height. hand to offer invaluable advice on issues like water regulations (WRAS)
outstanding quality, performance and aesthetics. For example, the dining furniture was designed by Carl Hansen while the ceilings were lined The sleek lines of the desk contrast with the textured timber and and can demonstrate how to save money by using resources more
with acoustic panels from Troldtekt, widely specified in Denmark and worldwide to reduce noise and create a quiet and peaceful environment. exposed walls of the building’s interior. www.cdukltd.co.uk efficiently and selecting quality products with long lifecycles that deliver
www.troldtekt.co.uk genuine value. www.hansgrohe.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


32 E 33

46

Sterte
The twin high-rise housing blocks of Sterte Court occupy a togethers,” explains Mr Hood. “The blue/aqua colours reflect
commanding location overlooking part of Poole Harbour in Sterte’s waterside location and have since been replicated 47

Glassolutions
Dorset. But, if the view from within the ten-storey flats was on the garden sheds, or ‘beach huts’, installed by PHP for
Court
Leading UK designer, manufacturer and installer argon warm edge spacer bar to reduce thermal
impressive, the external appearance of the 1960’s rendered residents to use following the project’s completion.” of commercial glazing products GLASSOLUTIONS bridging. Additionally, a distinctive and complex brise
concrete structure was far less so, and its exposed setting has given a new multi-occupancy office block at a soleil, designed by EPR Architects, was engineered

Stands near the coast also created corrosion issues. The revamp was particularly concerned with energy
efficiency and this was rewarded by the project winning the
Brings Thames Valley business park a sustainable edge, with
the company’s installation of solar control curtain
and installed by GLASSOLUTIONS to manage the
solar gain of the facade, the loads of which were

Out, A two-year, £7.5million refurbishment completed in summer


2015 has given the towers, together with two adjacent
‘Creating greener homes and reducing fuel poverty’ category
in the 2015 awards run by the National Federation of ALMOs Together walling providing exceptional thermal efficiency for
the building.
carried entirely by the curtain wall system. Working
with main contractor Wates and London based

Thanks To
four-storey blocks, a new lease of life with better insulation,
enclosed balconies, modern heating systems and a jaunty
external colour scheme thanks to the use of Trespa®
(Arms Length Management Organisations).

Residents have declared themselves extremely satisfied with


Comfort And Spanning 85 acres in the heart of the Thames
EPR Architects, work progressed swiftly and the
installation was completed in November 2015.

Sustainability
Valley, the Winnersh Triangle business park provides
Trespa cladding to form a robust rainscreen. the results of the refurbishment. Says Mr Hood: “They have a
new-found pride in their homes and many local people have
business and industrial space for a diverse variety
of enterprises, and is home to over 50 businesses,
The brief outlined at the beginning of the project
was met and surpassed: the exceptional solar control
“We were confident the tough, durable material would
meet the requirements for the building,” says David Hood,
been so impressed with the look of the blocks, they think it’s
a new-build.”
At Winnersh including Virgin Media, Bang & Olufsen, and Intel.
GLASSOLUTIONS was contracted to manufacture and
properties of the building’s glazing specification
have been extremely effective at reducing glare,
Project Manager at Poole
Housing Partnership, which Andrew Craig, Trespa Regional Manager adds: “Poole Triangle install 3400m2 of curtain-wall façade for a new multi-
occupancy office block at the Winnersh Triangle site.
controlling heat transmission, and minimising the
need for air conditioning inside the building.

Offices
manages the estate on Housing was looking for a material that would withstand Paul Rose, Commercial Manager at GLASSOLUTIONS,
behalf of Poole Borough coastal elements and not be affected by salt water whilst Sustainability and efficiency are at the core of the said: “With Wates and EPR, we’ve helped create
Council. “The panels have maintaining colour longevity and retaining its original looks. Winnersh Triangle’s ethos, so this needed to be an office space which will be comfortable for its
good resistance to dirt, Trespa® Meteon® was the ideal choice as it ticked all the factored into the planning process: solar control occupants and kinder to the environment, as well as
so a clean appearance boxes to satisfy the client's needs and added to that, due to glass was desired, and the client’s requirements for being less expensive to heat and cool.”
has been maintained. Our its surface technology, pollutants and other environmental air tightness were particularly exacting. To adhere
contractor, Keepmoat, stains can be easily removed. The client was really to Winnersh Triangle’s exacting sustainability GLASSOLUTIONS’ glazing installation has provided
also had experience of impressed with the end result." specifications, GLASSOLUTIONS employed a variety of more than solar control for the Winnersh Triangle
fitting Trespa in previous different elements to maximise the efficiency of the building’s sustainability credentials: the glazing
projects.” Trespa® Meteon® is the company’s leading family of building’s envelope. installation recently achieved an Air Tightness Rating
architectural panels for façades and exterior applications, of 2.1m3/hr/m2, exceeding the very tight requirement
The colour scheme, a created – as with all Trespa® products–in close collaboration Schueco FW60+ and FW60+ SG curtain walling of 3m3/hr/m2. www.glassolutions.co.uk
maritime mix of white, with architects, designers, installers, distributors and end- systems were installed: with a thermal rating of
grey and light blue, was chosen by the people living in the users. More than 5000 square metres of the 8mm thick 1.5w/m2k, these were the ideal choice to aid internal
134 one and two-bedroom apartments. “Residents had the product in a mix of Cobalt Blue, Royal Blue, Verdigris, White climate control. 6mm SGG COOL-LITE SKN174 panes
opportunity to select the colours for the blocks by casting and Ocean Grey were used in the Poole project. were used for the outer glazing, paired with a 16mm
votes during coffee mornings and neighbourhood get- www.trespa.com

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


34 E
e 35

use in steel profiles. The solution provides an hour


of integrity and insulation from fire and optionally
can be combined with counterpanes which offer
additional performance characteristics such as solar
control, thermal insulation, sound reduction, or attack
protection.

The Here East project was complicated by the need


to accommodate sloping head screens and, due
to the size of the building, significant vertical and
lateral movement. Wrightstyle’s design solution
was to incorporate a specially-welded anti-racking
configuration with bespoke brackets.

“Here East is all about transformative legacy planning –


a hugely imaginative project to create jobs, encourage
creative entrepreneurship, and foster further
education,” said Lee Coates, Wrightstyle’s technical
director. “Our advanced glazing systems allow ambient
light to flood through the building, removing the more
traditional internal walls that the designers saw as
being barriers to networking and collaboration,” he
said.

“The building-height internal atrium uses steel-framed


48 curtain walling with Pyroguard fire glass. On the ground

Glass And
A major project to transform the London 2012 Olympics Sport’s new broadcasting centre, while the rest of Here East floor, there is a subtle continuation of the stunning
and Paralympics media centre into a creative hub is nearing will include shared workspaces, public areas and a range ‘dazzle camouflage’ frit pattern that wraps around the
completion, with fire-resistant glazed atriums supplied by of bars and restaurants. The ambition behind Here East is
Glazing
facade of the building, whilst upper floors mix in black
Devizes-based Wrightstyle, utilising specialist glass from to create a community of offices, studio spaces and a data spandrel panels. This project demonstrates that the
Pyroguard. Here East is a new campus for the creative centre, alongside new facilities for University College London, use of fire rated glazing does not require compromise

Systems and digital industries, transforming the former press and


broadcast centres on the Queen Elizabeth Olympic Park into
Loughborough University and Hackney Community College –
a place for collaboration, entrepreneurship and learning.
in terms of design or performance,” said Simon Ellison,
UK Head of Project Sales at Pyroguard. “The result is

Transform 1.2 million sq ft of commercial space.


Wrightstyle also helped to transform the media centre for
a transformational project that will further rejuvenate
the east of London, become a destination for other

Media
Wrightstyle supplied three full-height steel curtain wall the 2004 Olympics and Paralympics in Athens, supplying over Londoners and serve as a model for other regeneration
internal atriums, to a total project size of over 800 m2, 41,000 m2 of steel glazing systems to create Golden Hall, projects across the UK,” he said.
combining fire resistance to 60 minutes of integrity and now one of Greece’s foremost retail centres. The company, www.wrightstyle.co.uk www.pyroguard.eu
Centre insulation with a high level of acoustic performance.
Wrightstyle also supplied a large number of its unlatched
which is a European leader in the design, fabrication and
supply of advanced steel and aluminium glazing systems, was
6050F1 doors to integrate seamlessly into the atriums over also a supplier to the 2012 London main stadium and the
various levels, part of Wrightstyle’s commitment to offer adjacent ArcelorMittal Orbit, the 114.5 metre tall sculpture
complete and guaranteed glazing system solutions. and observation tower.

Supplying to Lakesmere, the leading roofing, cladding and Pyroguard supplied Pyroguard T-EI60/25-3 VI for the project,
facade specialist, one of the atriums is now part of BT a double-glazed fire resistant glass specifically designed for

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


36 E 37

49 Network VEKA And FCD To The Rescue 52 Small And Mighty – GEZE UK Launches A Tiny
Powerhouse 54
Bury St Edmunds-based Network VEKA member Frames Conservatories
Commercial | Domestic | Listed & Heritage | Special Projects
Direct has stepped in to help a new customer solve an old problem. It may be small but it packs a punch! The launch of GEZE’s new sliding

Bespoke Garage Doors


Local resident, Mrs White was on the verge of despair after a nearby door system is a real David and Goliath affair. The Levolan 120 belies
contractor installed her a conservatory that was far from fit for purpose. its modest appearance – the slimline fitting can effortlessly move
Adrian Lewis, MD at FCD internal doors of up to 120kg with elegant ease. It has twice the load-
explains: “We were keen to fix bearing capacity of
the conservatory and wanted its “little brother”,
to help the customer gain some Tim Crocker ©
the Levolan 60
compensation. Network VEKA which won the Plus
was founded in reaction to the X Award and was
kind of unscrupulous trader named the Best
Mrs White had dealt with. It Product of 2014,
protects consumer’s interests in its category. The
guarantees, safeguarding Levolan 120 shares
their investment. In this case, the original installation was completely its discreet aesthetic:
unrelated to Network VEKA. We were pleased to fit a completely new with straight
roof to ensure that Mrs White was able to enjoy the light and welcoming lines and modular
space she desired in the first place.” www.networkveka.co.uk composition, it’s a
system which is highly adaptable. Its sleek track, which is only 50mm
high, includes integrated derailing protection and can be conveniently
installed from the front. This means that large panelled sliding doors
50 Total Glass Adds WarmCore To Its Aluminium Products – made from glass, wood, metal or plastic - which have interior design Quality - Innovative - Proven since 1968
impact and a real “wow factor” can be put in place in the knowledge
In response to the growing popularity of aluminium windows and
that their practical application can be effectively managed. Additional
doors - especially for residential applications - Total Glass has added
safety is provided by the Levolan 120 SoftStop draw-in damping
the full WarmCore system to its aluminium range.
device which can be incorporated into the track as an option. Solid Timber | Aluminium | Brass | Glass
The ‘next-generation’ WarmCore aluminium
www.geze.co.uk
window and folding sliding, French and
residential door system combines market-
T: 0151 280 6626 | E: info@rundum.co.uk | W: www.rundum.co.uk
leading thermal performance with slimline
aluminium aesthetics, durability and security.
WarmCore doors can be upgraded to PAS24
and Secured By Design (SBD) compatibility.
All WarmCore products are built around 53 Portfolio Collection From Premdor, A Study In Detail 55
a unique full-width thermal core that When the Premdor product development team designed The Portfolio
significantly outperforms the polyamide Collection, the range established new market standards for internal door

