Download as pdf or txt
Download as pdf or txt
You are on page 1of 35

review

May 2016 - Issue 2


www.ebpr.co.uk

The Essential Building Product

Interior Brick Finish Trends The Healing Power Of New Rich Firestone Tiles Vicaima Turn On Design Flair
For 2016 Good Architecture Deliver Flooring Impact At Electricity House
Page 12 Page 15 Page 40 Page 53
Contents
4 ProjectView
Project of the month - Stannah Lift
Products Star at Leeds Staion Entrance

8 InsideView
A closer look at two key building product
groups and industry news

24 OverView
Building product manufacturers share
their thoughts and opinions

27 The Product Review


News, developments, product and project
information for the building designer

68 RearView

Front cover:
Stannah Lift Products Star In Spectacular New Entrance To
Leeds Station
Full story on pages 4-7 Visit www.stannahlifts.co.uk

Page 2/3 photo:


COMPAC Launch Unique Calacatta
Full story on page 11 Visit www.compac.es

Reader Enquiry E-Service


If you would like to receive further information about any of
the products and services featured in this issue, just email
us at info@link2media.co.uk, type ‘EBPR16/2’ in the email
title, include the enquiry numbers of interest and your
contact details. If you’d prefer to fax the information, it’s
0845 862 8639, or you can even post it to us!)

Some of the colour photography used in The Essential


Building Product Review is provided and paid for by
contributors. The publishers do not accept liability for errors
that may appear in the publication. The views expressed
are not necessarily the views of the publisher. Published
in association with the lovable hooligans, Jasper, Muz and
little Ken. No part of this publication may be reproduced
or transmitted in any form or by any means, electronic or
mechanical, without the consent of the publisher.

Published by: Link2Media Limited

Editorial Office: Kingfisher’s Retreat, Dunston Business


Village, Stafford Road, Dunston, Stafford ST18 9AB

Tel: 01785 711591 Fax: 0845 862 8639

info@link2media.co.uk www.link2media.co.uk

@Link2Media www.link2media.co.uk/facebook
www.pinterest.com/link2media
www.issuu.com/link2media
5

Stannah Lift
Opened on 3rd January 2016, the new southern entrance to
Leeds Station features four Stannah escalators and two lifts.

Products Star Working with main contractor Carillion to fulfil the brief, the
work was completed by the Stannah Escalator & Moving

In Spectacular Walkway Department and Stannah Major Projects team in


just twelve weeks.

New Entrance Funded by the West Yorkshire Combined Authority, Leeds

To Leeds
Council, the Department for Transport and Network Rail, the
new extension provides an attractive new accessible entrance
and additional concourse built in the River Aire. The building

Station was created to diminish congestion at this busy commuter


station into and out of West Yorkshire and the North of
England, making it an attractive route for tourists again.

Up to 20,000 passengers (or 20% of current footfall) are


estimated to benefit from using the new entrance, shortening
commute times and providing easy access from the south of
Leeds.
>>>>

enquire online at www.ebpr.co.uk/card


6 P 7

>>> Stannah Lift Products Star In


Spectacular New Entrance
To Leeds Station
The four escalators provide continuous vertical transportation
for ambulant people. Those travellers with heavy luggage,
child buggies or wheelchair-users are well provided for with
two bespoke 13-person traction passenger lifts located just
inside the entrance.

The tight restraints on the site meant some of the features of


the lift equipment had to be modified to achieve the design
and vision without compromising safety.

The escalators are to NR specification


with some additional features bespoke to
the Leeds station project. These features
were based on the tight restraints of the
site and the designers risk assessment
required to mitigate those risks.

This included special software so that all


the machines operate to a special design
philosophy when stopped in an emergency
situation, including installing an additional
stop button on each machine during
mid travel. Bespoke manufacture of the
machines at 35 degrees instead of the
standard NR specification of 30 degrees,
and the reduction of the speed of the
machines from the standard NR .65m/s
to .05m/s all result in safe, efficient travel
within the constraints of an unusual and
stunning building design. With no room for
housing external controllers these became
an integral part of the escalators.

The lifts had restricted space so machine room-less traction


equipment was installed to enable the largest capacity
possible within the tight footprint of the new building.

The new pedestrian entrance will be of great benefit to


people living and working south of the river, and will open
up new travel opportunities providing a further stimulus to
redevelopment and expansion of the city centre, and will
support the continued regeneration of the southern quarter
of the city.

Stannah continue to add to their portfolio of high-profile rail


projects, helping Network Rail achieve their target of ‘Step-
free access’ across the rail network.

The North West England and North Wales Stannah service


branch, part of Stannah’s nationwide branch network, will be
maintaining the lifts and escalators to ensure the safe flow of
people and goods through this new entrance.
www.stannahlifts.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


8 EI 9

Lamp Factory,
The Lamp Factory, London, maker of fine quality detailing created from a collection of handmade skilled craftsmen producing lamps of the highest and are used to the high demands in quality
lighting has introduced four stunning new lamps solid brass components. Featuring a destressed quality. Central to the success of the business of work this entails. Russell and his team have
to their range. Called the brass work collection, brass finish and a repositionable brass shade is their problem solving skills. Lamp Factory are converted a range of wonderful items into fully
London Creates it features The Jasper Bar Lamp, the Connaught
Double Bathroom Light, the Cambridge
the Cambridge is a characteristic and functional
reading lamp that radiates quality.
regularly asked for custom designs incorporating
a range of materials, from the simplest of briefs,
working lamps, from buffalo horns to vintage oil
cans, and commemorative champagne bottles.

‘Brass Work’ Bookcase Light and the elegant Napier Floor


Lamp, four distinctive new designs that share The Napier Floor Lamp is the fourth new edition
often from a basic sketch. The Lamp Factory’s restoration work involves
working with beautiful materials like marble and

Mini Collection the same Lamp Factory values; attention to


detail, craftsmanship and quality.
to the lamp factory range, it’s a charming,
understated floor lamp featuring a reverse
‘I love it’
Russell is a man who thoroughly enjoys his work,
glass where care and attention to detail are the
utmost concern.

Consisting Of
tapered body/neck that flows elegantly into a a ‘hands on’ man who thrives on producing new
The elegant Jasper Bar Lamp has been tripod base. Created from solid brass with a faux and interesting designs, whilst very focused on The Lamp Factory range of lighting offers
handcrafted from a striking combination of solid antique gilt finish the Napier is a graceful lamp the detail of each lamp. Russell is involved with traditional designs as well as new and exciting

Four Stunning brass and walnut to provide a sturdy, luxurious


statement lamp. The solid brass neck and base
with unassuming beauty. every aspect of the manufacturing process from
the client brief to polishing each lamp before it
ideas, consisting of table lamps, wall lights,
ceiling lamps, and floor lamps. Within these

New Lamps feature a beautiful 24 carats, gilt antique gold


finish, a special bespoke formula honed from
The Lamp Factory, London is a real success
story, Russell Sidney, Managing Director
leaves the factory! ranges a selection of stunning metal designs can
be found, all lovingly produced by skilled British
years of development and testing to create the started the business in 2008 in the modest Russell Sidney, Managing Director comments: craftsmen. www.thelampfactory.co.uk
perfect antique gold finish. surroundings, following a twenty-five-year ‘As we come into our eighth year I’m extremely
career producing high quality lamps for a leading pleased on how the business is progressing
The Connaught is well designed, refined solid manufacturer. With a strong desire to run his and the high quality of the work my team is
brass light available in single or double lamp own business and a passion for bespoke high producing. Everyday throws up a new challenge
format. The heavily machined, and weighty brass quality lamps Russell made the leap and started due to the requests we get for bespoke designs
components are equalled by the high quality his own business. and solutions, but I can honestly say I love
glass cylinders to create a lamp of real quality it, coming up with a solution the customer is
and craftsmanship. With a destressed brass Today Russell leads an expert team from pleased with gives me great satisfaction.’
finish, the Connaught is a classic bathroom wall his factory in Croydon, South London. The
lamp for interiors of distinction. factory is a hive of activity with four dedicated Bespoke Designs, Restoration and Conversions
workshops; a brass machining workshop, a In addition to the range of wall, floor, table
The Cambridge Bookcase Light is a beautifully woodwork shop, metal finishing workshop, and and ceiling lamps, the Lamp Factory, London
engineered wall lamp with wonderful wingnut an electrical wiring workshop, with ten highly undertakes restorations and conversion work,

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


10 I 11

4 MX – It’s A ‘One Stop Shop’ For All Things Showering! 5 Popular Commercial Tap Range Extended And Enhanced
MX continues to build With New Technology And Design
its reputation for being
The popular commercial Performa tap
a ‘one stop shop’ for
range by Pegler Yorkshire has undergone a
all things showering.
major design and functionality overhaul to
From the widest
ensure modern water saving efficiency and
range of types and
design credentials are met. The ‘Performa’
sizes of shower tray
range has seen amendments to the classic
to its ranges of electric
design as well as the range extended to
showers including its popular
provide further options for commercial
care range, thermostatic shower
specifiers, plumbers and end users. The full range of ‘Performa’ taps
mixers, brassware, enclosures and shower
can be viewed here www.pegleryorkshire.co.uk/ebrochures/105_PY_
accessories, MX offers a massive selection of shower related products.
PERFORMA_40pp_LR_WEB/index.html www.pegleryorkshire.co.uk
www.mx-group.com

neaco Provides Bespoke Walnut-Effect


For New Medical Centre
Oak is by far the most popular choice for neaco’s wood-effect
handrails, but one project went against the grain with a
bespoke walnut-effect specification at a new health and social
care centre in Market Weighton, East Yorkshire.

The company’s advanced powder coating facilities can


replicate the intricate detail of wood grain as a maintenance-
free finish for its Timberline aluminium system. Due to mighty
high demand, oak is Timberline’s standard specification,
but special request required neaco to branch out with a
3 reproduction of walnut’s darker tones.

A Burning
The German premium manufacturer of firing passionate, skilled craftsmen. Test certificates
Assura Group completed the 16,000sq ft development in
technology Spartherm proudly presents an issued by TÜV Germany further underline the
conjunction with project managers, LSP Developments,
exclusive range of bioethanol fireplaces branded outstanding safety of ebios-fire® bioethanol
Passion ebios-fire® which are now also made available for
the discerning customer in Great Britain. Made
fires, which feature a wide choice of manual and
automatic bioethanol burners.
architects Pearce Bottomley and contractors, Hobson &
Porter. As well as an onsite pharmacy, the new building includes a minor surgery suite, training rooms and specialist clinics for those suffering from

For Fire
conditions like asthma, COPD and diabetes. Additional space for community services and visiting consultants has also been incorporated.
And Tested In Germany - In order to provide an
optimum of customer service, the expansive range Versatility Is Key - The ebios-fire® range of
Amanda Roddy, development manager at Assura Group, said, “The completion of Market Weighton Medical Centre will revolutionise the quality and
of ebios-fire® models comprises both standard products is available in a vast variety of finishes
accessibility of care for the local community. Creating a multipurpose centre that delivers a wide scope of diagnostic and treatment services is driven
and made to measure built-in fireplace models in meeting the requirements of architects and interior
towards enhancing the patient’s experience, but also for reducing the strain on local secondary care services. We hope that the staff, patients and wider
almost any thinkable layout. designers on an international level. Please visit
community will enjoy these benefits of the new centre.” www.neaco.co.uk
www.ebios-fire.com or write to info@ebios-fire.
com for further information. Spartherm – The Fire
Company
www.spartherm.com
7 COMPAC Launch Unique Calacatta - Inspired By The Beauty And
Elegance Of Natural Stone
COMPAC have launched Unique Calacatta, a quartz worksurface that offers
a stunning contrasting grey veining design on a pure white background.
Inspired by the beauty and elegance of natural stone, Unique Calacatta offers
a mechanical and chemical performance that is superior to nature's own.
Combining traditional skill with innovation, COMPAC has been able to create
a worksurface that makes it possible to decorate private homes and public
spaces with elegant overall compositions that transmit serenity and harmony.
Great versatility, product safety and outstanding
Every reference in this new product category is unique on the market,
German quality are key values at Spartherm's
because just like in nature, each slab presents different nuances and patterns
production facilities where all ebios-fire® models
in design. Added to this is an enviable set of technical specifications, the natural hardness of quartz comes hand in hand with a waterproof, hygienic
are originally designed, crafted and tested by
finish offering even greater resistance. www.compac.es

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


CABINETS
12 EI

8 Launch Of New Polaris Collection


Abet Ltd is delighted to announce the arrival of Polaris, a new collection launched
in the UK at the Architect@Work Show in London’s Olympia.
Polaris is a revolutionary new product with a smooth and velvety touch which is
highly resistant to shock, scratches, heat and fingerprints as well as being anti-
bacterial.
The curious combination of durability and texture stemming from Abet
Laminati’s stylistic and technical research gives Polaris a futuristic appeal. It
leads the category of latest generation products by the company, serving as
a sophisticated and durable reference point for inquisitive designers who seek
unusual results.
Polaris is the ideal choice for ultra-contemporary projects, delighting the senses
with a pleasant and unique effect. The Collection is available in 10 tones from
black, passing through soft muted and subtle colours to white. www.abetuk.com

9 Protect Against Black Mould With Forever White Hygienic Paint


The Forever White range from Everbuild – A Sika Company is expanding with the addition of
Forever White Paint, a hygienic paint that protects against black mould growth in bathrooms and
areas of high humidity.
For use on walls and ceilings, Forever White Hygienic Paint is ideal for showers, bathrooms, Design, supply and fit all styles
wetrooms and kitchens and contains SteriTouch® Antibacterial Protection.
Forever White Hygienic Paint is fast drying allowing two coats to be applied in one day and dries
of cabinets with great attention
to an exceptionally hard wearing finish that resists cracking and flaking. Highly versatile, this to detailing, using high quality
paint can be applied on a variety of substrates including concrete, brick, timber and ceramic tiles.
Available in Arctic White in a Satin and Matt finish, the 2.5ltr tubs are printed with a highly
materials and finishes.
attractive design in keeping with the Forever White brand. www.everbuild.co.uk. Call for brochure or to discuss
your current or future projects.

10

Interior Brick Finish Trends For 2016


Interior brick finishes remain a popular choice for designers within
the leisure and hospitality sectors this year. The diverse range of
colours and textures available allows for the creation of unique
styles, from modern, sharp lines to rustic, traditional character.
The size of standard bricks can make a brick interior unviable, but
brick slips provide a suitable alternative. Brick slips are the ideal
product for interiors; durable and low maintenance with a slimline
profile, typically ranging from 15-25mm thick, which means a
minimal loss of valuable floor space.
Eurobrick, a specialist in brick slip cladding systems, is one of the
UK’s leading stockists of brick slips and has been supplying materials
to the leisure industry for over 25 years. 11
Richard Haines, sales and technical director at Eurobrick, considers
which slips are proving popular right now “Cut brick slips such
as those featured in our Classic Range are always in demand for
interiors. Old English remains one of our best sellers as it evokes a lovely warm, welcoming feel. But we have recently introduced Newbridge Mix,
which has multi hues and a fissured texture and this has generated a lot of interest.”
“For those seeking a modern aesthetic, manufactured brick slips, such as those in our Britannia Range, are much more uniform in shape having
cleaner lines. Last year, we saw an increase in enquiries for smooth finish and glazed bricks and we believe this will continue as an important trend
during 2016.” As well as offering a broad range of slips, Eurobrick’s choice of systems can speed up application and make a safe secure installation.
Systems include pointing mortar in a range of colours to suit different bricks and situations. www.eurobrick.co.uk or call 0117 971 7117.

enquire online at www.ebpr.co.uk/card


. . .
Tel. 01923 818282 Fax. 01923 818280 Email. sales@shopkit.com www.shopkit.com MADE IN THE UK
14 Ei 15

13

Five-Star Luxury At The Touch Of A


Button For Park Hyatt Vienna Guests

With comfort and luxury at every turn, Geberit


AquaClean 8000plus shower toilets were the natural
choice for the five-star Park Hyatt Vienna Hotel.
Situated in the heart of Vienna’s old town, the
hotel has been converted from a 100-year-old bank
building. Geberit AquaClean shower toilets were
chosen for the guest bathrooms to help designers
achieve a contemporary
finish in a building
steeped in history.

When furnishing the


143 spacious hotel
rooms, the interior
designers combined
timeless, elegant design with local Viennese flair. The market-leading Geberit AquaClean shower toilets are a feature of
the 108 luxurious and spacious hotel rooms, plus 35 suites, offering guests the opportunity to indulge in spa-like comfort
12 throughout their stay.

