Professional Documents
Culture Documents
The Essential Building Product Review 2016 3
The Essential Building Product Review 2016 3
The Essential Building Product Review 2016 3
Modelling Abet’s Laminates ArmourFX Panels Create Glass And Glazing Systems Metal Technology Specified In
Page 21 Social Media Backdrop for Transform Media Centre Award-Winning Regeneration
Linq Spa, Las Vegas Page 34 Project
Page 24 Page 63
Contents
6 ProjectView
Project of the month - Aluprof On
Prestigious North West Project
11 InsideView
A closer look at two key building product
groups and industry news
68 RearView
Front cover:
Aluprof On Prestigious North West Project
Full story on pages 6-9 Visit www.aluprof.eu
info@link2media.co.uk www.link2media.co.uk
@Link2Media www.link2media.co.uk/facebook
www.pinterest.com/link2media
www.issuu.com/link2media
THE SHOP LOS ANGELES
Tom
Following the success of the inaugural Tom Dixon THE SHOP NEW YORK
showroom in New York City this past year, Tom Dixon Tom Dixon occupies a four-storey building on Howard St. in SoHo, an area currently
has decided to upscale commitment to the United
Dixon's
in the midst of a Renaissance and revitalisation that has become an epicentre for
States via bi-coastal expansion! Tom Dixon will be likeminded food, hospitality, fashion and interiors ventures. The space allows the
opening 2 new locations; his first retail presence in Los showcasing of Tom Dixon's latest wares and innovations in addition to offering
and multi-brand retailing chains, Tom Dixon has made The space is a living representation of the Tom Dixon mission, to manufacture
the choice to evade the status quo and offer to the US products that are tough enough for the professional market and attractive enough
intriguing retail concepts that will bring to life the Tom for the home. The raw and unfinished interiors of this temporary showroom provide
Dixon experience and offer consumers a new way to a fittingly theatrical backdrop as Tom Dixon highlights futuristic lamps, heavyweight
interact with the brand. The Los Angeles and New York furniture and extraordinary accessories. The New York store is located at 19 Howard
stores are now open. St, New York, NY 10013, USA www.tomdixon.net
Aluprof On One New Bailey is a new office development in Salford on the north bank of
the River Irwell, situated next to Spinningfields and close the Lowry Hotel. The
Prestigious
development is part of New Bailey, a new business and leisure hub within the
growing area of Salford Central and offers 125,000 sq ft of prime commercial
space adjacent to Manchester's central business district.
North West Aluprof’s “cap-less” curtain wall system, the advanced MB-SR50N EFEKT was
Project used on all elevations of the new build and the fabrication and installation of
the curtain wall was undertaken by CSi, Commercial Systems International,
of Humberside. Stuart Green, Managing Director of CSi comments on the
installation: “We are proud to be a part of such a prestigious project in the
heart of Salford’s new central business district. Our installation team completed
a top notch installation and we are looking forward to working with contractor
Bowmer & Kirkland on future projects”.
>>>>>
2 Flat Roof Manufacturer Bauder Launches Solar PV Design 5 VinylPlus: Championing PVC In European Sports Stadiums
Guide
The impressive Allianz Riviera Stadium in Nice, France features on the
Solar photovoltaic (PV) is currently the most popular renewable energy front cover of a new brochure from VinylPlus celebrating the prominent
in the UK and its deployment is rising rapidly across the globe. Despite role played by PVC in the construction
recent UK Government policy changes, the number of large, flat roof of modern sports venues. Published
installations should still rise as local authorities and businesses look to by VinylPlus, the European PVC
reduce their carbon footprint and gain energy security for the future. sustainability programme, ‘Vinyl in
All too often within European Stadiums’ charts the path
the construction to sustainable development for PVC
industry, photovoltaic and how the use of vinyl combines
specifications focus environmental responsibility and
on energy efficiencies architectural greatness in sports
and outputs of the complexes. More information on the brochure can be found at
solar panels, omitting www.vinylplus.eu/uploads/Modules/Documents/vinyl-in-european-
to give the same stadiums-180416.pdf
focus to ensuring
the rooftop array is
installed with methods 6 Protect Your Wood In The Sun 8
that have as little
Future
Osmo UK, the eco-friendly wood and finishes expert has developed a Formed in 2007, Spire Healthcare has grown to become The third phase has recently been completed and this
impact on the building finish to protect, maintain and restore exterior wood. Protection of the second largest provider of private healthcare in the focused on Spire Healthcare’s National Distribution
and its waterproofing exterior wood is of the utmost importance as UK. Now with a network of 38 private hospitals, 12 Centre. Based in Droitwich, this 100,000ft² facility
as possible and that the array works to its maximum potential for
its entire lifespan rather than just becoming a ‘tick box’ exercise to
it can fade if untreated due to the extreme
weather conditions. Osmo UV-Protection-Oil
Energy clinics and two specialist centres for the treatment of
cancer, the organisation undertakes a wide variety of
provides a platform to procure and supply goods and
services to the company on a daily basis through its
achieve sustainability credits.
To help combat this issue flat roof manufacturer Bauder has launched a
delays the greying process by shielding the
wood against harmful UV rays, and algae and Solutions activities and offers a full range of integrated surgical,
medical and diagnostic services. Corporate social
internal logistics network. Commenting on the reasons
for the change, Marcus Brodin says, ‘The importance
Prescribes
new design guide aimed at designers considering the inclusion of a PV fungal decay. responsibility (CSR) and sustainable operating practices of good quality lighting is often overlooked within
array on new build flat roof construction projects, which outlines the The oil allows the surface to remain healthy are very important to the company, with energy warehousing and distribution based operations. This
key elements to be mindful of sustainable design, protects the building and elastic, preventing it from drying and
LED
conservation guidelines available on Spire’s intranet for should not be the cas, as numerous studies have found
and meets lifespan expectations. Download the design guide at becoming brittle, and will not crack, flake, peel all its hospitals to minimise the amount of electricity and that light has a profound effect on our physical and
www.bauder.co.uk/technical-centre/design-guides/pv-flat-roof-design- or blister. Ideal for exterior decking, it provides gas consumed. emotional health and wellbeing. Poor lighting can cause
considerations a satin-matt, clear finish that protects the wood surface and can enhance
it’s natural look. www.osmouk.com
Lighting Nigel Sharp, National Engineering and Estates Manager at
eyestrain, migraines and headaches, in addition to
lethargy, irritability and poor concentration.’
3 Ten Years With Halo And A New Website For Patios South 7 Sika® Multi Stick - The Multi-Talented Grab Adhesive You
For Spire Spire Healthcare states, ‘As part of our ongoing process
of improvement, we recognised the need to reduce our There are no statutory workplace lighting levels in the
West
Patios South West Ltd, a specialist trade
Need In Your Tool Box
Healthcare’s lighting related energy spend and also maintain good
levels of illumination in our external car parking areas for
UK and Regulation 8 of the Workplace (Health, Safety
and Welfare) Regulations simply requires that lighting
National
Sika® Multi-Stick is a new generation in hybrid polymer the benefit of staff, patients and visitors. LED technology at work is ‘suitable and sufficient’. However, the Health
fabricator of patio door systems, is grab adhesive from Everbuild – A Sika Company, also provides us with Health and Safety benefits with & Safety Executive’s (HSE) Lighting at Work booklet
celebrating ten years of working with Halo, designed especially for the trade with the ability to the reduction of maintenance activities at height due to (HSG 38) sets out minimum recommended safe lighting
an industry-leading PVC-U profile brand
of national market leaders, The VEKA UK
bond virtually anything to everything.
Distribution the longevity of the product. So, in 2014 we began an
extensive programme of upgrading 1,400 luminaires to
levels and the Chartered Institution of Building Services
Engineers’ (CIBSE) offers guidelines regarding light levels
Centre
Group. The family-run company was started Solvent free and based on new SPUR technology, Sika® light emitting diode (LED) technology.’ required in correlation to workplace activities, stating that
in 2003 and now produces, on average, 120 Multi Stick boasts incredible initial grab, high bonding warehouses should have 150-200 Lux at floor level and
patio door systems per week, from a 4,500 strength and excellent slip resistance and is capable FES won the original tender and since then has 300 Lux in task areas.
sq. ft. factory in Paignton. It will relocate into an 8,000 sq. ft. factory of bonding almost all materials, both porous and non- completed two phases of the project. In order to
to meet growing demand. Patios South West is now looking to bolster porous including glass, marble, brick, concrete, metals maximise return on investment on the designated capital As with the previous phases of the project, FES
its reputation for impeccable customer service with a new website, and hard plastics. Suitable for both interior and exterior expenditure budget, the first comprised 21 of the largest undertook a comprehensive a feasibility study to scope
complete with an online quote facility. www.patiossouthwest.co.uk applications, Sika® Multi Stick is completely waterproof energy consuming sites, which achieved in excess of 73 the objectives and to determine the optimal LED lighting
and weatherproof and can even be applied to wet per cent energy savings from a simple point-for-point solution for the offices, mezzanine and warehouse areas.
surfaces, underwater or in the rain. replacement, while providing 25 per cent better light It decided to replace 339 116W batten and 400W high
4 Stertil Girls Complete Colour Rush To Combat Domestic output. bay luminaires with 59W LED battens and 178W high bay
Abuse Available in 350ml plastic cartridges and packaged into luminaires. These state-of-the-art products provide high
eye catching printed boxes, this product is sure to fly The second phase concentrated on 12 further sites and efficacy of >110lm/W, low luminous decline, excellent
An intrepid trio of girls from loading
off the shelves and into toolboxes everywhere. Marcus Brodin, Commercial Director at FES, comments, colour rendering and unrivalled uniformity.