The UK’s leading manufacturer


thermal breaks commonly used to reduce design and in particular quality of construction and attention to finer
the threat of cold bridging on aluminium detailing.
windows and doors.
This ‘warm aluminium’ frame construction is key to its 25% better
The solid core door collection is faced using natural veneers and utilising
Premdor’s innovative Veneer Match Technology, producing consistent
of architectural glass products
thermal-efficiency, achieving a U-value as low as 0.8 W/m2K with colour and grain yet still allowing for natural variation, ensuring no two
44mm triple glazing. www.totalglass.com doors are ever identical.
Each door is available with Partitions
sophisticated, contemporary
51 The VEKA UK Group Jumps The 'Q' With Ever-Evolving glazing options with fine
Systems detailing including colour
Balustrades
co-ordinated glazing beads,
The UK's industry-leading PVC-U systems
presenting a perfect colour
supplier, The VEKA UK Group, has achieved
finish. FD30 and FD60 BWF
further professional acclaim for the newly
certified Fire Doors are also Facades
unveiled M70 system. The VEKA UK Group
available throughout the
has completed a major update of its BSI
range.
Kitemark accreditation with the inclusion
Further attention to detail
of the new M70 and the system is already
is demonstrated by colour Stairs
helping ensure that fabricators are
co-ordinated, solid lippings
Document Q-ready. The Matrix 70 Window
along the two long edges of each door, the lippings can be trimmed to
System from VEKA led the industry for
size if necessary.
decades, with its classic good looks and Canopes
The Portfolio Collection presents four distinct design themes comprising
impressive technical performance. The new,
Natural, Exotic, Contemporary and Classic delivering nineteen
even more energy-efficient M70 system has been launched. M70 is just
aspirational designs with trend setting innovations in colour palette and
one of a number of systems from The VEKA UK Group that will help
grain combinations, sure to inspire Architects, Designers and Building Toughened ■ Laminated ■ Heat Soaking ■ CNC Cutting ■ Heat Strengthening ■ Back Painting ■ Screen Printing ■ Full Digital Printing
customers prepare for implementing Document Q. For more information
Professionals alike, who maintain an eye for detail.
on how The VEKA UK Group supports customers with technical and
www.premdor.co.uk/portfolio
compliance issues, contact Mark Barsby for #JustTheFACTS.
Email: mbarsby@veka.com www.vekauk.com
www.esg.glass 01376 520061

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


38 E 39

56 Innovative Patch Revolutionises Door Closer Technology 57 Crittall Windows: Style And Function For Hotel Projects
The latest in next-generation door closer technology, the new Ozone Crittall Windows, in partnership with
Plus (popularly known as the Hydraulic Patch) is now available at Total Firmdale Hotels, has produced a striking
Door Hardware. Suitable for frameless tempered glass and wooden new brochure to illustrate the upmarket
doors, this stylish and easy-to-fit projects that can be achieved using
patch fitting has an in-built hydraulic high quality steel windows, screens and
system which can be installed with doors. From traditional to contemporary,
just four fasteners. The Hydraulic Crittall products meet the architectural
Patch comes in a hold-open and specification and design of hotels,
non-hold-open function and is used restaurants and leisure centres. The
for double action swing doors. Since glossy 18-page ‘coffee table’ brochure
there is no floor cavity or cover plate, presents ‘rooms with a view’, a collection of dynamic colour photos
easy cleaning under the door is also possible. Please contact 01279 taken from Firmdale’s hotel portfolio. To view the brochure online go to:
406049 or email sales@totaldoorhardware.co.uk http://www.crittall-windows.co.uk/wp-content/uploads/rooms-with-a-
view-.pdf or visit www.crittall-windows.co.uk

58 Comar Gets A Great Reception


Comar Architectural Aluminium Systems recently completed a striking and memorable
new entrance and reception area at the Ashton 6th Form College. This entrance features
a series of dramatic fins showcasing the point of arrival and bringing together the old
and the new architecture, creating a dynamic and naturally lit space. Comar 6EFT stick
build curtain walling was specified for this project.
Comar 6EFT provides a capped curtain walling solution and offers architects the
opportunity to maximise large glazed areas as it has the slimmest sightlines available.
Comar 7 doors sets are available in swing, pivot, sliding, auto-sliding and sliding folding,
and have been designed specifically for applications where high traffic solutions are
required.
The Comar 7 doors were fitted with anti-finger trap stiles, Axim soft touch panic exit
devices and Axim concealed transom closers which were hung from the Comar 6EFT
frame and complied with the Disability & Equality Act 2010. www.comar-alu.co.uk

60

FAKRO L-Shaped
59 Glebe House is a development of 3-storey The internal pane is made of laminated
apartments off Abbey Foregate in glass for added safety. With a new frame
Changing Lifestyles With P C Henderson’s Shrewsbury, built by Morris Homes on behalf and sash structure, multi-point locking
Roomflex Folding Door Hardware Windows For of Severnside Housing. FAKRO L-shaped
roof windows with bespoke elements were
function, hardware and handle, it combines
contemporary appearance with high
Changing lifestyles such as people working
from home and multi-generational living has Severnside specified for the project to take the glazing
area from the roof into the wall.
functionality. A P5, anti-burglary glazing unit
with warm spacers between panes can also

Housing
led homeowners to seek more flexibility from be specified to offer a U-value of 0.5W/m2K.
the spaces they occupy. As a result, there has This is done by combining a traditional www.fakro.co.uk
been an increase in the trend for a broken-plan

Development
roof window installed at the eaves with an
layout, creating smaller, multi-use areas that offer adjoining element for the wall. Top windows
privacy and add new functionality to rooms. P C and flashings were in standard grey but
Henderson’s Roomflex hardware helps meets these on this project two lower elements and
ever-changing needs. flashings have been used and made in
It is an innovative internal folding door system that white to match ground and first floor PVC
makes the most of the space and privacy available windows.
in family homes.
Roomflex is designed primarily for use with room FAKRO L-shaped windows are available
dividers and is ideal for applications where there is in right hand, left hand, tilt-and-turn or
insufficient adjacent wall space to accommodate non-opening options and can be used to
sliding or swing doors when open. Homeowners link walls to roof pitches from 15 - 55⁰.
can combine both open and broken-plan living by neatly storing the doors when the spaces are opened for entertaining or socialising. When closed, the
smaller rooms can be used for independent activities such as reading or catching up on TV shows or to simply reduce the space to minimise the cost of
heating the property.
Roomflex is capable of carrying doors of up to 35kg which when fully open, stack up neatly to maximise the opening space. The system is available in three
kits which when mixed and matched, can provide up to 5 different configurations, promoting flexible living. A key advantage of Roomflex is that it does not
require a bottom channel, allowing your floor space to flow uninterrupted from room to room with no potential trip hazards or unsightly guide channel set
into the floor. www.pchenderson.com

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


40 E 41

61

Bright Space For


Market-leading UK glass manufacturer, ventilated space for students, GLASSOLUTIONS
GLASSOLUTIONS, has played a key role in creating selected Metal Technology’s System 17 High Rise
an optimal learning environment for students at curtain walling system to form the building’s
Bright Sparks: Alford Academy’s new Community Campus in
Aberdeenshire.
envelope. With a continuous thermal isolator
providing a thermal break throughout, paired with 62

GLASSOLUTIONS Main contractor Morrison Construction approached


thermally broken casement windows from Metal
Technology’s System 4-20 range, the low U-value
CMS Helps
A collaborative approach to creating new healthcare
facilities in North Lanarkshire, which has transformed
In nearby Kilsyth, CMS worked alongside GRAHAM to
provide aluminium curtain walling, windows and doors

Creates Ideal GLASSOLUTIONS to manufacture and install


an attractive curtain walling system for the
of this configuration provides excellent thermal
efficiency, maintaining a comfortable internal
Deliver
health services provision and access for people across
East Kilbride, Wishaw and Kilsyth, has demonstrated how
for the town’s new Community Health Centre. This £7.8
million facility is around twice the size of the health

Learning
development, choosing glazing products carefully to temperature for students and minimising the need local communities can reap expansive benefits when centre it replaced in the town and represents a step
create a space with excellent temperature control,
effective ventilation and plentiful natural light.
for climate control. Large glass units were chosen
for the project to maximise light transmittance and Lanarkshire’s locally based, sustainably focused supply chain partners change in the quality of the health care facilities and

Environment
are appointed. services available to patients locally.

New 21St
provide a bright interior.
In recent years, Alford Academy has found it All three projects were delivered with the help of CMS played an integral part in delivering the high quality

At Alford increasingly hard to accommodate its large yearly


intake of new pupils. With existing campus capacity
Responses to the new campus have been
overwhelmingly positive; the development has been
Century
Castlecary based CMS Window Systems, which was
appointed by main contractor GRAHAM to manufacture
internal environment due to the enhancement of the
building layout through a two storey courtyard and light

Community at its limit, a £37 million contract was devised by


Aberdeenshire County Council, in partnership with
hub North and the Scottish Futures Trust, to create
praised for its light, airy interior and how well it has
accommodated the needs of the students and wider
Healthcare
and install aluminium windows, doors and curtain
walling for the three new build facilities. Hub South West
well to maximise natural daylight within the building.
The third new medical centre built as part of the project

Campus
community. Scotland Limited was ultimately responsible for delivering is the £17 million Hunter Health Centre in East Kilbride.
the school’s new Community Campus. The new site
accommodates 960 pupils and has brought together
the primary, secondary and senior years on a single
Jim Hanna, project director at Morrison
Construction, said: “Working with our partners and
Facilities the new centres as part of a £48 million investment
programme funded by the Scottish Government.
Home to six GP practices, as well as a dental practice
and a variety of other medical services, the 6300m2
facility features a large glazed central atrium space,
site, as well as providing sport and leisure facilities suppliers, the Campus was finished ahead of the CMS was contracted to provide a variety of building intended to create a calming atmosphere and maximise
for the wider community. coming academic term… We are immensely proud envelope elements manufactured using thermally broken natural light within the building.
to have been involved in bringing this fantastic new aluminium systems from Metal Technology. These
The concept for the Community Campus was resource to fruition for the local community.” ensured the finished complexes would benefit from CMS played a key role in creating the four-storey
based around the creation of a central social hub the optimal combination of thermal comfort, energy building’s envelope, installing thermally efficient units to
for students, with classrooms and study areas The completed project has also been praised more efficiency, longevity and excellent visual appeal. regulate its internal temperature which keeps the Hunter
branching off from this central area. The social ‘hub’ widely by influential the construction industry. The Health Centre light and bright. www.cmswindows.com
area is two storeys high in places: this allows areas development, along with project managers hub The new £23 million Houldsworth Centre in Wishaw is a
to be used flexibly for a variety of activities, as well North, was named a finalist for the Community three and five storey complex providing NHS healthcare
as creating a large and airy space which lets in a Development Project of the Year award at facilities alongside North Lanarkshire council’s new
considerable amount of natural light. the Scottish Property Awards 2016. housing office and library, a shop and café. Centrally
www.glassolutions.co.uk located at the heart of the community, the building
The wide range of purposes that the new campus replaces the former Wishaw Health Centre and
was intended to fulfil meant that versatility was Wishaw library. CMS manufactured and installed all the
a particularly important aspect of the glazing aluminium curtain walling and side hung windows for this
specification. In order to create a safe, light, well- contemporary building.