Five
I love the capacity to refresh the look of the home with brassware. Resurface vanity and storage units with
The Geberit AquaClean 8000plus combines the functions of a toilet and a bidet in one compact unit. At the touch of a
an affordable makeover, enabling you to explore new water-resistant agglomerate and choose colour-themed
button the shower toilet washes the user clean with a gentle, airy water spray at body temperature. The intensity of the water can be adjusted to one
décor trends and personalise the living environment floor tiles in the same material, to improve the look of
Affordable to suit family and lifestyle. I have already remodelled
four different family homes, allowing us to move up the
your bathroom space. Retain the existing layout, though,
to minimise plumbing or structural issues.
of five levels, while the oscillating spray provides a particularly beneficial clean. The Geberit AquaClean 8000plus also offers many pampering functions
in addition to the shower function, including an adjustable spray temperature and intensity, a pulsating massage function has an invigorating effect, an

Remodelling
integrated warm-air dryer and an automatic odour extraction function, which fills the room with fresh, clean air. www.geberit-aquaclean.co.uk
property ladder by adding value at every stage.
Get creative with splashbacks – in the kitchen and

Tips Most experts agree that upgrading the kitchen and


bathroom is the best way to add value to your home,
bathroom, a splashback makes cleaning and hygiene
easier, but can also add a visual statement. In the
often earning back most, if not all, of your outlay on kitchen, extend agglomerate worktop materials up the
from Hayley Fenn, UK head fixtures and fittings. So here are a few tips on affordable adjoining walls, as upstands or half-height panels, for a 14
of Granite Transformations remodelling techniques, based on my own projects and fully coordinated look. Or use glass mosaic or subway
experience of running one of the country’s leading home tiles to create a unique textured backsplash that draws
The Healing Power Of
makeover brands. attention to your new décor. Then apply similar thinking
Good Architecture
to bath and washbasin panels, concealing discoloured
Reface your old worktops – get an instant injection of tiles and grouting and creating a wipe-clean finish. This 194 patient psychiatric hospital in Slagelse
quality and style, by overlaying your worn-out worktops Denmark is characterised by innovation and a
with luxurious, slimline agglomerate surfaces in granite, Get down to hard flooring - high on the must-have desire to construct a first class complex which
quartz, recycled glass or porcelain. Kick out unfashionable agenda for householders is replacing carpet, vinyl, supports patient care and recovery.
colours and materials, without having to rip out existing laminate and cork floorcoverings with more hardwearing Some of the most influential elements in any
countertops, and reface with fashionable white or off- materials for an upscale look. Hardwood flooring brings hospital are obviously the ceilings because so
white surfaces or plump like I did for perennially popular grace and elegance, but believe me it’s pretty expensive many bed-ridden people spend so much time
black, with a hint of mirror fleck to catch the light. and vulnerable to scratches, dents and staining. So looking at them.
consider instead agglomerate flooring, made from the Consequently, Troldtekt ceiling panels in natural
Change your cabinet doors – one good makeover trick same high performance materials as our worktops, in wood colour, with integral LED light fittings,
is that you don’t have to tear out all those wall and base medium or large format tiles or seamless sheets, for a have been used throughout, reducing noise and
units, you can simply replace the cabinet doors and door gorgeous yet practical finish. ensuring pleasant acoustics as well as a healthy
fronts with made-to-measure fittings. Changing your indoor climate.
doors and end panels to the latest high gloss acrylics, Like most people today, I simply don’t have the spare Simplicity pervades the new complex, coupled
matt finishes and woodgrain effects, in a choice of time or technical skills for do-it-yourself remodelling with the recognition that good social architecture
contemporary or traditional fascia styles, will totally projects, so I prefer getting someone in to ‘do it for is based on classic ingredients such as light and
transform the look of your kitchen, without the expense me’. Naturally, I use our expert Granite Transformations shade, materials, colours and green landscape
of installing a new fitted kitchen. fitters to carry out all the work – and you can too. Just elements.
get in touch with your nearest Granite Transformations For example and particularly dramatic is the central core with its large spiral staircases and the very large skylight which plunges daylight from
Remodel the bathroom – much the same makeover tips showroom and they’ll show you all our remodelling the fourth floor to the ground. Danish manufactured Troldtekt acoustic tiles are specified throughout the UK and Europe and can be delivered as
can be applied to remodelling a bathroom that’s seen materials, fixtures and fittings, then quote for the job, either FSC or PEFC certified panels. They are manufactured using 100% natural wood fibres and their benefits are high sound absorption, high
better days. You can reface outdated tiles by overlaying including installation. www.granitetransformations.co.uk durability, natural breathability, low cost life cycle performance and sustainability. Available in various sizes and in three grades from ultrafine to
with slim agglomerate or mosaics-on-a-mattress. Update coarse, they can be left unpainted or painted in virtually any RAL colour. www.troldtekt.co.uk
your fixtures and accessories by fitting a new bathroom
or walk-in shower, twin his’n’hers sinks and modern

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


16 EI 17

15

An Automatic Divide
Dividing the Canary Wharf office space of Boston
Consulting Group, partitioning experts Style has installed
DORMA’s Moveo ComfortDrive movable wall system. A
fully automatic solution, the stretched fabric-finished
panels slide effortlessly into place at the press of a
button, rapidly creating a solid divide with exceptional
55dB acoustics for privacy between the two areas.

The Boston Consulting Group has 85 offices in 48


countries, more than 12,000 employees, 900 partners
and more than 18,000 alumni. At its Knowledge and
Analytics centre in London’s Canary Wharf, Style worked
with main contractors, Bluu Solutions, and architects,
Create Interior Design, to design and install a moveable
wall solution to add flexibility to the main meeting room. Style is the sole UK distributor for the DORMA range of moveable walls, all of which have
an environmental product declaration (EPD) in accordance with ISO 14025 and EN 15804.

A very adaptable design, the Moveo system is available in almost any conceivable finish from laminate through to polished wood veneers.
Additional features include acoustic sound absorption boards, magnetic display boards, dry wipe marker and projection surfaces, plus single or
double inset pass doors can be included for ease of access. Comfortdrive automation is computer controlled, giving users confidence that all seals
will automatically extend or retract to the appropriate point, through each stage of the operating cycle, avoiding potential damage caused by
mishandling of the panels. A network of sophisticated sensors ensure instant response if an obstacle is encountered. www.style-partitions.co.uk

16 17
Pendock Boosts Retail Environment At Booths
When an ambitious and enterprising grocer said in 1847 that his aim was “to sell the
best goods he could buy in shops staffed with first-class assistants,” it is not perhaps
surprising that this philosophy remains at the heart of a business that has survived
two wars and several recessions.

In fact, Booths has just relocated one of its stores to Poulton-le-Fylde – and the
supermarket’s ethos to be the very best can be seen reflected in the selection of high
quality column casings from Pendock for the interior fit-out. Ordinary steel stanchions
to support the roof at Booths were simply not considered to offer the right impression
and the main sub-contractor was tasked with sourcing columns that were functional,
and attractive.

The contractor immediately turned to Pendock Limited, knowing that the specialist
supplier would come up with a solution that could offer both style and substance
to the new store. Pendock supplied nine column casings to surround the standard
structural steel sections: three oval in appearance and the other six circular. For
continuity of style, both types are clad with attractive brushed finish aluminium
bonded to the plywood casings up to one metre in height, while above this a RAL
7037 Dusty Grey shade of the company’s Mouse Laminate was specified, rising to
.co.uk
ceiling height.

interior film
Commercial use for walls, decorative panels, doors,
A 15 mm shadow gap marks the junction while ‘top hat’ feature joints with an
aluminium insert rise up the full length of the casings. The 150 mm high toe and 160
mm head collars are also finished in the Dusty Grey laminate. Pendock’s column architrave and furniture. A range of superbly styled
interior films which will bring any room to life
casings are all produced to order for clients across a variety of sectors including
hotels, leisure, hospital, education and retail. They are available with a very wide
selection of finishes and can incorporate lighting or other services.
www.pendock.co.uk

Call: +44 (0)1376 518037


enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card
18 i 19

with an even greater scope of options and can be specified with diameters colours, wood grain and metallic, as well as textured and real wood veneers,
from 250mm up to 1000mm or as square, rectangular or even hexagonal to name but a few. Circa and Quadra are used in almost every building type
forms. Recent projects, such as Winchester College, Middlesex Northwick Park from education, retail, hotel, sports and leisure, as well as the health sector
Hospital. University College London, the extensive Debenhams development at and commercial office buildings.
Cheshire Oaks and the restaurant area of the Mondrian Hotel perfectly illustrate As a result the choice of sizes
the versatility of Forma column casing solutions. available is also wide, allowing
specifiers to choose not only
At Winchester College, the casings are circular, at Debenhams, they are square circular and square, but also
and accommodate LCD display screens, while at The Mondrian Hotel, they are extended circles and rectangular
hexagonal and incorporate a perforated skin lined with acoustic foam to reduce profiles, which use additional
noise and reverberation from the restaurant. Alongside Forma, Encasement’s infill panels to give greater
‘Circa’ and ‘Quadra’ pre-formed plywood column casings ranges were the first flexibility while ensuring they
to be launched by the company and are still arguably the most popular, as they are still easy to install.
provide specifiers and contractors with an unrivalled selection of finishes, which
includes plain, laminated or real wood veneers. Recent Quadra projects include
Farnborough’s 6th Form Centre
In addition, as Encasement is the UK’s only supplier and manufacturer of and the Dame Kelly Holmes
pre-formed plywood pipe boxing and decorative casing products that holds an Sports Centre, while among
FSC® ‘Chain of Custody Certification’ from the Forest Stewardship Council, both the many Circa installations,
Circa and Quadra are manufactured from FSC® certified plywood. This makes Gatwick Airport’s South
them automatically compliant with sustainability codes and environmental Terminal, Liverpool University
procurement policies. and Gateshead International
Stadium are major installations.
Designed solely for interior decorative applications, Circa and Quadra casings
are used in an extremely diverse range of projects, which underlines their Encasement’s Managing
versatility, ease of specification and the immense range of decorative finishes Director, Martin Taylor,
available to complement or contrast with a building’s interior design scheme. commented: “Column casing
provide a perfect mix of
While Circa is available from Encasement as a plain casings for on site painting practicality and aesthetics and we’ve taken a lot of care to ensure our range
and decoration, by far the most popular casings are those finished with meets both of these key criteria while ensuring that we always remain
18
decorative laminates, which not only resist damage, scuffs and scratches, competitive and deliver high quality products. Our products are used in projects
but also provides the specifier with a diverse palette of finishes from plain all across the UK in just about every sector of the construction industry and

Decorative
If it wasn’t for column casings and interior wall lining just a few years ago, the system has been widely used
building type, often using different products from our range, which underlines
solutions, building interiors would be considerably less in retail, education and commercial buildings, such as
the versatility of our casing solutions.”
attractive environments. Yet, as they are designed Tesco, South Bank University and Prêt a Manger, as well
Casing to integrate as part of the fabric of a building, their
importance can often be overlooked or taken for granted
as prestigious office developments, including Wellington
House and the Carmine building in Paddington, London.
He added: “Our entire range has been configured to provide the widest possible

Solutions
choice as well as being easy to specify, which is why we offer next working
by the building’s occupants.
day delivery as
While Vecta has already gathered significant momentum,
well as some
– The Very few people stand back to admire a laminated
plywood column casing at a school or brushed stainless
it is for column casings that Encasement is perhaps best
known. The company’s extensive range not only includes
very specialised
solutions, such as

Undercover
steel wall cladding in a prestige office building, yet they pre-formed plywood and glass reinforced gypsum (GRG),
the Metza range,
are key elements in interior design and integral to the as well as a specialised fire resistant solution for use with
which provides
aesthetics of countless building environments. mezzanine floors, but also aluminium, stainless steel

Story For column casings, at least, their role has been


and glass reinforced polymer (GRP) casings for exterior
projects due to their inherent weather resistance.
up to two hours
fire protection for
mezzanine floor
transformed from being a purely functional device
columns.
for concealing structural steelwork to one of visual
and decorative importance. From their initial use by a
“The Vecta interior
relatively small number of architects in the mid 1980s,
cladding system
column casings are now commonplace, with their
enhances our
aesthetic values and appeal being a key consideration
building interiors offer and allows specifiers to source a range of specialised
alongside size and material during the specification
interior finish products from a single company with high levels of expertise and
process.
experience in this sector. We also have our own contracting arm, which enables
us to offer a full supply and install service to support contractors.”
The demand for wider choice and increased aesthetics
from architects, interior designers and specifiers have
Encasement’s latest ‘column casing solutions’ e-brochure is available for
been key influences on Peterborough based casing and
download from the company’s website and covers every product in the range
interior cladding company, Encasement, whose range has
as well as providing details on materials, sizes and finishes available alongside
continually expanded and diversified during the past ten
an extensive technical information section. Further information is also available
years to become the most comprehensive available in the
from their website at www.encasement.co.uk or by calling 01733 266889.
UK.
Interestingly, Encasement’s ‘Forma’ metal casings and
Alongside the company’s six individual ranges of column ‘Polyma’ GRP range are also widely used in interior
casings, its ‘Vecta’ system provides a high quality solution applications, where the selection of finishes available,
for interior wall linings, bulkheads and reveals. Launched particularly in the Forma range, provides specifiers

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


20 EI 21

19

Oxford University Opts For Invisible


Automatic Access
The purpose-built Blavatnik School of Government
at Oxford University, recently opened its TORMAX
automated swing doors to teachers, students and
academics, welcoming them into a state-of-the-art
facility that incorporates lecture theatres, exhibition
spaces, seminar and meeting rooms as well as a café
and informal seating areas.
Crafted by Birmingham Veneers Ltd, the two impressive
wooden and glass entrance doors are automated using
two TORMAX iMotion 1401 operators concealed in
sealed casings underneath the floor. Ensuring longevity
and reliability, even in such a busy location, the iMotion
motors, which are uniquely designed with no abrading
parts to cause friction wear, dramatically minimises maintenance, allowing them to be neatly located out of sight.
The Blavatnik School of Government is a global school pursuing a vision of better government, stronger societies, and
richer human opportunities across the world. Bringing all members together for the first time in three years, the new
building has been designed to maximise energy efficiency and sustainability by combining modern control systems
with ground-breaking technology.
Contributing to low environmental impact, two sets of TORMAX powered automatic twin-leaf swing doors create a
functional entrance lobby area. Effectively minimising heat-loss from the building, powerful high torque synchronous
motors combine with user-friendly keypad controls that allows staff to adjust hold open times and open/closing
speeds of the door leaves in response to changes in the weather as well as pedestrian foot traffic volume. 21

Portakabin
iMotion door drives are also manufactured from 96% recyclable products and require only low-energy operation, Portakabin, the UK’s leading supplier of interim and Project Manager at Atkins said, “Portakabin
making them a truly sustainable option. www.tormax.co.uk modular buildings, has successfully constructed offered us the solution which would provide the least
and handed over a complete new 300-pupil interim possible disruption to the school and I am pleased to
Delivers primary school in Devon in less than four months.
Working in partnership with architects and project
report this has been successfully achieved and in a
really ambitious timescale.”

Complete managers, Atkins, Portakabin provided more than


1,200sqm of primary teaching accommodation for the The buildings arrived on site around 80 per cent fitted

Interim
20
relocation of Dartington Primary School. out, with partitions, plumbing and electrics pre-
installed to reduce lead times. All internal fitting out
New Degrees Of Excellence From Metal Technology
Primary School
The scheme will be in use for the next two years was carried out by Portakabin and included provision
and was configured as 13 school buildings and of magnetic white boards for visual learning displays,
The new School of Veterinary Science at Surrey University, described as
three toilet blocks with disabled access. The project access ramps, entrance canopies, and security and

In Just 14
‘iconic’ by Professor Christopher Proudman, features high rise curtain
was delivered on time in a challenging timescale data communications.
walling façade and door systems from Metal Technology. Located
despite exceptionally high levels of rainfall during
on the Manor Park Campus in Guildford, the Devereux Architects
designed school comprises three complimentary and inter-related
buildings totalling around 9000 square metres; an academic building, a
Weeks To The the programme, and the green field site immediately
adjacent to the original school was highly constrained
The provision of high quality interim teaching
accommodation allows schools and LEAs to react
veterinary clinical skills centre and a veterinary pathology facility.
Amazement Of which made the building installation phase more
complex.
quickly to local needs and to provide alternative
facilities for pupils when it is necessary for building

Parents
projects to continue during term time. By providing
Metal Technology’s System 17 capped high rise curtain walling was
The modular buildings have been configured to classrooms of the very highest standards and with
central to creating the design aesthetic for the flagship development,
create a village feel and a welcoming environment for a design life of at least 60 years, buildings from
providing a structure tailored to the desired look without compromise
children with imaginative age and function-related Portakabin help to ensure that there is no compromise
on performance and efficiency. The end result is a clear demonstration
play zones. Facilities include a kitchen fitted out on the quality of the learning environment.
of System 17’s limitless flexibility in design applications. Considered
with the school’s own equipment, a music room,
a highly cost-effective, quality engineered glazing solution, System
library, pre-school nursery, 11 classrooms, and an As at Dartington Primary School, the facilities can be
17 complies with current British Standards and provides exceptional
administrative building for the staff room, head configured and fitted out to the exact requirements
standards of structural integrity, weather performance and thermal
teacher’s office, general offices, sick bay, toilets and of each individual school – as learning clusters,
enhancement.
school reception. standalone teaching blocks and generously-sized,
light, modern classrooms. The buildings can be linked
System 10 commercial doors from Metal Technology were also used to
“Externally the layout of the buildings has been to existing facilities; the floor area can be increased
achieve an integrated finish. The system offers single or double–action
carefully designed so our children can learn outside or reduced in line with local demographic needs, and
pivot doors, in both standard and anti-finger trap forms. A fully rebated
the classrooms as well as inside. The whole interim the accommodation can remain in use for as long as
option with butt hinges in double or single door leaf options is also
school was constructed very easily and the area will needed. www.portakabin.co.uk
available. The £45 million School was officially opened by Her Majesty
be turned back into a field when we move to our
the Queen, accompanied by His Royal Highness the Duke of Edinburgh.
permanent school. Parents really are amazed by the
ww.metaltechnology.com
quality of the facilities and cannot believe these are
interim buildings.” Kevin Presland, Principal Architect

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


22 EI 23

Maximum protection
Minimal effort

22

Timber
The growing demand for new school buildings across partners with innovative spaces for study and meetings
the UK has seen a move towards offsite manufactured that focused around a winter garden, in an Eden Project
solid timber structures as a fast and effective method of style dome.
Technology construction, providing an ideal sustainable solution for
educational environments. B & K Structures provided the enhanced hybrid structures,

Gets A* For As one of the UK’s leading specialist contractors in the


consisting of glulam columns, glulam floor beams, wall
cassettes and a cross laminated timber floor deck.

Education design and delivery of hybrid structures - optimised


in terms of cost, performance and sustainability - B &
The structure of the main building was curved and used
Whitewood Spruce glulam beams, the visual winter garden
K Structures offer an award winning service across an used Larch glulam beams and encompassed an Ethylene
extensive portfolio encompassing glulam, cross laminated Tetra Fluoro Ethylene (ETFE) along with a timber roof.
timber (CLT), timber cassettes and steel.
This acted as a buffer zone as well as supporting the
As more research unfolds, the connection between reflexive ventilation and heating strategy of the building.
building materials and the comfort and wellbeing of its Photovoltaics were added to the roof, to improve carbon
occupants is something that is becoming increasingly emissions and deliver renewable energy from a combined
more apparent. Not only are hybrid timber structures heat and power installation. The main lecture theatre
sustainable and adaptable, they deliver a natural and consisted of glulam, steel nodes, cross laminated timber
calming environment, providing a peaceful space for and curved wall cassettes that were assembled between
teaching and learning. The level of noise in a building can the raking glulam columns and put together onsite rather
have a direct effect on the productivity of its occupants. than pre-constructed offsite, so that the curved effect
Cross laminated timber, has a significantly higher density could be achieved.
than timber frame structures which offers acoustic
advantages, this results in a reduction in noise levels for The new building aimed to create a stimulating learning
the transmission of airborne sound. environment for students, reflecting the importance of Safesite's new range of Self Closing Safety Gates is ideal for protecting access
university’s sustainability ethos. The carbon neutral build and egress at height on rooftops, ladders, walkways, roof hatches as well as at
As the connection between health and wellbeing and demonstrates renewable technologies in action, with the ground level for industrial applications. The Kee Gate® range is easy to install
productivity becomes more significant, designers are intention of achieving a BREEAM rating of Excellent. or retrofit to existing structures and is spring loaded to automatically close
taking into consideration the structural systems available By selecting the most effective combination of systems behind the user, overcoming the potential for human error. Extensively tested
to create the optimum educational environment. Due to and materials to meet the brief and performance for ensured durability, Safesite’s range of self closing safety gates are CE
the company’s sustainable credentials, B & K Structures specification, B & K Structures, the UK’s leading accredited to the requirements of EN 1090 and comply with Work at Height
were appointed by Morgan Sindall to develop the sustainable frame contractor, specialise in the design, Regulations, European Union Directives, EN13374 and EN14122-3.
structural frame for the first zero carbon business school manufacture and delivery of optimised hybrid structures
in the UK, at Essex University. Plans were progressed for For more information or book an Optimised Hybrid
a three storey educational building and a single storey CPD session, please call 01773 853 400 Email: sales@ Guardrails / Mobile Man Anchor / Demarcation / Mobile Valley Frame / Fragile Roof Access
Solutions / Bespoke Access Platforms / Ladder Restraints / Self Closing Gate / Life Line Systems
MBA lecture theatre at the University. The design of the bkstructures.co.uk Visit: www.bkstructures.co.uk
facilities intended to provide students, staff and business

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card 23


www.safesite.co.uk
24 O 25

design and manufacture circular covers and a range


of shaped and bespoke solutions for unique settings
and access requirements. Some covers feature power Covers can be made to fit tile grids for easier installation and a
or data points, some incorporate lighting, some have better looking end result.
panels to match the surrounding floor, some have
contrasting inset panels. Every Howe Green cover
is made to order without a price premium or longer
lead-time. Special orders are standard to us, we can
turn them around very quickly and vitally, it means

Access Covers that the solution always fits.