bay equipment specialist Stertil
‘We calculated that Spire Healthcare will save in excess of
Dock Products recently completed a
For further information on Sika® Multi Stick or any £700,000 over a 10-year period thanks to lower energy By incorporating zone based lighting sensors and daylight
5K Colour Rush to raise money for
other product from the Everbuild and Sika brands, costs, reduced maintenance, environmental tax savings harvesting, this installation will achieve energy savings
SafeLives – a UK-based charity that
contact your sales representative, call the sales office related to its inclusion in the CRC Energy Efficiency of over 75 per cent, with a 732kW saving per day, while
aims to help victims of domestic abuse.
on 0113 240 2424 or visit www.everbuild.co.uk. Scheme, and additional resource savings. The effect on providing improved light levels. Also, since the rated life
If the 5K Colour Rush, which took place
the environment will also be significant as carbon dioxide of the new devices are well in excess of the previous
at Abington Park in Northampton,
(CO2) emissions will be reduced by 11,928lbs per annum, luminaires, Spire Healthcare will make a 90 per cent
wasn’t demanding enough, the participating runners were also pelted
mono-nitrogen oxide (NOx) will be lowered by 28lbs and saving on its ongoing maintenance spend. With a 10-year
with multi-coloured powdered paint by enthusiastic ‘supporters’ around
sulphur dioxide (SO2) by 68lbs over the same period – gross energy saving of £338,000, the environment will
the course. The girls would be delighted to receive any contributions via
this is the equivalent of four acres of forest being saved benefit, with over 1,200 tonnes of CO2 saved over the
the JustGiving website at www.justgiving.com/5kcolourrush
or two cars being removed from the road.’ duration of the business case. www.feslighting.co.uk
9 V850 Gate Valves Open Up a Plethora of Opportunities 10 Intelligent Home Air Solutions From Polypipe Ventilation
Pegler Yorkshire continues its drive to further enhance its valve portfolio Polypipe Ventilation has announced its next generation of Mechanical
and support its customers’ objectives of system optimisation. The new Ventilation with Heat
V850 ductile iron gate valve has been introduced Recovery appliances - the
to the company’s commercial valve offering and Silavent HRX-aQ, which
adds a solution for potable water applications. intelligently manages air
Gate valves, primarily used to allow the flow of conditions for maximum
liquids, ensure very low friction loss and provide a homeowner comfort.
high flow path when in the fully opened position. The HRX-aQ matches
The new V850 is characterised as having a non- ventilation rates to the
rising stem which supports ease if operation in internal environment and
confined spaces. The WRAS approved V850 from occupants’ requirements
Pegler Yorkshire is ideal for isolating pipelines that transport potable for maximum comfort,
water. www.pegleryorkshire.co.uk whilst also being the quietest and most compact Silavent MVHR unit
available. www.polypipe.com/ventilation
11
Siting a pizza oven inside a metal-clad railway arch had previously caused
problems with a build-up of heat in the summer and the site had limited
space for any plant, alongside restrictions on internal fittings because of
the metal cladding. Tyne and Wear-based ADS Air Con Ltd, who operate
throughout the UK, were called in to install a system whilst working around
14
the restaurant’s opening hours. “The arches are listed and owned by Network
Omnie
Rail and there were restrictions on the type of solution that we could install”, Exeter based Timóleon has provided a heating and the Omnie equipment. The LWD 70 ASX ASHP is ideal for
said David Short, Director of ADS Air Con. “That’s why the two-pipe solution ventilation solution for a self-builder to achieve his installations where there are other properties within close
ambition of creating a new home, with a very low level of proximity; generating as it does a noise level of just 45
Systems
from Mitsubishi Electric has worked so well”.
environmental impact and running costs. This results in dB at a distance of one metre. This single phase machine
A single City Multi outdoor unit has been installed in an empty space to a property with high standards of indoor air quality and is very efficient, with a typical Coefficient of Performance
the rear of the building and this can send simultaneous heating and cooling to the indoor units installed throughout the restaurant to maximise the
efficiency of the whole system. The arches are metal-clad to prevent water from the brickwork entering the building, so it was not possible to fix
Help Self- comfort. The dwelling has been constructed as a single
storey, deep plan structure within a walled garden in the
(COP) of 4.24 at design conditions A7/W35 which ensure
low running costs whilst also qualifying for the domestic
the internal air conditioning to this. The first floor VIP area in particular proved a real challenge due to the curvature of the building. A ducted fan
coil mounted on the roof of a storage room was finally selected as it offered easy installation and better air movement for the occupants. For the Builder village of Bradninch in Devon. Renewable Heat Incentive (RHI).
Achieve
ground floor restaurant, cassettes were hung from the structure for the first floor, however, it also required a unique solution that could cope with The ultra-sustainable design features not just an Omnie Representing the latest in heat pump technology from
the decorative lighting and herb racks. A ducted unit mounted on the top rack above the herbs provided a solution which didn’t affect the décor and 7kW Air Source Heat Pump (ASHP), delivering domestic renowned German specialist, Alpha InnoTec, the unit
provided comfortable air movement. www.mitsubishielectric.co.uk hot water and warmth via the manufacturer’s Omnie can achieve flow temperatures of up to 70 degrees
Profile warmed air throughout. coating, which prolongs the life of the heat pump making
it suitable for coastal areas, all Omnie heat pumps come
Now with the rural retreat completed the Omnie with a 5 year parts warranty as standard.
12 Panasonic Moves Into The Cloud With New Aquarea 13 Vent-Axia’s Prestigious Royal Warrant is Renewed
equipment is fulfilling on all of the design intentions, as
Control System the owner of the property commented: “I wanted to build Timóleon supported its design & supply with technical
Sussex-based British fan manufacturer Vent-Axia,
Panasonic has launched a new a leader in low-carbon ventilation, is delighted a home that was as low energy as possible and to take a assistance at the specification stage, plus full installation
internet-connected control system to announce that its prestigious Royal Warrant responsible approach to the specification of its building drawings & heating schematics identifying information
for the Aquarea H Series heat pumps. has been renewed. Vent-Axia was originally services so that it would not only provide peace of mind such as ideal positions for the manifolds for the UFH
The Aquarea Smart Cloud enables granted the warrant by HM the Queen in 1985 for myself in terms of future running costs, but also make and the location for the HRU distribution using 75
users to manage and monitor their as ‘Suppliers of Unit Ventilation Equipment to a positive contribution in respect of concerns over carbon mm diameter air ducts Additional technical support is
heating and hot water with an easy the Royal Households’ and has held it ever since. reduction and our energy security.” provided with every heat pump with final commissioning
to use interface. This can be accessed The company is now celebrating having held this and the 1 year back up (Gold) support service, which
via any web-enabled device. The Aquarea Smart Cloud has a simple, high status honour for over 30 years. Providing The accommodation comprises a spacious lounge-dining includes remote access package making it easy to
intuitive user-friendly interface that enables installers and maintenance the sector’s most comprehensive choice from any area orientated to a courtyard garden with two bedrooms monitor the performance of the heat pump.
operators to control a number of functions of the Aquarea H Generation single manufacturer, Vent-Axia’s range covers not just air movement and plus a further office/third bedroom. There is also a main www.omnie.co.uk
heat pump. ventilation technologies but heat recovery, electric heating, cooling and bathroom with shower and bath, a separate cloakroom
hygiene products. www.vent-axia.com close to the kitchen and a plant room containing all of
15
RINNAI: A
Gas-Fired
Range Of
Space Heaters
Ideal For All Sites - Churches,
Schools, Offices And All The
More….
24
26
Rinnai, the UK’s leading manufacturing supplier of high efficiency continuous Fire Safety,
Smoke Control
flow hot water heating and delivery units, has announced a major investment
in London and the South East with the formation of a dedicated sales team
covering the whole region. This major investment follows the opening of a
London office also dedicated to serving the region. The new sales team will
work in tandem with the Rinnai UK sales centre and technical support at the
And Compliance.
company’s Runcorn, Cheshire HQ.
Charting A Path
“The new premises have been set up in response to high demand for Rinnai
product and expertise. Specifiers and installers in the London area now have
a direct line to the Rinnai sales force which is ready to offer advice on the latest technologies
Through The
and legislation and will be a vehicle to inform the industry of new developments, new
technologies and new ways,” says Managing Director Tony Gittings.
Regulations.
The team and their areas are, as follows: Scott Amass will look after North London and the By Nelson Godinho –
associated Home Counties; Steve Richards will be heading sales in West London and associated Fire Engineer with SE Controls
Home Counties; Kim Wullf will be looking after South London and their Home Counties. All
three have extensive experience and track records in the hot water delivery business.