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


42 E 43

64

One Man With One Screwdriver


Architectural ironmonger BJ Waller has launched a
new service with a leading UK door manufacturer
for fully integrated commercial doorsets for
commercial internal doors, including fire resistant,
acoustic, X-ray and many more. As well as
ensuring accurate specification for high usage
applications, delivering slabs with pre-prepared
hardware will speed up timelines for contractors
by making doorset installation a job for “one man
with one screwdriver.”
Each doorset schedule is tailored to the project,
with BJ Waller providing expert technical advice
and support to deliver the right hardware for the
63
chosen door slab. Options include BJ Waller’s
new Quick-Fit Plus system which offers easy and

Imago Lift
The imaginative use of Imago Lift & Slide doors from AGB To support this effect, the architects wanted a door
precise assembly of the whole door handle set in
Hardware has enhanced the peaceful environment of opening that would appear invisible, to encourage free
a few seconds and without the need for screws, bolts or grub screws. Integrated doorsets are designed to make life easy for everybody. For
an innovative residential therapy centre for recovering movement of residents in and out of the pavilion. After
& Slide addicts. looking at options available on the market, Sara and Marta
fell in love with the possibilities offered by the Imago Lift &
contractors, there are obvious advantages in terms of time- and cost-savings but the bigger benefit will be to reduce the chance of damage
to doors from fitters rushing to complete the job.

Provides CentroSoranzo is a not-for-profit social health facility,


located on the site of a disused military fort in a wood
Slide system and incorporated Imago into their design.
For specifiers, that adds extra peace of mind that the finished product will be in top condition for long-term efficiency and durability, backed
by BJ Waller’s expert knowledge of hardware performance. By partnering with the door manufacturer, all preparation is done in the factory.
Slabs are supplied pre-hung with as much hardware already in place as possible – anything that is flush – for easy installation. All protruding
The Natural outside Venice, where drug, alcohol and gambling addicts
can be treated in a natural, therapeutic environment. The
“The fact that we could minimise the frame width meant
we could fit even more glass into the area, so that guests
hardware is fully prepared prior to delivery. Perfect for commercial installations such as hotels, hospitals, schools, apartment blocks and
top-end residential projects, BJ Waller developed its integrated packages ahead of CE Marking regulations on commercial internal doorsets

View For
centrepiece of CentroSoranzo is a wooden pavilion where can feel the benefits of being at one with nature even
due in 2017. www.bjwaller.co.uk
the centre’s guests can feel at one with nature to assist when they’re inside,” explains Marta Baretti.
their recovery, which features two Imago doors.

Therapy Imago’s slim-line frames and large glazing areas are


Two Imago doors are in use in the main pavilion, which
slide together and meet behind another pane of glass.

Centre perfect to frame the idyllic woodland view from the


building, while the easy opening mechanism ensures that
This provides two exit and entrance points, further
enhancing the effect of freedom that the architects
guests can enjoy the pavilion’s outdoor terrace. wanted.
Imago is also in use as a window system in the centre’s
65
canteens, highlighting the versatility of the hardware to “The asymmetrical design of the building presented a
create glazing that is as good-looking as it is useful. challenge in how best to incorporate the Lift & Slide
door into the overall shape of the glazed area, which is Metal Technology Rises To The
The design of CentroSoranzo was a collaboration between split into several different geometric shapes. Happily, Education Challenge
architects, artists, graphic designers, psychologist and the Imago hardware is so versatile and easy to use that
psychiatrists. Their collective objective was to place the installation of the door was a smooth process,” says Sitting on the grounds of Bruntsfield House, a Grade A-listed
natural beauty as a key element of therapeutic care, with Marta. building, sympathetic design, which respected the past but looked
careful use of space, shape, colour and décor to make the to the future was an essential part of the design of the 1,150-pupil
centre a welcoming environment. Given the simplicity of the Imago system in terms of James Gillespie High School in Edinburgh. To achieve that in the
design, installation and use, Marta and Sara were quick design and construction of the series of inspirational buildings, JM
Architects Sara Carbonera and Marta Baretti of Arbau to add Imago windows elsewhere in the centre, including Architects specified a suite of systems from leading architectural
Studio wanted a design that would emphasise this feel and high-usage areas such as the canteen. aluminium manufacturer, Metal Technology.
not be seen as a clinical environment. Buildings have been The scheme incorporates System 17 curtain walling in both standard
built in pine to match the woodland setting, with extensive “The Imago Lift & Slide door is an essential part of cap and T-shaped cap variants, used in conjunction with [THERMAL]
use of glazing to maximise the natural light coming into CentroSoranzo and has helped to make our design come to range Systems 25 Hi+ lift-and-slide sliding doors and 5-35 Hi+ tilt-
the pavilions. life. The guests love having the ease and freedom to step and-turn windows to create an overall aesthetic.
outside as part of their therapy – but thanks to Imago, All systems from Metal Technology have been developed and
The main pavilion features an outdoor terrace and the they can enjoy the view from indoors, too.” www.agb.it stringently tested to meet and exceed industry standards in terms
building is designed so that outside and inside blend of structural integrity and functionality, weather, thermal, safety and
together under an asymmetrical, overhanging roof. The security performance, while offering limitless flexibility in design.
eight metre glazed facade that looks out onto the terrace The original school building, founded in 1803 by Edinburgh tobacco
is not perpendicular to the building’s perimeter walls, merchant James Gillespie, was also renovated and refurbished in
being angled instead to strengthen the view and enlarge keeping with its historic building status as part of the overall scheme.
the terrace area for a dynamic blend of interior and www.metaltechnology.com
exterior.

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


44 E 45

Carleton Manor Park is an exclusive new Not only does the CI+ Matting benefit tiled
housing development that offers luxurious flooring installations by protecting the tiles,
family homes of the highest quality. In order but also helps as a time saving solution
to showcase the high-end, aspirational feel during the installation phase. It can be
of the development, the showhome was laid over the subfloor as soon as it is dry
proudly designed and created and all of the enough for a person to walk over, rather than
high quality products used throughout were traditional methods where subfloors need a
carefully considered. Dural UK’s CI+ Anti- substantial amount of time to fully dry. Air
Crack Matting, Micro Joint Infill and Durabase channels in the matting allow the subfloor
WP Waterproofing Membrane System were rafts to continue to dry out in a controlled
all used throughout the property to provide way by preventing the top layer of the screed
effective movement protection in the natural drying quicker than the bottom. This slow
stone flooring. drying period leads to a stronger subfloor.

A showhome with a wow factor - Located Dural’s Micro Joint Infill was also used in the
on the outskirts of Penrith, Carleton Manor kitchen area to provide additional protection
Park is surrounded by natural beauty with to the Astro Grey Marble tiles, and was
the Lake District National Park a stone’s supplied and colour matched to Grout 3000
throw away. The developers, Cumbrian Light Grey. The colour match enabled a
Homes, wanted to ensure the natural beauty seamless finish for the surface tiling. Micro
remained integral in the design throughout Joint Infill has been specially developed for
the luxury homes in Carleton Manor tiled flooring installations which are laid over
Park. Cumbrian Homes worked with local underfloor heating systems, particularly
specialists Penrith Tile Centre, and effectively for residential developments. It provides
combined the natural stones and porcelains effective movement protection for tiles and
throughout the showhome to complement natural stone on heated floors. It means
the surrounding area. The Tasman natural a tiled flooring installation with Micro Joint
floor and wall tiles with plank effect look Infill used is able to effectively absorb the
stunning in the main bathroom as they mimic movement energy transferred from the
the variability of natural wood. subfloor, protecting the tiles from cracking
and loosening.
In the kitchen and living areas of the
67 property, Ca Pietra’s Astro Grey Marble Penrith Tile Centre applied the Micro Joint

Superior
tiles were used in an unpolished finish. The Infill into the grout lines in between the
delicate, subtle tones of the tiles blend Astro Grey Marble tiles, carefully following
effortlessly with the beautiful, traditional the brick bond tile formation. In the shower
66
Flooring kitchen cabinetry. The high standard of finish and wet areas within the showhome, Dural’s

Looking
Bona White is a new wood floor primer designed to To produce a highly durable, easy to maintain finish, and attention to detail is clearly evident in WP Durabase Waterproofing Membrane
produce an on-trend bleached look when used in
conjunction with a Bona polyurethane lacquer. The
two coats of Bona Traffic HD lacquer were applied.
Traffic HD is Bona’s toughest lacquer. The very low
Products the beautiful showhome. It is important to
consider the function as well as the form,
was used. It is the ideal product for
waterproofing shower areas in preparation
For A intensity of ‘whiteness’ is dependent on how many
coats are applied. This client wanted a whitewashed
VOC content and low odour mean there is no need
for homeowners to vacate their property while the For Superior and the practicality and durability of the
stone tiled surfaces throughout.
for tile installations.

Whitewashed look to their original Victorian floor boards to tie in


with the soft greys of the kitchen.
works are being carried out and there is no lingering
smell. Living As with all hard flooring materials, they are
The Durabase membrane has excellent
sealing properties and enabled a better

Floor? This was achieved by the application of two coats Its fast cure time means the floor can be in full use
Spaces
prone to various forms of stress and strains
over time e.g. expansion and contraction
adhesion when using the Tilemaster
adhesives. The Tasman natural floor and wall
of Bona White under two coats of Bona Traffic just 12 hours after treatment – making it an ideal caused by underfloor heating systems, tiles, supplied by Marshalls, look stunning in
HD lacquer. The works were part of a complete choice for commercial floors too where there is cracking, loosening and others. It is essential the bathrooms throughout the showhome
renovation of a Victorian town house in Bath and little available downtime for renovation. TWF’s to protect the surface tiles to retain the and are now protected by the Durabase WP
were carried out by Bona Certified Contractor, TWF clients chose the Matt version of Traffic HD for their aesthetics and integrity of the flooring. Waterproofing Membrane.
Bath Ltd, who specialise in the restoration and kitchen floor. Silkmatt and Extramatt sheens are also
fitting of traditional wood floors. Before treatment, available. Dural UK, specialists in protecting tiled Dural are proud to have worked with Penrith
the TWF team filled large gaps using reclaimed flooring installations - throughout the Tile Centre and Cumbrian Homes on the
pine wedges and then sanded the floor to 100 grit As a Bona Certified Contractor, TWF Bath is part showhome, Dural’s CI+ Anti-Crack Matting Carleton Manor Park Project, and there are
abrasives. of Bona’s network of highly trained wood floor was used, together with Tilemaster plans to use the same high quality products
specialists - independent wood floor companies who adhesives. It effectively decouples the in the rest of the 39 houses in the luxury
Smaller gaps were filled using Bona Mix & Fill, have received extra in-depth training in the use of surface layer of tiling from the subfloor development. For further information on
which is mixed with sanding dust from the floor to Bona’s wood floor finishing products. beneath it, absorbing any stresses or Dural’s range of flooring accessories, contact
ensure the filled areas blend in with the rest of the www.bona.com movements caused by expansions or their flooring experts and they will be happy
surface. The floor was then sanded using 120 grit contractions. By doing this, it protects the to provide further information.
abrasives before the application of the first coat of tiles and prevents them from cracking or www.colouredmovementjoints.co.uk
Bona White. The floor was then abraded using a loosening.
Bona Scrad Pad to remove any grain raising from the
surface before the application of the second coat.

