Sr. No.

Date Shift

1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Inspection
6 Routine activity
01.06.2022 A
7 Routine activity

8 Routine activity

9 Running Defect

10 Routine activity

1 Inspection

2 Inspection

3 Inspection

4 Inspection
01.06.2022 B
5 Inspection

6 Shutdown Job

7 Shutdown Job

8 Routine activity

1 Inspection

2 Inspection
01.06.2022 C
3 Inspection
4 Inspection
5 Inspection
6 Routine activity
7 Routine activity

1 Inspection

2 Inspection
3 Inspection

4 Inspection

5 Inspection

6 07.06.2022 B Shutdown Job

7 Shutdown Job

8 Running Defect

9 Routine activity

1 Inspection

2 Inspection

3 Inspection
4 Inspection

5 Routine activity
07.06.2022 C

6 running defect

7 running defect

8 Routine activity
9 Inspection
10 Routine activity

11 Routine activity

1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
08.06.2022 A
6 Routine activity
7 Routine activity
8 Routine activity

9 Routine activity

1 Inspection
2 Inspection
3 Inspection
4 Inspection
08.06.2022 C
Routine activity
5 Inspection
6 Routine activity
7 Routine activity

1 Inspection

2 Inspection
3 Inspection

09.06.2022 A
4 Routine activity
09.06.2022 A

5 Routine activity

6 Routine activity

1 Inspection

2 Inspection
3 Inspection
4 Inspection

5 Routine activity
09.06.2022 B

6 Routine activity

7 Reliability Improvement

8 Running Defect

9 Routine activity

1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 09.06.2022 C Routine activity
6 Inspection
7 Routine activity
8 Routine activity
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
10.06.2022 A
4 running defect
5 MM
1 Inspection

2 Inspection
3 Inspection
4 Inspection

5 10.06.2022 B Routine activity

6 Routine activity

7 Reliability Improvement

8 Running Defect

1 Inspection
2 Inspection
3 Inspection
4 10.06.2022 C Inspection
6 Inspection
7 Routine activity
8 Routine activity
1 Inspection
2 Inspection
3 Inspection

4 running defect
11.06.2022 A

5 Routine activity

6 Routine activity

1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Inspection
6 Routine activity

11.06.2022 B+C
11.06.2022 B+C

7 running defect

8 Routine activity
9 Routine activity
10 Routine activity

1 Inspection

2 Inspection
3 Inspection
12.06.2022 C
4 Inspection
5 Routine activity

6 Routine activity

7 Reliability Improvement

1 Inspection

2 Inspection
3 Inspection
4 Inspection
5 Routine activity

6 13.06.2022 A Running Defect

7 Reliability Improvement

8 Shifting

9 Routine activity

10 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 13.06.2022 B Routine activity

6 Routine activity

7 Routine activity
8 Reliability Improvement

1 Inspection

2 Inspection
3 13.06.2022 C Inspection
4 Inspection
5 Routine activity

6 Routine activity

7 Reliability Improvement

1 Inspection

2 Inspection

3 Inspection
4 Inspection
5 14.06.2022 A Routine activity
6 Running Defect

7 Reliability Improvement

8 Shifting
9 Routine activity

10 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
14.06.2022 B
5 Routine activity

6 Routine activity

7 Routine activity

1 Inspection

2 Inspection
3 14.06.2022 C Inspection
4 Inspection
5 Routine activity

6 Routine activity

1 Inspection

2 Inspection

3 Inspection

4 Inspection

5 Routine activity

15.06.2022 A
6 Reliability Improvement

7 Reliability Improvement

8 New Project
9 Routine activity

10 Reliability Improvement

1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity

15.06.2022 B

6 Reliability Improvement

7 Reliability Improvement

8 Routine activity

1 Inspection

2 Inspection
15.06.2022 C
3 Inspection
4 Inspection
5 Routine activity
6 Routine activity

1 Inspection

2 Inspection
3 Inspection
4 16.06.2022 A+G Inspection
5 Routine activity
6 Routine activity
7 Routine activity

8 Routine activity
1 Inspection

2 Inspection

3 Inspection

4 16.06.2022 B Inspection

5 Routine activity

6 Reliability Improvement

7 Reliability Improvement

1 Inspection

2 Inspection
3 16.06.2022 C Inspection
4 Inspection
5 Routine activity
6 Routine activity
7 Routine activity

1 Inspection

2 Inspection

3 Inspection

4 17.06.2022 B Inspection

5 Routine activity
6 Running Defect

7 Running Defect

1 Inspection

2 Inspection

17.06.2022 C
3 17.06.2022 C Inspection
4 Inspection
5 Routine activity
6 Routine activity
7 Routine activity
8 Routine activity

1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
18.06.2022 A
6 Routine activity