Rinnai’s comprehensive range of A rated energy efficient products for hot water solutions
qualify for additional energy efficiency points, boosting building energy performance. The
product range far exceeds energy efficiencies in current Building Regulations (Conservation of
fuel and power) and legislation. For owners of existing commercial buildings, the use of Rinnai Infinity condensing and high efficiency water
heaters qualifies for extra heating efficiency credits. www.rinnaiuk.com
25
Remodelling
choose to remodel their existing properties, rather cloakroom, wowing guests and letting your creativity
than move to a new house. The most desirable home run wild. Quality glass mosaic wallpaper can add drama,
improvement is a designer kitchen, with an ensuite especially with downlighters picking out reflective
burning passion
31
Mapei
A range of Mapei resilient floorcovering Ultrabond Eco 380 and Ultrabond
products have been used at Arnold Hill Eco Tack are part of Mapei’s popular
Academy, a new multi million pound Ultrabond Eco adhesive range comprises
Transforms state of the art school building, based in
Nottingham which aims to transform the
solvent-free, water dispersion, non-
flammable, non-staining and carries the
Arnold Hill education of 1,700 students. EC1 GEV Emicode labelling for ultra-low
emissions of volatile organic compounds.
33 34
Armourfx
ArmourFX Timber Effect panels were specified for pattern and wallcovering in the spa – the purpose
the renovation of the latest Las Vegas strip hotel of which was to create that ‘instagramable’
by Elkus Manfredi Architects. The Boston-based backdrop” she said.
Panels Create architects have converted the original Imperial
Palace hotel into a lavish property specifically Timber Effect panels are created from Douglas Fir
Social Media designed for a millennial guest. planks that are hand worked to achieve different
aesthetic qualities. The panels offer great design
interior film
Las Vegas guests. From the murals on the walls, www.armourcoat.com Commercial use for walls, decorative panels, doors,
the thought bubbles in the meeting spaces, the
colour-changing 3535 bar, the carpet design in architrave and furniture. A range of superbly styled
the corridors, VIP area and ‘living room’, to the tile interior films which will bring any room to life
35 New Slimline Towel Rail From Stelrad 36 Keeping Up With The Jones’s
15 years ago, Intelli Heat invented new electric radiators with
individual temperature controls and timers and created their well-
known Thermodynamic Fluid Wireless Collection of Italian style
designer Electric Radiators. Now it is the interior design of the
rooms that can have that WOW factor with the brand new range
of LivingStone Heating. This brand new range of electric designer
39
A Burning
The German premium manufacturer of firing Made And Tested In Germany - in order to provide
technology Spartherm proudly presents an an optimum of customer service, the expansive
exclusive range of bioethanol fireplaces branded range of ebios-fire® models comprises both
Passion ebios-fire® which are now also made available for
the discerning customer in Great Britain.
standard and made to measure built-in fireplace
models in almost any thinkable layout.
41
Pendock Boosts Retail Environment At Booths
When an ambitious and enterprising grocer said in 1847 that his aim was “to sell the
best goods he could buy in shops staffed with first-class assistants,” it is not perhaps
surprising that this philosophy remains at the heart of a business that has survived
two wars and several recessions.
In fact, Booths has just relocated one of its stores to Poulton-le-Fylde – and the
supermarket’s ethos to be the very best can be seen reflected in the selection of
high quality column casings from Pendock for the interior fit-out. Ordinary steel
stanchions to support the roof at Booths were simply not considered to offer the
right impression and the main sub-contractor was tasked with sourcing columns that
were functional, and attractive.
44
The contractor immediately turned to Pendock Limited, knowing that the specialist
Yeoman Shield Is Hospital’s Guardian
supplier would come up with a solution that could offer both style and substance
to the new store. Pendock supplied nine column casings to surround the standard Yeoman Shield’s new Guardian Twin Handrail was installed as part
structural steel sections: three oval in appearance and the other six circular. For of the ward refurbishment project recently undertaken at Barnsley
continuity of style, both types are clad with attractive brushed finish aluminium Hospital, South Yorkshire. Serving a quarter of a million people in the
bonded to the plywood casings up to one metre in height, while above this a RAL Barnsley area, the hospital demands a constant regime of maintenance
7037 Dusty Grey shade of the company’s Mouse Laminate was specified, rising to throughout its premises.
ceiling height. Barnsley Hospital have improved the
surroundings and facilities in 6 of the
A 15 mm shadow gap marks the junction while ‘top hat’ feature joints with an hospital wards.
aluminium insert rise up the full length of the casings. The 150 mm high toe and 160 As part of the refurbishment project
mm head collars are also finished in the Dusty Grey laminate. www.pendock.co.uk Yeoman Shield were employed
to remove the old bump rail and
handrails and replace them with the
dual purpose Guardian Twin Handrail
to corridors and waiting areas throughout the 6 wards.
The twin handrail was supplied with a 50mm dia. PVCu upper handrail
Photo: ©Lendlease for support to those who need it and a lower 125mm deep protection
42 rail which standing slightly forward of the handrail, offers protection
Acoustic Ceiling Pops Up In World Famous to both the wall décor and the handrail itself, minimising on repair and
Restaurant replacement.
43 Supplied in a Pastel Blue colour with contrasting accessories in
The design of the NOMA Pop-up Restaurant at Barangaroo Antarctica Corian® Transforms Historic Manchester Office Pebble Grey the Guardian Twin Handrail from Yeoman Shield was
near Sydney in Australia was most unusual - unusual because complemented with matching 200mm protection strip and corner
it was designed to operate only 10 weeks, just like another Bluesky Design Interiors have transformed a former canalside protection angles. www.yeomanshield.com/handrails
temporary Japanese one which popped-up for a short time warehouse into an exciting and dynamic workspace for Well Pharmacy
in Tokyo. in Manchester.
It was the initiative of famous Chef Rene’ Redzepi and Combining the listed building's
his Danish team, designed and built in a few months by original features and character Crometta: Combining Water Efficiency And Premium
45
the Australian Design and Planning collaboration, led by with contemporary styling,
Design
Lendlease and principal architect Darren Kindrachuk. the team created a bespoke
The restaurant covered about 500 sqm including the main reception centrepiece in The latest Hansgrohe
kitchen, serveries and the dining area as well as an outdoor Antarctica Corian® from CDUK. Crometta range comprising of
preparation space and guest lounge. With space for only 56 Fabricated by Production overhead and hand showers,
diners, 27,000 disappointed visitors were left on the waiting- TM Ltd, the 14m² desk was shower sets and showerpipes
list! complemented by a matching has been developed in
The idea of the restaurant was to interpret Noma’s bespoke waiting bench in the landlord's collaboration with long
culinary creations and gave them a unique Australian identity. lobby. standing partner Phoenix
References to elements of the Australian landscape, as well The design concept is based on the building’s location. The shape of Design. Specially created for
as Rene’s in-depth investigation and sourcing of natural the desks reflects the ripples in the canal water, creating a simple desk the entry-level segment, it
Australian ingredients, also provided the foundation for the that has an organic form. Angles with softened corners were added to combines water efficiency, sustainable technologies and premium design
underlying design theme of Land and Water. References to Noma Copenhagen and the Danish origins of the restaurant and its Chef were graduate between the desk height and counter height sections of the at an attractive price. The new Crometta range is showcased at the
subtly incorporated in the restaurant design. desk and a similar detail followed in the lobby desk graduating from Water Studio, Clerkenwell, London. The Hansgrohe Project Team is on
In this context, the review of materials and furnishings included only a limited number of selected Danish sourced options, chosen for their desk height to seating height. hand to offer invaluable advice on issues like water regulations (WRAS)
outstanding quality, performance and aesthetics. For example, the dining furniture was designed by Carl Hansen while the ceilings were lined The sleek lines of the desk contrast with the textured timber and and can demonstrate how to save money by using resources more
with acoustic panels from Troldtekt, widely specified in Denmark and worldwide to reduce noise and create a quiet and peaceful environment. exposed walls of the building’s interior. www.cdukltd.co.uk efficiently and selecting quality products with long lifecycles that deliver
www.troldtekt.co.uk genuine value. www.hansgrohe.co.uk
46
Sterte
The twin high-rise housing blocks of Sterte Court occupy a togethers,” explains Mr Hood. “The blue/aqua colours reflect
commanding location overlooking part of Poole Harbour in Sterte’s waterside location and have since been replicated 47
Glassolutions
Dorset. But, if the view from within the ten-storey flats was on the garden sheds, or ‘beach huts’, installed by PHP for
Court
Leading UK designer, manufacturer and installer argon warm edge spacer bar to reduce thermal
impressive, the external appearance of the 1960’s rendered residents to use following the project’s completion.” of commercial glazing products GLASSOLUTIONS bridging. Additionally, a distinctive and complex brise
concrete structure was far less so, and its exposed setting has given a new multi-occupancy office block at a soleil, designed by EPR Architects, was engineered
Stands near the coast also created corrosion issues. The revamp was particularly concerned with energy
efficiency and this was rewarded by the project winning the
Brings Thames Valley business park a sustainable edge, with
the company’s installation of solar control curtain
and installed by GLASSOLUTIONS to manage the
solar gain of the facade, the loads of which were
Thanks To
four-storey blocks, a new lease of life with better insulation,
enclosed balconies, modern heating systems and a jaunty
external colour scheme thanks to the use of Trespa®
(Arms Length Management Organisations).
Sustainability
Valley, the Winnersh Triangle business park provides
Trespa cladding to form a robust rainscreen. the results of the refurbishment. Says Mr Hood: “They have a
new-found pride in their homes and many local people have
business and industrial space for a diverse variety
of enterprises, and is home to over 50 businesses,
The brief outlined at the beginning of the project
was met and surpassed: the exceptional solar control
“We were confident the tough, durable material would
meet the requirements for the building,” says David Hood,
been so impressed with the look of the blocks, they think it’s
a new-build.”