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


46 e
E 47

69

Inaugural
Installation
Of Mapei’s
Comfort
Flooring
68
System
tough, hard-wearing film, EW99 is easy to clean EW99 delivers a spreading rate of approximately The international architects BDP have
Aviation Museum and decontaminate, and it can be used with a low-
slip additive for extra performance.
12 square metres per litre and is surface dry in two
hours, with overcoating possible after a minimum of
recently refurbished the floors within
their Bristol office with Mapei’s new

Rebuild Gets ‘The Ashley Colella, the museum’s manager, explains the
16 hours. Complete cure is achieved in six days. Mapecomfort Floor System. The floors
in the meeting, library and toilet areas

Bradite Treatment’ progress of the rebuild and Bradite’s contribution:


“First, we applied a thinned base coat of Bradite’s
“In the case of the Gatwick Aviation Museum,” says
James Burton, Bradite’s national sales manager,
have been covered using Mapecomfort
Floor System AR/X in grey – the first
EW99. Then we applied two coats of EW99 mixed “When the unit was weather-tight, we met with all completed project worldwide using the
Bradite’s 2K Floor and Wall EW99 specialist coating with aggregate to give us a low slip surface. We the people of the museum to discuss Bradite EW99 system. Originally established in 1961,
was recently specified as part of the rebuild of the required a total of 385 litres to cover the new loor for the floor. Our team then carried out regular BDP have offices worldwide combining
Gatwick Aviation Museum. Now run as a charitable area of 1805 square metres.” visits to check on the preparation and application of local knowledge with vision, value and
trust, the museum began in 1981 when local our products,” James continues. “After three coats infrastructure of an award winning
businessman and aircraft enthusiast, Peter Vallance, An added challenge arose when all aircraft and of EW99 were applied to the floor, the airframes practice. The project was undertaken by
transformed a run-down battery farm to house his engines had to be moved up the entire length of were moved into their new home, ready for the Coatech Ltd. who specialise in all types of
growing collection of aircraft, parts, models and the museum for arranging and positioning. Despite opening of the museum on 25th March this year.” resin flooring nationwide.
memorabilia. some of the engines weighing around 1.5 ton - and
the heaviest aircraft weighing 12 ton - volunteers For this project, Bradite’s SA12 aggregate was used Initially, carpet and multiple layers of vinyl
However, as the collection grew, most of the aircraft and staff were impressed that no damage occurred in conjunction with EW99 to reinforce the low-slip tiles were removed exposing the sub base.
had been stored outside for more than 20 years. to the floor, thus demonstrating EW99’s durability finish. This additive, which consists of tough, hard- A cove was installed to all toilet walls
To ensure the heritage of this significant collection, and wear-resistance. wearing particles, is suitable for use with all types ensuring that the floor area remains easy
a new structure has now been built to house a of floor and deck paint to give a low slip surface to clean and maintain. Mapecomfort was then laid to the floor and sealed with Mapefloor Pore Filler. Once this had
number of historic aircraft. Demolition of the old Resistant to many chemicals and solvents, EW99 in areas of heavy traffic and helps to prevent cured, Coatech applied a coat of Mapei Mapefloor PU 460, a 2-3mm flexible, self-smoothing polyurethane. To finish,
building was carried out, with the rebuild scheduled inhibits the growth of fungus and bacteria, and accidents on wet floor areas. two coats of Mapei Mapefloor Finish 58 W, a matt finish polyurethane coating, was applied.
for completion within 10 weeks. can also be used as an anti-graffiti coating in
common internal areas. As there are no solvent With the completion of its new building, the Due to its elastic properties the Mapei Comfort Floor System proves advantageous when a good level of comfort
For the floor treatment, the application of a high fumes, no odour and no tainting of food, there Gatwick Aviation Museum moves into a new phase. is required underfoot. This is provided from the matting at the base of the system which also has excellent
performance non-slip coating was imperative. is no discomfort or disruption caused to nearby Bradite, a company with a long history of its own soundproofing capabilities, reducing the impact of noise transmission into areas below. The flooring system also
Bradite’s 2K Floor and Wall EW99 was specified. operatives; this avoids the costly inconvenience of dating back to 1938, is pleased to be making a has a high resistance to wear and abrasion from constant foot traffic and moveable office furniture such as castor
This two-pack water-thinned, epoxy coating and shutdowns during application. Safe after use, this contribution to this significant heritage project. chairs. For more information regarding this new flooring system please call 0121 508 6970 or email
finish paint is designed for application to floors, floor paint is certified as class O for surface spread www.bradite.com info@mapei.co.uk. Visit www.mapei.co.uk to view the full product range.
walls, structural steel and machinery. Delivering a of flame to BS476.

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


48 E

Notes from the Comar


design team... Large 62mm glazing
pocket for acoustic
or triple glazed glass.
BIM ready.
Slim sight lines for
both the casement Fast-track semi unitised
With thermal foam and and tilt/turn. construction for floor to
triple glazing, U-values are ceiling glazing.
reduced to 0.77, creating a
future proof solution.
Windows hang direct from
the Comar 9P.i Frame as
well as rebated doors.
The latest thermal
break technology
70 including foam.
Kemperol
Three roofs of one of Manchester’s most iconic Having cleaned and prepared the existing roof
office buildings have been refurbished with an surface, Castle Contractors applied a primer before
overlay of Kemperol liquid membranes from applying the resin in a single wet-on-wet process
Membranes Kemper System. Piccadilly Gate is home to various
Government departments including Education,
in which the resin is first applied to the substrate;
reinforcement fleece is then laid directly on to the

Put Piccadilly Ofsted and Highways England. wet resin, immediately followed by more resin on
top.

Gate's Roofs The 125,000sqft building adjacent to Manchester


Piccadilly Station was refurbished in a £25 million This ensures complete saturation of the

Back On
BREAM ‘Excellent’ scheme in 2010. Issues with the reinforcement fleece. Once cured, the resin forms
integrity of the roof had continually plagued the a seamless, elastomeric waterproof membrane
building with leaks, resulting in unsightly staining that cannot delaminate, is UV stable and bonds

Track to the suspended ceilings within. Consequently, the


decision was taken to overlay the existing single
directly to the substrate.

ply roofing membranes on levels 10, 4 and 3 with a For the green roof on level 3, Castle Roofing
cold-applied liquid system from Kemper System. carried out the refurbishment in two sections,
removing half the green roof medium and installing
Roofing contractor, Castle Roofing, was appointed Kemperol V210 onto to the existing surface as an
to carry out the works and selected Kemper overlay before replacing it and lifting the second
System’s solvent-free Kemperol 2K-PUR as the section so that the new roofing membrane could
most appropriate solution for the level 10 roof. be installed. The second section was then re-

comar 5P.i
instated, completing the programme.

ADVANCED
Explains Mark Atherton from Castle Roofing: “The
level 10 roof is directly above occupied office Comments Jim Fozzard, building manager at
areas and is also the location for the building’s Piccadilly Gate: “We needed a roofing system that
air handling plant, so nuisance odours could could be installed quickly to prevent any further
Latest Thermal Break Technology Produces the
71
potentially have been transferred into the office damage to the building’s interior, while minimising
areas. any disruption to occupiers and maintaining
Piccadilly Gate’s high aesthetic standards.
Next Generation of Windows.
“As a result, we chose to use Kemper System’s Comar’s Design Team brief was to specifically meet architectural demands; low For more information about
2K-PUR system, which is solvent-free and “Using Kemperol 2K-PUR on the level 10 roof
U-values, matching slim sight lines for both the casement and tilt/turn windows, comar5P.i ADVANCED please contact us:
odourless, while still offering high performance and meant that occupiers were not affected by any
large glazing pocket for acoustic glass, Secured by Design and large sizes. For our
a BBA-accredited 25-year service life.” changes to air quality, while all three roofs have Tel: 0208 8685 9685
been overlaid using a seamless membrane without fabrication and contractor partners, performance with built in fast-track fabrication
Email: projects@parksidegroup.co.uk
The level 4 roof is above the building’s record- the use of hot works for a durable solution and installation.
Web: www.comar-alu.co.uk
breaking extra-long escalators and leaks from requiring no strip out.”
two water outlets had caused staining of the http://kemper-system.com The technology from the Comar 9P.i system has been incorporated into the Comar 5P.i
suspended ceiling. This roof was also refurbished window range. This ensures the Comar 5P.i Advanced Casement and Tilt/Turn window
as an overlay system, using Kemper System’s
system integrates seamlessly into Comar 9P.i framing and creates the option for standalone
Kemperol V210.
high performance windows, up to 2.5m high with U-values as low at 0.77. BIM Models
available at Comar Partners: www.comar-alu.co.uk/login/.
enquire online at www.ebpr.co.uk/card
ARCHITECTURAL ALUMINIUM SYSTEMS
50 E 51

73

Heraklith Roof Board Respecified For


Restoration Of Richard Rogers House

A detailed refurbishment project to conserve an


architecturally significant residential property is making
use of a special composite woodwool board from the
range supplied by Marmox Limited to ensure not just the
integrity of the work, but also the building’s long term
performance.
The house in Wimbledon was originally designed and
built by acclaimed architect, Richard Rogers to serve as
his parents’ home and takes inspiration from some of the
Modern Movement buildings of the early 20th century.

Completed in the late sixties, the property features extensive glazed elevations and a flat roof of minimal depth, where the designer of such iconic
structures as Lloyds insurance offices in the City of London, chose to employ Heraklith woodwool “Roof Board” to help regulate humidity levels within
the occupied space.