7 Routine activity

8 Routine activity
9 Routine activity
1 Inspection

2 Inspection

3 Inspection

4 Inspection
18.06.2022 B
5 Routine activity

6 Running Defect

7 Running Defect

1 Inspection

2 Inspection

3 Inspection

4 Inspection
18.06.2022 C
5 Inspection
18.06.2022 C

6 Reliability Improvement

7 Routine activity
8 Routine activity

9 Routine activity

1 Inspection

2 Inspection
3 Inspection

4 Inspection
19.06.2022 A

5 Routine activity

6 Routine activity

7 Routine activity

8 Routine activity

1 Inspection

2 Inspection
3 Inspection

4 19.06.2022 B Inspection

5 Routine activity

6 Routine activity

1 Inspection

2 Inspection

3 Inspection

4 19.06.2022 C Inspection
19.06.2022 C

5 Inspection

6 Routine activity

7 Routine activity

8 Routine activity

1 Inspection

2 Inspection

3 Inspection

4 20.06.2022 A Inspection

5 Routine activity

6 Running Defect

7 Running Defect
8 Running Defect

1 Inspection

2 Inspection

3 Inspection
20.06.2022 B
4 Inspection

5 Routine activity

6 Running Defect

7 Routine activity

1 Inspection

2 Inspection

3 Inspection

4 Inspection
5 20.06.2022 C Inspection
6 Routine activity
20.06.2022 C

7 Routine activity

8 Routine activity

9 Routine activity

10 Routine activity

1 Inspection

2 Inspection
3 Inspection
4 Inspection
21.06.2022 A
5 Routine activity

6 Running Defect

7 Running Defect

8 Running Defect

1 Inspection

2 Inspection

3 Inspection
21.06.2022 B
4 Inspection

5 Routine activity

6 Routine activity

1 Inspection

2 Inspection

3 Inspection

4 Inspection

21.06.2022 C
21.06.2022 C
5 Inspection

6 Routine activity

7 Routine activity

9 Routine activity

10 Routine activity

1 Inspection

2 Inspection
3 Inspection
4 Inspection
5 Inspection

6 22.06.2022 C Routine activity

7 Routine activity

8 Routine activity

9 Routine activity

10 Routine activity

11 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection

5 Routine activity
23.06.2022 A
6 Running Defect

7 Running Defect

8 Running Defect
1 Inspection
2 Inspection
3 Inspection
4 Inspection

5 23.06.2022 B Routine activity

6 Running Defect

1 Inspection

2 Inspection

3 Inspection

4 Inspection

5 23.06.2022 C Inspection

6 Routine activity

7 MM

8 Routine activity

9 Routine activity

1 Inspection
2 Inspection
3 Inspection
4 Inspection

5 Routine activity

6
24.06.2022 B

7 Running Defect

9 Running Defect
9 Running Defect

1 Inspection

2 Inspection

3 Inspection

4 Inspection
24.06.2022 C
5 Inspection

6 MM

7 Routine activity

8 Routine activity
9 Routine activity

1 Inspection

2 Inspection

3 Inspection

4 Inspection

5 25.06.2022 A Routine activity

6 Running Defect

7 Running Defect

8 Running Defect
9 Routine activity

1 Inspection

2 Inspection
3 Inspection
4 Inspection
5 25.06.2022 B Routine activity

6 Routine activity

7 Routine activity
25.06.2022 B

8 Routine activity
9 Routine activity

1 Inspection

2 Inspection
3 26.06.2022 A Inspection
4 Inspection
5 Routine activity
6
5S
7

1 Inspection

2 Inspection

3 Inspection

4 Inspection

5 Inspection
26.06.2022 C
6 Breakdown
26.06.2022 C

7 Breakdown

8 Routine activity

9 Routine activity

1 Inspection

2 Inspection
3 Inspection
4 Inspection
5 Routine activity
27.06.2022 A
6 Routine activity

7 Routine activity

8 Routine activity

9 Running Defect

1 Inspection

2 Inspection
3 Inspection
27.06.2022 B
4 Inspection
5 Routine activity

6 Routine activity

1 Inspection
2 Inspection

3 Inspection

4 Inspection

5 Inspection

27.06.2022 C
6 27.06.2022 C Routine activity

7 Routine activity

8 Routine activity

9 Routine activity

10 Routine activity

1 Inspection

2 Inspection

3 Inspection
4 Inspection
5 Routine activity

6 28.06.2022 A Routine activity

7 Running Defect

8 Running Defect

9 Routine activity
10
11 Routine activity

1 Inspection

2 Inspection

3 Inspection

4 Inspection

5 Routine activity

6 28.06.2022 B Running Defect


28.06.2022 B

7 Routine activity

8 Running Defect

9 Routine activity

10 Routine activity

1 Inspection

2 Inspection
3 Inspection

4 Inspection
28.06.2022 C
5 Inspection

6 Routine activity

7 Routine activity

8 Routine activity

1 Inspection

2 Inspection

3 Inspection

4 Inspection

5 Routine activity

6 Routine activity
29.06.2022 A

7 Running Defect

8 Routine activity

9 Routine activity
1 Inspection

2 Inspection

3 Inspection

4 Inspection

5 Routine activity
29.06.2022 B

6 Running Defect

7 Routine activity

8 Routine activity

9 Running Defect

1 Inspection

2 Inspection
3 Inspection

4 Inspection
29.06.2022 C
5 Inspection

6 Routine activity

7 Routine activity

8 Routine activity

1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity

30.06.2022 A
30.06.2022 A
6 Running Defect

7 Routine activity

9 Routine activity

1 Inspection

2 Inspection

3 Inspection

4 Inspection
30.06.2022 B
5 Routine activity

6 Running Defect

7 Routine activity

8 Routine activity

1 Inspection

2 Inspection
3 Inspection

4 Inspection
30.06.2022 C
5 Inspection

6 Routine activity

7 Routine activity

8 Routine activity
Job Description
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnomalties,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Blower house sump area new dewatering pump current measured as per mech team instruction.
Power cable for hydrojet machine laying done from blower pdb to tb-2 ground floor.PDb side
connection done.loto fix on feeder.
3-phase hydraulic pump connection done at boiler-2 welding socket.
Boiler-2 PT-212A,PT-214A , PT 216A signal not found.24v not came.So pt-212a & pt-214A fuse tb
open and pt-216a field cable disconnected from tb.Further work to be done in shutdown.
TRT sync. Done at 2:15pm.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnomalties,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.


Boiler#02 Field FSSS Panels Preventive Maintenance Done.LL#01,LL#02,LL#03,LL#04 And UL Field
FSSS LCC Inspection, Cleaning,Tighness Done.After That All Panels sealed by silastic.

1 Nos LED Light Given To Boiler#02 Drum Floor.To Mechanical Team.

Blower House Sump Dewatering Pump Current Measured Found Taken Average 9Amp.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.
TRT FDA status checked and report sent.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnomalties,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.


Routine round taken in All area.

Boiler And Blower UPS Status checked.

TRT Barring Motor And Limit Switch Connection Done.

TRT AOP Loto Normal.

Boiler BFP Pump Vibration And ID/FD Fan temp not showing found For bfp pump vibration found its
lan cable was loose same was tighten.for fan temp data check field side found temp shwing ok in
scanner but not showing in hmi same was checking in progress.

Boiler#02 TE-202,203,204 Temperature not showing ok.field side checked found ok.problem in plc
side found its range change in program same was made normal.after that reading shhowing ok.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.


Routine round taken in All area.
TRT all field JB cover with silastic and cable dressing done.

TRT barring gear motor and POP LOTO normalised and direction checked.

after barring started spped ot showing in hmi so again all 3 speed sensor set and checked after in
barring. RPM show proper.
Blower house hydrojet machine cable removed and blower PDB door closed.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.

TRT FDA status checked and report sent.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
TRT all field JB cover with silastic and cable dressing done.

4nos of temp. gauge installed in trt return oil line.


2nos of 24v hand lamp shifted from trt to blower house elec. Repair room.
Boiler-3 L-4 bfg new shutoff valve new tubing work under progress.
TRT outlet goggle valve not open.Mech side further work under progress.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler 2 and 3 4 nos of shutoff valve rseting done.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.
TRT FDA status checked and report sent.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

HT panel room,LT mcc's , PLC room AC working condition checked.


Routine round taken in All area.