Access Vs Aesthetics - Howe Green’s Richard Centa says compromise is not always necessary, as long as access to building services is well Weighty Issues - It is important to consider the
designed and a focus on quality is always maintained. amount the cover will weigh when installed and
where loads are excessive, the use of hydraulic lifting
Industry leading manufacturer of access covers for floors, walls and blighting the flooring landscape, even in some very high profile devices can solve the problem. A lifting device like
ceilings, Howe Green is a family-run business that, for over 30 years, locations. Flooring can account for a big chunk of the budget and is such Cover Skate will also address this issue and help
has focused on providing architects, specifiers and contractors with an important factor in the overall interior aesthetic. We frequently see make lighter work of heavy floor access covers.
reliable solutions to gaining access to services points and utilities in access covers breaking tile grids, hatches positioned at random angles
buildings across the world. Sales and Marketing Director Richard Centa and vast mazes of unsightly covers creating unwanted features, and There is a 300kg lift from each Cover Skate and
shares his access recommendations and experience of leaving it to last. almost all could have been avoided with the right solution and a little lifting keys are available to suit other manufacturers
A virtually invisible challenge - Access is an issue to address at some planning. covers which make it more of a universal solution.
Hinged covers with assisted lift or gas hinges are the
The minimal footprint - We manufacture most labour-saving option and can be equally time-
aluminium and stainless steel access covers in saving anywhere regular access is needed.
multipart configurations as well as in single www.accesscovers.co.uk
units and duct covers. Where several service
points are involved, a multipart solution can
give a more discreet access cover footprint Floor Access Cover Checklist:
as well as a more cost-effective option. All • What is the final floor finish to be i.e. hard-
our hatches and frames can be made to fit flooring or flexible floor covering?
an exact size and shape, to mirror tile grids
for example. This level of accuracy can help
• Will the unit be designed to suit the clear
opening or the overall frame size?
speed up installation times because hardly any
cutting on the site is needed. Plus, it obviously • What load will the unit be required to
produces a much more visually pleasing result. support?
Our minimalist barrel-style lifting points help
• Is the unit to be un-sealed or double-sealed?
further hone the show edge and are a popular
option for contemporary interiors. • What visible edge appearance is required?

• Does the cover need to offer fire resistance?


Optimum performance - Specifying access
covers correctly ensures a safe floor surface • How is the cover to be opened and secured?
continuum in accordance with the DDA and • If heavy, how will it be lifted?
helps prevent slips and trips. The quality of
materials and precision of manufacture are the • Are there any other special requirements i.e.
most important factors here in my opinion. cable outlets?
point in almost every build project, whether new or refurb. How do we We make access covers using high-quality materials and to exacting
make sure reliable and easy access to services is provided and at the standards using the latest CNC technology.
same time, ensure the aesthetics remain protected? Whether working A maze of
on The Shard, London Bridge or the next supermarket store opening, This, coupled with rigid and robust testing ensures they will not bow, unsightly covers
our collective challenge is to design, manufacture and install the most bend or distort in any way once installed, unlike many imports available can create
reliable but importantly, the most invisible solution. on the market. Our covers are also double sealed to prevent the ingress an unwanted
of dirt and moisture and to better maintain the structural integrity of the and unsightly
Ugly consequences - The consequences of not considering service sub floor. A quality access covers will last the lifetime of the building. flooring feature.
access properly or early enough in the process can get quite ugly. It
often falls to the contractor to solve the issue of access as part of the Uplifting solutions - Access covers don’t have to be square or
flooring phase, and we have seen many examples of access covers rectangular. The vast majority of the covers we make are, but we also

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


26 O

Invisible assets
Stop Downloading And Start
Streaming – Hot Water On
Pay As You Go
Author: Tony Gittings, Managing Director, Rinnai UK

Storing hot water can cost a lot more money than using on-demand
heating appliances. The fuel bills can add up to seriously significant sums
of money in fuel bills in light commercial sites such as restaurants, retail
outlets, schools catering, leisure centres or any one of the numerous other
possible applications.
Stored hot water, because of the design of the systems, can find it difficult,
to cope with demand, as the recovery times can be longer than the period
of time in use. The length of time this type of product has been on the
market – plus inertia due to technology recognition has ensured that the
industry, especially the installer and the specifier, think hot water storage
systems are a sustainable option.
But like with the way we watch TV, movies and play games – eventually
certain technology is ‘leapfrogged’ by more sustainable technologies
compare real time base running costs for a continuous flow hot water
heating system - all day every day, like for like in specific applications
- with those for a stored system, they will find they can save between
25-30% in energy bills over the lifetime of that appliance. The only time
a user pays for energy use is when there is a demand, in other words the
system will only burn gas when a tap or shower is being run. Just like
streaming movies or TV shows! guarantees a constant flow of safe hot water at a precise temperature
The end-user will be paying ‘as they go’- as opposed to paying for a store that helps prevent Legionella proliferation or there are limited standing
of hot water that has to be brought up to 60°C from cold then constantly bodies of water and the system is constantly turned over.
maintained at that temperature 24/7 even when it is not being used. When Continuous flow units can be operated via an easy to use built-in digital
all the water is used up, cold water will be heated and then stored until it is controller. Burners on these superior units use lean and rich technology
needed - meaning continual standby losses and continued re-circulation allowing them to self-modulate down to an unbeatable 2.4 kW. In many
via a pump around the building, creating losses – all so the store avoids commercial operations these heaters are the best of all possible options.
stratification systems. Multiple condensing units can be linked via a manifold arrangement to
Stored hot water systems are almost always designed to over-capacity provide a never-ending supply of heated water without costly storage in
because of the difficulty in sizing to any real accuracy. For example, how the most demanding situations. The units are available in internal and
much store for peak loads? Estimated lengths of shower time per person? external appliance and suitable for natural gas or LPG.
How many people? How much water? So systems are often oversized in The unit also, cleverly, eliminates sudden changes in water temperature.
compensation and they use too much gas and too much storage – wasted The water temperature set via the digital temperature controller is the
money. water temperature that is delivered. So, for example, in a commercial
Rinnai recently completed a detailed study and report on a project to application, water can be guaranteed at 60 degrees C for ACOP L8. 24
replace a fractioned storage system providing hot water only, no heating, As a failsafe, the unit will automatically cut the heater off should the
for a school’s annexe kitchen. The kitchen was not in continual daily use temperature rise by 3°C above the chosen set point. The condensing
and was shut over weekends. A traditional storage system, which would process delivers up to 95% thermal efficiency, which translates to Schueco’s new FWS 60 CV aluminium façade features a concealed vent
have to heat and store water until it is needed, incurs cost and wastes significant energy savings when compared to standard on-demand water that makes it impossible to distinguish from outside which vents open and
valuable resources. But a continuous flow system would have no energy heaters. which are fixed. The result is elegant, state-of-the-art, floor-to-ceiling ribbon
costs unless the units are being used – in other words, someone turns the End users and specifiers, taking lifetime costs into the calculation, choose windows presenting an unbroken sleek appearance. Also ideal for punched
tap ON and the water is heated. The water hasn’t been stored (and paid a product with quality engineering that uses only the best components openings, the façade combines narrow face-widths with high levels of
to be stored). available and is precision engineered, technically advanced and up to the functionality and Ucw values as low as 0.85 W/m2K. www.schueco.co.uk
A detailed plan showed costs on a like-for-like use would give payback job it needs to perform.
for a continuous flow condensing unit system in a fraction over two “Simply replacing like with like, albeit a newer version may not be the
years simply because of slashed running costs. The model illustrates that best way to cut overall costs. Never buy on price alone even though the
payback would be even sooner as in reality the system would actually initial impression may be favourable. It really does pay to look beneath
use less gas. And continuous flow systems have many other significant the surface and calculate all outgoings, not just the initial unit price,” says
advantages over stored. A condensing continuous flow water heater the study. www.rinnaiuk.com

enquire online at www.ebpr.co.uk/card


28 E 29

26

25
Reynaers Invests In Top Gear Day For Architects
Reynaers’ R-Cuisine, a series of exclusive events for
specifiers, has kicked off again this year in spectacular style.
Continuing on from last year’s R-Cuisine, this year Reynaers
is holding six events over the spring and summer.
New Deal Sees Each event will see guests taken to the Top Gear race
track to take part in the 'Star in a reasonably priced car'

Siniat Acquire experience. This full on day of driving fun is followed by


exquisite fine-dining at the Michelin star 'Matt Gillan at The

EOS Facades Pass' restaurant at the stunning 5* South Lodge Hotel in


Sussex.
Around 50 guests from 40 companies will be attending the
EOS Facades, a leading innovator in light R-Cuisine events, which will see participants battling it out on
gauge steel construction, is pleased the race track against industry peers to earn a place on the
to announce that the company has leader board.
been acquired by the prominent dry Paul Duffy, Sales Director at Reynaers, said: “The R-Cuisine events represent a significant investment for us and last year’s
construction solutions company, Siniat. results show our commitment to building lasting relationships with architects. Our guests hear about the ongoing successes
that Reynaers has enjoyed over the past 25 years in the UK and all the steps we are taking in research and innovation – and also
The acquisition follows a decade of delivering some fantastic building solutions in the global arena. As well as introducing new people to the Reynaers brand, we
significant investment in developing the also improved brand awareness and market presence across the industry. We are in discussion with high profile architects and
EOS Facades product and service range, contractors on a number of new projects throughout the UK as a direct result of the R-Cuisine events last year.”
underpinned by investment in state- See more from the day here www.reynaers.co.uk/en-UK/rcuisine2015.
of-the-art design and manufacturing
technology, coming together to deliver
award winning steel framing systems
across a wide range of construction
sectors.

Significant investment has resulted in EOS


experiencing considerable growth through
forming strategic alliances with some
major players in the construction industry,
including Kier, Bam and Barratt London.
EOS has been directly involved with such
high profile projects as the £80m North
West Cambridge Development, Fulham View our website
Wharf, Enderby Wharf and the Education www.popuppower.co.uk
Funding Agency project to deliver six
schools, worth £44m across the Midlands.

In January 2016 EOS announced


investment in the company’s fifth Howick
Retractable Service Unit at
machine – the only FRAMA machine in the Covent Garden, London
UK – which is providing unique sections
and pre-assembled elements for the offsite and volumetric modular building sector.

EOS Facades’ ambition to become the leading player in Steel Frame Systems will be accelerated by the Siniat deal, providing an
outstanding opportunity to combine its technical expertise and specialist knowledge with those of Siniat to create innovative
Pop Up Power Supplies®
new solutions for light steel frame designers, engineer and installers.
Safe, secure, silent power: retractable utility points supplying
Steve Thompson, Managing Director of EOS Facades said, “This as an investment for the future and for manufacturing jobs electricity, water and air to public places
here in County Durham. EOS Facades is an ambitious company and this deal will open up further opportunities for investment
and innovation to ensure we remain at the forefront of research and development and to meet the exacting demands of the Our projects include Pop Up Power Supplies® Ltd 27
construction industry. He continues, “Siniat’s vision is to be the leading expert in dry construction; Steel Frame Systems is a
installations for: Telephone 020 8227 0208
key component of this service offer. Our combination of technical knowledge, innovation and manufacturing expertise will allow
Email info@popuppower.co.uk
us to bring new solutions to create the buildings of tomorrow.” • Markets • Town Centres Web www.popuppower.co.uk
www.eos-facades.co.uk • Heritage • Universities
• Parks • Sports Stadiums There when you need them, hidden when you don’t...

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


30 E 31

28
2 New Design Guide From Lindapter
Lindapter, the steel connection specialist, has
launched its product guide for professionals
involved in the design of structural and
secondary connections and features popular
products such as the Girder Clamp for quickly
connecting I beams without drilling or welding
and the Hollo-Bolt®, the original expansion
bolt for Structural Hollow Sections. It also
introduces new fixing solutions such as the
Type AAF high slip resistance clamp and Type ALP adjustable lifting
point. The catalogue reveals several new product approvals including
the CE Mark and Hollo-Bolt becoming the first to achieve full seismic
approval (A-F) from Californian based ICC-ES. Download the catalogue
from www.Lindapter.com 30
A Smart Step-Up For Greenford From Howe Green
Mapei Launches New Adesilex P9 Express To Its Tiling Best known for high-quality access covers for floors, walls and ceilings,
29
Adhesive Range UK manufacturer Howe Green also creates bespoke metalwork solutions
for a variety of applications. Recently, the company supplied custom-
Mapei UK has launched its new adhesive 32
fabricated staircase risers for refurbishment works at LUL’s Greenford

RCM
- Adesilex P9 Express to its existing RCM are delighted to announce an outstanding start to division. The skills shortages within the industry have
Station, home of the original step-free access project which was re- 2016 – with the business hitting a £1million turnover for
Adesilex product range. Adesilex P9 been widely reported and to overcome this challenge
established with the opening of an innovative incline lift in October 2015. the month of January, with February and March building on RCM implemented a recruitment drive to ensure the best
Report
Express is a cement based, rapid-setting
Howe Green supplied over 100 bespoke risers for specialist contractor this success - achieving in excess of the million mark over
adhesive, ideal for the internal and candidate was identified for the role. Other challenges such
D&D Rail to install, made to their specification from 316-grade stainless consecutive months. This milestone is an indicator of the
external installation of porcelain, ceramic as managing the synergy of supply chain and scheduling
and non-moisture sensitive natural stone
materials to floors. Adesilex P9 Express
steel and delivered within days.
Howe Green undertakes substantial and ongoing investment in design Expansion improved business performance achieved through targeted
activity and subsequent sales growth of its full product
for ‘just in time deliveries’ were overcome by appointing
specific project managers and the careful co-ordination

And
software and machinery, which enables the accurate and cost-effective range, as well as a significant growth within their A1 range
has a high performance ‘Fast Track’ of logistics of material deliveries onsite - enabling RCM to
manufacture of special purpose access covers, corner guards and trims of non-combustible building boards including Y-wall™ and
formulation so the setting time is 4 cut, clearly mark materials and schedule delivery ensuring
in unique sizes and shapes, plus tree grilles and pit covers and other

Growth
hours. Each product is available in white Multipurpose™, used in over 18 metre applications. the installations were clear, precise and streamlined for the
metalwork for the architectural building sector. www.howegreen.com
and grey colours. www.mapei.co.uk customer.
The results represent a split of product sales comprising
75% building boards and 25% made up from the enhanced RCM’s First Board and Façade Cutting Machine - RCM
range of facade solutions. Through increasing the facades have recently invested in a new state-of-the-art cutting
product portfolio, RCM can now offer an extensive range machine. The benefit of the new machine has enabled
to their existing customers and generate interest from new boards and facades to be cut to size, minimising wastage
31 clients. and removing the need to cut onsite thus benefitting the
client by saving time. Naturally the commissioning of a
Play The Light: Trespa® Meteon® Range Extended With Lumen Highlights - Project CSSB (Clinical Services Support new machine encounters challenges such as maximising
Trespa has announced the launch of its new Trespa® Meteon® Lumen range. Architects Building), which is part of a three phase redevelopment utilisation and efficiencies.
and designers can now play with the composition of light reflection on exterior façades, of the Royal Liverpool University Hospital - scheduled for
allowing natural light to be creatively introduced as a design element. It can be reflected, completion by early 2017, was a great success for RCM Training was essential once the installation and testing
scattered, enhanced or muted according to architects’ and clients’ wishes. and their client, Prater. This redevelopment was the first phase was finalised to ensure all technicians have an in-
“Trespa® Meteon® Lumen changes the way designs are perceived, it changes how people project where RCM were able to work with their customer depth understanding of the machine and its capabilities to
interact with structures and how buildings interact with their surroundings,” says Lucas and offer design elements on their through wall product, effectively use cutting forms to achieve economies of scale
Stevens, Design Expert at Trespa. “With Trespa® Meteon® Lumen, you can play with the including Y-wall™, airtightness solutions and an aluminium and minimise wastage – a benefit to both the customer
compositions of light reflection on your façade, within a single colour. This new diversity support frame as part of the overall solution. and the environment. This has been so successful that a
of finishes enhances design creativity and ensures façades will truly stand out.” second machine is planned to be installed at the end of
Bring your colour to life with reflections of light - Trespa® Meteon® Lumen is available in Another highlight for the period was securing the Rathbone May 2016.
three variations across eight colours. Each of the three Lumen variations is available in Market project which will be worth £500,000 in turnover to
grey, black and white and several terracotta tones. RCM when completed. The 680,000 sq ft Rathbone Market Ian Quinton, Managing Director of RCM said: “It’s been
‘Diffuse’ removes glossiness, reflection and texture, resulting in instant tranquillity. scheme, developed by English Cities Fund - a joint venture a phenomenal start to 2016, the results achieved by the
Scattered light gives façades a smooth, subdued appearance. ‘Oblique’ has a pleasantly between Muse Developments, Legal and General Property teams at RCM speak for themselves and I would like to
uneven matt-and-gloss surface that brings a natural, weathered look to any façade. ‘Specular’ reflects its surroundings, adding liveliness with deep and the Homes and Communities Agency - is part of the thank each member of staff for their dedication, loyalty
colours and gloss. Buildings become seamlessly integrated into their environment. Canning Town & Custom House regeneration programme and consistently exceeding our customer’s expectations.
About Trespa® Meteon® - Based on decades of leadership and setting new trends in façade solution design and aesthetics, Trespa® Meteon® Lumen creating a new commercial district, new housing and a The purchase of the new cutting machine has enabled
represents a logical next step for the Trespa® Meteon® family. Trespa is the first choice of exterior panelling for many leading architects, who insist refreshed High Street within the Thames Gateway. RCM RCM to operate more efficiently, minimise wastage for the
on quality, reliability and durability. Trespa® Meteon® is a decorative high-pressure compact laminate (HPL) with an integral surface manufactured supplied Y-wall™, an airtightness solution, aluminium client and provide an enhanced service which has had a
using Trespa’s unique in-house technology, Electron Beam Curing (EBC). The blend of up to 70% natural fibres and thermosetting resins, support frame and a Rimex composite cladding to the positive impact on our business and in turn our customers.
manufactured under high pressures and temperatures, yields a highly stable, dense panel with good strength-to-weight ratios. project. RCM will be investing further in additional cutting and CNC
Trespa® Meteon® stands out in vertical exterior wall coverings such as facade cladding, balcony panelling and sunblinds. The entire Trespa® Meteon® machinery to enable us to be a leading supplier in the
product range is available with PEFCTM or FSCTM certification upon request, in restricted quantities and certain jurisdictions. Experience the effect Challenges and Solutions - Alongside every success story facade industry. ”
for yourself - See what Trespa® Meteon® Lumen can do: order your samples today on new.trespa.com. www.trespa.info are associated challenges, which in RCM’s case included
sourcing and appointing the additional skilled workforce RCM Offer Informative CPD Seminars - For more details
to manage the increased growth within the facades call 0845 1303725 or visit: www.buildingboards.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