Basically the depth of the roof did not provide sufficient space for ventilation and instead Rogers specified the special grade woodwool board to
absorb moisture from the air when humidity levels are high. But then when the air is dry, it will release moisture back into the air. This keeps the room
humidity constant and comfortable, while also reducing the risk of surface condensation which can lead to mould growth. In fact the Roof Board was
manufactured specifically for this project, incorporating timber slats to provide additional strengthen and allow them to sit unsupported above the
72
ceiling. The refurbishment of the single storey southwest London house has been carried out by Piperhill construction, with the Northern Irish company

Dry Fixing
Since the NHBC’s change of policy on mortar fixing A new British Standard is at the planning stage and we striving for authenticity in keeping with the design ethos of the Grade II listed dwelling. www.marmox.co.uk
and the revision to BS 5534 forecasts for an increase in may be lucky enough to see it published around the turn
the use of dry ridge, hip and verge systems have, not of the year. If it is to succeed, we will have to hope that
Problems surprisingly, proved to be accurate. in-house testing isn’t accepted or we are likely to be
faced with the questionable results seen with underlays

Exposed The continued upward trend in roofing-associated claims


under the Buildmark new homes warranty had made the
following publication of BS 5534. The only way to avoid
less scrupulous manufacturers claiming like-for-like quality 74
need for action unavoidable and with a clear reduction against materials which are genuinely fit for purpose is to
in mortar problems having been seen in Scotland (where define and measure objectively material requirements and Metrotile Profiles Make Light Work Of
dry fixing has been in favour for many years) the evidence performance. Coastal Conditions
was clear. Even so, despite the benefits, complaints
have been increasing and there is little doubt that some There is often little published technical detail in support Climate change is increasing the likelihood of last
products reaching the market are of poor quality. In the of low cost dry fix systems and a few minutes checking is winter’s extreme weather. Architects, developers
absence of a British Standard to provide meaningful well spent as it can do much to reduce the chance of calls and specifiers should consider resistance to storm
regulation, merchants and roofers have been encouraged back to site. Products with a proven track record have force winds and saline air, as well as transport
to think that cheaper options are like-for-like with tried achieved it by being universally compatible and yet there costs, when weighing up options for roofing in
and tested ones. is still a tendency among some tile manufacturers to claim coastal areas.
that long-term performance can only be guaranteed by Shingle-covered asphalt is cheap but unattractive
In the RMI sector, the lack of effective building control using their own dry fix systems. This is despite the fact and not durable. Clay
has also encouraged use of cheaper roofing accessories that some describe their products as suitable for universal and slate require
and dry fix products in particular. There seems little doubt use! large amounts of
that in the face of a growing market some manufacturers maintenance. Wooden
have been cutting corners to maximise profitability. This In practice, specialist roofing accessory manufacturers roofs look great but
extends to the variations in ridge and hip kit components with no dependency on selling tiles or slates are more won’t stand up to the
for which Klober supplies all that a roofer needs to fix 5 likely to offer products offering genuine assurance weather for long.
metres of ridge or hip, including hip trays. of performance. To be compatible with a tile profile Metrotile UK believes
manufactured by several companies the scope of testing lightweight steel tiling can be the perfect solution – if it’s good quality. If well installed, durable, galvanised and properly coated, it can stand up
One element of a kit that can perpetuate early failure is undertaken by such manufacturers is likely to have been against all of nature’s extremes.
the adhesive backing on ridge rolls. If this is to withstand both thorough, well documented and, in many cases will Metrotile profiles are fully accredited by the British Board of Agrément and are tested against extreme weather – from cyclical freeze-thaw
the effects of severe weather and provide a strong bond have been done by an independent third party. As a result, conditions in Japan, to extreme wind uplift testing in California. And they’re really light – making transport easy and cheap while reducing carbon
to the surface of a tile the adhesive has to offer the the contractor will find that accessories are more practical footprint.
highest standard of performance. Klober uses Butylon® to use and that the ridge, hip and verge systems are easy Extreme locations where specifiers are recommending our products include Gibraltar, where procurement specialists Colomendy have used
which bonds to almost any surface and provides virtually to fit. www.klober.co.uk Metrotile to refurbish 25 blocks of flats in the Reclamation Areas, and Fair Isle off the north Scottish coast, where a prefabricated bird observatory
immediate weatherproofing and usually needs no primer. was transported by land and sea before being craned into position. www.metrotile.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


52 E 53

75

Impressive
With capacity for almost 4000 guests and 96% separate sections, like a wagon wheel – ensuring
occupancy, keeping the central area of Center Parcs the structure was not compromised by uneven load
Longleat Forest open was key to the refurbishment distribution. This stepped, terraced temporary roof
Center Parcs of its impressive Subtropical Swimming Paradise. A
massive challenge for Delomac Roofing, the project
was then covered with plywood and completely
weathered by Delomac with a Sarnafil membrane.

Roof Refurb to renew the roof with a Sika Sarnafil membrane


was accomplished with two years of meticulous With the temporary roof in place, existing glazing 76

Completed planning and 30 months of onsite construction. and coverings could be safely removed, maintaining
water-tightness with guests enjoying the facilities Spanish
The attractive, durable and easy to handle properties
of Cembrit Duquesa natural slates have meant that
Cembrit has a reputation for sourcing Spanish slates,
and can be relied on to supply the best value and

With Zero
Originally completed in 1994, the Subtropical below. Scheduled over more than two years, this a large roofing project, spanning 3,200m2, could most appropriate slates for all project types. Duquesa
Swimming Paradise roof and glazed rain-screen
systems were in need of refurbishment. The new
way of working resulted in a dry building envelope,
despite some of the wettest weather on record.
Natural be completed in just 14 weeks. Following approval is a high quality natural slate from Cembrit which is

Guest
from East Herts Council, a disused estate has produced by some of the finest quarries in Spain.
roof installation was planned in close discussion
with the Sika Sarnafil and Delomac supply chain, Comprehensive vapour barrier measures were used Slates been regenerated to include a multi-million pound
supermarket and maltings. The site is now home to a Regarded as one of the best Spanish natural slate

Disruption developing the specification to address all the


client’s strict performance, environmental and
on the pool side of the building to ensure the high
humidity chlorinated environment was contained. Fit The large ASDA store, which has brought more than 100
jobs to the local community in Ware, Hertfordshire.
brands available in the UK, it is a tough material with a
smooth texture that will provide an attractive and long
aesthetic requirements. Robust SFS sealant and Sarnafil metal-lined vapour

Supermarket
lasting roof covering for a wide variety of projects.
barrier detailing at all Glulam beams and fascia Bracknell Roofing was appointed as the roofing Duquesa is available in a variety of sizes to suit
Chris Meadows, Technical Advisor, Sika Sarnafil interfaces ensured no risk of condensation. contractor for this project by the main contractor, individual requirements. It has a smooth, even texture,
explained: “The client needed a durable, long lasting
roof system that would complement the woodland Sarnafil membrane and accessories were used for
Bill Mace Group. Working closely together, the two
companies specified suitable roofing materials to
which, as well creating an attractive appearance, also
aids the preservation of the finish.
setting. This was complicated by differences all the coverings, and again overall specification meet the major criterion for this project - achieving a
between the swimming pool side and dry side, with development was tailored to suit the varying balance between cost and quality aesthetics. Due to The hard surface also ensures the slate can withstand
restaurants and meeting rooms, of the building. build-ups; new, overlay, bonded and mechanically its attractive appearance, and cost effective benefits, the most severe weather conditions and remain
fastened. An increased thickness membrane was Cembrit Duquesa natural slates were specified. unaffected by sunlight, ultraviolet light and even acid
“We proposed two distinct solutions– a mechanically manufactured in one single batch to ensure colour rain. When laid correctly, Duquesa will last the lifetime
fastened system using Sarnafil S327-18EL for the consistency. Sika added further value with an Approximately 40,000 500x250mm grey Duquesa of a building and is ideal for use on any major project
dry side and an adhered system using Sarnafil impressive 17 visits to the site by the Applications slates were installed by Bracknell Roofing. The natural including supermarkets, schools, city offices and
G410-18EL for the more humid area. Both were Team to advice and support. www.sarnafil.co.uk slates provide a striking design on the new 2000m2 prestige homes.
specified in Patina Green to blend with the natural mansard roof, and the existing 800m2 building, which
environment. Sarnafil membranes are cold applied now serves as the back of house for the main store. Duquesa slate is a tough natural material which has
and free from naked flames, the obvious choice for Peter Edwards, National Project Manager, Bracknell been tested to ensure it meets the current national
an open site.” Roofing, commented “Cembrit Duquesa slates deliver standard, BS EN 12326-1:2004. For more information,
on all aspects, as they are a cost effective natural visit www.cembrit.co.uk Follow on Twitter at @
An innovative temporary terraced platform was material, provide the finish that the client requires, and CembritUK and Facebook at Cembrit UK.
designed and installed, suspended underneath are easy to cut and install, which helps us when trying
the main structure by cables and lattice beam to complete a project quickly and effectively.”
scaffold units. Work was carried out over 16

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


54 E 55

78 Ronadeck Resin Bound Surfacing – Not Just Decorative 79 Eye-Catching Brett Paving Solution For £15.5m School
Refurbishment
Resin bound surfacing systems can differ not only in quality and
longevity but in other factors such as slip resistance, sustainability, Sarum Academy in Salisbury has
health and safety and cost per square metre. So what features should regenerated its external grounds
be considered? using a permeable paving solution
It is worth looking at from Brett Landscaping. The eye-
manufacturer credentials catching scheme has been created
such ISO 9001 and ISO using Piatto Block paving with its
77 14001 certificates, OH SAS vibrant colours and clean, modern
18001 certificate and FERFA design, combined with classic
Omega and Omega Flow rectangular

Hauraton
membership.
Types of resin used - the block paving. The permeable paving allows rainfall to permeate naturally
best resin bound surfacing between the paving blocks into a permeable sub-base as part of a SuDS

Customised systems use aliphatic resins


rather than aromatic resins.
solution designed to help prevent flooding. www.brettpaving.co.uk

Drainage Ratio of resin to aggregate


- this should be minimum
Marshalls' Mono Beany Wins Prestigious Innovation Award
Solutions
7% to ensure consistent 80
strength and performance
Marshalls has picked up the
of the system. Application thickness -this can vary, but a good quality
Innovation Award at the 2016
system should be laid from 15mm for pedestrian traffic and 18mm for
Mineral Products Associations
vehicular traffic. Slip resistance - A good system should conform to
Hauraton manufacture a vast selection of surface water British Precast Annual Best Practice
BS 8204-6:2008+A1:2010 Appendix B. Quality control - a two part
drainage channels for Civil and Landscaping applications that awards ceremony in Leicester.
system where the catalyst is built into the manufacturing process
cover all loading categories from Class A15 to F900 and storage Marshalls beat off stiff competition
should only be sourced.
volumes up to 443.0 litres per metre. Their FASERFIX® channel from the likes of Charcon, PCE
Permeability - SuDS compliant system; Aresin bound surfacing system
components are cast from the company’s Fibre Reinforced Limited, and Tarmac Building
should be permeable, but permeability rates can vary depending on
Concrete (FRC) whilst the RECYFIX® channels are moulded from Products to scoop the award. The
the aggregate size. If you are still unsure then ask for technical help,
100% recycled polypropylene (PP). Both of these channels are winning project from Marshalls was for their innovative drainage system
the Ronacrete Technical Department will be happy to assist.
available with a wide range of slot or mesh gratings made from Mono Beany, which is a combined kerb and drainage system and utilises
www.ronacrete.co.uk
ductile iron, galvanised steel, stainless steel or FIBRETEC®, a Marshalls’ latest concrete mix technology M Tech, which is formed
composite reinforced material (PA-GF) developed specifically around a 100% recycled Polyethlene core. www.marshalls.co.uk
by Hauraton.