1)Boiler-2 Ft-201 water flow-as per operation team flow showing less compare to b-1&3.
Boiler-2 Ft-202 steam flow-As per operation team flow showing higher compare to b-1&3.
Ceid engineer calibration done as per engineer trasmitter side ok .flushing is done.Now kept in
observation.As per operation team after flushing ft-201 is now ok.
TB-2 hotewell RC valve Lv-502 trouble shooting done.also valve cleaning done. Valve trial taken with
operation team.now working ok.
Boiler-2 ng line mov 260m motor meggar done.winding resistance found open.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.

Boiler#02 206B Air control valve troubleshooting done.found pilot relay Faulty same was replaced and
Positioner calibration done after that valve trial taken working ok as per command.feedback
transmitter installed and feedback set as per command.valve taken in line by operation team.

Boiler#01 FD#01 VVVFD Drive Filters Replaced By Spare Cleaned Filters.

52 nos Vvvfd drive spare filters cleaning done

Boiler#01 ID/FD Fan temperature not showing in hmi same was checked in field found its transmitter
24v supply mcb was tripped same was made on after that temperature showing ok.

Boiler#02 LL#01 Shutoff Valve Going Into Monitoring Valve Reset Done.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler 2 and 3 4 nos of shutoff valve rseting done.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.
TRT FDA status checked and report sent.
Drawing Made ready for TRT inlet & outlet goggle valve.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI and OTI
readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
TRT ilnet goggle valve motor removing work in progress.all foundation bolt made open and control JB bolt 2 out
of made hole my drill and open. Further work in progress.
material repaired from CEId put in in store.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.

TRT Inlet Goggle Valve Control JB 2 LN Key Bolt Open And Motor Connection Removed And Tagging
Done.After That Overall Valve Cover By Tarpoline.

Float Switch Install At Blower House Sump And Dewatering Pump ON/OFF Operation Check Found
Working Ok.
TRT Stroke Checking SOP Pasted in control room and inlet/outlet goggle valve Drawing pasted in
feeder.
Boiler Temperature Gun Cell Was Dead Same Was Replaced Now Temperation Gun Working
Ok.Handover To Operation Department.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.
TRT FDA status checked and report sent.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI and OTI
readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.

Boiler #02 NG line east MOV260M motor removed from the motor. And moved to PRDS floor.

3 nos handlamp, 2nos 230V extesnion board ,1 nos of LED are removed from the Boiler 2.

1 nos of 230V extesnion board, 2nos of 24V handlamp removed from the blower house.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.
Boiler PLC room DATA aggrigator PC was not working,so PC cleaning done.RAM,hard-disk
connections checked and again tried to turn ON but found PC turns ON and automatically
restarted.So hard-disk of another PC connected and found that PC turned ON and worked OK.So
found that original Hard-disk of data aggrigator PC is faulty.Further work under progress.

TRT FDA status checked and report sent.


Boiler-2 NG East main line MOV faulty motor shifted from PRDS floor to Instrument store.
Instrument store 5S and Housekeeping done.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.

Energy Consumption Report Sent To BF Electrical.

Boiler-1 OS#1 PC was slow to operate.So PC Restarted And Program Activated,working Ok.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Boiler Client PC Trend Not Showing In HMI Also Data loss error Come.Same Was checked found
wrong program was open same was program deativated and correct program Open After that trends
are showing aslo error not come in pc.
Blower House Sump Motor Current set With Mechanical team after that measure found Average
9.00amp taken.Also float switch auto operation working ok.motor body,de,nde,Temperature Measure
50,49,39.
TRT Inlet Goggle Valve MOV Faulty Motor Shifted From Inlet Goggle Valve Plateform To Blower
Instrument Store.
Hotwell Level Transmitter With Displacer Assembly Send To CEID For Calibration.

Boiler#02 PT-203 PLC Panel To Field JB Cable Laying In Progress Now Prds Floor To Boiler#02 Field
Plc JB Cable Laying Done.PRDS Floor To PLC Room Laying Work In Progress.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.

Boiler#02 PT-203 PLC Panel -Cable laying done from prds floor to plc panel.Also tagging done.

Boiler-1 ground floor area indsutrial board given for mech. Work.
Spare ID/FD filter set cleaning done.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.

Energy Consumption Report Sent To BF Electrical.

Boiler house and blower house Lighting timer timing setting done.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.


Routine round taken in All area.
Boiler And Blower UPS Status checked.
Industrial Board Removed From Boiler#01 Ground Floor And Shifted Instrument Store.

Boiler Cabel Cellar Housekeeping Done.

Boiler#03 L#04 New Shutoff Valve Limit Switch Installing Work In Progress.
2 MVA Trafo Room#2 Housekeeping Done.
MPCB And Channel Arragned For Blower House sump Dewatering Motor PUMP On/Off Operation
Required To Oparation Team Matarial Arranged Now MPCB To Be Installed.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Boiler#03 L#04 New Shutoff Valve feedback transmitter installed.Valve trial taken with operation
team.Valve working ok.also open/close feedback shown in hmi.
Domestic board connetion removed from trt.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.

Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler#01 IL#02,IL#04
Boiler#02 L#01,IL#04
Boiler#03 L#01,L#02,IL#04
BF Shutoff Valve Reset Done

Turbo Blower#01 AI RTD (RI-4) Faulty Module Replaced By New AI RTD(RI-4) Module (331-7PF01-
0AB0)
Spare Total 8 RTDs Connection Done In TB#01&TB#02 plc Panels (RI-4) Module For Journal Bearing
blower And Turbine before And After temperature Monitoring Trial.
Single Phase Industrial Board Connetion Given Between Boiler#01&02

Blower House Sump Motor DOL Starter Mounted And MPCB Mounted Cabels Termination Done.Trial
Taken Working Ok.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.

Boiler#02 L#01,IL#01,IL#04
Boiler#03 IL#03
BF Shutoff Valve Reset Done

FDFAN-2 filter cleaning done.

As per operation team blower house sump area dewatering current measured.R-9.0A,Y-8.3A,B-9.2A.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.

TB-1 journal bearing rtd -- From field jb to plc panel Cable laying work done.Total 4run laid.
TB-1 & TB-2 JOURNAL BEARING RTD'S added in HMI.
TB-1 ES PC BLOWER & STATOR CONTROL page not open.Troubleshooting done.Now both page are
working.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.


4 Core
Armoured 4 Run Cable Laying Done From Turbo Blower#01 Field JB To PLC Panel For Turbine And
Blower Journal Bearing RTDs.