32 E 33

33 Vent-Axia’s Sentinel Kinetic Advance Commended At The 34 Pumps For All Applications
Energy Show 2016
Wilo UK continues working with its
Vent-Axia is delighted to have been partners across the UK and Ireland, 39
commended at the Energy Show adding its expertise and knowledge to
2016 Product of the Show Awards in the quite exceptional range of products
Dublin, Ireland. The company gained available for projects. It has the ability
Rinnai BiM Level 2 Now ‘Live’
recognition in the Best Energy Efficient to provide solutions that exceed
Product category of the awards for its the increasingly stringent European Rinnai has added its own BiM shelf ‘live’ to
unique, best in class Sentinel Kinetic regulations that offer superior energy its website to co-incide with the industry
Advance Mechanical Ventilation with Heat Recovery unit. Vent-Axia’s efficiency benefits. Wilo offers a wide wide implementation of Level 2 BIM - visit
Sentinel Kinetic Advance impressed the judges through its exceptional range of pressure booster sets for reliably boosting water pressure this at www.rinnaiuk.com/products/bim/ -
energy efficiency and app control. The next generation of whole house and providing water to medium to larger sized properties. In particular, and save it to your favourites.
MVHR, the Sentinel Kinetic Advance provides energy efficient ventilation where there are significant demands on all floors for reliable water
and pioneering control. www.vent-axia.com supplies. www.wilo.co.uk If there are any queries, questions or
concerns about the potential impact of BIM
on your business Rinnai has, as a dedicated
resource, technical resources at your service
35 Johnson & Starleys Extends Free 5 Year Guarantee To 36 Wavin Launches BreakThrough Revit Piping Packages – simply email engineer@rinnaiuk.com
Cover All Quantec Range Of Boilers *You can follow Rinnai on twitter @rinnai_uk
Wavin, the leading supplier of plastic
pipe systems and solutions in Europe, and send us a picture of you downloading our
Johnson & Starley have extended
announces the launch of its new Building BIM objects for a chance to win a goody bag!
the 5 Year free parts and labour
Information Modelling (BIM) content
guarantee to cover all of its
packages for plumbing and drainage. Built Government Procurement officially starts
QuanTec boiler range. Introduced
in Revit, these content packages contain the implementation of Building Information
in 2012 the Quantec boilers have
intelligent assistance which help the Revit Modelling (BIM) in public sector build from now, requiring collaborative 3D BIM with all project and asset information,
proved reliable, easy to install
modeller to arrive very easily at a full ‘as documentation and data to be electronic. Fully collaborative 3D BIM has been defined as ‘Level 2 BIM’ and is documented
and popular, with the range
built’. To support users, Wavin has created tutorials and tips and tricks in PAS119:2. This publicly available specification sets out the standards and collaborative workflows needed to complete a
being further extended in 2016
videos on a dedicated YouTube channel, a downloadable training manual construction project to Level 2 BIM. A PAS 1192 compliant Level 2 BIM project typically requires the following deliverables:
to include an LPG version of the
and training options for Revit modellers so they can quickly take full models in their original formats, COBie UK 2012 data and traditional 2D drawings in PDF.
HR28C. The QuanTec HR28C is
advantage of the intelligent assistance built into the newly created Revit
the smallest boiler on the market
piping packages. myportal.wavin.co.uk/bim-centre
with integral Passive Flue Gas
Heat Recovery.
The Aquair range itself has
also been extended with the
40
introduction of the highly
versatile downflow S-36 water to
Advanced Chosen To Protect Tyne And Wear Metro
air space heater. It offers all the
benefits of centralised heating The Tyne and Wear Metro system is being protected by
and can replace a warm air intelligent fire systems from Advanced after the industry-leading
heater, making use of existing warm air ducting. manufacturer provided it with new fire alarm panels.
It also has the option of supplying unheated air for cooling purposes in
warmer weather. Designed for use with a vast range of renewables and Nexus, the public body which owns and manages Metro,
traditional heating sources, the S-36 sits at the top of the Aquair range upgraded fire panels at 50 locations on the system, including 21
and its output is ideal for larger premises. stations and at other key pieces of its infrastructure including
www.johnsonandstarley.co.uk relay rooms, vent shafts and other operational buildings.
Advanced’s reputation for producing the highest quality fire
systems has helped to achieve rapid expansion throughout the
UK and worldwide.
38
The fire panels which have been installed on the Tyne and Wear
37 Sector Leading Heating Controls From ESi Reliable, Renewable Heating At CIH Housing 2016
Metro, which has the fastest passenger growth of any light rail
Effective heating controls are a vital part of Mitsubishi Electric is bringing its heat pump expertise to the CIH Housing system outside of London, are cutting edge MxPro 5 models,
an efficient central-heating system. Most 2016 exhibition to offer social housing providers advice on how to compatible with multiple external components and renowned for
homes in the UK have a single heating combat fuel poverty whilst hitting renewable targets. The company will their quality, reliability and flexibility. The contract for the installation was awarded to leading North East Electrical Contractor Veale Nixon,
zone – and the only control in the rooms is be exhibiting (Stand F4) at the exhibition, held at Manchester Central, 28- who selected The Dante Group to supply and commission the Fire Alarm Systems.
through thermostatic radiator valves. 30 June 2016 and showcasing its Ecodan range of heat pumps specifically
When a new central-heating system is designed for heating domestic buildings. As Advanced partners The Dante Group selected the MxPro 5 Panels. The MxPro 5 can be used in single loop, single panel format or easily
installed, it's possible to fit a full zone Mitsubishi Electric experts will be on hand to offer advice and help by configured into high speed, 200 panel networks covering huge areas and tens of thousands of field devices. The panels installed in the
control that has different pipe loops and providing access to the latest information on legislation, the renewable metro stations vary from two loop to four loop panels depending on the size station and report to a BMS/ Graphics systems via IP.
separate thermostats for two or more heat incentive and general advice on how to engage tenants in the
areas. This can offer significant energy process. Staff will be able to explain how to self-deliver an Air Source Advanced’s legendary ease of installation and configuration and wide peripheral range make it customisable to almost any application and
savings. ESi offers a range of zone valves Heat Pump (ASHP) Programme and also be able to outline the funding it is found in challenging and prestigious sites around the world. The MxPro 5 panels installed at the Tyne and Wear Metro Stations are
which are a direct replacement for existing valves if they fail. These are streams available. www.mitsubishielectric.co.uk among Advanced’s best performing fire systems and one of the few available approved to EN54 Parts 2, 4 and 13. www.advancedco.com
very quiet in operation and now come with an industry leading five-year
warranty. www.esicontrols.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


34 E 35

Advanced Manufacturing In Sheffield 42

Factory 2050, the latest development within the University of Sheffield’s Advanced
Manufacturing Research Centre in Sheffield, has a striking, ultra-modern appearance,
partly thanks to an external Solar Shading solution from Levolux.

The development comprises a main rotunda building and an adjoining rectangular building.
Levolux was approached to develop a passive solar shading solution, to be applied to both
buildings. Solar shading is essential to help maintain occupant comfort levels throughout
the year without relying on expensive air conditioning systems. The solution proposed by
Levolux comprises oval-shaped aluminium louvres, arranged horizontally between vertical
aluminium carriers. Each louvre measures 60mm wide by 50mm thick and is formed from
extruded aluminium components. Based on Levolux’s Infiniti Fin system, the oval-shaped
louvres feature concealed fixings for a clean, uncompromised appearance.

The tubular louvres, which are vertically stacked with a pitch of 200mm, have been custom
engineered to suit the shape of each building. The main rotunda building has 8 metre
high curtain walling, with full height glazing. To accommodate the building’s circular form,
41 each louvre has been carefully curved. 20 rows of louvres run around the perimeter of
the building at high level, accentuating the building’s unusual shape, which resembles the

New High
When Paul and Cathe Hazlewood decided to leave the in the options available and with the experience to be
‘Starship Enterprise’.
agreeable urban living environment they had enjoyed able to advise pretty much anyone about what was best
for years in the centre of Oxford, looking for a new life for them. Specifically. And that is exactly what they did
Temperature in the country, they and Cathe’s brother and sister-
in-law decided to head for deepest Dorset. The sale
for Paul and Cathe. After a lengthy chat they decided to
start with the solar PV system and then rather than going
In contrast, for the rectangular-shaped adjoining building, louvres have been incorporated into a continuous vertical stack,
providing shade to glazed areas at high level. 18 rows of louvres combine to form a shading structure, measuring 15 metres in

Heat Pump of their properties allowed them to shop around for


an idyllic setting that they could remodel to suit the
with biomass, to look at the latest high temperature air
source heat pump from LG as the source of their heating
length by 3.5 metres in height. The louvres are mitred to accommodate an external corner of the building. The louvred section
applied to the rotunda building is secured back to steel mullions using Levolux’s Triniti® brackets. These incorporate a unique
and highly effective thermal break which minimises the risk of cold bridging and virtually eliminates any problems associated
– The Right lifestyle choices they wanted to make with energy
efficiency, ‘green’ living and utilising modern renewable
and hot water.
with interstitial condensation. They also help to reduce noise transmission through the building envelope. All extruded
aluminium components, including the tubular louvres and vertical carriers, are finished in a durable, light grey powder coating.

Response…
technologies an important factor in their decision- The solar PV 18kW array would see them exporting
www.levolux.com
making. around 50% of the electricity they generated. They were
attracted by the idea of storing electricity if they could
The property they purchased allowed them both to but decided to put of this extension of the system until
enjoy large adjoining semi-detached properties, on a plot the technology to do it was cheaper and more reliable.
that included a large building that had been built and It’s on their agenda! The LG Therma V high temperature
43
envisaged as a ‘business centre’ although it had never air source heat pumps – one for each home - have been a
quite managed to be that, extensive woods and views huge eye opener to the couple.
Rinnai Is Really Motoring Aboard The Bedroam Bus
across the Dorset countryside to die for. Paul and Cathe
admit they were not renewable experts. Being intelligent They had got used over twenty years to heat on demand Rinnai, the leading continuous flow gas fired water heater manufacturer, has seen
people they had a grasp of what was available but knew using a traditional boiler. They had got used to the ease its products installed in numerous sites with unusual applications but one project
only a little more than the average person when it came of having gas through the mains. There was concern has pushed the boundaries of the unusual. The project is so unusual it caught the
to what they could go with and how those options might initially about how responsive the air source heat pumps eye of Channel 4’s ‘Amazing Spaces’ presented by George Clarke and the Rinnai
fit together. They were convinced they would go with would be to deliver heat and hot water when it was product was one of the stars of the show.
solar PV to generate their electricity – the properties needed. But with the latest ‘high temp’ system from LG
they had chosen were blessed with south east and south they say they shouldn’t have worried. ‘Bedroam’ is the brainchild of Ollie Kemp, a farmer, motor racing competitor
west facing roofs – and were sizeable, allowing them and enthusiast from Melbourne, Yorkshire. He wasn’t happy with the lack of
to install a solar array that would more than meet their But what about costs? “It’s difficult to be exact because onsite accommodation at events that would allow competitors to stay close
requirements. we don’t have historical oil usage figures for the to their expensive and irreplaceable racing gear. The constructive result of
properties here – so we can’t measure or compare the this dissatisfaction is the Bedroam bus, complete with 18 Japanese-style pod
They thought they might possibly go for a biomass boiler costs but in our experience the savings over oil are in bedrooms. As well as using it himself for motorsport meets, Bedroam is available
option – they had the woods and a pretty much endless excess of 50% per year – and that’s impressive,” says to hire.
supply of fuel available so they wouldn’t necessarily be Martin. We will be monitoring the ‘real time’ costs of
reliant on a supply of expensive wood pellets. But the the air source heat pump and we’re confident it will be The Bedroam has two fully-equipped bathrooms with shower, toilet and sink. Sinks and showers are supplied with safe temperature controlled hot
deeper they got into planning their future the more mightily impressive when compared with any other forms water from Rinnai Infinity LPG water heaters, complete with MC91 controller, via motion sensor-operated taps. Two Rinnai Infinity 17e external
they began to realise they needed to talk to someone. of heating and hot water comfort provision.” To find out units fitted to the back of the bus drawing water from a bespoke designed tank. “I first saw Rinnai units in operation at an event where there
Someone they could trust who really understood more about LG high temperature air source heat pumps were luxury mobile showers powered by Rinnai units. On my return, I researched Rinnai online and spoke to my friend Andy, a registered Gas Safe
renewables and how they might work together to head to http://partner.lge.com/uk, or www.bublshop. engineer also based in Melbourne, who then ordered and undertook the installation. Andy Dixon, who runs his own plumbing and heating service,
provide the best energy solutions for them. They were co.uk or you can email LG at HVAC.marketing@lge.com. explains: “The boilers had to go on the back of the bus as Ollie was struggling to find enough space inside. As the bus has an air con system, I had
recommended to talk to local experts Bublshop. already put a cooling radiator off the back so the two Rinnai units sat very handily behind that simply hung on a metal grid attached to the back of
the bus.
Bublshop had been operating in the area under its name
and a previous one – Dorset Energy Solutions - for “Piping was easy. I used plastic pipework for both hot and cold outlets running to a little plant room where the back seats of the bus were originally
several years driven by Technical Director Martin Perrin, which is directly beneath the bathrooms from where the water is pumped to the header tank via a small 12V. Rinnai’s technical guys were very
dedicated to working with renewable options, well versed helpful when I phoned them initially for some advice and installation of the units was really easy. I will definitely be using Rinnai again,” says Andy.
www.rinnaiuk.com

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


36 E 37

44

SE Controls Feels The Power With


Bristol’s Electricity House Development

Electricity House, Crest Nicholson Homes’ stylish city centre


apartment development in Bristol is using an advanced smoke
ventilation system from leading smoke and natural ventilation
specialist, SE Controls, to help keep residents safe if a fire should
occur.

Originally designed by acclaimed architect Sir Giles Gilbert Scott


in the 1930s, the six-storey Grade II listed building has being
converted into 85 luxury apartments, while ensuring that many of
the original design features are retained or reinstated to enhance
its art deco style.

The building’s main atrium is at the heart of the SE Controls


solution, as the smoke ventilation system is designed to vent
smoke from the atrium in the event of a fire to ensure escape
routes are kept clear.

46
To achieve this, SE Controls designed, installed and commissioned
the system, which comprises 37 SHEVTEC automatically controlled louvres, which are manufactured and tested in accordance with
Passivhaus With less than 400 PassivHaus certified properties so far the ground floor if our health deteriorates in later life.
®

BS EN 12101: 2. The SHEVTEC® louvres also incorporate ‘fall protection’ to increase safety, as well as using IP rated external motors, completed across the UK, the ultra-low energy standard We chose the PassivHaus low energy route in order to
from Germany can still be viewed as nascent in this keep future bills as low as possible, while also utilising
Design
which are essential to allow easy access for future maintenance. A further 21 low level air inlet louvres and linear door actuators also
form part of the system, all of which are controlled by a series of OS2 control panels with integral battery back up and fully compliant country, though there are many compliant components materials and products, which would offer a healthy
with the relevant sections of the BS EN 12101 standard. www.secontrols.com and technologies available to assist in these designs: living environment”.

Maintains such as the mechanical ventilation and heat recovery


system offered by Omnie. “Gale & Snowden identified the HRU as being the most

Indoor The highly efficient Passive house certified CA550


appropriate, low energy model on the market for our
needs and the fact that Omnie is an Exeter based

Environment
heat recover unit (HRU) has in fact just been installed company also fitted with our ethos of trying to buy local.
as a crucial element to the building services within a While the HRU and the two manifolds and ducting have
45
private residential property under construction near been installed by the Go Green Engineering of Exeter.