At Winnersh including Virgin Media, Bang & Olufsen, and Intel.
GLASSOLUTIONS was contracted to manufacture and
properties of the building’s glazing specification
have been extremely effective at reducing glare,
Project Manager at Poole
Housing Partnership, which Andrew Craig, Trespa Regional Manager adds: “Poole Triangle install 3400m2 of curtain-wall façade for a new multi-
occupancy office block at the Winnersh Triangle site.
controlling heat transmission, and minimising the
need for air conditioning inside the building.
Offices
manages the estate on Housing was looking for a material that would withstand Paul Rose, Commercial Manager at GLASSOLUTIONS,
behalf of Poole Borough coastal elements and not be affected by salt water whilst Sustainability and efficiency are at the core of the said: “With Wates and EPR, we’ve helped create
Council. “The panels have maintaining colour longevity and retaining its original looks. Winnersh Triangle’s ethos, so this needed to be an office space which will be comfortable for its
good resistance to dirt, Trespa® Meteon® was the ideal choice as it ticked all the factored into the planning process: solar control occupants and kinder to the environment, as well as
so a clean appearance boxes to satisfy the client's needs and added to that, due to glass was desired, and the client’s requirements for being less expensive to heat and cool.”
has been maintained. Our its surface technology, pollutants and other environmental air tightness were particularly exacting. To adhere
contractor, Keepmoat, stains can be easily removed. The client was really to Winnersh Triangle’s exacting sustainability GLASSOLUTIONS’ glazing installation has provided
also had experience of impressed with the end result." specifications, GLASSOLUTIONS employed a variety of more than solar control for the Winnersh Triangle
fitting Trespa in previous different elements to maximise the efficiency of the building’s sustainability credentials: the glazing
projects.” Trespa® Meteon® is the company’s leading family of building’s envelope. installation recently achieved an Air Tightness Rating
architectural panels for façades and exterior applications, of 2.1m3/hr/m2, exceeding the very tight requirement
The colour scheme, a created – as with all Trespa® products–in close collaboration Schueco FW60+ and FW60+ SG curtain walling of 3m3/hr/m2. www.glassolutions.co.uk
maritime mix of white, with architects, designers, installers, distributors and end- systems were installed: with a thermal rating of
grey and light blue, was chosen by the people living in the users. More than 5000 square metres of the 8mm thick 1.5w/m2k, these were the ideal choice to aid internal
134 one and two-bedroom apartments. “Residents had the product in a mix of Cobalt Blue, Royal Blue, Verdigris, White climate control. 6mm SGG COOL-LITE SKN174 panes
opportunity to select the colours for the blocks by casting and Ocean Grey were used in the Poole project. were used for the outer glazing, paired with a 16mm
votes during coffee mornings and neighbourhood get- www.trespa.com
Glass And
A major project to transform the London 2012 Olympics Sport’s new broadcasting centre, while the rest of Here East floor, there is a subtle continuation of the stunning
and Paralympics media centre into a creative hub is nearing will include shared workspaces, public areas and a range ‘dazzle camouflage’ frit pattern that wraps around the
completion, with fire-resistant glazed atriums supplied by of bars and restaurants. The ambition behind Here East is
Glazing
facade of the building, whilst upper floors mix in black
Devizes-based Wrightstyle, utilising specialist glass from to create a community of offices, studio spaces and a data spandrel panels. This project demonstrates that the
Pyroguard. Here East is a new campus for the creative centre, alongside new facilities for University College London, use of fire rated glazing does not require compromise
Media
Wrightstyle supplied three full-height steel curtain wall the 2004 Olympics and Paralympics in Athens, supplying over Londoners and serve as a model for other regeneration
internal atriums, to a total project size of over 800 m2, 41,000 m2 of steel glazing systems to create Golden Hall, projects across the UK,” he said.
combining fire resistance to 60 minutes of integrity and now one of Greece’s foremost retail centres. The company, www.wrightstyle.co.uk www.pyroguard.eu
Centre insulation with a high level of acoustic performance.
Wrightstyle also supplied a large number of its unlatched
which is a European leader in the design, fabrication and
supply of advanced steel and aluminium glazing systems, was
6050F1 doors to integrate seamlessly into the atriums over also a supplier to the 2012 London main stadium and the
various levels, part of Wrightstyle’s commitment to offer adjacent ArcelorMittal Orbit, the 114.5 metre tall sculpture
complete and guaranteed glazing system solutions. and observation tower.
Supplying to Lakesmere, the leading roofing, cladding and Pyroguard supplied Pyroguard T-EI60/25-3 VI for the project,
facade specialist, one of the atriums is now part of BT a double-glazed fire resistant glass specifically designed for
49 Network VEKA And FCD To The Rescue 52 Small And Mighty – GEZE UK Launches A Tiny
Powerhouse 54
Bury St Edmunds-based Network VEKA member Frames Conservatories
Commercial | Domestic | Listed & Heritage | Special Projects
Direct has stepped in to help a new customer solve an old problem. It may be small but it packs a punch! The launch of GEZE’s new sliding
56 Innovative Patch Revolutionises Door Closer Technology 57 Crittall Windows: Style And Function For Hotel Projects
The latest in next-generation door closer technology, the new Ozone Crittall Windows, in partnership with
Plus (popularly known as the Hydraulic Patch) is now available at Total Firmdale Hotels, has produced a striking
Door Hardware. Suitable for frameless tempered glass and wooden new brochure to illustrate the upmarket
doors, this stylish and easy-to-fit projects that can be achieved using
patch fitting has an in-built hydraulic high quality steel windows, screens and
system which can be installed with doors. From traditional to contemporary,
just four fasteners. The Hydraulic Crittall products meet the architectural
Patch comes in a hold-open and specification and design of hotels,
non-hold-open function and is used restaurants and leisure centres. The
for double action swing doors. Since glossy 18-page ‘coffee table’ brochure
there is no floor cavity or cover plate, presents ‘rooms with a view’, a collection of dynamic colour photos
easy cleaning under the door is also possible. Please contact 01279 taken from Firmdale’s hotel portfolio. To view the brochure online go to:
406049 or email sales@totaldoorhardware.co.uk http://www.crittall-windows.co.uk/wp-content/uploads/rooms-with-a-
view-.pdf or visit www.crittall-windows.co.uk
60
FAKRO L-Shaped
59 Glebe House is a development of 3-storey The internal pane is made of laminated
apartments off Abbey Foregate in glass for added safety. With a new frame
Changing Lifestyles With P C Henderson’s Shrewsbury, built by Morris Homes on behalf and sash structure, multi-point locking
Roomflex Folding Door Hardware Windows For of Severnside Housing. FAKRO L-shaped
roof windows with bespoke elements were
function, hardware and handle, it combines
contemporary appearance with high
Changing lifestyles such as people working
from home and multi-generational living has Severnside specified for the project to take the glazing
area from the roof into the wall.
functionality. A P5, anti-burglary glazing unit
with warm spacers between panes can also
Housing
led homeowners to seek more flexibility from be specified to offer a U-value of 0.5W/m2K.
the spaces they occupy. As a result, there has This is done by combining a traditional www.fakro.co.uk
been an increase in the trend for a broken-plan
Development
roof window installed at the eaves with an
layout, creating smaller, multi-use areas that offer adjoining element for the wall. Top windows
privacy and add new functionality to rooms. P C and flashings were in standard grey but
Henderson’s Roomflex hardware helps meets these on this project two lower elements and
ever-changing needs. flashings have been used and made in
It is an innovative internal folding door system that white to match ground and first floor PVC
makes the most of the space and privacy available windows.
in family homes.
Roomflex is designed primarily for use with room FAKRO L-shaped windows are available
dividers and is ideal for applications where there is in right hand, left hand, tilt-and-turn or
insufficient adjacent wall space to accommodate non-opening options and can be used to
sliding or swing doors when open. Homeowners link walls to roof pitches from 15 - 55⁰.
can combine both open and broken-plan living by neatly storing the doors when the spaces are opened for entertaining or socialising. When closed, the
smaller rooms can be used for independent activities such as reading or catching up on TV shows or to simply reduce the space to minimise the cost of
heating the property.
Roomflex is capable of carrying doors of up to 35kg which when fully open, stack up neatly to maximise the opening space. The system is available in three
kits which when mixed and matched, can provide up to 5 different configurations, promoting flexible living. A key advantage of Roomflex is that it does not
require a bottom channel, allowing your floor space to flow uninterrupted from room to room with no potential trip hazards or unsightly guide channel set
into the floor. www.pchenderson.com
61
Learning
development, choosing glazing products carefully to temperature for students and minimising the need local communities can reap expansive benefits when centre it replaced in the town and represents a step
create a space with excellent temperature control,
effective ventilation and plentiful natural light.
for climate control. Large glass units were chosen
for the project to maximise light transmittance and Lanarkshire’s locally based, sustainably focused supply chain partners change in the quality of the health care facilities and
Environment
are appointed. services available to patients locally.
New 21St
provide a bright interior.
In recent years, Alford Academy has found it All three projects were delivered with the help of CMS played an integral part in delivering the high quality
Campus
community. Scotland Limited was ultimately responsible for delivering is the £17 million Hunter Health Centre in East Kilbride.
the school’s new Community Campus. The new site
accommodates 960 pupils and has brought together
the primary, secondary and senior years on a single
Jim Hanna, project director at Morrison
Construction, said: “Working with our partners and
Facilities the new centres as part of a £48 million investment
programme funded by the Scottish Government.