Although Hauraton’s FASERFIX® and RECYFIX® stock ranges


cover most application, Architects, architectural technicians
and engineers need not be constrained by the components
offered. The company can provide customised solutions that 81
achieve reliable drainage, and where necessary, provide designs
that blend in with the desired aesthetic effect demanded. Power Bollards Provide A Safe, Secure Outdoor Power
Supply For Gravesham Borough Council
Where a customised solution would provide the answer,
Hauraton Area Project Managers will document the designer’s Pop Up Power Supplies® were approached by council planners to provide an outdoor
specific requirements at an early stage of the pre-planning power supply for an area outside the local civic centre.
phase. A specialist team will then engineer the channel scheme
taking into account the aesthetic appearance of the channel Pop Up Power Supplies® were able to offer their range of power bollards to provide a
run as well as its functional requirements. safe, secure and silent outdoor power supply. Specified in a Button Top Supply Bollard
with hatch closure, the slim bollards are all located around the perimeter area next to
Tim Connolly, Managing Director of Hauraton Limited says, walls, and as a result have a limited impact on the outdoor area.
“Solving the many and diverse surface water drainage
requirements requires in-depth knowledge, considerable The power bollards are a popular choice of street furniture as they are an elegant design
expertise and comprehensive experience. Our technical office and complement the surround environment well with their sleek aesthetics. George
personnel and Area Project Managers have this technical and Parker, Director of Pop Up Power Supplies® commented, “Our range of Power Bollards
product-specific knowledge. If a specifier requires anything out were ideal for the area right outside the civic centre for Gravesham Borough Council.
of the ordinary with regard to functionality or design, we can The sleek design of the bollards is helped with the brushed stainless steel finish, which
support their individual requirements, from project-specific complements the surrounding metal railings and street furnishings. The bollards provide
tender text, through to production, delivery and installation. a reliable, secure outdoor power supply, and are totally encased therefore are a safe
option for the large footfall the area gets.”
For further information about Customised Drainage Solutions,
customers can request a copy of our digital 48 page catalogue. Pop Up Power Supplies® range of stainless steel power bollards provide between 220
Technical information including sizing and installation details for and 400 volts and 125A of power. They are available with standard configurations plus
Hauraton stock ranges is available digitally on www.hauraton. additional equipment is available for a completely bespoke outdoor power solution.
co.uk and for case studies go to www.drainage-projects.co.uk www.popuppower.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


56 E 57

83 Bespoke Loading Bays From Stertil Dock Products Support 84 Wraptite-SA Conquers Airtightness At 1066 Zero Carbon
DHL Operations At Manchester Airport Homes
An installation of 99 loading Wraptite-SA airtight membrane has been specified to achieve a highly
bays has been completed efficient building fabric as part of a concept to create a terrace of 5
by Stertil Dock Products Zero Carbon homes in a site close to Hastings Castle. The homes are
to support a revolutionary built from pre-fabricated heavyweight
new DHL distribution hub at timber frame panels, with Wraptite-SA,
Manchester Airport City. DHL self-adhering vapour permeable air barrier
has begun operations within being applied on site. The use of Wraptite-
the Manchester Airport City SA makes a significant contribution to
Global Logistics site which was a £15m project completed in 2015. The a building’s thermal performance by
company’s new 37,308 sq ft facility incorporates a mix of conventional preventing lateral air movement. It also
loading bays and specially shaped bays to accommodate Mercedes provides high vapour permeability in a
Sprinter vans. The site replicates a similar installation at Schiphol Airport continuously sealed, self-adhered, airtight membrane.
in Amsterdam. www.stertil.co.uk http://www.proctorgroup.com/air-barriers

‘Order…Order’… In The Transformation Of A


85
Court House To A Sumptuous 5* Boutique Hotel
Selectaglaze helped turn an old draughty court house into a warm and peaceful
boutique hotel. Once a building where judges passed sentences and the Police
placed criminals under arrest, a Grade II Listed Magistrates Court and Police Station
on Old Street, has been converted into a 5* boutique hotel.
To transform this Grade II Listed building from a Courthouse
to a hotel, careful consideration had to be given as to how
the thermal performance could be improved as well as
mitigating the ingress of noise from outside.
As the building is Listed, the original primary windows
could not be removed, so Selectaglaze was approached
by the principle contractor McAleer and Rushe to provide
a solution. A total of 106 units were installed including
curved, raked, casement doors and a double-floor feature
window which was 5.287m high. The circular windows on
82
the top floor required particular care and a bespoke fixing

Glassolutions
High performance glass and an excellent value maximise natural light whilst offering excellent thermal
method for installation had to be created to meet the
engineering approach from GLASSOLUTIONS has played performance and minimising solar gain. GLASSOLUTIONS
client’s requirements.
a major part in the delivery of the St John Bosco College worked with leading architectural aluminium systems
Chosen For and Wandsworth Residential Surrey Lane scheme, a
sustainable college and Code level 4 and 5 housing
company Metal Technology to supply and install glazing
in a contract valued at around £2.5m.
Secondary glazing is an independent window installed on
the room side of a building, which reduces noise ingress

Lendlease development in the London Borough of Wandsworth.


A stringent glazing specification saw standard glazing
creating a quieter environment and a reduction of 45dB
is achievable. Along with noise reduction, secondary glazing assists in minimising
heat loss by up to 50%. Old Street Hotel is currently on target to achieve a ‘BREEAM
London Opened in September 2015, St John Bosco College
is a voluntary-aided school within the trusteeship of
in the college buildings featuring argon gas filled 16mm
double glazed units with black warm edge spacer
Very Good’ rating. Selectaglaze is the specialist in the design, manufacture and
installation of secondary glazing, with fifty years’ experience, it has a wealth of

School
the Salesian of Don Bosco and the Archdiocese of between 6mm SGG SECURIT HST outer panes and
experience working on all building types. For further information, please contact
Southwark, whose ethos is based on the teachings 6.8mm SGG STADIP PLANITHERM ULTRA N inner panes.
Selectaglaze on 01727 837271/email: enquiries@selectaglaze.co.uk
of the Roman Catholic Church and the educational Solar control glazing units featured 6mm SGG SECURIT
or visit: www.selectaglaze.co.uk
approach of Saint John Bosco - with the capacity to HST COOL-LITE SKN 174 II outer panes and 6.8mm SGG
cater for over 1,300 students. Whilst its admissions STADIP inner panes whilst rooflights combined 8mm
policy gives priority to children in Catholic primary SGG SECURIT HST PLANITHERM ULTRA N II and 8.8mm
schools, it welcomes students from other faiths and SGG STADIP glass.
86 Notifier Gets A View From The Top At The Royal Liver 87 Aico’s Solution Increases HMO Fire Safety
backgrounds.
Building
Solar glazing and standard glazing also featured in the The RHP Group, a registered housing provider in South West London,
Its new premises form part of a £50m mixed use residential buildings with the Code level 5 town houses Fire detection technology from Notifier by has used Aico fire protection equipment to help improve safety in
development by Lendlease which also provides a range including triple glazed units with 6mm SGG SECURIT HST Honeywell is protecting staff and visitors at Houses in Multiple Occupation. Each flat
of 100 new homes on the site. Working with London PLANITHERM ULTRA N II and 4mm SGG SECURIT HST one of the world’s largest banking institutions already benefits from an Aico BS5839
architects Allford Hall Monaghan Morris, Lendlease separating two 16mm argon gas filled cavities. at Liverpool’s Royal Liver Building. When the Part 6 domestic smoke alarm system
committed to delivering sustainable residential and company moved in, it sought to redesign one of – if this is triggered it will only sound
educational buildings, designing in air source heating, Having already established a good working relationship the floors and install a set of high specification within that flat. Throughout the common
a range of water saving and sustainable transport with GLASSOLUTIONS on the Ministry of Justice building services, including a new life safety circulation areas a separate communal
measures as well as building in ‘lean and clean’ design Framework, Lendlease appointed the UK based glass system. Triple Star Fire & Security specified a BS5839 Part 1 fire alarm system has
measures. supplier in competitive tender on the basis of their value fire detection solution based around Notifier’s been installed. To maximise safety and ensure the communal alarm
for money and technical support in a project which innovative Pearl intelligent addressable control can be heard within each property, RHP has integrated the two alarm
The four-storey school complex comprises steel frame required tight fiscal control and delivering within tight panel. In addition, over 60 Notifier optical systems. This has been achieved by installing an Aico Ei164e Heat
construction with primarily brick and wooden clad finish timescales. www.glassolutions.co.uk detectors were installed. www.notifierfiresystems.co.uk alarm in the hallway of each flat, which interconnects to the existing
and uses high performance glazing widely throughout to alarm system within the flat. www.aico.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


58 E 59

89 Profloor Levelling System Gives A Lift To Flats Conversion 91 UZIN System Used In Plattens Fish & Chips Refurbishment
The A. Proctor Group Ltd has supplied UZIN products were recently
its Profloor Levelling System to help used to renovate the floor at
with the conversion of Linden Court, Plattens Fish and Chip Shop in
a Grade II listed building in Reigate, to Wells-next-the-sea, Norfolk.
residential flats. The project required The old floorcovering had to be
a floating floor acoustic treatment removed, before 2 coats of UZIN
to the existing out of level floors. PE 480 damp proof membrane was
Developed to allow a level finished applied over the very old sub-floor.
floor to be installed on a cambered, UZIN PE 280 primer was then
stepped, or uneven sub-floor, Profloor Levelling System is typically used applied, followed by a coat of UZIN NC 150 a heavy duty smoothing
on structural concrete floors where the differences in level are too great. compound. Safety flooring was laid, capped and coved in the kitchen
The floor is levelled by inserting packers in each levelling base to adjust and preparation areas whist luxury vinyl tiles were installed in the front
the level of the timber battens. www.proctorgroup.com of house. Both floor coverings were stuck with UZIN KE 2000 S pressure
sensitive adhesive. www.uzin.co.uk

90 Fall Protection Takes Off At Virgin Atlantic With Safesite 92 Insulation Gives New Lease Of Life To Cornish Units
Safesite has provided Virgin Atlantic
Social housing provider, RCT Homes, has accessed Phase 2 Arbed
with a collective roof edge protection
funding to carry out a range of improvements on 30 Cornish Units in
system that ensures optimum roof top
Cwmbach, Wales, including the installation of ROCKWOOL stone wool
safety for maintenance and inspection
insulation to alleviate fuel poverty issues and improve living conditions
teams and complies with all relevant
for tenants. ROCKWOOL
health and safety regulations. After
devised a tailored, envelope
removing all existing guardrails,
refurbishment solution,
demarcation bases and chain,
featuring its REDArt® External
Safesite installed 900 Lm raked and standard KeeGuard® systems. The
Wall Insulation System (EWI)
KeeGuard® range includes standard vertical, raked, radiused and folding
combined with the use of
systems. The modular design features Kee Klamp® open-style fittings,
ROCKWOOL FLEXI® insulation
which facilitate quick and easy installation of the horizontal rails and
which is proving very successful.
88 100% recycled PVC counterweights. www.safesite.co.uk
www.rockwool.co.uk