Boiler#03 IL#02 305-A BFG Control Valve Checking Work In Progress.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Started making PPT for Turbo blower tripping logic change.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.


TE 304 was fluctuationg so tightness done.
Boiler#03 IL#02 305-A BFG Control Valve Checked, found gear box jammed. Valve does not go
operate in auto manual. So said to operation all tubeing are removed from actuator.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Started making PPT for Turbo blower tripping logic change.
Boiler And Blower UPS Status checked.
Boiler-3 IL-4 BFG shut-off valve reset done.
Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Started making PPT for Turbo blower tripping logic change.
Boiler And Blower UPS Status checked.
Boiler-3 IL-2 305a Bfg control valve mech. Found jamed.So actuator removed.Positioner and feedback
transmitter connection removed.Further mech. Work under progress.
Hydrojett m/c power cable shifted from blower pdb to tb-1 ground floor.
FSSS-1 ,2 & 3 spare cpu made ready and kept in plc room.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler 2 East side main BF gas valve actuator trial taken after giving direct air. Actuator working ok.

Boiler 1 L2 BF gas shutt off vlave was going in monitoring so SOV and actuator servecing done and
trial taken. Now working ok.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.


Boiler#03 Flame Monitoring System Communication Diagram Made In MS-Exel.Print Out Taken And
Pasted In PLC Room.
Boiler#01 IL#02-UV-105 Shutoff Valve Going Into Monitoring Valve Reset Done.
TRT FDA status checked and report sent.

Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler HT&LT panel room a,d blower MCC room vaccum cleaning done.

2MVA trafo room housekeeping done.

SO attended in Boiler cable cellar.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

1 nos extension board connection was given near TRT blade flusing tank for mechanical work but it's
MCB was tripping.Checked and found that Connection was loose so same was made tight.After that
no tripping occurred.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.


Boiler And Blower UPS Status checked.

Boiler Cabel Cellar Round Taken.

TRT FDA status checked and report sent.

Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

Sound was coming in LP dosing pump 1 so motor removed from the pump and checked. After trial of
motor, no sound come from motor. Found pump shaft unbalanced so mechanical will attend it.
TB#01 turbine and blower journal bearing RTD cable lugging done in field side in PLc side and
marking done.
PT 316A and PT317A boiler 3 layed cable lugging PLc and field side.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.


After mechanical work completion in LP dosing pump-1,connectiond restored and made ON.Found
working ok and no sound is there.
ID-2 VVVFD filters cleaning done.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.


Boiler And Blower UPS Status checked.
Boiler Cabel Cellar Round Taken.
TB#02 New Vacuum Pump Current Measured After Belt Replacement Found Taken Average 52amp.

Boiler#02 IL#01-UV-204 Shut-Off Valve Reset Done.

TRT FDA status checked and report sent.

Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.

BFP#02 motor PM done

Boiler 1 IL2 BF gas actuator found seal leakge so move to store and seal replacement work in
progress.
FT 208A and B flushing done. Now showing proper reading. FT 108A and B troubleshoting work in
progress.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

TB-1 blower side and turbine side journal bearings RTD cables lugging and connection done in field
side JB.tagging done.all readings are showing in HMI except before turbine RTD(TIA-205B).So
resistance checked,it's resistance was showing 50kohm.All JBs covered with tarpaulin.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.


Boiler And Blower UPS Status checked.

Boiler Cabel Cellar Round Taken.

Boiler#01 IL#02,UV-105,Boiler#02 L#01,UV-208,IL#01,UV-204, Boiler#03 IL#03,UV-306 Shutoff


Valves Reset Done.

TRT FDA status checked and report sent.

Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.

Boiler Cabel Cellar Round Taken.Both Exhaust Fan Found Off So Made On.

Boiler#02 Lightup Done And Connect In Line.

TRT LT Mcc Incomer#01 Charged And Buscoupler Made On.

TB#01&TB#02 Both New Vacuum Pump Current Measured As Per Operation Team Requirement.

TRT FDA status checked and report sent.

Energy Consumption Report Sent To BF Electrical.


Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler IL2 BF gas control valve 305A actuator seal replacement done.

Blower house EOP battery bank testing done by CEID team. After CEID team report 4 nos of battery
found faulty so 4 battery byapssed in battery bank and out put voltage checked. Found 246VDC.

BF data not show in Boiler so Data aggricator PC made restart.then showing data.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler-3 L3 air control valve(FIC-310B) feedback was not showing as per command but physically
valve was working ok.Checked and found that coupling shaft of feedback transmitter was loose.SO
same made tight.After that found valve working ok.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler Cabel Cellar Round Taken.

Boiler, Blower & TRT PLC Spare Modules Inventory Done And All Data Noted. All Modules
Separated As Per Its Location And Tagging Done.
TRT FDA status checked and report sent.

Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler-1 top floor lighting was tripping.So checked all connected old 70W fixtures disconnected.after that MCB made
ON.but after some time again tripped.further to be checked.

Boiler-3 top floor lighting troubleshooting done.all connected old 70W fixtures disconnected.after that
found no tripping happened.

Boiler-3 tL-3 BF gas shut-off valve was gone in monitoring,so same made reset.

Boiler-3 IL-2 air control valve (FIC-305B) actuator calibration done after seal replacement,working
ok.Actuator mounting pending due to mechanical manpower unavailability.
Boiler-3 IL-2 air control valve (FIC-305B) actuator calibration done after seal replacement,working
ok.Actuator mounting pending due to mechanical manpower unavailability.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

BBT Area PLC Spare Modules Update In Excel File.

Boiler Cabel Cellar Round Taken.

TRT FDA status checked and report sent.


Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.


Boiler 3 IL2 305A BF gas control valve actuator mounting done. Feedback setting done, trial taken
with operation. Working ok taken in line.
Boiler #03 305B air line control valve troubleshooting done found seal leakage in actuator,so all
connection removed and actuator move to the store.
faulty Pilot relay serviceing done operation to be checked in valve.
1nos of 230V extension board given at blower house TB#02
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.

Boiler 2 IL4 & Boiler 3 IL3 BF gas Shut-off valve was gone to monitoring.so same made reset.

Blower LT MCC housekeeping done.Cleaning and mopping done.


4 nos 20W LED tubes installed in electrical repair room.
FD-3 VVVFD Filters cleaning done.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Blower house east side dtore repair room 5S done. Housekeeping done.
repair room woodan rack and elctrical spare moved to the new store inventory work in progress,.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler#03 Lower Layer And Uper Layer Main Line NG Shutoff Valves Was Not Working Same Was
Troubleshooting Done Found in FSSS Panel Its Feedback Relay Supply MCB Was Faulty.New MCB
Installed.And All Burners Valves Power Supply Restored.
Boiler#03 all manually open valves put in auto trial taken working ok.all burners taken in line by
operation. L#04 pilot valve not working same was troubleshooting done.After That working ok.