Home to six GP practices, as well as a dental practice
and a variety of other medical services, the 6300m2
facility features a large glazed central atrium space,
site, as well as providing sport and leisure facilities suppliers, the Campus was finished ahead of the CMS was contracted to provide a variety of building intended to create a calming atmosphere and maximise
for the wider community. coming academic term… We are immensely proud envelope elements manufactured using thermally broken natural light within the building.
to have been involved in bringing this fantastic new aluminium systems from Metal Technology. These
The concept for the Community Campus was resource to fruition for the local community.” ensured the finished complexes would benefit from CMS played a key role in creating the four-storey
based around the creation of a central social hub the optimal combination of thermal comfort, energy building’s envelope, installing thermally efficient units to
for students, with classrooms and study areas The completed project has also been praised more efficiency, longevity and excellent visual appeal. regulate its internal temperature which keeps the Hunter
branching off from this central area. The social ‘hub’ widely by influential the construction industry. The Health Centre light and bright. www.cmswindows.com
area is two storeys high in places: this allows areas development, along with project managers hub The new £23 million Houldsworth Centre in Wishaw is a
to be used flexibly for a variety of activities, as well North, was named a finalist for the Community three and five storey complex providing NHS healthcare
as creating a large and airy space which lets in a Development Project of the Year award at facilities alongside North Lanarkshire council’s new
considerable amount of natural light. the Scottish Property Awards 2016. housing office and library, a shop and café. Centrally
www.glassolutions.co.uk located at the heart of the community, the building
The wide range of purposes that the new campus replaces the former Wishaw Health Centre and
was intended to fulfil meant that versatility was Wishaw library. CMS manufactured and installed all the
a particularly important aspect of the glazing aluminium curtain walling and side hung windows for this
specification. In order to create a safe, light, well- contemporary building.
64
Imago Lift
The imaginative use of Imago Lift & Slide doors from AGB To support this effect, the architects wanted a door
precise assembly of the whole door handle set in
Hardware has enhanced the peaceful environment of opening that would appear invisible, to encourage free
a few seconds and without the need for screws, bolts or grub screws. Integrated doorsets are designed to make life easy for everybody. For
an innovative residential therapy centre for recovering movement of residents in and out of the pavilion. After
& Slide addicts. looking at options available on the market, Sara and Marta
fell in love with the possibilities offered by the Imago Lift &
contractors, there are obvious advantages in terms of time- and cost-savings but the bigger benefit will be to reduce the chance of damage
to doors from fitters rushing to complete the job.
View For
centrepiece of CentroSoranzo is a wooden pavilion where can feel the benefits of being at one with nature even
due in 2017. www.bjwaller.co.uk
the centre’s guests can feel at one with nature to assist when they’re inside,” explains Marta Baretti.
their recovery, which features two Imago doors.
Carleton Manor Park is an exclusive new Not only does the CI+ Matting benefit tiled
housing development that offers luxurious flooring installations by protecting the tiles,
family homes of the highest quality. In order but also helps as a time saving solution
to showcase the high-end, aspirational feel during the installation phase. It can be
of the development, the showhome was laid over the subfloor as soon as it is dry
proudly designed and created and all of the enough for a person to walk over, rather than
high quality products used throughout were traditional methods where subfloors need a
carefully considered. Dural UK’s CI+ Anti- substantial amount of time to fully dry. Air
Crack Matting, Micro Joint Infill and Durabase channels in the matting allow the subfloor
WP Waterproofing Membrane System were rafts to continue to dry out in a controlled
all used throughout the property to provide way by preventing the top layer of the screed
effective movement protection in the natural drying quicker than the bottom. This slow
stone flooring. drying period leads to a stronger subfloor.
A showhome with a wow factor - Located Dural’s Micro Joint Infill was also used in the
on the outskirts of Penrith, Carleton Manor kitchen area to provide additional protection
Park is surrounded by natural beauty with to the Astro Grey Marble tiles, and was
the Lake District National Park a stone’s supplied and colour matched to Grout 3000
throw away. The developers, Cumbrian Light Grey. The colour match enabled a
Homes, wanted to ensure the natural beauty seamless finish for the surface tiling. Micro
remained integral in the design throughout Joint Infill has been specially developed for
the luxury homes in Carleton Manor tiled flooring installations which are laid over
Park. Cumbrian Homes worked with local underfloor heating systems, particularly
specialists Penrith Tile Centre, and effectively for residential developments. It provides
combined the natural stones and porcelains effective movement protection for tiles and
throughout the showhome to complement natural stone on heated floors. It means
the surrounding area. The Tasman natural a tiled flooring installation with Micro Joint
floor and wall tiles with plank effect look Infill used is able to effectively absorb the
stunning in the main bathroom as they mimic movement energy transferred from the
the variability of natural wood. subfloor, protecting the tiles from cracking
and loosening.
In the kitchen and living areas of the
67 property, Ca Pietra’s Astro Grey Marble Penrith Tile Centre applied the Micro Joint
Superior
tiles were used in an unpolished finish. The Infill into the grout lines in between the
delicate, subtle tones of the tiles blend Astro Grey Marble tiles, carefully following
effortlessly with the beautiful, traditional the brick bond tile formation. In the shower
66
Flooring kitchen cabinetry. The high standard of finish and wet areas within the showhome, Dural’s
Looking
Bona White is a new wood floor primer designed to To produce a highly durable, easy to maintain finish, and attention to detail is clearly evident in WP Durabase Waterproofing Membrane
produce an on-trend bleached look when used in
conjunction with a Bona polyurethane lacquer. The
two coats of Bona Traffic HD lacquer were applied.
Traffic HD is Bona’s toughest lacquer. The very low
Products the beautiful showhome. It is important to
consider the function as well as the form,
was used. It is the ideal product for
waterproofing shower areas in preparation
For A intensity of ‘whiteness’ is dependent on how many
coats are applied. This client wanted a whitewashed
VOC content and low odour mean there is no need
for homeowners to vacate their property while the For Superior and the practicality and durability of the
stone tiled surfaces throughout.
for tile installations.
Floor? This was achieved by the application of two coats Its fast cure time means the floor can be in full use
Spaces
prone to various forms of stress and strains
over time e.g. expansion and contraction
adhesion when using the Tilemaster
adhesives. The Tasman natural floor and wall
of Bona White under two coats of Bona Traffic just 12 hours after treatment – making it an ideal caused by underfloor heating systems, tiles, supplied by Marshalls, look stunning in
HD lacquer. The works were part of a complete choice for commercial floors too where there is cracking, loosening and others. It is essential the bathrooms throughout the showhome
renovation of a Victorian town house in Bath and little available downtime for renovation. TWF’s to protect the surface tiles to retain the and are now protected by the Durabase WP
were carried out by Bona Certified Contractor, TWF clients chose the Matt version of Traffic HD for their aesthetics and integrity of the flooring. Waterproofing Membrane.
Bath Ltd, who specialise in the restoration and kitchen floor. Silkmatt and Extramatt sheens are also
fitting of traditional wood floors. Before treatment, available. Dural UK, specialists in protecting tiled Dural are proud to have worked with Penrith
the TWF team filled large gaps using reclaimed flooring installations - throughout the Tile Centre and Cumbrian Homes on the
pine wedges and then sanded the floor to 100 grit As a Bona Certified Contractor, TWF Bath is part showhome, Dural’s CI+ Anti-Crack Matting Carleton Manor Park Project, and there are
abrasives. of Bona’s network of highly trained wood floor was used, together with Tilemaster plans to use the same high quality products
specialists - independent wood floor companies who adhesives. It effectively decouples the in the rest of the 39 houses in the luxury
Smaller gaps were filled using Bona Mix & Fill, have received extra in-depth training in the use of surface layer of tiling from the subfloor development. For further information on
which is mixed with sanding dust from the floor to Bona’s wood floor finishing products. beneath it, absorbing any stresses or Dural’s range of flooring accessories, contact
ensure the filled areas blend in with the rest of the www.bona.com movements caused by expansions or their flooring experts and they will be happy
surface. The floor was then sanded using 120 grit contractions. By doing this, it protects the to provide further information.
abrasives before the application of the first coat of tiles and prevents them from cracking or www.colouredmovementjoints.co.uk
Bona White. The floor was then abraded using a loosening.
Bona Scrad Pad to remove any grain raising from the
surface before the application of the second coat.
69
Inaugural
Installation
Of Mapei’s
Comfort
Flooring
68
System
tough, hard-wearing film, EW99 is easy to clean EW99 delivers a spreading rate of approximately The international architects BDP have
Aviation Museum and decontaminate, and it can be used with a low-
slip additive for extra performance.
12 square metres per litre and is surface dry in two
hours, with overcoating possible after a minimum of
recently refurbished the floors within
their Bristol office with Mapei’s new
Rebuild Gets ‘The Ashley Colella, the museum’s manager, explains the
16 hours. Complete cure is achieved in six days. Mapecomfort Floor System. The floors
in the meeting, library and toilet areas
Put Piccadilly Ofsted and Highways England. wet resin, immediately followed by more resin on
top.