Using Omnie Tiverton in Devon. The two storey 200 square metre
structure replaces an earlier dwelling on the Bampton In fact the semi-rigid ductwork is an integral part of the

MVHR
Herschel Infrared Heating Solutions site where Gale & Snowden is the specialist architectural Omnie system and enables good flow characteristics
William Herschel discovered infrared in 1800 and, today, consultant and passive house designer responsible for to be maintained while routing the pipes around the
Herschel is building on his legacy by pioneering the use the specification process. structure to different rooms. The reduced number of
of infrared to provide heat in more efficient, effective, fittings also assists in preventing air leakage.
stylish and comfortable ways than many traditional In addition to the ducted central ventilation system,
forms of heating. which will constantly harvest warmth from extracted The CA550 HRU itself is designed to run continuously
Far infrared heating works on the basis of gentle, long- stale air, the new home uses a holistic set of measures in at a cost of approximately 30 pence per day, depending
wave infrared which penetrates the air and heats solids, order to keep energy usage within the tightly controlled on the tariff and is extremely quiet in operation as well
providing the same feeling of warmth as the winter PassivHaus parameters. These include a super-insulated as offering such sophistications as automatic summer
sun on your face or the heat from a coal fire. Herschel building envelope, use of thermal mass to mitigate bypass and a boost facility for when humidity levels
provides infrared heating solutions for many different extremes of temperature and standards of airtightness increase.
environments. Second only to gas central heating in so exacting as to restrict air changes to below 0.6 per
total annual cost of ownership, hour. Overall the Omnie CA550 HRU is 92 % efficient making
Herschel Far infrared heating emerges as the more it fully compliant with SAP, as well as able to feature
compelling long-term package that provides an energy- The latter figure, set by the PassivHaus Institute, is so in a near-to-zero energy house design such as has
efficient, comfortable and simple to install electric low that it would lead to problems of stale, moisture been created by Hugh and his wife along with their
heating solution that is changing the way homes are laden air becoming trapped in the living spaces, with the consultants.
heated. Rather than just looking at running costs, possibility of it causing condensation, damp and damage
Herschel Far Infrared has reviewed all elements of the to the fabric of the building or even “sick building This advanced ventilation solution is also a key
purchase decision and created a total annual cost of ownership. syndrome” which adversely affects the health of the component to Omnie’s whole house offering which can
This combines purchase cost, installation, running and maintenance costs. The total cost of Herschel infrared heating when employed in a three- occupants. also feature renewable energy in the form of ground and
bedroom semi-detached 89m2 house in central England is £804 per year. This compares with gas at £608 but is less than half the £1,734 cost of air source heat pumps, a wide selection of underfloor
owning modern electric storage heaters with automatic controls. The Devon self-builder, Hugh, commented: “Sherwood heating systems with sophisticated control options.
For the same size house, electric underfloor heating with zone controls is expensive at £1,508 while using high efficiency electric convertor heaters with has been built on the site of a former bungalow and www.omnie.co.uk
unit thermostatic controls is £1,322. The company couples unrivalled knowledge of infrared heating technology with the most comprehensive range of has been designed by the architects, Gale & Snowden
infrared heaters for the widest range of applications. www.herschel-infrared.com to be our forever home: with the scope for us to live on

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


38 E 39

48 New STEICOdurelisdek Boosts On Site Floor Deck 50 Remmers Flooring Systems Installed At Distribution Centre
Performance With Triple Protection
A selection of Remmers flooring systems have been installed at the new
Leading I Joist supplier STEICO have Food Distribution Centre for Pallas Foods (now part of Sysco) in North
introduced a complementary decking County Dublin. The new €45m facility includes two warehouse areas
product which offers the very best totalling 33,000 sq.m half of which is dedicated to refrigerated storage
on site protection for the timber areas as well as 2,500 sq.m. of high specification office space. Over
floor. STEICOdurelisdek features triple
protection avoiding excessive swelling
of the board substrate. The top surface
has an additional wax sealer applied
which adds further protection and allows the finished floor to be
cleaned easily for a pristine finish on handover. A final proven slip
resistant and durable blue peel off layer together with a customised
fixing kit protects the floor for the exposed construction period.
www.steico.co.uk

49 Rejuvenation Project Uses Striking Brett Landscaping


Solution To Draw Footfall To Hull ‘Old-Town’ Centre
Hull Trinity House, a charitable organisation which has served seafarers
and their families in the area for over
600 years, has successfully regenerated 3000m2 of Remmers flooring materials were used in the facility including
part of Hull’s Old Town, using hard- Remmers Crete RT, a heavy duty polyurethane screed, to the refrigerated
landscaping materials supplied by Brett storage areas. Remmers Ceramix coloured quartz was applied to the
Landscaping. With an inspiring colour canteen and wash room areas, and Remmers Floormix aggregate was
spectrum and capacity for creativity, incorporated as a binder to our Epoxy CR Color, a chemical resistant
products from the Brett Landscaping coating which was required for the vehicle maintenance and battery
Alpha Antique block paving range were charge areas. www.remmers.co.uk
the perfect choice to create a striking
new and much needed car parking area, which doubles as an outdoor
entertainment space. www.brettpaving.co.uk

47
51

New Allura
Perfectly capturing the beauty of the natural world, Allura Flex 0.55 floor coverings are offered in a variety
Allura Flex 0.55, the new loose lay Luxury Vinyl Tile of formats to enhance their naturalistic designs. Stone
(LVT) collection from Forbo Flooring Systems, takes the designs are available in three square and rectangular
Flex 0.55 trend for nature-inspired interiors to a new level. ‘slab’ sizes whilst Wood designs are offered in a choice
of three ‘plank’ formats to allow diverse and striking
Airpop Insulated Floors In New Homes Promise
Comfort And Reduced Home Heating Bills
From Forbo Natural designs are increasing in popularity across
all sectors, and reclaimed wood and exposed stone
layouts to be created, including herringbone, chevron
and wicker designs.
Across The UK
are in high demand. Allura Flex 0.55 is right on trend, To solve the nation’s housing shortage, more than 250,000 new
featuring the grains, patterns and tones inherent Julie Dempster, Marketing Manager at Forbo Flooring homes are desperately needed across the UK every year for
within wood and stone, and offers authentic, realistic Systems, comments: “This new loose lay LVT collection many years to come. And with cavity wall and roof insulation the
designs that will connect end users to the natural world. will have particular appeal in retail, office and leisure accepted norm in new build properties, the emphasis now is on
Aesthetics are not the only attraction: the loose lay and hospitality environments. Designers looking to making cold, non-insulated flooring a thing of the past in new
format means that installation is quick, easy and cost optimise the use of the finite space available are houses and apartments.
effective. increasingly using floor coverings of different textures, One fast, reliable floor insulation solution is demonstrated in a new
colours and characteristics to create different activity video highlighting the advantages of airpop® to house builders.
In the Allura Flex 0.55 Wood range there are 30 stylish zones within open plan areas. Aesthetically pleasing Used either in simple slab or tailored ‘beam and block’ applications
options, including vintage wood designs and traditional, modular floor coverings that are quick and easy to fit the installation of ‘airpop - engineered air’ - the new name adopted
classic wood looks with timeless appeal. The authentic, offer an ideal solution. Allura Flex 0.55 vinyl tiles can be by the European expanded polystyrene industry – could not be
rustic tones of salvaged timber have been accurately installed alongside carpet tiles and contractors can even simpler and brings major benefits in energy conservation, reduced
represented, alongside refreshed colourful finishes that use the same tackifier, which results in less time, cost fuel bills and significant savings of time and installation costs on
give the collection a modern edge. and mess during installation.” site. The constant insulation value across the full life of a building – means thermal performance for grey EPS/Airpop is 0.03 W/mK and for
white - 0.038 W/mK for EPS 70 falling as low as 0.032 for higher density EPS 500.
Deemed a ‘luxury’ surfacing material, natural stone has For more information please call 0844 822 3928, email The new video which can be viewed at https://youtu.be/SU0kGYw8oB4 demonstrates that airpop® is exceptionally lightweight and can be
been used in interior design and decor for centuries. info.flooring.uk@forbo.com or visit www.forbo-flooring. transported to site and lifted into place where it is easily cut and installed with no special equipment needed. Once in place, it provides a
Within Forbo’s Allura Flex 0.55 Stone range, designers co.uk/alluraflex firm, level insulation ready to take the final screed.
will find the lavish styling of marble together with It can also create a ventilated airspace and even act as a stable ‘carrying board’ for underfloor heating systems below the screed. As an
contemporary stone designs, enabling specifiers to extra reassurance to housebuilders airpop® is non-toxic, chemically inert, non-irritant and rot-proof. Fungi and bacteria cannot grow on
recreate this ever-popular look, but without the high airpop® and it is insoluble and non-hygroscopic.
costs associated with using quarried stone.

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


40 E 41

53

Micro Joints – The Discreet New


Way To Protect Tiles Installed Over
Underfloor Heating Systems

The popularity of underfloor heating systems


has increased signifantly in recent years, as
they provide a cost-effective, comfortable,
unobtrusive heating solution for millions of
homes. However, these systems often cause
movement between the subfloor and the top
substrate in the form of expansions and contractions.
Failing to accommodate for this movement will almost certainly result in cracked tiling surfaces. Dural UK are proud to have developed a solution
in the form of Micro Joint Infill, which provides discreet stress protection for tiles and natural stone on heated floors.
Micro Joint Infill has been specially developed for tiled flooring installations which are laid over underfloor heating systems, particularly for
residential developments. It provides effective movement protection for tiles and natural stone on heated floors. It means a tiled flooring
installation with Micro Joint Infill used is able to effectively absorb the movement energy transferred from the subfloor, protecting the tiles from
cracking and loosening.
Importantly, it can be colour matched to the existing grout or tile colour for a discreet appearance – in fact any colour in the RAL chart. The
Micro Joint Infill is simply applied into the grout line spaces in between tiles and can be used on Brick Bond or Opus floor tile layouts. Due to the
colour matched nature of the Micro Joint Infill it helps to create a beautiful, seamless design to the tiled flooring.
www.colouredmovementjoints.co.uk

54
52

New Rich
Burnt terracotta tones are predicted to be hot for Craven Dunnill is a leading distributor and retailer
floors this autumn. Craven Dunnill captures this of floor and wall tiles to the KBB sector, architects,
latest design style with the introduction of its new interior designers, developers and builders. The
Firestone Firestone glazed porcelain floor tile range, which
boasts a blend of rich, antiqued terracotta tones
Firestone range is a new addition to Craven
Dunnill’s award winning Renaissance Collection,

Tiles Deliver with an almost volcanic fired effect. The finished


floor shouts personality and hints at mature luxury.
introduced March 2016.

Flooring Firestone from Craven Dunnill’s Renaissance


For further information or to visit Craven Dunnill’s
showroom in Bridgnorth 01746 761611

Impact
Collection is available from stock in a 300 x www.cravendunnill.co.uk
300mm tile format and a contrasting colour
palette: Amber, Shadow and White. Larger format
tiles are also available for order, including 453 x
453mm, 605x300 mm and 758 x 453mm.

Steve Whitehurst, Sales and Marketing Director


at Craven Dunnill highlights the unique qualities
of the new range: “Firestone is aligned to the
fashion-inspired interior design trend for fired
natural clay materials, bringing with it outstanding
depth of pattern and a unique surface texture”.

Despite their sophisticated appearance, Firestone


tiles require no special cleaning and will maintain
their inner warmth and depth of decoration for
many years to come.

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


42 E 43

55 56

Looking For A VMZINC Roof


Bona White is a new wood floor primer designed to To produce a highly durable, easy to maintain finish, 10 Trinity Square, the former headquarters The immediately recognisable Portland stone
produce an on-trend bleached look when used in two coats of Bona Traffic HD lacquer were applied. of the Port of London Authority and one of rotunda has been meticulously restored and
the capital’s best recognised and most iconic upgraded in keeping with a building which
For 10 Trinity
conjunction with a Bona polyurethane lacquer. The Traffic HD is Bona’s toughest lacquer. The very low
Whitewashed intensity of ‘whiteness’ is dependent on how many
coats are applied. This client wanted a whitewashed
VOC content and low odour mean there is no need for
homeowners to vacate their property while the works
buildings, has been restored and transformed
by the Reignwood Group with a design by
stands next to the Tower of London World
Heritage Site. 10 Trinity residences are said

Floor? look to their original Victorian floor boards to tie in with


the soft greys of the kitchen.
are being carried out and there is no lingering smell.
Square Woods Bagot. Situated in the heart of the City,
the building was badly damaged by bombing
to combine old world elegance and new
age luxury, complemented by the discreet
Its fast cure time means the floor can be in full use just during the Blitz in World War II. placement of the latest building technology.
This was achieved by the application of two coats of 12 hours after treatment – making it an ideal choice
Bona White under two coats of Bona Traffic HD lacquer. for commercial floors too where there is little available Though renovated in the 1970s, the functional
The works were part of a complete renovation of a downtime for renovation. TWF’s clients chose the Matt rectangular office block erected to occupy the
Victorian town house in Bath and were carried out by version of Traffic HD for their kitchen floor. Silkmatt and original central part of the building lacked any
Bona Certified Contractor, TWF Bath Ltd, who specialise Extramatt sheens are also available. architectural merit. The recent redevelopment
in the restoration and fitting of traditional wood floors. has seen the Grade II* listed building have a
Before treatment, the TWF team filled large gaps using As a Bona Certified Contractor, TWF Bath is part of VMZINC® roofing cassette system in QUARTZ-
reclaimed pine wedges and then sanded the floor to Bona’s network of highly trained wood floor specialists ZINC® and QUARTZ-ZINC PLUS® covering the
100 grit abrasives. - independent wood floor companies who have inner courtyard. This now houses a five star
received extra in-depth training in the use of Bona’s Four Seasons Hotel, a private members’ club
Smaller gaps were filled using Bona Mix & Fill, which is wood floor finishing products. www.bona.com and 41 luxury apartments and penthouses in
mixed with sanding dust from the floor to ensure the a modern interpretation of the original 1920’s
filled areas blend in with the rest of the surface. The rotunda designed by Sir Edward Cooper. Pre-weathered zinc is now finding widespread
floor was then sanded using 120 grit abrasives before popularity for its colour retention and long
the application of the first coat of Bona White. The The rainscreen roof is highly distinctive and design life. With a heritage dating back nearly
floor was then abraded using a Bona Scrad Pad to formed using a non-ventilated, compact build- 200 years, it seems only appropriate that
remove any grain raising from the surface before the up which incorporates Foamglas® cellular glass the metal should have been specified for a
application of the second coat. insulation. development showing such attention to detail.
www.vmzinc.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


44 E 45

57 62 Cembrit BBA Certified Slates Provide Natural Finish To


Dallmer Introduces ‘Red Zone’ Roof Drain
New Housing Development
We are constantly being warned about the potential
consequences of Climate Change and the risk of more Jutland, smooth and
frequent extreme weather events but are offered few lasting Zeeland, textured BBA
solutions other than “cutting carbon emissions” – which is certified fibre cement
why Dallmer has introduced its high capacity ‘Red’ Drain. slates from Cembrit,
The unit’s red colour identifies it as a separate system have demonstrated their
from the conventional flat roof drainage and is intended versatility, design and
to provide overflow when the main outlets are being performance features on
overwhelmed. Crucially, the versatile design can be a stylish, nature-inspired
connected to chutes or to pipework in gravity or siphonic housing development in the
systems. seaside town of Weymouth.
This clears excess storm-water quickly before it can find Jutland and Zeeland slates
vulnerable joints (typically where the waterproofing meets are manufactured to the highest European standards using Portland
upstands) or exert excess structural loads. ‘Red’ Drain cement together with a formulation of superior blended synthetic and
variants can be installed as part of a new roof or retrofitted cellulose fibres. Cembrit fibre cement slates are finished with a high
into an existing one and are adjustable to suit different quality, semi-matt acrylic coloured coating to the face and edges and a
insulation thicknesses and waterproofing systems. tinted, high performance binder to the back face. www.cembrit.co.uk
www.dallmer.de/en 61
The New Way Of Doing Things The Old Way
Installing and replacing mortar bedded ridges and hips is easy with the
Redland Mortar Bedded Fixing Kit, a complete pack to mechanically fix Kier Construction Installs Rockwool At Its HQ In
63
ridges and hips when a traditional aesthetic is required. Designed to Cambridge
59 Property, residential, construction and services group, Kier Group
assist roofing contractors the fixing kit enables installers to maintain a
traditional mortar aesthetic, whilst still complying with BS 5534 and the specified a combination of ROCKWOOL flat roofing solutions on
New FAKRO Rooflights Add
NHBC Guidelines regarding mechanical fixings. its new headquarters in Cambridge. A roofing material that would
Contemporary Style provide exceptional
Changes to the BS 5534: Code of practice for slating and tiling state acoustic management,
When upgrading thermal inefficient rooflights,
that mortar alone cannot be used to fix ridges and hips, so even if good thermal insulation
FAKRO’s new range of flat roof windows offers
mortar is used, all ridges and hips must also be mechanically fixed. and a high quality finish
a choice of flat or domed profiles. All have a
The Redland Mortar Bedded Fixing Kit provides everything required to that needed minimal
contemporary style, utilise a multi-chamber PVC
mechanically fix ridges and hips in accordance with BS 5534 and it is maintenance was
sash and frame and come in sizes designed to match
58 fully compatible with all types of Redland tiles. required. ROCKWOOL
those being replaced. The triple-glazed DRF DU6 has
Klober Launches Over- stone wool products
a window U-value of 0.74W/m2K while the DRC-C
Rafter Insulation Boards P2, which offers added burglary resistance through While dry-fix solutions are preferred, mortar bedding may still be an suited the project’s
aesthetic requirement in conservation areas and the Mortar Bedded specification perfectly.
Klober Permo® therm is a Kooltherm® use of a laminated internal pane, is only slightly less
Fixing Kit is a simple to use solution for roofing contractors. ROCKWOOL HARDROCK® Multi-Fix (DD) and HARDROCK® Multi-
insulation board with tongue and impressive at 0.88. For smoke evacuation, the DSF
Batten straps, included in the contents of the kit, are vital to the Fix (DD) Underlay, with the ROCKWOOL Acoustic Membrane were
groove edges, integrated underlay and DU6 and DSC-C P2 open automatically to a height of
correct and secure installation of the timber ridge batten, required as used to cover the flat roof. The ROCKWOOL products have provided
self-adhesive edge strips for sealing 50cm through activation of motors on each side of
the base into which the screws are fixed. the new Kier Construction offices with a complete roofing solution.
laps. the frame. www.fakro.co.uk
www.rockwool.co.uk.