TRT FDA status checked and report sent.

Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.

Boiler-3 IL-2 305b air control valve founs seal leakage.So new seal changing work and actuator
servicing done.Further work under progress.

19mw islanding contact checked.

1no of industrial board connection removed near Tb-1 turbine floor and shifted to instrument repair
room.
Boiler-3 IL-3 , Boiler-2 IL-1,IL-4 bf shutoff valve resetting done as per operation team instruction.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.

Boiler 1 IL4 & Boiler 3 L1 BF gas Shut-off valve was gone to monitoring.so same made reset.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.


Boiler Cabel Cellar Round Taken.

TRT FDA status checked and report sent.

Boiler 3 BF gas shutoff valve UV306 reset done.

Boiler PLC room and HT room 1 no AC found off. Made feeder supply on in PDB now all Ac are on

Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.


Routine round taken in All area.
Boiler And Blower UPS Status checked.

Boiler-1 il-2 105, Boiler-2 l1,il-4 bfg shutoff valve reseting done.
Boiler-1 L-2 109 bfg shutoff valve not operating from hmi.Found problem in sov.So sov servicing done
after trial taken valve working ok.
Boiler-3 IL-2 fic 305-b air control vave after seal replacement calibration done.Inform to boiler
operation team for moutning.
TRT Power Oil Pump-1 & 2 loto given for mech. Work.
Boiler-3 trench area dewatering pump checked.Taking current R-3a,Y-2.7,B-3.2a.OLR setting-5a.
2nos of 24v hand lamp shifted from trt to blower house.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

1)Boiler#03 303A NG Control Valve Troubleshooting Done Now Working Ok.Found Its pilot Relay Was
Faulty And Positioner 0 Setting Was Disturb Same Was pilot relay replaced And Positioner calibration
done.trial taken valve working ok.Handover To Operation Team.
2)Actuator Shaft Lubrication Done.
TRT Power oil Pump 1&2 Loto Normal After Mechanical work completed Trial Taken Working Ok.
POP#01 Current R-20.09 Y-19.37 B-19.99
POP#02 Current R-19.30 Y-18.17 B-18.56.

Boiler#01 ID/FD Fan Temp Not Showing In HMI..Same Was Troublshooting Done.Found Its TT 24v
Supply MCB Was Trip.Same Was Made On Now Temperature Showing Ok.

Boiler#02 IL#04 UV-207 Shutoff Valve Reset Done

ID/FD VVVFD Drive 2 Set Spare Filters Cleaning Done.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler Cabel Cellar Round Taken.

TRT FDA status checked and report sent.

Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler-1 il-2 105, Boiler-2 l1,il-4 bfg shutoff valve reseting done.

Boiler-3 IL-2 fic 305-b air control valve actuaor installed.After that put in auto valve operated up to
20%.After 20% valve operated up to 40% as per command when 50% command given valve suddenly
operated with jerk up to 70% and then again stopped at 40%.So further checking under progress.

As per Blast furnace engineer blower house turbine cooling water FT-2115 calibration done by ceid
team.

1Nof of domestic board connection removed from tb-2 ground floor and shifted to instrument repair
room.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

PT-108A&B Both FT Reverse Air Flushing Done.and FT Flushing And Venting Done.after That main shut

Boiler#01 Furnace Camera mcb Was Trip field side check found camera side main input socket and
plug was burn.

Boiler OS Client PC Running Slow Restart And Project Activated Working Normal.

Boiler#02 Furnace Camera Checking In Progress

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler Cabel Cellar Round Taken.

TRT FDA status checked and report sent.

Energy Consumption Report Sent To BF Electrical.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Trt outlet sealpot valve not working as per operation engineer. Found mech. Valve jammed.So mech . Valve free n open at
tht time no air coming in control valve .so control valve manualy open but still water not came from valve. After air header
valve open control valve working from sov.inform to mech. Team for further checking of line chokeup. Also found control
vale main air line header valve found off.So valve made on.

Boiler-2 trench area dewatering pump not working as per operation team.Found main power supply off.So supply
nomalised now wrking ok.

TB-2 data shown in OS-1 & OS-2 Pc.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.

HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler#03 L#01 IV-304 Pilot Valve Feedback Was Not Showing In HMI Troubleshooting Done.Found
Both Limit Switches Are Disturbed From Its Position Same Was Properly Setting Done.After that trial
taken found both open/close feedback showing ok in hmi.

Boiler#03 ID#03 VVVFD Drive Filters Cleaning Done.

Boiler#02 L#01 UV-208 Shutoff Valve Reset Done.

Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.

TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.


HT panel room,LT mcc's , PLC room AC working condition checked.

Routine round taken in All area.

Boiler And Blower UPS Status checked.

Boiler Cabel Cellar Round Taken.

TRT FDA status checked and report sent.

Energy Consumption Report Sent To BF Electrical.


Action Plan If job
Status Notification Attended By
pending
Completed
Completed
Completed
Completed
Completed
Completed
Anand
Completed

Completed

Completed

Completed 3001768288

Completed

Completed

Completed

Completed
Bhushan
Completed

Completed 3001768473

Completed 3001768474
Completed

Completed

Completed
Santanu
Completed
Completed
Completed
Completed 3001768578
Completed

Completed

Completed
Completed

Completed

Completed

Completed Bhushan

Completed

In Progress

Completed

Completed

Completed

Completed
Completed

Completed
Milan

Completed

Completed

Completed
Completed
Completed

Completed

Completed
Completed
Completed
Completed
Completed
Anand
Completed
Completed
Completed

under progress

Completed
Completed
Completed
Completed
Milan
Completed
Completed
Completed
Completed

Completed

Completed
Completed

Anand
Completed
Anand

Completed

Completed

Completed

Completed
Completed
Completed

Completed 3001771222
Bhushan

Completed 3001771223
Completed 3001771224

Completed 3001771225

Completed 3001771227

Completed
Completed
Completed
Completed
Completed Santanu
Completed
Completed 3001771378
Completed
Completed
Completed
Completed
Completed
Milan
inprogress
Completed
Completed

Completed
Completed
Completed

Completed Bhushan

Completed

Completed

Completed

Completed
Completed
Completed
Completed Santanu
Completed
Completed 3001771859
Completed
Completed
Completed
Completed