Back On
BREAM ‘Excellent’ scheme in 2010. Issues with the reinforcement fleece. Once cured, the resin forms
integrity of the roof had continually plagued the a seamless, elastomeric waterproof membrane
building with leaks, resulting in unsightly staining that cannot delaminate, is UV stable and bonds
ply roofing membranes on levels 10, 4 and 3 with a For the green roof on level 3, Castle Roofing
cold-applied liquid system from Kemper System. carried out the refurbishment in two sections,
removing half the green roof medium and installing
Roofing contractor, Castle Roofing, was appointed Kemperol V210 onto to the existing surface as an
to carry out the works and selected Kemper overlay before replacing it and lifting the second
System’s solvent-free Kemperol 2K-PUR as the section so that the new roofing membrane could
most appropriate solution for the level 10 roof. be installed. The second section was then re-
comar 5P.i
instated, completing the programme.
ADVANCED
Explains Mark Atherton from Castle Roofing: “The
level 10 roof is directly above occupied office Comments Jim Fozzard, building manager at
areas and is also the location for the building’s Piccadilly Gate: “We needed a roofing system that
air handling plant, so nuisance odours could could be installed quickly to prevent any further
Latest Thermal Break Technology Produces the
71
potentially have been transferred into the office damage to the building’s interior, while minimising
areas. any disruption to occupiers and maintaining
Piccadilly Gate’s high aesthetic standards.
Next Generation of Windows.
“As a result, we chose to use Kemper System’s Comar’s Design Team brief was to specifically meet architectural demands; low For more information about
2K-PUR system, which is solvent-free and “Using Kemperol 2K-PUR on the level 10 roof
U-values, matching slim sight lines for both the casement and tilt/turn windows, comar5P.i ADVANCED please contact us:
odourless, while still offering high performance and meant that occupiers were not affected by any
large glazing pocket for acoustic glass, Secured by Design and large sizes. For our
a BBA-accredited 25-year service life.” changes to air quality, while all three roofs have Tel: 0208 8685 9685
been overlaid using a seamless membrane without fabrication and contractor partners, performance with built in fast-track fabrication
Email: projects@parksidegroup.co.uk
The level 4 roof is above the building’s record- the use of hot works for a durable solution and installation.
Web: www.comar-alu.co.uk
breaking extra-long escalators and leaks from requiring no strip out.”
two water outlets had caused staining of the http://kemper-system.com The technology from the Comar 9P.i system has been incorporated into the Comar 5P.i
suspended ceiling. This roof was also refurbished window range. This ensures the Comar 5P.i Advanced Casement and Tilt/Turn window
as an overlay system, using Kemper System’s
system integrates seamlessly into Comar 9P.i framing and creates the option for standalone
Kemperol V210.
high performance windows, up to 2.5m high with U-values as low at 0.77. BIM Models
available at Comar Partners: www.comar-alu.co.uk/login/.
enquire online at www.ebpr.co.uk/card
ARCHITECTURAL ALUMINIUM SYSTEMS
50 E 51
73
Completed in the late sixties, the property features extensive glazed elevations and a flat roof of minimal depth, where the designer of such iconic
structures as Lloyds insurance offices in the City of London, chose to employ Heraklith woodwool “Roof Board” to help regulate humidity levels within
the occupied space.
Basically the depth of the roof did not provide sufficient space for ventilation and instead Rogers specified the special grade woodwool board to
absorb moisture from the air when humidity levels are high. But then when the air is dry, it will release moisture back into the air. This keeps the room
humidity constant and comfortable, while also reducing the risk of surface condensation which can lead to mould growth. In fact the Roof Board was
manufactured specifically for this project, incorporating timber slats to provide additional strengthen and allow them to sit unsupported above the
72
ceiling. The refurbishment of the single storey southwest London house has been carried out by Piperhill construction, with the Northern Irish company
Dry Fixing
Since the NHBC’s change of policy on mortar fixing A new British Standard is at the planning stage and we striving for authenticity in keeping with the design ethos of the Grade II listed dwelling. www.marmox.co.uk
and the revision to BS 5534 forecasts for an increase in may be lucky enough to see it published around the turn
the use of dry ridge, hip and verge systems have, not of the year. If it is to succeed, we will have to hope that
Problems surprisingly, proved to be accurate. in-house testing isn’t accepted or we are likely to be
faced with the questionable results seen with underlays
75
Impressive
With capacity for almost 4000 guests and 96% separate sections, like a wagon wheel – ensuring
occupancy, keeping the central area of Center Parcs the structure was not compromised by uneven load
Longleat Forest open was key to the refurbishment distribution. This stepped, terraced temporary roof
Center Parcs of its impressive Subtropical Swimming Paradise. A
massive challenge for Delomac Roofing, the project
was then covered with plywood and completely
weathered by Delomac with a Sarnafil membrane.
Completed planning and 30 months of onsite construction. and coverings could be safely removed, maintaining
water-tightness with guests enjoying the facilities Spanish
The attractive, durable and easy to handle properties
of Cembrit Duquesa natural slates have meant that
Cembrit has a reputation for sourcing Spanish slates,
and can be relied on to supply the best value and
With Zero
Originally completed in 1994, the Subtropical below. Scheduled over more than two years, this a large roofing project, spanning 3,200m2, could most appropriate slates for all project types. Duquesa
Swimming Paradise roof and glazed rain-screen
systems were in need of refurbishment. The new
way of working resulted in a dry building envelope,
despite some of the wettest weather on record.
Natural be completed in just 14 weeks. Following approval is a high quality natural slate from Cembrit which is
Guest
from East Herts Council, a disused estate has produced by some of the finest quarries in Spain.
roof installation was planned in close discussion
with the Sika Sarnafil and Delomac supply chain, Comprehensive vapour barrier measures were used Slates been regenerated to include a multi-million pound
supermarket and maltings. The site is now home to a Regarded as one of the best Spanish natural slate
Supermarket
lasting roof covering for a wide variety of projects.
barrier detailing at all Glulam beams and fascia Bracknell Roofing was appointed as the roofing Duquesa is available in a variety of sizes to suit
Chris Meadows, Technical Advisor, Sika Sarnafil interfaces ensured no risk of condensation. contractor for this project by the main contractor, individual requirements. It has a smooth, even texture,
explained: “The client needed a durable, long lasting
roof system that would complement the woodland Sarnafil membrane and accessories were used for
Bill Mace Group. Working closely together, the two
companies specified suitable roofing materials to
which, as well creating an attractive appearance, also
aids the preservation of the finish.
setting. This was complicated by differences all the coverings, and again overall specification meet the major criterion for this project - achieving a
between the swimming pool side and dry side, with development was tailored to suit the varying balance between cost and quality aesthetics. Due to The hard surface also ensures the slate can withstand
restaurants and meeting rooms, of the building. build-ups; new, overlay, bonded and mechanically its attractive appearance, and cost effective benefits, the most severe weather conditions and remain
fastened. An increased thickness membrane was Cembrit Duquesa natural slates were specified. unaffected by sunlight, ultraviolet light and even acid
“We proposed two distinct solutions– a mechanically manufactured in one single batch to ensure colour rain. When laid correctly, Duquesa will last the lifetime
fastened system using Sarnafil S327-18EL for the consistency. Sika added further value with an Approximately 40,000 500x250mm grey Duquesa of a building and is ideal for use on any major project
dry side and an adhered system using Sarnafil impressive 17 visits to the site by the Applications slates were installed by Bracknell Roofing. The natural including supermarkets, schools, city offices and
G410-18EL for the more humid area. Both were Team to advice and support. www.sarnafil.co.uk slates provide a striking design on the new 2000m2 prestige homes.
specified in Patina Green to blend with the natural mansard roof, and the existing 800m2 building, which
environment. Sarnafil membranes are cold applied now serves as the back of house for the main store. Duquesa slate is a tough natural material which has
and free from naked flames, the obvious choice for Peter Edwards, National Project Manager, Bracknell been tested to ensure it meets the current national
an open site.” Roofing, commented “Cembrit Duquesa slates deliver standard, BS EN 12326-1:2004. For more information,
on all aspects, as they are a cost effective natural visit www.cembrit.co.uk Follow on Twitter at @
An innovative temporary terraced platform was material, provide the finish that the client requires, and CembritUK and Facebook at Cembrit UK.
designed and installed, suspended underneath are easy to cut and install, which helps us when trying
the main structure by cables and lattice beam to complete a project quickly and effectively.”
scaffold units. Work was carried out over 16
78 Ronadeck Resin Bound Surfacing – Not Just Decorative 79 Eye-Catching Brett Paving Solution For £15.5m School
Refurbishment
Resin bound surfacing systems can differ not only in quality and
longevity but in other factors such as slip resistance, sustainability, Sarum Academy in Salisbury has
health and safety and cost per square metre. So what features should regenerated its external grounds
be considered? using a permeable paving solution
It is worth looking at from Brett Landscaping. The eye-
manufacturer credentials catching scheme has been created
such ISO 9001 and ISO using Piatto Block paving with its
77 14001 certificates, OH SAS vibrant colours and clean, modern
18001 certificate and FERFA design, combined with classic
Omega and Omega Flow rectangular
Hauraton
membership.