With LABC approval, it is suitable for If batten straps are not used, should the mortar fail at any stage during
all pitches but, unlike square-edged the lifetime of the roof, all of the ridge tiles fixed into the unsecured
boards, it will not provide an air ridge batten could slide off the roof together, severely damaging other Easi-Dec Provides Safe Access For Low Level Roofs
60 roof tiles and potentially injuring passers-by below.
65
leakage path. Permo therm is installed
www.redland.co.uk/ridges Easi-Dec, the working at height safety specialist, has developed a Low
over rafters and not only provides
Celotex Announces New Industry- Level Roof Edge Protection system to provide a cost and time effective
added height within the roof space
Leading Flat Roofing Range alternative to scaffolding. Designed to provide safe access and edge
but removes the need for separate
protection, contractors
underlay installation. Celotex unveils a new innovative range of flat roofing
Wraptite-SA Enhances Thermal Performance Of Zero can now be confident
solutions giving installers a versatile, quality product 64
Bills Home in accessing low level
Boards can be laid either from left to range. The range comprises three products; Celotex
rooftops such as single
right or right to left with no ventilation Crown-Bond, Crown-Up and Crown-Fix. The new Flat Wraptite-SA airtight membrane has
garage roofs or on a
of the batten/counter-batten cavity Roofing range was developed and rigorously tested for been selected by the Zero Bills Home
collection flat roof units.
needed other than for impervious or an 18 month period prior to its launch to ensure the Company and development pioneers
Easi-Dec’s dedicated low
tight-fitting roof coverings. result is of the highest standard. Celotex Crown-Bond in ZEDfactory in their latest innovative
level roof access platform
www.klober.co.uk particular embodies their values of expertise and clever solution to deliver zero carbon housing.
system combined with
solutions, offering cutting edge thinness and thermal The Zero Bills Home has been built at
edge protection allows
performance. Not only does this new range provide the the BRE Innovation Park in Watford.
contractors to work on
practical excellence and performance required, but Celotex Wraptite-SA, the only self-adhering
the roof and sides of a
customers enjoy the benefits of personal expert advice, support and service synonymous with the brand’s vapour permeable air barrier certified by the BBA, was installed as part
building without moving the system. It provides continuous protection
name, which is unmatched in the market. In addition, Celotex’s unrivalled, intuitive online support gives of the OSB panel construction of the home. The use of Wraptite-SA
during repairs or inspection to specific areas of a flat roof, or whilst re-
customers access to practical project management tools, including an easy to use U-value calculator. makes a significant contribution to a building’s thermal performance by
roofing work is being undertaken. www.easi-dec.co.uk
www.celotex.co.uk/ preventing lateral air movement. www.proctorgroup.com/air-barriers

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


46 E 47

Easi-dec Half vertical Roof ad 258x96.5.qxp_Layout 1 20/01/2015 10:39 Page 1

67 Introducing The New Bond 71


Acting on intelligence out in the
field, undercover fixing specialist
Ancon has launched a new super-
Bond, ultra-low thermal conductivity
Looking for safe
wall tie that even SPECTRE would
find hard to crack! The new Teplo- rapid access?
BF basalt fibre wall tie features
specially moulded safety ends that
improve buildability and enhance
mortar bond strength by up to 80%. The ultra-low thermal conductivity,
twenty times below that of stainless steel, means that Teplo-BF ties are
excluded from U-value calculations to BS EN ISO 6946, helping to minimise
insulation and wall thickness, a particular benefit in modern low-energy
construction applications. www.ancon.co.uk

68 Mapei Provide Essential Strengthening Solutions For


then get our
Reading Bridge
Mapei products have been extensively utilised in the strengthening and
easi-dec systems
refurbishment of Reading Bridge. Mapei Carboplate was bonded to the
soffit of the bridge deck slab and beams with Adesilex PG1 adhesive.
Highly stressed spandrel columns were wrapped with Mapewrap C UNI-
AX. The road construction was stripped back to
the bridge deck and Maperod C, pultruded carbon
fibre rods pre-impregnated with epoxy resin, were
inserted into slots cut into the top surface of the
deck. Mapelastic was used to provide protection
to the carbon fibre against ultraviolet light. The
66 final aesthetic to the structure’s elevations was
completed with Elastocolor Paint.

Seismic
After recently receiving received the full seismic reduced the amount of work at height in comparison www.mapei.co.uk
approval from ICC-ES for all seismic design categories to traditional welding or through-bolting methods.
(A to F), Lindapter’s Hollo-Bolt has been specified for The design also eradicated the possibility of tube
Approved the tallest skyscraper in Western USA, which is in the
heart of a high-risk seismic area.
deformation that can be associated with through-
bolting if the bolts are over-tightened. The end
69 Four Ways To Create Attractive Brick Soffits
A new 8-page brochure and online animation from brick support

Hollo-Bolts Towering 73 stories above downtown Los Angeles,


result was an aesthetically pleasing, clean and subtle
connection which complements the design of the
specialist, ANCON, show just how simple it
is to create suspended masonry soffits on

Specified For the Wilshire Grand Center will be the tallest building
in the Western United States. It will include a hotel,
architecturally exposed structural steel. virtually any brick building. Deep brick-faced
reveals and soffits add extra depth to a

Wilshire Grand
offices, retail space and a rooftop ‘sky lobby’ which building façade, maintaining the colour and
will provide guests with sweeping views of LA that texture of the main brick façade typically
extend to Santa Monica. above door and window openings. Key to Easi-Dec is the cost saving alternative to scaffold,
Center In LA Opening in early 2017, the billion-dollar skyscraper
achieving this aesthetic is the design of the
supporting steelwork which is hidden from
because it’s quick to erect, with a minimal amount of parts,
to get people working sooner after arriving on site.
designed by AC Martin, is poised to set the view and this is where Ancon’s expertise comes in. Ancon provides four
The basic system includes a standard platform, but our
architectural standard for innovation, design and effective, yet distinctly different, soffit suspension solutions, all covered
full range offers solutions for both solar panel and window
quality in Los Angeles. The main feature of AC in a new technical brochure. www.ancon.co.uk/Nexus.
installation. With health & safety being at the core of the
Martin’s design is the swooping glass canopy which
creates an atrium with a modern exposed steel
system, Easi-Dec is EN tested, with full training provided
design.
on request.
70 Waterproof New Underground Structures With Mapei’s
The Lindapter Hollo-Bolt has an extensive range
New Mapeproof HW, Natural Sodium Bentonite Membranes For further information call 01767 691812
Lindapter’s seismic approved Hollo-Bolt was specified of independent approvals, including Los Angeles
for connecting circular sections throughout the Research Report (LARR) and full seismic approval Mapei has launched Mapeproof HW into its or email info@easi-dec.com.
curved atrium structure. Following the structural from ICC-ES for all seismic design categories (A-F). waterproofing product line. Based on natural
engineer’s recommendation, steelwork contractors It is also independently approved as a structural sodium bentonite, Mapeproof HW is a high Don’t forget to check out our videos
used over 3,000 M20 Hollo-Bolts to secure the connection for primary steel and features in the SCI/ performance waterproofing membrane, at www.easi-dec.co.uk
structural hollow sections which form the swooping BCSA joint publication ‘Joints in Steel Construction ideal for waterproofing concrete structures
atrium framework. – Simple Connections’ (Or Green Book as it is below ground level. Mapeproof HW consists
commonly referred to). The guide provides primary of 5.5kg/m2 of natural sodium bentonite
Hollo-Bolts were installed from just one side, rapidly design advice and information on using the Hollo- encapsulated between two-geotextiles
achieving discreet splice connections without the
need for drilling or welding. The extremely cost
Bolt for Structural steel connections. secured with a special needle-punched system. Bentonite is a natural
clay mineral which swells in contact with water absorbing around 60%
easi-does it
effective installation did not require specialist Download the Lindapter catalogue from www. of its own mass. Once swollen, the bentonite membrane forms a dense
equipment or specialist labour. It dramatically lindapter.com today. monolithic material creating an effective seal. www.mapei.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


48 E 49

73

Repairs,
Stuart Hicks, from cold liquid-applied wet-on-wet Once the new waterproofing system was in place,
waterproofing specialist, Kemper System, discusses the insulation, slabs and green roof medium that had
the problems caused by a failed waterproofing system been removed to access the failed waterproofing
Refurbishment at a luxury residential development near Brighton and
outlines the project undertaken to replace it
membrane were then reinstated to complete the roof.
The build-up for each of the new builds’ terraces was

And Water The Grand Ocean Hotel in Saltdean, near Brighton,


the same as the main roof and the same process and
materials were used.

Ingress By first opened on a four-acre site in 1938. Now the


central building from which a development of luxury For the roof and balconies of the former hotel

The Sea
apartments takes its name, this costal landmark building, however, the damage caused by the failed
72 has had a varied history, being acquired by holiday waterproofing membrane was even more significant
camp pioneer, Billy Butlin in 1953. It remained open because the original roof build-up was not inverted.

Achieving
In a complex new build roofing project that was deemed with Sika Sarnafil we quickly presented a new bespoke
almost impossible, Contour Roofing stepped up to the specification; an adhered system using Sarnafil G410- as a hotel until 2005 when planning permission was The roofing contractor tackled the balconies first and
challenge with a Sika Sarnafil membrane to achieve truly 15ELF Lead Grey with a polyester fleece backing as the granted to convert it into luxury apartments with an had to strip out the entire roof build-up of paving

The stunning results. main roof sheet for a flawless result and Sarnafil G410-
15EL Lead Grey for all the detail work flashings.”
additional four new build apartment blocks. slabs, waterproofing membrane and insulation.

Impossible 32 Ewart Grove, a Paul Simon Homes residential


development minutes from Wood Green tube station, The installation was very challenging, with various shapes,
Problems with the integrity of the originally specified
waterproofing system became apparent even before
Here, not only had the originally specified membrane
failed but the insulation below it had begun to rot

With Sika required a high-performance roof with a striking aesthetic details, upstands and intricate sections to cover. refurbishment of the main hotel building had been too. The concrete substrate was allowed to dry on
result to match the contemporary luxury flats within. completed, leading to a replacement roofing system. each balcony before the new waterproofing could
The existing hotel building and the four new builds are be installed. The build-up for each balcony was then

Sarnafil
Located in a prominent position at a fork in a road, the Lee added: “Working closely with the carpenter, the
roof can be seen when travelling up to the building, as plywood deck had to be spot on to make sure the of a flat roof design and the architect had specified a reinstated as an inverted warm roof.
well as from the upper floors of surrounding buildings. membrane could be laid smartly and correctly. Absolute liquid waterproofing membrane to maintain the listed
attention to detail and skill were required to make sure building’s appearance while providing a neat finish. The same primer, resin and fleece waterproofing
With its extremely intricate design, including two barrel the membrane was flush with the substrate below. system was used for the balconies of the refurbished
roofs and a large, unique triangulated tower at the front, Décor profiles were used to imitate the standing seams The system originally selected was not robust enough hotel as for the new build apartment blocks and the
the project presented a real challenge. Originally the of a metal roof, which is what the original designs had to adhere seamlessly to both the roof and all upstands membrane was allowed to cure before new insulation
specification for the 400sq m area called for a metal envisaged. The project really took installation to new and outlets as a permanently elastic, monolithic and paving slabs or decking were installed. The
roof but the cost implications of this meant that another frontiers and pushed the boundaries of what can be membrane. The development’s coastal location also installation team then moved onto the former hotel
solution was needed, and fast. achieved in roofing.” required a more durable and flexible membrane roof, which comprises five ‘fingers’ with a central
that could withstand a moist and salty atmosphere core. Water ingress around the roof outlets where
It was thought that such a complex roof design could not Sikalastic was used for the guttering when the space and high UV levels. The roofing contractor turned the failed membrane had not bonded properly meant
be done, especially with the time and budget available. was just too tight for single ply, demonstrating the to a cold-applied wet-on-wet waterproofing system that the recently installed warm roof insulation was
However Jonathan Woods, director at Contour Roofing, compatibility between Sika’s various roofing products. that the company had used on a wide variety of already sodden and the roof had to be stripped back
alongside senior contracts manager, Lee Clift, sought to Both the Sika Sarnafil and Sika Liquid Plastics systems construction projects. to the vapour barrier.
prove that the roof could indeed be covered using a high were awarded a 20 year guarantee.
quality single ply membrane, if the correct product and The decision was taken to install the replacement To aid water run-off in the future, a tapered insulation
level of expertise were applied. The project impressed the judges of the upcoming NFRC waterproofing system as an overlay onto the existing scheme was designed which introduced a slight pitch
UK Roofing Awards and has been shortlisted in the Single failed membrane wherever possible. Where an overlay to each roof section. These pre-primed sections were
Jonathan and Lee met with the architect and the director Ply category. The winners will be announced in May. wasn’t viable, the contractor stripped out the existing then fixed to the substrate and joint sealed before
of Paul Simon Homes to discuss amending the roofing www.gbr.sarnafil.sika.com. and replaced it with the new flexible liquid membrane. application of the new waterproofing membrane
specification. Jonathan explained: “With our previous The existing roof build up for the new build apartment began. See more at: http://www.hbdonline.co.uk/
experience of Sika Sarnafil products, we knew that we blocks was an inverted roof with the originally news/repairs-refurbishment-and-water-ingress-by-
could get the perfect finish within budget. In partnership specified membrane installed beneath the insulation. the-sea/#sthash.OiO6WG7v.dpuf

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


50 E 51

75

Wrightstyle Launches New Website


Wrightstyle, the advanced steel and aluminium glazing system supplier, has
launched a new website to provide customers with an enhanced level of product
and system information. The website, designed by Marlborough-based Callia Web,
has also been designed for ease of access from mobile devices, and provides
practical information and full technical data on the company’s specialist systems.
Wrightstyle, based in Wiltshire, designs, fabricates and supplies internal and
external glazing systems to mitigate against fire, ballistic and bomb attack, and for
noise suppression – everything from curtain walling to internal doors and screens.
The company supplies systems for all commercial applications – including transport,
education, retail and the public sector – and for both new-build and refurbished
residential buildings.
“The new website has easy navigation and improved functionality, so that potential
customers can immediately find what they’re looking for,” said Jane Embury,
Wrightstyle’s marketing director. “As a specialist glazing systems supplier, we design
and supply to a worldwide market, and it’s vitally important for us to communicate
effectively with architects and specifiers across countries and continents,” she said.
www.wrightstyle.co.uk

74

CMS
CMS Window Systems has played a key role in the With a continuous thermal isolator providing a thermal PORTFOLIO Collection From Premdor, Create A Unique Look 76
manufacture and installation of thermally-efficient break throughout the system, as well as 6mm toughened
The exciting new innovative PORTFOLIO collection of internal veneered doors
curtain walling, windows and doors for Emerson Process Planitherm Ultra N glass used in conjunction with 16mm
Delivers For Management’s new facility at the new D2 business park,
Aberdeen.
Swisspacer V warm edge spacer, the system is compliant
with the thermal requirements of current building
from Premdor consists of four themed ranges, Natural, Exotic, Contemporary and
Classic. All are made in the UK and utilise Premdor’s cutting edge technology,

Engineering
Veneer Match, which presents real veneers with consistent grain and colour yet still
regulations.
allows for individual personality ensuring they are never identical. The PORTFOLIO
Emerson is one of the world’s foremost names in
Contemporary range is centred around four sub-ranges. Mocha horizontal grain is

Giant’s New engineering services across a wide range of industrial


and commercial markets, and places high value on
Since planning consent was granted in 2012, D2 has
become one of the biggest mixed use developments in
characterised by rich modern tones. Charcoal Grey is centred around a horizontal
grain door, a vertical grain door and an elegant horizontal grain with a four line black inlay. Lastly in the PORTFOLIO

Facility
the efficiency and integrity of its staff, operations and Scotland for many years, aiming to support industry in the 79
Contemporary collection is the Light Grey range. With an extensive choice of five unique looks including horizontal Assure Adds Another
facilities. Efficiency, therefore, was a high priority when area with its versatile premises and convenient transport
grain, light grey two stile, four line vertical or horizontal with black inlay and the dramatic black and light grey two Valuable String To Its Bow
Emerson Process Management – a branch of the company links.
stile model. Request a catalogue by ringing 0844 2090008 or visit www.premdor.co.uk/portfolio
which focuses on developing problem-solving technologies Industry-leading competent persons
and services for industrial businesses – acquired a site Emerson’s cutting-edge new site on the park forms part of scheme Assure is now able to offer
at the D2 business park in Dyce, Aberdeen to support its this; Stuart Brown, General Manager of Emerson Process certification services alongside its
77
work with the North Sea oil and gas industry. Management UK and Ireland, said: “consolidating three many existing benefits.
existing facilities in the Dyce area into a single leading- As an official, trusted, UKAS-
CMS was appointed by main contractor Bowmer & edge building close to the Aberdeen airport demonstrates
Dock Houses – Are You Ignoring A Good Thing?
accredited certification body, Assure
Kirkland to design, manufacture and install curtain walling, Emerson’s commitment to support our Scotland and North Dock houses - complete pods comprising a dock leveller and dock shelter is unique in being able to offer this
windows and doors for the facility. The £20 million Sea customers.” are used to maximise warehouse space by providing an additional area service direct to customers.
development, built to replace Emerson’s existing Aberdeen where vehicles can be loaded/unloaded. Situated on the outside of the Technical and Compliance Manager
headquarters in nearby Kirkhill, comprises 2,600m2 of The D2 development has also achieved wider recognition warehouse, they ensure maximum use of internal space. It’s also possible Austin Greene says: “ Assure
office space, as well as a 3,065m2 service centre with at the tail end of 2015 as it has been named as a finalist to build ‘portable’ dock houses for greatly improved operational flexibility. Certification Services will be able to
meeting facilities and a customer collaboration suite, and for the Architectural Excellence Award (Commercial In short, they can be invaluable additions to warehouses or distribution offer certification of windows, doors,
can accommodate up to 200 Emerson personnel. Buildings) in the 2016 Scottish Property Awards. centres. Stertil Dock Products believes that dock houses are an underrated option that more logistics operations glass units, CE Marking, SBD and
www.cmswindows.com should consider. The company can build dock houses in virtually any shape or size incorporating a variety of cladding more. Assure membership is not a
Reflecting this code of efficiency, the facility adheres to finishes. www.stertil.co.uk requirement of using our certification
exacting thermal performance standards and complying services.”
with the latest requirements of current building As an additional benefit, VEKA and
regulations. With site development overseen by Miller and Comar 5P.i Advanced Window System 78 Halo fabricators will no longer need
construction completed by Bowmer & Kirkland, work on to pay to have each of their products
Integration underpins the latest new product launch from Comar Architectural
Emerson’s new Aberdeen premises began in June 2014, type tested individually.
Aluminium Systems. Their Comar 9P.i Framing system offers fast-track semi
with CMS joining the project in February 2015. Assure Certification Services
unitised construction for floor to ceiling glazing, allowing tilt/turn or casement
windows to hang direct from the Comar 9P.i Frame as well as rebated doors. will ‘cascade’ test data down to
The solutions delivered by CMS were chosen to enhance fabricators. The VEKA UK Group
With the addition of thermal foam and triple glazing Comar 9P.i offers
the efficiency of the building’s envelope, reducing is constantly updating its test
U-values down to 0.77. Comar have incorporated the technology from their
heat transfer while allowing the entry of natural bank data, giving more and more
Comar 9P.i system into the Comar 5P.i window range, and are launching
light. Aluminium curtain walling created using Metal combinations of components to
the Comar 5P.i Advanced Casement and Tilt/Turn window system which
Technology’s System 17 ensures the building adheres to choose from.
integrates seamlessly into Comar 9P.i creating the option for standalone high
exacting thermal performance standards. www.assurewindowsanddoors.com
performance windows. www.comar-alu.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


52 E 53

80

VS-1 Curtain
A new structural glazing system from GLASSOLUTIONS Its relative simplicity reduces risk of component
has been specified for Hiscox’s new landmark failure, improves constructability and reduces costs of
underwriting and customer experience centre in York, programme delays in both construction and post-
Walling Part part of the insurance company’s £19 million investment
to create its largest office outside London.
construction phases.

Of Cutting The VS-1 mullion-only system from GLASSOLUTIONS


The installation at The Hiscox Building in York features
Wicona curtain walling to the punch hole windows and

Edge Vision eliminates the need for horizontal framing members,


enabling Make Architects to achieve the clean viewing
louvres, roof terrace curtain wall, a bespoke structurally
bonded rooflight and GLASSOLUTIONS’ patented VS-1

For Hiscox’s
lines on the curved atrium screen which forms a key glazing system to form the main atria screen and
feature of the new building. terrace parapet.