Completed 3001771957
Milan

Completed

Completed

Completed
Completed
Completed
Completed
Completed
Completed 3001772258
Santanu
Santanu

under progress 3001772260

Completed
Completed
Completed

Completed

Completed
Completed
Santanu
Completed
Completed

Completed 3001772602

Completed 3001772603

Completed

Completed
Completed
Completed
Completed

Completed 3001772758 Bhushan

Completed

Completed 3001772760
Completed 3001772764

In Progress
Completed
Completed
Completed
Completed
Completed Anand

Completed 3001772995
Completed 3001772996
Completed 3001772997

Completed

Completed
Completed Santanu
Completed
Completed

Completed 3001773032
Completed 3001773031

Completed

Completed

Completed
Completed
Completed Bhushan
Completed

Completed

In Progress
Completed

Completed
Completed
Completed
Completed
Completed
Anand
Completed

Completed

Completed

Completed

Completed
Completed Santanu
Completed
Completed

Completed 3001773420

Completed

Completed

Completed

Completed

Completed

Bhushan
Completed 3001773628

Completed 3001773613

Completed
Completed

Completed 3001773625

Completed
Completed
Completed
Completed
Completed

Anand

Completed 3001773628

Completed 3001773613
Completed

Completed

Completed
Milan
Completed
Completed
Completed
Completed

Completed

Completed
Completed
Completed Anand
Completed
Completed
Completed

Completed
Completed

Completed

Completed

Completed Bhushan

Completed

Completed 3001774313

Completed

Completed

Completed
Completed Santanu
Completed

Completed
Completed 3001774440
Completed

Completed

Completed

Completed Milan

Completed
Completed 3001774684
Completed 3001774683

Completed

Completed

Santanu
Completed Santanu
Completed
Completed
Completed
Completed 3001774826
Completed 3001774825

Completed
Completed
Completed
Completed
Completed
Anand
Completed

Completed 3001774970
Completed 3001774973
Completed 3001774974
Completed

Completed

Completed

Completed
Milan
Completed

Completed
3001775168
Completed

Completed

Completed

Completed

Completed
Bhushan
Completed
Bhushan

Completed 3001775229
Completed 3001775228
Completed

Completed 3001775227

Completed

Completed
Completed

Completed
Milan

Completed

Completed

Completed

Completed

Completed

Completed
Completed

Completed Santanu

Completed

Completed 3001775624

Completed

Completed

Completed

Completed Bhushan
Bhushan

Completed

Completed

Completed

Completed 3001775697

Completed

Completed

Completed

Completed Milan
Completed

Completed 3001775834

Completed
Completed

Completed

Completed

Completed
Santanu
Completed

Completed

Completed 3001776033
Completed 3001776075

Completed

Completed

Completed

Completed
Completed Bhushan
Completed
Bhushan

Completed

Completed

Completed

Completed

Completed

Completed
Completed
Completed
Milan
Completed

Completed 3003195767

in progress

in progress

Completed

Completed

Completed
Santanu
Completed

Completed

Completed 3001776533

Completed

Completed

Completed

Completed

Bhushan
Bhushan
Completed

Completed

Completed 3001776596

Completed

Completed 3001776594

Completed

Completed
Completed
Completed
Completed

Completed Bhushan

Completed

Completed

Completed

Completed

Completed
Completed
Completed
Completed
Completed

Completed
Milan
Completed

Completed 3001777205

Completed
Completed
Completed
Completed
Completed

Completed Santanu

Completed 3001777489

Completed

Completed

Completed

Completed

Completed Bhushan

Completed

Completed 3001777642

Completed

Completed 3001777639

Completed
Completed
Completed
Completed

Completed

Completed
Santanu
3001778012
Completed

Completed 3001778039

Completed 3001778001
Completed 3001778001

Completed

Completed

Completed

Completed
Bhushan
Completed

Completed

Completed

Completed
Completed

Completed

Completed

Completed

Completed

Completed Milan

Completed

Completed 3001778269
Completed
Completed

Completed

Completed
Completed
Completed
Completed Santanu

Completed

Completed 3001778597
Santanu

Completed 3001778596
Completed 3001778595

Completed

Completed
Completed Milan
Completed
Completed
Completed
Completed

Completed

Completed

Completed

Completed

Completed
Bhushan
Completed
Bhushan

Completed

Completed

Completed

Completed

Completed
Completed
Completed
Completed
Anand
Completed 3001779333

Completed 3001779334

Completed 3001779337

Completed 3001779339

Completed

Completed
Completed
Santanu
Completed
Completed

Completed

Completed
Completed

Completed

Completed

Completed

Milan
Completed Milan

Completed

Completed

Completed

Completed

Completed

Completed

Completed
Completed
Completed

Completed 3001779701 Anand

Completed 3001779703

Completed 3001779705
Completed 3001779707
Completed
Completed

Completed

Completed

Completed

Completed

Completed

Completed 3001779965 Bhushan


Bhushan

Completed 3001779966

Completed 3001779967

Completed

Completed 3001779968

Completed

Completed
Completed

Completed
Milan
Completed

Completed

Completed

Completed 3001780122

Completed

Completed

Completed

Completed

Completed

Completed
Anand

Completed

Completed

Completed
Completed

Completed

Completed

Completed

Completed
Bhushan

In Progress

Completed

Completed

In Progress

Completed

Completed
Completed

Completed
Santanu
Completed

Completed

Completed

Completed 3001780796

Completed
Completed
Completed
Completed
Completed

Anand
Anand
Completed 3001780957

Completed

Completed

Completed

Completed

Completed

Completed
Bhushan
Completed

Completed 3001781177

Completed 3001781178

Completed 3001781179

Completed

Completed
Completed

Completed
Santanu
Completed

Completed

Completed

Completed 3001781224
Technician

Sagar(A) Vivek(G)

CEIDTech vaibhav(B)

NA
vivek(B)

NA
Vivek(A)

NA

Vaibhav(A)
Vaibhav(A)

Sagar(B)

NA

Vivek(A)
Sagar(B)

NA

Vaibhav(A) Vivek(G)

NA
NA

NA

Vaibhav(A),Vivek(G)
CEID Tech.
Sagar(B) Vivek(G)

NA

Vaibhav(A),Vivek(G)
Sagar(B),Vivek(G)

N.A

Vaibhav(A),Vivek(G)
sagar(B),Vivek(G)

N.A

Vaibhav(A),Vivek(G)
Vivek(B),CEID Tech

N.A

vivek(B)

N.A
N.A

Vaibhav(A) Vivek(B)