Comprehensive
Stretching along the south bank of the Thames from demands posed by the complex balcony designs at
Battersea to Vauxhall, the Nine Elms area in London the Ambassador Building is Schöck. The diverse range
has become the largest development zone in Central of Schöck Isokorb load-bearing thermal insulation
Schöck Range London. The residential and commercial heart of this
huge development is Embassy Gardens, London’s
products guarantees totally verifiable performance
standards, meets full compliance with the relevant UK 93

Meets Embassy new diplomatic precinct on the riverside. The blocks


are arranged around raised courtyards, with retail and
building regulations and offers BBA Certification and
LABC Registration.
Levolux Gets The All Clear In Cardiff

Gardens commercial frontages at ground level that connect The new £44 million Cardiff University Brain Research Imaging Centre (CUBRIC)
the Embassy Square, Linear Park and River Frontage The specific requirements at the Ambassador Building building at Cardiff University’s Innovation Campus, which is equipped with an
attractive Timber Fin Screening Solution from Levolux, is specially designed to

Demands
through a network of streets and a central square. . involved firstly the Schöck Isokorb type K for concrete-
to–concrete connectivity. The type K units were facilitate brain research.
The development has inevitably attracted a incorporated into the cast in-situ cantilever balconies TIBI Group architects specified a Levolux external solar shading and screening
sophisticated level of residents who demand the on the road facing external elevation; and where there solution, this time incorporating vertical Timber Fins in addition to Ventilation
highest standards of detail throughout these was a shear force transfer element required, also and Acoustic Louvres. These were applied in different parts of the building.
buildings; and one of the key features is the wide involving concrete-to-concrete loggia’s or supported The most visual aspect of the solution is the Timber Fin screening structure
variety of balcony types, each governed by unit size balconies, the Isokorb type Q was installed. A further that is located at the centre of the development, accommodating the main
and orientation. With such a demanding specification variation, Isokorb type K-WU units were also used as reception, a staircase and circulation areas. At 13 metres in height, the ‘drum’
involving different balcony types, the minimisation of slab-to-wall thermal breaks. like structure has a curved footprint that extends out beyond the building’s
any possible thermal bridging problems is crucial. glazed curtain walling.
The Isokorb type KS for concrete-to-steel were used This creates a useful reference point for visitors when locating the main
This is something highlighted in research findings on the internal courtyard balconies; and to assist the entrance. Inside the building, the timber fins form balustrading for the
from the Oxford Institute for Sustainable Development structural engineer in keeping the transverse beam reception area and around circulation areas on first and second floors.
(OISD) at Oxford Brookes University. It shows that continuous between the external columns, Schöck The structure comprises up to seven rows of vertical rectangular-shaped
with increasingly improved airtightness and fabric SLD dowels were also used to support the propped timber fins, each measuring 185mm wide by 44mm thick, engineered from
U-values in UK buildings, thermal bridge heat losses cantilever walkway externally. untreated Western Red Cedar.
are responsible for an increasing percentage of the The Fins in each row are set at 250mm centres and are fixed at an angle
overall building heat loss. It is common for thermal In addition to providing highly effective connectivity that varies by 45 degrees, creating an interesting aesthetic that changes,
bridges to account for 20% – 30% of the heat loss solutions for concrete-to-concrete and concrete-to- depending on your viewpoint. The timber fins are virtually maintenance free
in multi-residential units (as calculated by thermal steel thermal bridging situations, the Schöck Isokorb and will be allowed to weather naturally, giving them an attractive silver-grey patina. In addition to the timber fin screening, Levolux also provided its
modelling) and balcony connections can be a major range also offers a modular product for steel-to-steel Ventilation Louvres to screen plantroom areas at high level.
contributor to the thermal bridge heat loss – if applications and even a maintenance free alternative Levolux’s Contour and High Performance Ventilation Louvres were utilised to provide an attractive, yet highly weather-resistant facade. Extruded
effective thermal isolation is not included in the to wrapped parapets. For a free copy of the Schöck aluminium louvres feature an effective ‘S’ shaped profile. This delivers the optimum performance, both in terms of airflow, resistance to wind and rain
design. And the company able to offer the ideal range Thermal Bridging Guide and / or the Thermal Bridging and their aesthetic quality. www.levolux.com
of solutions to the differing thermal connectivity Solutions brochure, visit www.schoeck.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


60 e
E 61

94

Portakabin
With the end of the recruitment cap on “The project team was fast and responsive, which
undergraduate numbers in England now taking was key to the success of the project. We are
effect, the requirement for upgrading and expanding also very happy with the quality of finish and the
Constructs ‘Pop learning facilities continues to rise to meet the
increased demand for higher education.
additional elements which give the building a
permanent feel and further improve the student

Up’ Learning An extra 30,000 student places have been made


experience.”

Hub For UCL available in England this year, and the Russell Group
has estimated that more than £9 billion is being
The learning hub accommodates a lecture theatre
for up to 100 students and has three smaller seminar

In Just 2 Days
spent on capital projects by its 24 world-class rooms. Portakabin supplied decking around the
universities, with a large proportion going towards building, an access ramp, stairs up to the entrance, 95
new high quality learning facilities. air conditioning, emergency lighting, and data

As Pressure On One of the Russell Group of universities is University


communications. The building has a striking finish,
created using a vinyl wrap with strong graphics
Omnie Heat
Underfloor heating systems from the
Omnie range have been employed in the
In total 400 metres of the high performance
heating pipe were laid across the Foilboard

Universities
refurbishment of a South-west community Floating panels, installed on top of the
College London (UCL) where Portakabin constructed
an innovative ‘pop up’ learning hub in central
that reflect and communicate UCL’s programme to
transform its estate. Social Services building, providing energy efficiency as
well as helping to create a healthy indoor
building’s existing sub-floor.

Increases To London in just nine weeks from receipt of order


to handover. This is to help address the surge
in student numbers and was achieved with no
The new Portakabin building is sited in a complex
environment for the many members of
the public as well as the staff who use the
The zones – with individual pipe runs
of up to 90 metres in length - were all

Meet Rising
location within an enclosed courtyard. This required
facility. connected back to the Axios manifold which
disruption to teaching. detailed logistical planning from the Portakabin hire
is fed from the flow and return pipework,
team and great precision for the installation phase

Demand The two-storey modular building will be in use for


two years until significant elements of UCL’s major
with only centimetres to spare. One of the walls
also had to be fire rated to 60 minutes due to the
The Wat Tyler building in Exeter is home to
CoLab, a wellbeing hub bringing together a
connected to the main boiler plant. Omnie
based in Exeter, offers a choice of different

For Higher
host of specialist housing, voluntary sector, underfloor heating systems suitable for
capital programme to provide new permanent and proximity to an adjacent brick building.
social enterprise and recovery providers installation within timber floors as well as
refurbished teaching space is completed.
to offer a unique range of opportunities over solid substrates and other situations.

Education
Modular buildings for short-term use can now be
for people looking to rebuild their lives
The new learning hub was installed in just two days supplied with an even wider range of architectural
and play a positive role in the community The range also includes air and ground
ready for the start of the academic year. It would options and amenities to enhance the environment
after periods of homelessness, re- source heat pumps, mechanical ventilation
have taken many weeks had the building been for work and study. Developed and installed by
offending, drug/alcohol abuse or long term with heat recovery (MVHR) units and
constructed using site-based building methods. Portakabin, the range is designed to give interim
unemployment. sophisticated control options able to
buildings a more permanent feel and includes:
optimize the performance of the complete
Commenting on the project, Sam Williams, Capital canopies and shelters for under-utilised outdoor
The main floor where Omnie Foilboard integrated installation. www.omnie.co.uk
Projects Manager at University College London, spaces; covered walkways with curved, high barrel,
underfloor heating panels and other
said, “We needed facilities of the highest standard low barrel or flat roofs; vinyl wraps, which are low
equipment have been installed, is
delivered in the shortest possible timescale. This was maintenance and simple to install but can totally
divided up into two consultation rooms,
achieved and it is an excellent, robust building which transform a building’s appearance with strong
a treatment room, waiting rooms and
has been positively received and is being well used. branding and graphics; free-standing outdoor
circulation space. The five areas are served
The vinyl wrap has really enhanced the facility and structures; cycle storage; smoking shelters; street
by a five port Axios manifold, supplied
internally we have varied room sizes to suit the type furniture such as litter bins, benches, picnic tables,
as part of the package and installed
of learning – from large lectures to smaller seminar bollards and barriers. www.portakabin.co.uk
by contractor, Steve Guppy Limited.
working groups.”

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


62 E 63

97

Metal Technology
96 Girdwood Community Hub in North were specified for the project,

Guernsey
A landmark high-rise apartment block that was once “On the subject of environmental impact, using a Belfast brings together physical complemented with System 5-20D
thought to have outlived its usefulness has been given ventilated rainscreen cladding system allowed us to regeneration and eco-design Hi+ doors and System 4-20D Hi+

Flats Go
a new lease of life and a fresh appearance, thanks to
Trespa® Meteon® cladding panels.
increase the amount of insulation, thereby improving
the energy efficiency of the building,” says Mr
Specified In principles in the creation of a state-
of-the-art, socially inclusive centre
windows from the [THERMAL]
range.

Thoroughly Built in 1963, Cour du Parc is 11 storeys high and the


Roussel. “There were less expensive options we first
looked at but, with knowledge of other use of Trespa® Award-Winning offering leisure, community and
education facilities. Complying with the latest British

Regeneration
tallest building on the Channel Island of Guernsey. on the island both at Sir Charles Frossard House and Standards, System 17 provides

Modern With Only five years ago it stood empty of tenants and
was considered to have reached the end of its useful
Oakvale School, we were satisfied that the product
was capable of withstanding the harsh coastal
Part of the overall regeneration of structural integrity, weather

Project
the former Girdwood Barracks site, performance, thermal enhancement

Trespa
life. Then an imaginative refurbishment and upgrade environment to provide a long -term solution without the Michael Whitley Architects design and complete design versatility. The
was given the go ahead by the States of Guernsey high maintenance costs,” he adds. achieves high Metal Technology 5-20D Hi+ door
planners. levels of thermal and 4-20Hi+ window systems blend
The refurbishment project reconfigured space performance seamlessly and offer advantages of
The result is an eye-catching structure where it’s internally to provide 50 flats where previously there without polyamide thermal break technology
previously uninspiring dun-coloured brickwork has had been 42 and also made provision for an additional compromising in meeting the latest thermal
given way to vibrant Trespa® Meteon® cladding panels lift. The end result has been a welcome increase in aesthetics using requirements of the current building
in two shades of light green. social housing units for the island. an integrated regulations.
range of products
“Visually the improvement to the building and Says Mr Roussel: “GHA is a long term owner of this from leading Opened in January, Girdwood
the ability to detail openings and vary colour to property so we wanted something without a high aluminium systems Community Hub has already
enhance vertical features were key to choosing maintenance requirement. Trespa® Meteon® panels manufacturer brought recognition to Michael
Trespa,” says Phil Roussel, Development Manager have good resistance to dirt, so we are confident the Metal Technology. Whitley Architects with the RSUA
of Guernsey Housing Association, which carried out building will look good for many years.” (Royal society of Ulster Architects)
the transformation in partnership with the States of Both System 17 SP Regeneration Award 2016. The
Guernsey Housing Department. Trespa® Meteon® is a decorative high-pressure (silicone pointed) project also won ‘Community Benefit
compact laminate (HPL) with an integral surface curtain walling Project of the year’ at the Property
“The new panels have rejuvenated a tired old building manufactured using the company’s unique in-house with concealed Excellence Ireland Awards 2016.
and brought it up to date for the 21st century,” technologies; Electron Beam Curing (EBC) and Dry vents and System www.metaltechnology.com
says architect Ricky Mahy whose practice, Create, Forming (DF). It is the company’s leading family 17 capped
masterminded the new design. of architectural panels for façades and exterior curtain walling
applications, created in close collaboration with
Of crucial importance was protection against the architects, designers, installers, distributors and end-
elements. By using a ventilated façade system, the users. www.trespa.com
continuous air flow draws air through the cavity
between the cladding and the inner layer of the
exterior wall aiding in the removal of heat and
moisture from rain or condensation.