York Offices Make Architects’ brief was to design a bespoke office


which reflects the character of the Hiscox business and
The VS-1 system façade is articulated with both convex
and concave curved insulated units, the largest of which
81

Vicaima Turn
Vicaima innovative door designs have been featured selected 3D Grey finish to provide the perfect tonal
delivers high-quality contemporary design within York’s is 2.0m wide x 4.2m high. The argon filled laminated
prominently in a landmark city centre project for Crest contrast to the wall and floor covering. 3D Grey was
rich architectural heritage. heat strengthened units have high performance
Nicholson, which sees a modern apartment complex also chosen for the communal areas, including the

Located adjacent to the Grade II* listed early-17th


coatings to limit solar gain, achieving g-values as low
as 0.34. To meet internal thermal comfort targets, On Design created in a former 1930’s iconic utility building. striking and visually dominating atrium area, where
occupants enjoy a panoramic view of multiple floor

Flair At
Century Black Swan public house, The Hiscox Building glass units with centre pane u-values of 1.1 W/m2K
Electricity House has stood at the very heart of Bristol levels, displaying Vicaima doors at every level.
will establish a new focal point for the Hungate area have been used. Combined with the thermally efficient
City centre since its construction in the late 1930’s and
of the city. The spectacular four-storey building will frames, this creates screens with weighted average
house up to 500 employees in a dynamic working
environment with open, flexible floor space. The light
U-values of 1.3 W/m2K.
Electricity was perhaps best known as the home of the South
West Electricity Board. Designed by architect Sir Giles
Inside the apartments and penthouses themselves,
Vicaima Satin White doors with Easi-Fit frames

House
Gilbert Scott, who also famously created the much were selected. These ultra-smooth white lacquered
airy interior effect is created by the extensive use of the Says Make Architects’ Jason Parker, partner and the
loved red telephone box, this building has commanded doors provide a luxurious look and feel at every
VS-1 curtain walling. This combines with a cantilevered project lead architect: “The building has been designed
attention for generations. With its Portland stone turn and fit perfectly with the superior build quality
concrete frame and undulating woven brickwork façade to complement York's rich architectural heritage whilst
façade and magnificent curved frontage, the building synonymous with this project. The design has been
to provide a workspace which fosters creativity and providing a new home for Hiscox in the heart of the
embodies the grace of the Art Deco era. Now further embellished with the addition of a refined
collaboration. Work on site began in 2014. city. It has been a fantastic collaboration between
this bygone treasure has taken on a new lease of groove pattern, which was also carried through onto
York, Hiscox, the designers and contractors – each
life following its lovingly re-imagined and inspired the architraves to add yet another design element.
UK-based GLASSOLUTIONS, part of the international contributing to a building which conveys a sense of
regeneration by Quality developer Crest Nicholson. Overall the project is a fine example of regeneration
Saint-Gobain Group, supplied and installed the curtain joy from both inside and out. The incorporation of
They have created luxury living space by blending at its best and Vicaima products are sure to grace this
walling structure for main contractor BAM Construction VS-1 into the design creates a light and airy space
period charm with contemporary interior design. reincarnation for generations to come.
as part of a £1.8 million contract. VS-1, which has also and reinforces the openness and the friendly face of
been used successfully on the Sky Believe in Better Hiscox.”
Of course inspired design requires inspirational Vicaima offer an extensive range of innovative design
building in London, is a new type of curtain wall – a
products and so Crest chose Vicaima to enhance options, with fire, acoustic and security performance
mullion only system where the glass is held away from Steve Langan, Managing Director, Hiscox UK and
the apartment entrance doors with Dekordor 3D for luxury housing and modern apartment living space.
the mullion so the glass wall visually ‘floats’. In this Europe, said: “The brief we gave the architects was to
Portaro matching door and frame systems. This was For further details about these and other products
project, the mullions are fixed back directly to primary create something that represents a progressive addition
further augmented by a surrounding and matching from the many Vicaima collections, visit the Vicaima
structural columns. to the long history of York – something that taps into
wall panelling which incorporated distinctive back lit website www.vicaima.com alternatively, call 01793
the history of the Hungate site and is sympathetic to
apartment numbering. Performance was to client 532333 for additional information.
VS-1’s highly engineered simplicity delivers remarkable the surrounding listed buildings, while using cutting-
requirements which included certified FD30 fire doors
aesthetics for architects, developers and building edge architectural, design and working practices. I
with a roller lock and eye viewer. Dekordor 3D provides
owners. It is the only curtain wall system where the want it to be a centre that drives innovation and a place
a horizontal and highly tactile grain effect and Crest
floating glass façade is held away from the mullion that both Hiscox and York can be extremely proud of
without the use of obtrusive bolt fixings or transoms. for many years to come.” www.glassolutions.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


54 E 55

82 CMS Window Systems Appointed On New £270M 83 Portfolio Collection From Premdor, Crafted Not
Dumfries Hospital Development Manufactured 87
Chapter House Of St Paul’s Cathedral Becomes A
CMS Window Systems has won a comprehensive building envelope The exciting, new innovative Portfolio More Ecologically Efficient Office
contract to manufacture and install Kawneer curtain walling for the collection of doors from Premdor consists
new Dumfries & Galloway of four themed ranges, comprising of Grade II* Listed Chapter House is a stunning building neighbouring the
Hospital. High performance Natural, Exotic, Contemporary and Classic. iconic St Paul’s Cathedral; it was built between 1712-1714 and designed by
sealed units manufactured by All are made in the UK using sustainable, Christopher Wren and his son.
GLASSOLUTIONS will combine natural veneers engineered in Italy, The building was initially used as accommodation for the Dean and other
with the Kawneer aluminium presenting real veneers with a consistent members of the Chapter. However, after suffering severe damage during
systems to blend superb grain and colour. Ebony vertical exudes a the Second World War, it was refurbished into offices, and has since been
aesthetics with thermal and sophisticated warmth. The Ebony vertical viewed as the administrative heart of the Cathedral.
acoustic insulation, plus reliable door is complemented by various glazed Recently Chapter House underwent a major refurbishment to bring it up to
solar control. Key to achieving this is the specification of COOL-LITE SKN options. Portfolio Exotic Wenge presents a modern and ecological office standards. A key requirement was to improve
165 by Saint-Gobain Glass. CMS will also install around 500 sealed units stunning finish with a striking vertical grain. the thermal insulation throughout the building, retaining the buildings heat
featuring integral blinds. www.cmswindows.com www.premdor.co.uk/portfolio and reducing energy bills.
As a specialist in the design, manufacture and installation of secondary
glazing, Selectaglaze was specified as its tested products can reduce heat
84 Heavers Of Bridport Celebrates 20th Anniversary With 85 Sika Provides Airtight Solution For Landmark London loss by up to 50%. This can be achieved by the bespoke fitting of the
The VEKA UK Group Development secondary glazing alongside the use of high performance seals.
2016 marks an important anniversary for South West home A number of Selectaglaze slim line products were used to suit the various
Sika-Membran has enabled thousands of
improvement specialists, Heavers window styles and sizes. These units were chosen as the units are discreet,
windows to be installed at a spectacular
of Bridport as it celebrates 20 a reversible adaptation and are accepted by most heritage bodies.
London dockland development, New
successful years, fabricating and Over 120 units have been installed in six different colour finishes to match
Providence Wharf, with an airtight
installing industry-leading PVC-U the existing frames. Established in 1966 and Royal Warrant holders since
seal. Contractors, Lindner Facades,
window and door systems from The 2004, Selectaglaze has a wealth of experience working in all building types.
specified Sika-Membran for two blocks
VEKA UK Group. “We’ve always Selectaglaze will be exhibiting at the BIID Annual conference on the 16th of
using the system to create an air and
prided ourselves on being the best”, June at the Royal Geographical Society.
weathertight seal around the façade.
comments Managing Director, For further information, literature and test results, please contact
Sika-Membran, from global building product manufacturer Sika, is a
Malcolm Heaver “and that includes Selectaglaze on 01727 837271/e-mail:enquiries@selectaglaze.co.uk or
versatile EPDM synthetic rubber waterproofing membrane, designed
offering the best products. We started working with VEKA in 1996 and visit: www.selectaglaze.co.uk
to provide an efficient method of sealing construction gaps in building
we’ve not looked back since! ”www.vekauk.com
façades. www.sika.co.uk

88
86

Crittall Windows Introduces A New Steel Window Aimed


At The Residential Market, The Homelightplus Range The UK’s leading manufacturer
An enhanced version of the company’s successful Homelight steel window
of architectural glass products
first made during the 1920s, the new-look window features contemporary
styling and window profiling, plus higher energy-savings, performance, and
Partitions
improved security. The authentic ‘like-for-like’
steel window offers significant energy savings
- thermally improved to meet Part L of Building
Regulations by achieving either a window energy Balustrades
rating Band B or a centre pane U-value of 1.2w/
m2k.
The window has been made especially secure
through an improved, robust, security multi-point Facades
locking option.
This modern steel window is dual double-finned
weather-stripped and features high performance
Stairs
double glazing. Its slim frame gives minimal
sight-lines allowing for larger areas of glass than
any other window of a similar size to maximise
daylight. Canopes
As a galvanised steel window it will last over 60 years. Polyester powder
coated the HomelightPlus window has a consistent, even, coating, not
requiring redecoration for 25 - 30 years. It is competitively priced and
economical to maintain long-term. HomelightPlus is available in a choice of Toughened ■ Laminated ■ Heat Soaking ■ CNC Cutting ■ Heat Strengthening ■ Back Painting ■ Screen Printing ■ Full Digital Printing
styles including a true divided glazing bar option and in 46 colours, plus a

www.esg.glass
dual colour option. The steel window frames can match, or contrast, with
interior décor. www.crittall-windows.co.uk 01376 520061

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


56 E 57

90

Vision Design
Leading Structural and Architectural Glass Trade Glass Railing Innovation
Contractor Vision Design Projects Ltd is delighted The Glas Marte (GM) Glass Railing system is a new
to announce the opening (June 2016) of their addition to the Vision Design Projects range. The
Projects brand new showroom in Morden, Surrey. The new
showroom features a large selection of design
innovative modular system resolves many historic
glass railing design issues and takes the tolerance

Showcase led, and innovative glass products, and is open to


Architects, designers, developers and home owners
control and the final installed visual lines to
previously aspirational levels.
89
A Range Of alike.
The GM Glass Railing system offers flexible design
Versatility
A new fully reversible hinge from Yale – exclusively A safety key locks the window in any of its key positions

Innovative
distributed in the UK by Sealco – brings maximum versatility – safety position, outer ventilation or easy clean – to Central in the showroom is the Glas Marte (GM) solutions via nine fixing profile solutions (each
in installation and ease of stocking thanks to its unique minimise the risk of injury from falling through the ‘Frameless’ Glass Railing system. The beautiful and of which can be adapted further to suit specific

Is Key patented dual function restrictor. window. The restrictor can quickly be configured using the
safety key and a star form driver, which means that the And Striking
ingeniously simple railing system offers flexible
design solutions and the assurance that testing has
conditions), and the assurance that testing has
been carried out in compliance with the (ABP) TRAV

With Fully The Yale Revolution Window Hinge can be switched


between anti-blowback and easy close functions depending
functionality can be altered with the window in place, with
no need to remove the sash.
Glass Solutions
been carried out in compliance with the (ABP) TRAV
General Test Certificate.
General Test Certificate.

Reversible on customer requirements. As a result, a single solution Glass and the metal profiles are bonded into one
meets the needs of private and public sector buildings – “Different customers might have a particular preference as
At Their New The attractive Origin Bi-Fold Door system is on
display in two configurations, the stunningly
unit in a factory environment, under constantly
defined conditions and controls, with a sophisticated

Hinge From
housing associations, property developers or commercial to how they want to close windows. Private homes tend to
designed Bi-Fold Doors open up rooms and merge quality management system. Then delivered to site
owners need only select their preferred option at the point
of installation.
favour the anti-blowback feature for its added protection,
whereas public buildings such as hotels prefer the option to Showroom the inside with the outside to form wonderful open as a finished section of glass and base channel. This

Yale And Developed jointly between Yale and Sealco, the hinge offers
pull the window shut without de-restricting it, due to the
greater likelihood that users will be unfamiliar with the need
spaces full of fresh air and unrestricted views. reduces planning costs, assembly costs and offers
a multitude of demonstrable gains at each stage,

Sealco real advantages in terms of safety and convenience. Its


design allows the window to rotate fully, enabling it to be
to use the sash release button,” explains Alan Malcolm,
Sales Director at Sealco.
Alongside the Origin display is the sleek ORAMA
sliding door system with its minimal frame and
just a 25mm vertical profile design made from
through to site installation.

Architectural and Structural Glass Designers and


easily cleaned from within the comfort and safety of the
building. It also features integral locking for safety, making “The restrictor has been developed to enable this choice to insulated aluminium profiles. Clean lines, maximum Suppliers
it the ideal choice for reversible residential and commercial be made on site – or even to allow customers to try both functionality and optimal comfort combined with a Vision Design Projects Ltd are a leading structural
upper floor windows. options – without costly and time-consuming delays in silent sliding are just some of the advantages of the and architectural glass designer and supplier. Since
removing the sash. ORAMA system. the company formed over 25 years ago, Vision
When opening, the sash release lever must be pressed to Design Projects has built up a formidable reputation
pass two restricted positions – thus avoiding the risk of the At the same time, the dual function hinge halves the Also on view in the new showroom is Sika® Sarnafil® of delivering quality glass designs, constructing
window being opened suddenly. The positions are a safety stocking requirement for the product, making it much single ply PVC roofing system. Sarnafil roofing visually stunning architectural and structural glass
position and outer ventilation; there is also a wash position easier for housing associations, property developers or membranes are very versatile and therefore ideal pieces to buildings across the UK.
when in the fully reversed situation. commercial agents to specify. “This is a real benefit for almost any kind of flat roofing project from
to users – it’s a single solution, whichever function is new commercial, to extensions and conservatories, Installation solutions include glass floors/bridges,
Central to the new hinge is its configurable restrictor, preferred.” replacement or refurbishment of existing roof glass partitions/doors, architectural balustrades,
which alters the closing functionality mechanism to suit coverings, to bay windows and garages. glass canopies, and interior decorative glazing.
requirements. As supplied, in the first configuration, it The Yale Revolution Window Hinge is available in 27 sizes, Glass projects successes include Kings Cross,
delivers anti-blowback functionality, as the sash release ensuring a truly comprehensive range that can be used with The showroom also features a range of interior glass Heathrow airport, and Wembley Stadium plus many
lever must be depressed at each stage to facilitate closing. every major window type. Designed to carry a greater sash solutions such as shower screen enclosures and more landmark projects.
In the second configuration, the window will close without weight capacity, the hinge can comfortably accommodate kitchen splash backs. The full range of products from
requiring the sash release lever to be depressed. triple glazed windows. www.sealco-scotland.co.uk Vision Design Projects includes Glass Railings and As well as commercial projects, Vision Design
Balustrades, Architectural Doors and Partitions, the Projects also provides a large range of residential
GM Railing® Series, Origin Bi-Fold Doors, Architectural glass installations; glass balconies/balustrades,
Bi-Fold Doors, Orama Sliding Doors, Sarnafil Roofing stairways, shower screens, mirrors and kitchen
Membrane, and Structural Glass Silicone Bonding. splashbacks. www.visiondesignprojects.com

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


58 E 59

92

A Great Picture Inside And Out


Following the complex extension and
conversion of an existing office block in
London’s Crouch End, a new Picturehouse
Cinema has been created by Panter
Hudspith Architects. The project forms part
of a wider initiative within the borough of
Haringey, designed to re-establish the area
as one of London’s cultural and arts centres.
The unique style of this four-screen cinema
has attracted much interest, not only
because of the dramatic transformation
but also because of its new external
elevation. Here, Panter Hudspith Architects
have replaced the original curtain wall and
specified Kalwall. Unusually, this unique
translucent cladding is fitted with a tight
150mm wide grid, known as Verti-Kal, which not only serves to emphasise height but is the first of its type in the UK. On this scheme the
Kalwall panels also insulate to a U-value of 0.78.
Unlike conventional glazing, Kalwall eliminates shadows and glare and the stark contrasts of light and shade. The system also enhances
simplicity by eliminating the need for blinds, curtains or solar control. Even on cloudy days, the interior is bathed with natural daylight,
which means less artificial lighting and, because Kalwall is highly insulating, energy costs are reduced. Apart from being specified for
all types of new build project, Kalwall is increasingly used for the refurbishment of cladding or rooflights on aged buildings. Kalwall is
distributed in England, Wales and Northern Ireland by Structura UK, a leading supplier, fabricator and installer of glass curtain walling,
rainscreens, glass atria, windows and other architectural glass building products. www.structura-uk.com/kalwall

91

Iconic Art
New fenestration for an iconic listed arts centre at the The complete refurbishment of the building, including a
University of Sussex presented a particular challenge for main auditorium with a flexible 350 seating arrangement,
architects RH Partnership but the successful outcome has exhibition spaces, four differently-sized studios and
Centre’s been achieved thanks to close collaboration with steel
window experts Crittall.
teaching rooms and the development of an area beneath
the auditorium to provide 33% more usable space than
93
Commercial | Domestic | Listed & Heritage | Special Projects
Winning was envisaged in the original design, has provided the

Bespoke Garage Doors


The University’s Attenborough Centre for Creative Arts University with a cultural flagship structure.

Performance (ACCA) was designed in the 1960s by Sir Basil Spence


and subsequently listed Grade 2* by English Heritage. Says David Sweeney: “Working on a Sir Basil Spence,

With Crittall
Grade 2* Listed Building such as this can be a real
The building’s curved brick exterior is punctuated at challenge. The solution provided by Crittall Windows has
ground floor level by steel windows and doors that, along been very successful both in terms of its performance Tim Crocker ©

Windows with the rest of the structure, had fallen into disrepair. and the appearance of this 1969 iconic building.”

Extensive consultation was undertaken by the Brighton- Also on the University campus a second Sir Basil Spence,
based architectural practice with English Heritage (now Grade 2* listed structure, the Chichester 1 building,
Historic England) and Brighton & Hove City Council’s is undergoing refurbishment and, once again, Crittall
conservation team for the most acceptable solution to products – the Corporate W20 and Corporate 2000
replace the existing metal framed, single glazed windows windows – have been specified.
and doors.
Corporate W20 windows and doors offer designers great
“RH Partnership have worked very closely with Crittall versatility including the ability to create or reproduce
Windows to reproduce the patterns and profiles using many styles. They deliver very slim sightlines, are English
W20 sections and to incorporate double glazed units,” Heritage approved, and find widespread favour with
says architect David Sweeney. “With large areas of planners and conservationists. Corporate 2000 are
glazing in the front-of-house spaces, the capability to equally suited for residential, institutional and commercial
add slim line double glazed units has drastically improved applications, and can be used to produce unusual and Quality - Innovative - Proven since 1968
the thermal performance of this building.” innovative window wall designs. Major user sectors are
offices, hotels, hospitals, universities and schools.
Solar control glass has also been added to particular www.crittall-windows.co.uk Solid Timber | Aluminium | Brass | Glass
south and east facing windows so as to reduce
overheating during summertime and natural ventilation
has been improved by an increase in openable windows
T: 0151 280 6626 | E: info@rundum.co.uk | W: www.rundum.co.uk
and the introduction of trickle vents.