Types of resin used - the block paving. The permeable paving allows rainfall to permeate naturally
best resin bound surfacing between the paving blocks into a permeable sub-base as part of a SuDS
83 Bespoke Loading Bays From Stertil Dock Products Support 84 Wraptite-SA Conquers Airtightness At 1066 Zero Carbon
DHL Operations At Manchester Airport Homes
An installation of 99 loading Wraptite-SA airtight membrane has been specified to achieve a highly
bays has been completed efficient building fabric as part of a concept to create a terrace of 5
by Stertil Dock Products Zero Carbon homes in a site close to Hastings Castle. The homes are
to support a revolutionary built from pre-fabricated heavyweight
new DHL distribution hub at timber frame panels, with Wraptite-SA,
Manchester Airport City. DHL self-adhering vapour permeable air barrier
has begun operations within being applied on site. The use of Wraptite-
the Manchester Airport City SA makes a significant contribution to
Global Logistics site which was a £15m project completed in 2015. The a building’s thermal performance by
company’s new 37,308 sq ft facility incorporates a mix of conventional preventing lateral air movement. It also
loading bays and specially shaped bays to accommodate Mercedes provides high vapour permeability in a
Sprinter vans. The site replicates a similar installation at Schiphol Airport continuously sealed, self-adhered, airtight membrane.
in Amsterdam. www.stertil.co.uk http://www.proctorgroup.com/air-barriers
Glassolutions
High performance glass and an excellent value maximise natural light whilst offering excellent thermal
method for installation had to be created to meet the
engineering approach from GLASSOLUTIONS has played performance and minimising solar gain. GLASSOLUTIONS
client’s requirements.
a major part in the delivery of the St John Bosco College worked with leading architectural aluminium systems
Chosen For and Wandsworth Residential Surrey Lane scheme, a
sustainable college and Code level 4 and 5 housing
company Metal Technology to supply and install glazing
in a contract valued at around £2.5m.
Secondary glazing is an independent window installed on
the room side of a building, which reduces noise ingress
School
the Salesian of Don Bosco and the Archdiocese of between 6mm SGG SECURIT HST outer panes and
experience working on all building types. For further information, please contact
Southwark, whose ethos is based on the teachings 6.8mm SGG STADIP PLANITHERM ULTRA N inner panes.
Selectaglaze on 01727 837271/email: enquiries@selectaglaze.co.uk
of the Roman Catholic Church and the educational Solar control glazing units featured 6mm SGG SECURIT
or visit: www.selectaglaze.co.uk
approach of Saint John Bosco - with the capacity to HST COOL-LITE SKN 174 II outer panes and 6.8mm SGG
cater for over 1,300 students. Whilst its admissions STADIP inner panes whilst rooflights combined 8mm
policy gives priority to children in Catholic primary SGG SECURIT HST PLANITHERM ULTRA N II and 8.8mm
schools, it welcomes students from other faiths and SGG STADIP glass.
86 Notifier Gets A View From The Top At The Royal Liver 87 Aico’s Solution Increases HMO Fire Safety
backgrounds.
Building
Solar glazing and standard glazing also featured in the The RHP Group, a registered housing provider in South West London,
Its new premises form part of a £50m mixed use residential buildings with the Code level 5 town houses Fire detection technology from Notifier by has used Aico fire protection equipment to help improve safety in
development by Lendlease which also provides a range including triple glazed units with 6mm SGG SECURIT HST Honeywell is protecting staff and visitors at Houses in Multiple Occupation. Each flat
of 100 new homes on the site. Working with London PLANITHERM ULTRA N II and 4mm SGG SECURIT HST one of the world’s largest banking institutions already benefits from an Aico BS5839
architects Allford Hall Monaghan Morris, Lendlease separating two 16mm argon gas filled cavities. at Liverpool’s Royal Liver Building. When the Part 6 domestic smoke alarm system
committed to delivering sustainable residential and company moved in, it sought to redesign one of – if this is triggered it will only sound
educational buildings, designing in air source heating, Having already established a good working relationship the floors and install a set of high specification within that flat. Throughout the common
a range of water saving and sustainable transport with GLASSOLUTIONS on the Ministry of Justice building services, including a new life safety circulation areas a separate communal
measures as well as building in ‘lean and clean’ design Framework, Lendlease appointed the UK based glass system. Triple Star Fire & Security specified a BS5839 Part 1 fire alarm system has
measures. supplier in competitive tender on the basis of their value fire detection solution based around Notifier’s been installed. To maximise safety and ensure the communal alarm
for money and technical support in a project which innovative Pearl intelligent addressable control can be heard within each property, RHP has integrated the two alarm
The four-storey school complex comprises steel frame required tight fiscal control and delivering within tight panel. In addition, over 60 Notifier optical systems. This has been achieved by installing an Aico Ei164e Heat
construction with primarily brick and wooden clad finish timescales. www.glassolutions.co.uk detectors were installed. www.notifierfiresystems.co.uk alarm in the hallway of each flat, which interconnects to the existing
and uses high performance glazing widely throughout to alarm system within the flat. www.aico.co.uk
89 Profloor Levelling System Gives A Lift To Flats Conversion 91 UZIN System Used In Plattens Fish & Chips Refurbishment
The A. Proctor Group Ltd has supplied UZIN products were recently
its Profloor Levelling System to help used to renovate the floor at
with the conversion of Linden Court, Plattens Fish and Chip Shop in
a Grade II listed building in Reigate, to Wells-next-the-sea, Norfolk.
residential flats. The project required The old floorcovering had to be
a floating floor acoustic treatment removed, before 2 coats of UZIN
to the existing out of level floors. PE 480 damp proof membrane was
Developed to allow a level finished applied over the very old sub-floor.
floor to be installed on a cambered, UZIN PE 280 primer was then
stepped, or uneven sub-floor, Profloor Levelling System is typically used applied, followed by a coat of UZIN NC 150 a heavy duty smoothing
on structural concrete floors where the differences in level are too great. compound. Safety flooring was laid, capped and coved in the kitchen
The floor is levelled by inserting packers in each levelling base to adjust and preparation areas whist luxury vinyl tiles were installed in the front
the level of the timber battens. www.proctorgroup.com of house. Both floor coverings were stuck with UZIN KE 2000 S pressure
sensitive adhesive. www.uzin.co.uk
90 Fall Protection Takes Off At Virgin Atlantic With Safesite 92 Insulation Gives New Lease Of Life To Cornish Units
Safesite has provided Virgin Atlantic
Social housing provider, RCT Homes, has accessed Phase 2 Arbed
with a collective roof edge protection
funding to carry out a range of improvements on 30 Cornish Units in
system that ensures optimum roof top
Cwmbach, Wales, including the installation of ROCKWOOL stone wool
safety for maintenance and inspection
insulation to alleviate fuel poverty issues and improve living conditions
teams and complies with all relevant
for tenants. ROCKWOOL
health and safety regulations. After
devised a tailored, envelope
removing all existing guardrails,
refurbishment solution,
demarcation bases and chain,
featuring its REDArt® External
Safesite installed 900 Lm raked and standard KeeGuard® systems. The
Wall Insulation System (EWI)
KeeGuard® range includes standard vertical, raked, radiused and folding
combined with the use of
systems. The modular design features Kee Klamp® open-style fittings,
ROCKWOOL FLEXI® insulation
which facilitate quick and easy installation of the horizontal rails and
which is proving very successful.
88 100% recycled PVC counterweights. www.safesite.co.uk
www.rockwool.co.uk
Comprehensive
Stretching along the south bank of the Thames from demands posed by the complex balcony designs at
Battersea to Vauxhall, the Nine Elms area in London the Ambassador Building is Schöck. The diverse range
has become the largest development zone in Central of Schöck Isokorb load-bearing thermal insulation
Schöck Range London. The residential and commercial heart of this
huge development is Embassy Gardens, London’s
products guarantees totally verifiable performance
standards, meets full compliance with the relevant UK 93
Gardens commercial frontages at ground level that connect The new £44 million Cardiff University Brain Research Imaging Centre (CUBRIC)
the Embassy Square, Linear Park and River Frontage The specific requirements at the Ambassador Building building at Cardiff University’s Innovation Campus, which is equipped with an
attractive Timber Fin Screening Solution from Levolux, is specially designed to
Demands
through a network of streets and a central square. . involved firstly the Schöck Isokorb type K for concrete-
to–concrete connectivity. The type K units were facilitate brain research.
The development has inevitably attracted a incorporated into the cast in-situ cantilever balconies TIBI Group architects specified a Levolux external solar shading and screening
sophisticated level of residents who demand the on the road facing external elevation; and where there solution, this time incorporating vertical Timber Fins in addition to Ventilation
highest standards of detail throughout these was a shear force transfer element required, also and Acoustic Louvres. These were applied in different parts of the building.
buildings; and one of the key features is the wide involving concrete-to-concrete loggia’s or supported The most visual aspect of the solution is the Timber Fin screening structure
variety of balcony types, each governed by unit size balconies, the Isokorb type Q was installed. A further that is located at the centre of the development, accommodating the main
and orientation. With such a demanding specification variation, Isokorb type K-WU units were also used as reception, a staircase and circulation areas. At 13 metres in height, the ‘drum’
involving different balcony types, the minimisation of slab-to-wall thermal breaks. like structure has a curved footprint that extends out beyond the building’s
any possible thermal bridging problems is crucial. glazed curtain walling.
The Isokorb type KS for concrete-to-steel were used This creates a useful reference point for visitors when locating the main
This is something highlighted in research findings on the internal courtyard balconies; and to assist the entrance. Inside the building, the timber fins form balustrading for the
from the Oxford Institute for Sustainable Development structural engineer in keeping the transverse beam reception area and around circulation areas on first and second floors.