SAGAR(B)

N.A
N.A

vaibhav(A)

Sagar(B)

N.A
N.A

Sagar(A) vivek(G)

Vaibhav(B) Vivek(G)

N.A
N.A

Sagar(A) vivek(G)

Vaibhav(B) Vivek(G)

N.A
N.A

N.A

Sagar(A)
Vivek(B)

N.A

Vivek(B)
N.A

Sagar(A)

Vivek(B)
Vivek(B)

Sagar(A)

N.A
N.A

Vivek(A)

Vaibhav(B)

N.A
N.A

Vaibhav (A) Vivek(G)

Sagar(B) Vivek(G)
Sagar(B) Vivek(G)

N.A

Vaibhav (A) Vivek(G)


Sagar(B) Vivek(G)

N.A

Vaibhav(A) Vivek(G)
Vaibhav(A) Vivek(G)

Sagar(B) Vivek(G)

N.A
BBT boiler_E&I Pending Jo
Sr. No.
High priority
Boiler OS3 PC not suitable for operation. Working
1 very slow & hang many times during operation.
( emergency operation not possible with this HMI)
2 All 3 boilers furnace camera not working

3 boiler-2 PRDS MOV M-245 open limit not coming.


boiler -2 main BFG shut off valve (EAST SIDE) PV-
4 208B actuator work pending.
5 boiler -3 main BFG shut off valve (WEST SIDE) PV-
308A actuator work pending since long time.

control valve FIC- 101B, 305B, 303A are not operate


6
from HMI.(made manually open)

7 control valve FIC- 105A, 108A, 310B, feed back not


availble.
control valve FIC- 111B, 108A, 203B, 208B, 308A,
8
307B not operate as per command.
deaerator-3 steamline conrol valve PV 305 Not
9 operate from HMI. (open manually 50%)

BFG flow transmitter FT 108 A&B, 208 B, 308 A&B


10 not showing correct reading. Many time showing
zero reading.
deaerator inlet pressure (PT 104 & 204) not giving
11 calibration. 10% level difference between both
correct reading.
12 deaerator
BBT boiler_E&I Pending Job list 27th june 2022
status Other pending list
Boiler-1 furnace PT & TE:- PT 116B, TE-113A, TE-116A
#
calibrate.
Boiler-2 furnace PT & TE:- PT 212 A&B, PT 213A, PT 2
boiler 2 and boiler 3 camera lense not available. Boiler 1 video out
# 211B, TE 212B, TE 213A, TE 214 A&B, TE 215B not giv
put not come its to be checked. Boiler 3 flame scanner data available.
& all req to calibrate
actuator cannot be open due to column, need to change the valve Boiler-3 furnace PT & TE:- PT 316A, PT316 A&B, TE 3
#
position. 312A, TE 315B, TE 316B,
E&I actuator checked installation pending # Turbo blower-2 data not avilable since 5 days.
actuator to be checked , need to mechanical support to remove # ID/FD-1 FAN temp not coming in DATA PC.
actuator.

101B( no problem in actuator and postioner , due to valve postioner


FD-2 DE side vibration transmitter not working. (obse
does not take load.) 305B( seal leakge found in actuator attended #
long time)
now valve in line) 303A( Attend Working Ok.)

105A (valve working proper checked with operation. Feedback signal


issued from PLC).108A( try to calibrate, its to be send to CEID) 310B # BFP-2 motor temp. DE/NDE temp. not working since
( feedback shaft found loose attend it.
108A( try to calibrate, its to be send to CEID), other valves to be Required atleast 2 pressure gauge (0 to 100 BAR) out
#
checked. discharge line.
to be checked. # Generated Alarm timing not reflect correct in all 3 bo

FT108A and 108B equilising valve made closed checked flow not BLR-1 & 2 ID&FD FAN TRIPPING HOOTER IS NOT ACTI
showing zero.also bf gas main valve whwn closed its show ZERO and #
id/fd TRIP CONDITION IT IS RUNNING.
open its show 16000 nm3 flow.
PRDS-2 CONTROL VALVE NOT WORKING SINCE LONG
#
calibration required. CARD NOT AVAILBLE)
# DM Water totalizer (boiler side) req to add shiftwise
FACE PLATE SHOULD BE CHANGE IN ALL BFP's RECIRC
#
MOV AND DISCHARGE
All 3 boiler's LINEwater
steam & feed MOV.( M-215range
totalizer TO M- 22t
req
#
stuck 48000 T
# steam totalizer range req to increased. (FT - 003) Val
# DM Water totalizer range req. to increased. Value stu
PRDS steam totalizer not working. also range req. to
#
stuck 16500 T
Other pending list Status
& TE:- PT 116B, TE-113A, TE-116A all req to

& TE:- PT 212 A&B, PT 213A, PT 214A, PT 216A, TE


13A, TE 214 A&B, TE 215B not giving correct reading

& TE:- PT 316A, PT316 A&B, TE 311B, TE 313B, TE


16B,
not avilable since 5 days. Configuration Done Now Data Showing Ok.

ot coming in DATA PC. Attend Fan Temp.Showing OK.

n transmitter not working. (observed zero since

DE/NDE temp. not working since long time.

ressure gauge (0 to 100 BAR) out of 4 BFP in

ming not reflect correct in all 3 boilers.

N TRIPPING HOOTER IS NOT ACTIVE. ONLY BOILER-3


N IT IS RUNNING.
ALVE NOT WORKING SINCE LONG TIME. (CONTROL
)
boiler side) req to add shiftwise in daily shift report.
BE CHANGE IN ALL BFP's RECIRCULATION LINE
GE LINEwater
& feed MOV.( M-215range
totalizer TO M- 222)
req to increased. Value
e req to increased. (FT - 003) Value stuck 65000 T
ange req. to increased. Value stuck 16500 T
r not working. also range req. to increased. Value
Sujhav QC SAM Near Miss
Nandhan
Anand 1 1 1
Milan 1
Shantanu 1 1
Bhusan 1
Date of update This file: DD/MM/YY
Updated By:

SR.NO JOB Area FREQUENCY SCHEDULE LAST DONE NOTIFICATION


1 FD-1 MONTHLY 5th of every month Bhushan 3001771223
2 ID-1 MONTHLY 10th Bhushan 3001772523
3 FD_2 MONTHLY 15th Anand 3001773613
HT DRIVE PANEL FILTERS CLEANING
4 ID-2 MONTHLY 20th Santanu 3001776075
5 FD-3 MONTHLY 25th Santanu 3001778595
6 ID-3 MONTHLY 30th
7 EOT CRANE Inspection BLOWER & TRT QUARTERLY 1/15/2022
8 PANEL TOP SURFACE CLEANING BBT MONTHLY
9 AUTOMATION PC CLEANING BBT MONTHLY
10 TRT GENERATOR COOLER ROOM HK TRT WEEKLY 4/24/2022 Bhushan 3001752453