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


60 E 61

94

Cladding
Selecting a cladding material for the new Jigsaw Building It was also important for the client that the building was
at the Royal Bournemouth Hospital presented no as low maintenance and as energy efficient as possible
puzzle for architects Stride Treglown. Trespa® Meteon® and the 600sq. metres of Trespa® Meteon® cladding
Choice Was was chosen to provide a ventilated facade, scoring on
appearance and cost, as well as contributing to energy
contributed to this within the tight budget available for
the project.

No Puzzle efficiency.
In total, seven timber effect grains and colours from the

For Jigsaw The two-storey building, which was opened last


September, has provided the hospital with a 21,000 sq.ft.
Trespa® Meteon® range were supplied. Stride Treglown
varied the mix of these along the main elevations

Building
women’s health centre. The facilities now available include providing visual interest but also breaking up the
oncology, haematology, breast and pregnancy care, along appearance of the large scale elevations.
with cancer and blood disorder treatment, as well as 95
administrative offices. By specifying the matt effect panels – all of which were

Cafe Football
Cafe Football, a 140-seat restaurant in Westfield layering techniques to achieve the desired look. In
new additions to the Trespa® Meteon® range when the
Stratford City, has specified a new external render addition, large branded planters in the same finish
The Royal Bournemouth Hospital’s Jigsaw charity raised project was designed – the building achieves a more
system from Armourcoat. marks out the al-fresco dining space.
funding in support of the £5.7 million building project,
giving its name to the state-of-the-art-care centre.
natural timber appearance in direct sunlight as there is a
reduced glare from the matt texture. Scores With PPX is a polymer-modified limestone render system PPX offers a low maintenance, durable

The architects wished to ensure that, both inside and


out, the building created a friendly environment where
“This project proves that design does not need to be
expensive. Using a variety of colours and narrow panels
Armourcoat suitable for new build and renovation projects,
producing stunning honed and textured decorative
weatherproof coating for building exteriors or
areas prone to moisture. A complete PPX External

patients could feel at ease despite the tensions aroused


by medical procedures. The use of timber effect materials
has added no extra cost. It also proves that a surface
fixing does not detract from the design,” said Simon
PPX surface finishes. Wall Insulation system is also available to provide
outstanding thermal insulation tested to stringent
A GG Hospitality business venture led by former ETAG (European Technical Approval Guidelines)
and complementing colours helps provide a relaxing, Vicary, Trespa’s Regional Sales Manager.
Manchester United teammates Ryan Giggs standards. www.armourcoat.com
domestic feel despite a highly clinical finish.
and Gary Neville, Cafe Football aims to bring
Trespa® Meteon® is a decorative high-pressure compact
an authentic football culture to the dinner
The building is wrapped in variegated tones of Trespa ®
laminate (HPL) with an integral surface manufactured
table. Designed by Checkland Kindleysides,
Meteon® Wood Decors cladding on the first floor, using the company’s unique in-house technologies;
the atmosphere of the restaurant is warm and
punctured with ribbon windows, white brick to the ground Electron Beam Curing (EBC) and Dry Forming (DF). The
welcoming, with hints to football culture running
floor and an undulated roof form to conceal roof top blend of up to 70% natural fibres and thermosetting
throughout the menu and décor.
plant. resins, manufactured under high pressures and
temperatures yields a highly stable, dense panel with
Armourcoat PPX (Polished Plaster eXternal) has
“Stride Treglown wanted to use a material that was good strength-to-weight ratios. www.trespa.com
been used to striking effect on the full width
‘natural’ in appearance, but that stood out from the
external façade, incorporating the distinctive Cafe
existing hospital palette of materials,” says architect
Football branding used throughout. An urban
Jessica Ellis. “We generally try and use materials with a
concrete effect has been achieved with additional
‘natural’ appearance where possible within healthcare
environments as they can provide calming spaces for
patients and staff.”

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


62 E 63

97

Pendock Columns And Wall Panels


Distinguish Staff Dining At BG Group
The refurbishment of the main staff restaurant within
the Reading headquarters of BG Group has included the
specification of three large diameter, bespoke column
casings and some 40 matching wall panels, all supplied
by encasement specialist, Pendock. The work within the
ground floor eatery has been carried out by Middlesex
based W. & L. Interiors.
The column casings were delivered as pre-shaped ovoid
half panels, with male and female edge joints to facilitate
site assembly; circumferential to the building’s structural
stanchions. In accordance with the striking design
statement for the restaurant, both the columns and the
wall panels display the strong horizontal striping of the
Formica Ashen Ribbonwood. The panels were mainly
produced in 2500 mm lengths and three heights to cover
the wall in a staggered pattern, while each column rises 2645 mm in height to the underside of the
suspended ceiling.
As a specialist fit-out contractor working across several sectors in the London region and the business
corridor to the west, W. & L. is fully familiar with Pendock’s capabilities. Dean West, who supervised the
project for W. & L. confirmed: “This was a very prestigious project for BG Group where a wall cladding
and column finish were specified and actually Pendock is the first name that comes up when anyone
96 considers column casings. It was a nice opportunity to work with the company and everything was
installed to the client’s satisfaction.”

Latham’s
James Latham offers one of the biggest ranges of installed in accordance with the Field of Application,
www.pendock.co.uk
high performance, fire retardant panel and timber they can provide the first line of defence in a fire,
products on the market, all directly available from helping to protect lives in both commercial and
Range Of FR stock through its nationwide network of depots. residential properties.”

Products Is Fire damage in buildings can be devastating and as a


result, flame retardant products are being specified
Mr Wright added, “We are continually reviewing
our range to ensure we have the most up-to-date

Second To in construction to help reduce this impact. Latham’s


extensive collection of fire retardant products
offering available for all our customers and our team
of knowledgeable and experienced staff can provide
98

None
includes; CE marked Birch Plywood, Timber Cladding, information and samples for all these products.”
Chipboard, MDF, MF/MDF, OSB, and Decorative www.lathamtimber.co.uk
Products for interiors including Valchromat, MFC, HI-
MACS solid surface, Laminate and Fire door blanks.
A Seamless Finish From Metal
All products are certified and independently tested Technology
to Euroclass B or Euroclass C and copies of these
reports and the Field of Application are available to Advanced architectural aluminium
download from www.lathamtimber.co.uk. systems from Metal Technology have
underpinned the transformation
These fire tests are carried out for the manufacturer of Clifton House from 1960s office
by an approved third party and measure readings block to state-of-the-art student
such as; rate of fire propagation, lateral fire spread, accommodation.
total heat release and smoke production. The Nord Architecture designed
project in Glasgow city centre’s Park
Andrew Wright, Director of Lathams Limited said, Conservation area offers fantastic spaces
“The number of projects where Fire Retardant for living and socialising. Designed by
products are being specified is increasing. When Bo Concept - the iconic Danish designer
the correct fire retardant product is specified and – these student flats offer sleek modern
and contemporary design combined with large communal areas including the ‘Work, Rest and Play’ area on the ground floor and breakout
social spaces. Metal Technology’s System 17 Silicone pointed and High Rise curtain walling was used extensively thought-out the project.
The end result is testament to System 17’s limitless flexibility and aesthetic appeal whilst meeting all structural requirements and delivering
high levels of thermal and weather performance.
Metal Technology system 5-20Hi+ tilt and turn windows were used with turn lock handles providing additional safety in their operation by
students. System 5-20D Hi+ high performance thermally enhanced doors were also specified throughout. Metal Technology Hi+ systems are
part of their [THERMAL] range, offering seamless aesthetics combined with full security compliance, impressive weather performance and
greatly enhanced U values. For more information visit www.metaltechnology.com

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


64 E 65

100

Marmox Heraklith Panels Help


Restore Post War Church

Hundreds of square metres of thermo-acoustic


woodwool boards made by Heraklith and supplied by
by Marmox have been employed in the restoration of
a significant church building, located in East London,
following weather damage.
St. Paul’s Church, Bow Common has been described
as the most significant church built in Britain since the
Second World War, having been completed in 1960 to
the designs of architect, Robert Maguire, along with
interior designer, Keith Murray.
Having celebrated the 50th anniversary of its
consecration in 2010 – a relatively short time-span in
ecclesiastical terms – water ingress led to a sudden
and serious collapse of some of the existing woodwool
ceiling panels during 2013. The area beneath the
lantern was cordoned off immediately and services moved westward into a safe-zone, so there were never any questions that
the building could not be used. Now though, a comprehensive repair contract carried out by Noble & Taylor, Ongar, has been
completed with significant funding by the Heritage Lottery Fund.
During the painstaking work a total of 135 standard Heraklith panels were consumed by Noble & Taylor’s craftsmen: being readily
cut to shape on site and decorated as desired by the consultants to match as closely as possible the original decorative scheme.
Heraklith panels are produced from natural timber fibres to provide a durable and versatile wood wool insulation. They are simple
to cut and fix with conventional tools. www.marmox.co.uk

99

Refurbished
A owner of a dwelling in Hampshire/West Sussex has ground and first floors. The total pipe length installed
completed the transformation of one of its earliest into the FoilBoard and LowBoard profiles on each of 101
buildings by installing underfloor heating, using two the two floors was approaching 535 metres.
Building of the ranges manufactured and distributed by Exeter
based Timóleon Limited. The one time pigsty, located Not only do the various Omnie systems - which also
Inside-Out – Scotland’s First External Façade
Made From DuPont™ Corian®
Warmed not far from Midhurst, derelict for a time time, before
work began on repairing the roof and making the
includes one for retrofitting between timber floor
joists – offer comfort and convenience, but underfloor
In the first application in Scotland of DuPont™ Corian® as a rain

By Omnie stone-built structure habitable. heating is also a proven way of bringing the optimum
performance from renewable technologies, particularly
screen façade, architectural practice Chambers McMillan has
created an elegant exterior ‘shell’ as part of an architecturally

Underfloor
Today the old agricultural building provides care and air and ground source heat pumps.
sympathetic extension to a much-loved period home. The
accommodation for elderly residents with a day room
addition creates a small garden room with a canopy covering an
on the first floor, along with a shower room and These are most effective and energy efficient

Heating
external area and connecting it to the house, including a linear
other facilities. Being keen to be green, as well as when left to run for long periods, delivering a low
workbench which continues through the glazing to the outside
to minimize its running costs, the client has chosen temperature background warmth; while underfloor
area beneath the canopy.
to install an air source heat pump to supply the systems also free up wall space and allow old
property’s space heating and domestic hot water, with buildings to be more sensitively restored.
Maximising the multiple benefits of DuPont™ Corian® high-tech
the underfloor heating systems – part of the Omnie www.omnie.co.uk
surface, this high-performance rain screen has an enduring
range - being installed by Agincourt Contractors from
beauty. Corian® Quality Network Industrial Partners, RMC
Petersfield.
Worktops delivered the precise fabrication, preparation and
installation of approximately 35 sq m of the material, supplied by
The Omnie’s FoilBoard floating floor system was
CD (UK) Ltd.
chosen for installation across the ground floor slab
while Omnie’s LowBoard is used upstairs. The project
The 45 degree angled corners and junctions help create a seamless effect between the walls and the roof, which has concealed guttering.
also made use of Omnie’s precisely engineered five
The visual solidity of the Corian® cladding complements and contrasts with the Victorian stone built original structure, while the Anthracite
port manifolds to feed the various zones on both the
colour specified is tonally similar to the existing slate roof, while having a lustre that brings the Corian® to life, on the most overcast of days.
www.cdukltd.co.uk

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


66 E 67

102

New RECYFIX®
A new Travelodge in Weston Super Mare, Somerset slot openings where the moulded bars have slightly
has opened its doors to guests in March 2016. The raised triangular bosses along their outside edges. As
hotel is located on Beaufighter Road, some three well as providing an elegant appearance, this ensures
MONOTEC miles from the Grand Pier and includes a newly laid
asphalted main car park with 47 spaces drained by a
surface water is directed into the slots helping
eliminate any cross-flow over the grating which helps

Drains Car 60 metre run of RECYFIX® MONOTEC, Hauraton’s new


high capacity channel system.
optimise the channels attenuation volume.

Park At Hauraton Limited introduced the RECYFIX®


Cat Jones, Hauraton‘s Project Manager for the
South West comments; “We worked closely with 103

Continuous
The Chiswick Point development, at Bollo Lane, in West that as a result of airtightness and fabric U-values being
The New
MONOTEC, their new high capacity channel system the ground workers to ensure the drainage systems
in January, the new Travelodge being the first specified were going to be discreet, blended in well London, is a £20m contemporary mixed-use residential improved in UK building, thermal bridge heat losses are
scheme. The apartments are either south facing single responsible for an increasing percentage of the overall
Ribbon
installation of the system in the United Kingdom. with the desired design effect and meet the loading

Travelodge The MONOTEC channels installed in the Travelodge


car park have a nominal grating width of 100mm,
Class required. It was particularly pleasing this
first installation of our tough RECYFIX® MONOTEC
aspect, or dual aspect with some even enjoying a triple
aspect. A sustainable approach was important, with
building heat loss. It is common for thermal bridges to
account for 20% - 30% heat loss in multi-residential

Weston Super an overall height of 380mm and are suitable for a


loading category of up to Class D400. The channels
channels here in the UK went so well, with a
maximum weight of 10.4kg the contractor found
Balconies all of the units designed to meet Level 4 of the Code
for Sustainable Homes, and the Lifetime Homes code.
units (as calculated by thermal modelling) and balcony
connections can be a major contributor to the thermal

Mare provide a cross-section of 355.5cm2 and have a high


attenuation volume.
the channels supplied, easy to handle and install
with no breakages reported during the installation Require Constructed in two blocks of six and nine storeys, the
frame is mainly reinforced concrete, with the concrete
bridge heat loss if effective thermal isolation is not
included in the design.

Effective
process. Matching Trash Boxes and End Caps were frame floors and cladding providing thermal mass, which
The RECYFIX® MONOTEC one metre long channel also supplied. All Hauraton surface water drainage absorbs energy and slowly releases it to help reduce Schöck offers a number of highly effective solutions
component is of a sturdy monolithic design where the systems’ comply with European Standards (hENs) and temperature fluctuations. to various thermal bridging situations. In addition
HEELSAFE grating and the tongue and groove linking
system are integral to the channel moulding. The
carries the CE mark”. Thermal Long continuous ribbon balconies provide solar shading
to concrete-to-concrete capability, the Isokorb range
provides totally verifiable solutions for concrete-to-steel,
whole unit is made of tough, virtually unbreakable
polypropylene (PP) formulated to be very resistant to
Malcolm Benham, Operations Director for the
main contractors Pavenet Limited comments, “The
Insulation to the two blocks and provide the residents with a very
pleasant outlook across the London Wildlife Trust nature
steel-to-steel and even a maintenance free alternative
to wrapped parapets. All solutions meet full compliance
daily temperature fluctuations from frost conditions RECYFIX® channel runs were easy to install and user reserve at the rear of the development. The continuous with the relevant UK building regulations and offer BBA
to strong sunlight, including the Ultra Violet (UV) friendly. With the job complete, we had a day of very balconies are a major feature of the scheme and with Certification and LABC Registration.
spectrum. PP is naturally resistant to de-icing salt. heavy rain and were impressed that both car parks several hundred metres of them winding across the two
Complying with the requirements of EN 1433, were effectively drained with no puddles on site”. blocks, effective thermal insulation was imperative if The requirement that the temperature factor used to
the PP is given its UV resistance by adding just thermal bridging is to be avoided. indicate condensation risk (the fRsi value), in residential
sufficient carbon black as a stabiliser so that the For RECYFIX® MONOTEC video go to https://youtu. buildings, must be equal to or greater than 0.75 is
structural strength of the material is unaffected and a be/AE3laBjWlRM To minimise any condensation problems and subsequent comfortably met by incorporating the Isokorb. It also
consistent appearance is maintained. For RECYFIX® MONOTEC product specifications go to mould growth as a result, plus the avoidance of thermal complies with the Government Standard Assessment
www.hauraton.co.uk. CIVILS section outflow, Schöck Isokorb type K heat-insulating load- Procedure, SAP 2012, concerning CO2 emissions from
The front asphalted car park, with 15 spaces, at the For case studies go to www.drainage-projects.co.uk bearing elements are installed at various strategic buildings and respectively heat losses through non-
new Travelodge is drained with over 40 metres of positions along the large expanse of balconies. The repeating thermal bridges. The lambda values of the
RECYFIX® PRO 100 channels fitted with Hauraton’s Isokorb type K provides high thermal resistance by Isokorb enable energy loss to be reduced by as much as
FIBRETEC® Class C250, HEELSAFE gratings which using stainless steel bars to act as tension and shear 84% to 91% in various connective situations.
have a similar appearance of the MONOTEC grating. reinforcement, plus high-strength HTE pressure bearing www.schoeck.co.uk
This HEELSAFE grating has super smooth, elliptical modules. Research at the Oxford Institute for Sustainable
Development (OISD) at Oxford Brookes University shows

enquire online at www.ebpr.co.uk/card enquire online at www.ebpr.co.uk/card


Notes from the Comar
design team... Large 62mm glazing
pocket for acoustic
or triple glazed glass.
BIM ready.
Slim sight lines for
both the casement Fast-track semi unitised
With thermal foam and and tilt/turn. construction for floor to
triple glazing, U-values are ceiling glazing.
reduced to 0.77, creating a
future proof solution.
Windows hang direct from
the Comar 9P.i Frame as
well as rebated doors.
The latest thermal
break technology
including foam.

comar 5P.i ADVANCED


104
Latest Thermal Break Technology Produces the
Next Generation of Windows.
Comar’s Design Team brief was to specifically meet architectural demands; low For more information about
U-values, matching slim sight lines for both the casement and tilt/turn windows, comar5P.i ADVANCED please contact us:
large glazing pocket for acoustic glass, Secured by Design and large sizes. For our
Tel: 0208 8685 9685
fabrication and contractor partners, performance with built in fast-track fabrication
Email: projects@parksidegroup.co.uk
and installation.
Web: www.comar-alu.co.uk
The technology from the Comar 9P.i system has been incorporated into the Comar 5P.i
window range. This ensures the Comar 5P.i Advanced Casement and Tilt/Turn window
system integrates seamlessly into Comar 9P.i framing and creates the option for standalone
high performance windows, up to 2.5m high with U-values as low at 0.77. BIM Models
available at Comar Partners: www.comar-alu.co.uk/login/.

ARCHITECTURAL ALUMINIUM SYSTEMS

You might also like