(OISD) at Oxford Brookes University. It shows that continuous between the external columns, Schöck The structure comprises up to seven rows of vertical rectangular-shaped
with increasingly improved airtightness and fabric SLD dowels were also used to support the propped timber fins, each measuring 185mm wide by 44mm thick, engineered from
U-values in UK buildings, thermal bridge heat losses cantilever walkway externally. untreated Western Red Cedar.
are responsible for an increasing percentage of the The Fins in each row are set at 250mm centres and are fixed at an angle
overall building heat loss. It is common for thermal In addition to providing highly effective connectivity that varies by 45 degrees, creating an interesting aesthetic that changes,
bridges to account for 20% – 30% of the heat loss solutions for concrete-to-concrete and concrete-to- depending on your viewpoint. The timber fins are virtually maintenance free
in multi-residential units (as calculated by thermal steel thermal bridging situations, the Schöck Isokorb and will be allowed to weather naturally, giving them an attractive silver-grey patina. In addition to the timber fin screening, Levolux also provided its
modelling) and balcony connections can be a major range also offers a modular product for steel-to-steel Ventilation Louvres to screen plantroom areas at high level.
contributor to the thermal bridge heat loss – if applications and even a maintenance free alternative Levolux’s Contour and High Performance Ventilation Louvres were utilised to provide an attractive, yet highly weather-resistant facade. Extruded
effective thermal isolation is not included in the to wrapped parapets. For a free copy of the Schöck aluminium louvres feature an effective ‘S’ shaped profile. This delivers the optimum performance, both in terms of airflow, resistance to wind and rain
design. And the company able to offer the ideal range Thermal Bridging Guide and / or the Thermal Bridging and their aesthetic quality. www.levolux.com
of solutions to the differing thermal connectivity Solutions brochure, visit www.schoeck.co.uk
94
Portakabin
With the end of the recruitment cap on “The project team was fast and responsive, which
undergraduate numbers in England now taking was key to the success of the project. We are
effect, the requirement for upgrading and expanding also very happy with the quality of finish and the
Constructs ‘Pop learning facilities continues to rise to meet the
increased demand for higher education.
additional elements which give the building a
permanent feel and further improve the student
Hub For UCL available in England this year, and the Russell Group
has estimated that more than £9 billion is being
The learning hub accommodates a lecture theatre
for up to 100 students and has three smaller seminar
In Just 2 Days
spent on capital projects by its 24 world-class rooms. Portakabin supplied decking around the
universities, with a large proportion going towards building, an access ramp, stairs up to the entrance, 95
new high quality learning facilities. air conditioning, emergency lighting, and data
Universities
refurbishment of a South-west community Floating panels, installed on top of the
College London (UCL) where Portakabin constructed
an innovative ‘pop up’ learning hub in central
that reflect and communicate UCL’s programme to
transform its estate. Social Services building, providing energy efficiency as
well as helping to create a healthy indoor
building’s existing sub-floor.
Meet Rising
location within an enclosed courtyard. This required
facility. connected back to the Axios manifold which
disruption to teaching. detailed logistical planning from the Portakabin hire
is fed from the flow and return pipework,
team and great precision for the installation phase
For Higher
host of specialist housing, voluntary sector, underfloor heating systems suitable for
capital programme to provide new permanent and proximity to an adjacent brick building.
social enterprise and recovery providers installation within timber floors as well as
refurbished teaching space is completed.
to offer a unique range of opportunities over solid substrates and other situations.
Education
Modular buildings for short-term use can now be
for people looking to rebuild their lives
The new learning hub was installed in just two days supplied with an even wider range of architectural
and play a positive role in the community The range also includes air and ground
ready for the start of the academic year. It would options and amenities to enhance the environment
after periods of homelessness, re- source heat pumps, mechanical ventilation
have taken many weeks had the building been for work and study. Developed and installed by
offending, drug/alcohol abuse or long term with heat recovery (MVHR) units and
constructed using site-based building methods. Portakabin, the range is designed to give interim
unemployment. sophisticated control options able to
buildings a more permanent feel and includes:
optimize the performance of the complete
Commenting on the project, Sam Williams, Capital canopies and shelters for under-utilised outdoor
The main floor where Omnie Foilboard integrated installation. www.omnie.co.uk
Projects Manager at University College London, spaces; covered walkways with curved, high barrel,
underfloor heating panels and other
said, “We needed facilities of the highest standard low barrel or flat roofs; vinyl wraps, which are low
equipment have been installed, is
delivered in the shortest possible timescale. This was maintenance and simple to install but can totally
divided up into two consultation rooms,
achieved and it is an excellent, robust building which transform a building’s appearance with strong
a treatment room, waiting rooms and
has been positively received and is being well used. branding and graphics; free-standing outdoor
circulation space. The five areas are served
The vinyl wrap has really enhanced the facility and structures; cycle storage; smoking shelters; street
by a five port Axios manifold, supplied
internally we have varied room sizes to suit the type furniture such as litter bins, benches, picnic tables,
as part of the package and installed
of learning – from large lectures to smaller seminar bollards and barriers. www.portakabin.co.uk
by contractor, Steve Guppy Limited.
working groups.”
97
Metal Technology
96 Girdwood Community Hub in North were specified for the project,
Guernsey
A landmark high-rise apartment block that was once “On the subject of environmental impact, using a Belfast brings together physical complemented with System 5-20D
thought to have outlived its usefulness has been given ventilated rainscreen cladding system allowed us to regeneration and eco-design Hi+ doors and System 4-20D Hi+
Flats Go
a new lease of life and a fresh appearance, thanks to
Trespa® Meteon® cladding panels.
increase the amount of insulation, thereby improving
the energy efficiency of the building,” says Mr
Specified In principles in the creation of a state-
of-the-art, socially inclusive centre
windows from the [THERMAL]
range.
Regeneration
tallest building on the Channel Island of Guernsey. on the island both at Sir Charles Frossard House and Standards, System 17 provides
Modern With Only five years ago it stood empty of tenants and
was considered to have reached the end of its useful
Oakvale School, we were satisfied that the product
was capable of withstanding the harsh coastal
Part of the overall regeneration of structural integrity, weather
Project
the former Girdwood Barracks site, performance, thermal enhancement
Trespa
life. Then an imaginative refurbishment and upgrade environment to provide a long -term solution without the Michael Whitley Architects design and complete design versatility. The
was given the go ahead by the States of Guernsey high maintenance costs,” he adds. achieves high Metal Technology 5-20D Hi+ door
planners. levels of thermal and 4-20Hi+ window systems blend
The refurbishment project reconfigured space performance seamlessly and offer advantages of
The result is an eye-catching structure where it’s internally to provide 50 flats where previously there without polyamide thermal break technology
previously uninspiring dun-coloured brickwork has had been 42 and also made provision for an additional compromising in meeting the latest thermal
given way to vibrant Trespa® Meteon® cladding panels lift. The end result has been a welcome increase in aesthetics using requirements of the current building
in two shades of light green. social housing units for the island. an integrated regulations.
range of products
“Visually the improvement to the building and Says Mr Roussel: “GHA is a long term owner of this from leading Opened in January, Girdwood
the ability to detail openings and vary colour to property so we wanted something without a high aluminium systems Community Hub has already
enhance vertical features were key to choosing maintenance requirement. Trespa® Meteon® panels manufacturer brought recognition to Michael
Trespa,” says Phil Roussel, Development Manager have good resistance to dirt, so we are confident the Metal Technology. Whitley Architects with the RSUA
of Guernsey Housing Association, which carried out building will look good for many years.” (Royal society of Ulster Architects)
the transformation in partnership with the States of Both System 17 SP Regeneration Award 2016. The
Guernsey Housing Department. Trespa® Meteon® is a decorative high-pressure (silicone pointed) project also won ‘Community Benefit
compact laminate (HPL) with an integral surface curtain walling Project of the year’ at the Property
“The new panels have rejuvenated a tired old building manufactured using the company’s unique in-house with concealed Excellence Ireland Awards 2016.
and brought it up to date for the 21st century,” technologies; Electron Beam Curing (EBC) and Dry vents and System www.metaltechnology.com
says architect Ricky Mahy whose practice, Create, Forming (DF). It is the company’s leading family 17 capped
masterminded the new design. of architectural panels for façades and exterior curtain walling
applications, created in close collaboration with
Of crucial importance was protection against the architects, designers, installers, distributors and end-
elements. By using a ventilated façade system, the users. www.trespa.com
continuous air flow draws air through the cavity
between the cladding and the inner layer of the
exterior wall aiding in the removal of heat and
moisture from rain or condensation.
98
CMS Set To
Leading window, door and curtain walling designer, sustainability is also evident in the products chosen for
manufacturer and installer, CMS Window Systems, the building’s entrances and exits. Doors from Metal
has secured the contract to provide glazing solutions Technology’s System 5 and System 9 will be installed 99
With New CMS’s contract comprises the fabrication and Work began on the project early in the new year, and Centre’s
architects RH Partnership but the successful outcome
has been achieved thanks to close collaboration with The complete refurbishment of the building, including
Harbour
an internal screen system. The University’s Attenborough Centre for Creative Arts studios and teaching rooms and the development of
100 102
101 103
104
Meet the family Call us on 01322 299800
Passenger
Lifts
Escalators and
Moving Walkways
Platform
Lifts
Goods and
Service Lifts
Lift
Refurbishment
Bespoke
Lifts
Lift Service
and Repair www.stannahlifts.co.uk