BBT MAINTENANCE SCHEDULE


SR.NO ROUTINR MAINTENANCE TASK AREA FREQUENCY LAST DONE NEXT DUE REMARKKS
1 TRAFO OIL DGA 6 MONTHS APR-21 OCT-21 3001604776
2 EARTH PIT RESISTANCE 6 MONTHS 05.12.2021 05.06.2022 3001720188
3 HAND TOOLS CERTIFICATION 6 MONTHS 13-09-2021 March'22 3001662427
4 THERMOGRAPHY BBT 6 MONTHS 2/9/2022 8/9/2022 3001721152
5 TB-1 1 YEAR
6 TB-2 1 YEAR
7 TRT 1 YEAR 9/23/2020 9/23/2021 Completed
INSTRUMENTS CALIBRATION
8 BOILER-1 1 YEAR
9 BOILER-2 1 YEAR
10 BOILER-3 1 YEAR 4/29/2021 4/29/2022 Completed
BOL,TRF-1, 2 MVA-WINDING TEMP 34°C
BOL,TRF-1, 2 MVA-OIL TEMP 34°C
BOL,TRF-1, 2 MVA-OIL LEVEL 48% Approx.
BOL,TRF-1, 2 MVA-OIL LEAKAGE OK
BOL,TRF-1, 2 MVA-SILICA GEL PERCENT OK
BOL,TRF-1, 2 MVA-NOISE OK
BOL,TRF-1, 2 MVA-EXHAUST FAN OK

BOL,TRF-2, 2 MVA-WINDING TEMP 34°C


BOL,TRF-2, 2 MVA-OIL TEMP 33°C
BOL,TRF-2, 2 MVA-OIL LEVEL 10% Approx.
BOL,TRF-1, 2 MVA-OIL LEAKAGE OK
BOL,TRF-2, 2 MVA-SILICA GEL PERCENT OK
BOL,TRF-2, 2 MVA-NOISE OK
BOL,TRF-2, 2 MVA-EXHAUST FAN OK
Status of PLC - BBT area

CPU Status(Healthy or
Sl.No Area PLC Panel Description PLC CPU Battery status
NOT,Master/slave)

1 CPU 1 (L) Healthy/master ok


PLC 001 Boiler#01 & 03
2 CPU 2 (R) Healthy/slave ok
3 CPU 1 (L) Healthy/master ok
PLC201 CPU for Boiler#02
4 Boiler CPU 2 (R) Healthy/slave ok
5 FSSS1 Boiler 1 FSSS CPU Healthy ok
6 FSSS2 Boiler 2 FSSS CPU Healthy ok
7 FSSS3 Boiler 3 FSSS CPU Healthy ok
8 CPU 1 (L) Healthy/master ok
Turbo Blower#01 TB#01 PLC panel
9 CPU 2 (R) Healthy/slave ok
Blower
10 CPU 1 (L) Healthy/master ok
Turbo Blower#02 TB#02 PLC panel
11 CPU 2 (R) Healthy/slave ok
Remarks
(Any alarm/fault on
CPU ,Power Supply and
IM)
AUTOMATION PCs. OF BBT
Sr. Area PC Operation Remarks PC Make Model Windows Login details
No.
Username: Engineer

1 TRT ES/OS Windows XP Siemens AG Simatic Rack PC 547B Password: Master(*&(

Username: Administrator

2 TRT OS Windows 7 HP AMD HPdx5150MT Password: delta123#

BLOWER
Username: engineer

1 TB-1 ES/OS Windows XP Siemens AG Simatic Rack PC 547B Password: master(*&(

Username: Administrator

2 TB-1 OS Windows XP Siemens AG Simatic Rack PC 547B Password: delta123#

Username: engineer

3 TB-2 ES/OS Windows XP Siemens AG Simatic Rack PC 547B Password: master(*&(

Username: Administrator

4 TB-2 OS Windows XP Siemens AG Simatic Rack PC 547B Password: delta123#

Username: Administrator
Blower CR Vacuum Pump/TRT Opn
5 Windows XP HP compaq HPd220MT (PT794PA) Password: delta123#

BOILER
Username: Administrator

1 Boiler FSS1/ES Windows 7 HP AMD HPdx5150MT Password: delta123#

Username: Administrator

2 Boiler FSS2 19MW data HP AMD HPdx5150MT Password: delta123#

Username: engineer

3 Boiler FSS3/ ES HP AMD HPdx5150MT Password: master(*&(

Username: Administrator
Username: engineer
4 Boiler ES/OS Siemens AG Simatic Rack PC 547B Password: delta123#
Username: Administrator
5 Boiler OS1 HP compaq Elite 8300 CMT PC Password: master(*&(
Username: Engineer
6 Boiler OS2 Siemens AG Simatic Rack PC 547B Password: delta123#
7 Boiler OS3 Client PC HP AMD HPdx5150MT Password: Master(*&(
Motor/BFP RTD & Vib. Username: Administrator
8 Boiler EM & Temp. Monitoring System HP AMD HPdx5150MT Password: master(*&(
Sr. No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Job Description Area

BOILER-2 ID FAN MAINTENANCE


BOILER-2 FD FAN MAINTENANCE
Boiler-3 ID/FD vibration data communication to PLC troubleshooting
Boiler-2 PIC-203 (main BFG control logic for auto operation) lower limit to be checked.
Boiler-2 PT-212A,214A,216A troubleshooting Boiler
Boiler-2 LT-201B condensate pot cleaning
PRDS-2 PCV control valve replacement & hookup to PLC
PRDS-2 TCV control valve replacement & hookup to PLC
245M open limit switch installation
TB-1 ESV2 open feed back to be corrected
TB-1 & TB-2 ANTI_SURGE VALVES CLEANING AND TRIAL
TB2 PLC & HMI MAINTENANCE Blower
TB-1 NRV proximity limit switch to be taken in line
TB-2 POWER OIL STATION MAINTENANCE
TRT PLC COMMUNICATION THROUGH NEW SCALANCE TRT
Notificati
Engineer on/ Remarks
Order
3003141483
3003128426

1000688171
1000688172
1000688179
1000688176
1000688177
100688178
1000688179
1000688180
1000688183
1000688185

1000688186