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


64 E 65

98

CMS Set To
Leading window, door and curtain walling designer, sustainability is also evident in the products chosen for
manufacturer and installer, CMS Window Systems, the building’s entrances and exits. Doors from Metal
has secured the contract to provide glazing solutions Technology’s System 5 and System 9 will be installed 99

Make Waves for the redevelopment of the ferry terminal at Brodick


Harbour on the Isle of Arran.
internally and externally, in addition to a three-leaf
manual revolving door at the building’s main entrance. Iconic Art
New fenestration for an iconic listed arts centre at the
University of Sussex presented a particular challenge for
has been improved by an increase in openable windows
and the introduction of trickle vents.

With New CMS’s contract comprises the fabrication and Work began on the project early in the new year, and Centre’s
architects RH Partnership but the successful outcome
has been achieved thanks to close collaboration with The complete refurbishment of the building, including

Brodick installation of over 600m2 of Metal Technology curtain


walling for the terminal building, along with doors and
completion of the development is expected in mid-
2017.
Winning
steel window experts Crittall. a main auditorium with a flexible 350 seating
arrangement, exhibition spaces, four differently-sized

Harbour
an internal screen system. The University’s Attenborough Centre for Creative Arts studios and teaching rooms and the development of

This is part of a £22.2m project for client Caledonian


CMS Aluminium Director, Stephen Anderson, said:
“We’re really pleased to be a part of the Brodick Performance (ACCA) was designed in the 1960s by Sir Basil Spence
and subsequently listed Grade 2* by English Heritage.
an area beneath the auditorium to provide 33% more
usable space than was envisaged in the original design,

Contract Maritime Assets Ltd (CMAL), which aims to maintain


and enhance the vital ferry services between the island
Harbour redevelopment project. The ferry service is a
fundamental part of the lives of Arran residents - the With Crittall
The building’s curved brick exterior is punctuated at
ground floor level by steel windows and doors that,
has provided the University with a cultural flagship
structure.
of Arran and mainland Scotland, upgrade work will modernise and transform the original along with the rest of the structure, had fallen into a
providing solutions which will
endure for at least the next 60
site into a truly cutting-edge facility which will provide
an improved experience for the passengers who use it.
Windows state of disrepair. Also on the University campus a second Sir Basil Spence,
Grade 2* listed structure, the Chichester 1 building,
years. Led by civil engineering CMS is proud to play a part in bringing these changes Extensive consultation was undertaken by the Brighton- is undergoing refurbishment and, once again, Crittall
contractor George Leslie Ltd., the to the island.” based architectural practice with English Heritage (now products – the Corporate W20 and Corporate 2000
redevelopment project includes a Historic England) and Brighton & Hove City Council’s windows – have been specified. Corporate W20 windows
new pier, an increased marshalling CMAL’s Head of Civil Engineering, Ramsay Muirhead, conservation team for the most acceptable solution and doors offer designers great versatility including the
area through reclaimed land, and said: “The ferry terminal infrastructure at Brodick to replace the existing metal framed, single glazed ability to create or reproduce many styles.
a modern terminal building with is now nearing the end of its serviceable life and windows and doors.
bus stances and extensive parking the project will see the harbour transformed. The They deliver very slim sightlines, are English Heritage
facilities. new terminal building will improve the passenger “RH Partnership have worked very closely with Crittall approved, and find widespread favour with planners and
experience”. Windows to reproduce the patterns and profiles using conservationists. Corporate 2000 are equally suited for
CMS’s glazing specification for the project prioritises For more information about CMS, visit W20 sections and to incorporate double glazed units,” residential, institutional and commercial applications,
environmental sustainability and energy efficiency. The www.cmswindows.com says architect David Sweeney. “With large areas of and can be used to produce unusual and innovative
terminal building will benefit from a highly thermally glazing in the front-of-house spaces, the capability window wall designs. Major user sectors are offices,
insulating building envelope achieved by CMS through to add slim line double glazed units has drastically hotels, hospitals, universities and schools.
combining low U-value IGUs with 634m2 of Metal improved the thermal performance of this building.” www.crittall-windows.co.uk
Technology’s System 17 curtain walling system.
Solar control glass has also been added to particular
The company’s emphasis on energy saving and south and east facing windows so as to reduce
overheating during summertime and natural ventilation

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


66 E 67

100 102

Balconies And Balustrade Bridge Project Goes Swimmingly With Marmox


Contemporary And Traditional Multiboard
neaco created a bespoke balconies and balustrade Swimming pools present a notoriously aggressive
specification to bridge the aesthetic divide between environment for building materials including
traditional and contemporary at a new purpose-built reinforced concrete, so it is a measure of
UK headquarters in Leeds for leading healthcare IT Marmox Multiboard’s inherent durability and
business, TPP (The Phoenix Partnership). other attributes that it has been specified for a
challenging refurbishment contract at a leisure
Purpose-built by contractors ISG, the four-storey, centre in Peterborough.
85,000 sq ft structure was designed by Bowman
Riley Architects to complement the existing built The Regional Fitness & Swimming Centre is just
environment with a frontal, road-side elevation a short walk from Peterborough Cathedral in the
of traditional Yorkshire stone with pitched tiled city centre and is popular with families as well
roofing in contrast to a rear façade featuring a more as clubs and schools. Unfortunately, however,
contemporary appearance with extensive curtain the warm moist conditions had caused areas of
walling. neaco supplied products to both sections with the paintwork around insides of the very large
bespoke railed balconies to the front, bespoke terrace skylights to peel. High above the water and with
balustrade to the rear and internal balustrade to asbestos present in the original lining panels, this
stairwells and the main reception area’s double-height meant a maintenance nightmare.
atrium.
Main contractor Amey was successful in tendering for the wider project, but brought in Commercial Rope Access with its team of abseillers to
The balconies and external balustrade feature traditional-style railed infill combined with a contemporary twist in the form of tapered tackle relining the nine rooflights: each of which measures 8.5 x 4.5 metres and is five metres deep. Half-size sheets of Marmox Multiboard,
flat-bar stanchions with laser-cut holes. neaco’s national sales manager, Peter Melia, said: “neaco’s technical team has the expertise and measuring 1250 x 600 mm, were able to be fixed directly over the top of the existing asbestos based substrate, the Multiboards also offer a
experience to offer total design flexibility and over the years we have developed bespoke solutions across a huge range of projects. The greatly improved thermal performance which will help prevent problems of condensation forming. The boards had been treated with one coat of
new TPP headquarters is the latest example and the building is certainly an impressive sight from all angles.” www.neaco.co.uk EP150 on the reverse side and received a further two coats on the visible face. Marmox Multiboards are manufactured from extruded polystyrene
or XPS and offer a range of positive physical characteristics in addition to being fully waterproof. www.marmox.co.uk

101 103

Advanced ExGo Panels Protect


Bulgarian Government Building Lighting Up Leisure
Critical assets in the Ministry of Education and Science
This new swimming pool at Immingham includes
building in the Bulgarian capital Sofia, are being
some of the best examples of how the Kalwall®
protected by industry-leading ExGo suppression
translucent daylighting system is used for
control panels from Advanced. A recent upgrade of the
leisure and sport activities. The £1.45 million
fire systems in the Ministry’s Sofia HQ was undertaken
transformation and creation of this stunning
by Advanced partner, FireTech Engineering Ltd.
facility was designed by ENGIE - Architectural
Consultancy for North East Lincolnshire Council
The project saw Advanced’s ExGo suppression system
with support from Sport England.
installed in the main archive room, supported by
optical smoke and air sampling detection, LCD+LED
It includes Kalwall cladding for all the walls in
indicators and remote indicators.
the new fitness suite and exercise studio. The
choice of Kalwall mirrors specification of the same
Stoyan Grozdanov, spokesperson for FireTech
cladding several years ago for the adjacent Oasis
Engineering Ltd, said: ‘We selected an Advanced
Academy where the system is used for both roof
system for the Ministry of Education and Science as we know from working with Advanced in the past that the ExGo system is very reliable. We
and wall applications. This brings a sense of
needed a cutting edge system to protect a very important room in the building, with the option to expand and enhance it in the future.”
uniformity and symmetry across both sites.
The ultra-dependable ExGo extinguishant and suppression control system, has been developed by Advanced specifically for sensitive and strategic
assets such as server rooms, historic and cultural attractions and control rooms. The system installed at the Ministry of Education and Science
One of the main attractions of specifying high performance Kalwall is its unique effect on both the interior and exterior. Internally, rooms are
has 28 components and is connected to the existing fire alarm control panel in the building. ExGo is suitable for almost all single-flooding area
bathed with diffused natural daylight which creates a stimulating and healthy exercising environment. While being translucent, it also offers
applications and include a range of control options and devices.
privacy. Externally, the elevations appear crisp, simple and inviting. When illuminated at night Kalwall will glow softly presenting a striking
external appearance. Unlike conventional glazing, highly insulating Kalwall eliminates shadows and glare and the stark contrasts of light and
It is approved to EN54 parts 2,4 and 13 and EN12094-1 and is among the first systems to combine these with EN12094 in a single solution.
shade. The system also enhances simplicity by eliminating the need for blinds, curtains or solar control. In addition, the even distribution and
EN12094-3 relates to the integrated manual release on the front of the panel. ExGo can be integrated into Advanced’s Axis EN fire system or any
deep penetration of light through Kalwall means less artificial lighting is needed thereby reducing energy costs. www.structura-uk.com/kalwall
third party alarm system. www.advancedco.com

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


At Leeds Station new southern
entrance our escalators and lifts
are in the spotlight. Supplied,
installed and maintained 24/7.
What can Stannah do for you?

104
Meet the family Call us on 01322 299800

Passenger
Lifts
Escalators and
Moving Walkways
Platform
Lifts
Goods and
Service Lifts
Lift
Refurbishment
Bespoke
Lifts
Lift Service
and Repair www.stannahlifts.co.uk

You might also like