Date Shift
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Inspection
6 Routine activity
01.06.2022 A
7 Routine activity
8 Routine activity
9 Running Defect
10 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
01.06.2022 B
5 Inspection
6 Shutdown Job
7 Shutdown Job
8 Routine activity
1 Inspection
2 Inspection
01.06.2022 C
3 Inspection
4 Inspection
5 Inspection
6 Routine activity
7 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Inspection
7 Shutdown Job
8 Running Defect
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
07.06.2022 C
6 running defect
7 running defect
8 Routine activity
9 Inspection
10 Routine activity
11 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
08.06.2022 A
6 Routine activity
7 Routine activity
8 Routine activity
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
08.06.2022 C
Routine activity
5 Inspection
6 Routine activity
7 Routine activity
1 Inspection
2 Inspection
3 Inspection
09.06.2022 A
4 Routine activity
09.06.2022 A
5 Routine activity
6 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
09.06.2022 B
6 Routine activity
7 Reliability Improvement
8 Running Defect
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 09.06.2022 C Routine activity
6 Inspection
7 Routine activity
8 Routine activity
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
10.06.2022 A
4 running defect
5 MM
1 Inspection
2 Inspection
3 Inspection
4 Inspection
6 Routine activity
7 Reliability Improvement
8 Running Defect
1 Inspection
2 Inspection
3 Inspection
4 10.06.2022 C Inspection
6 Inspection
7 Routine activity
8 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 running defect
11.06.2022 A
5 Routine activity
6 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Inspection
6 Routine activity
11.06.2022 B+C
11.06.2022 B+C
7 running defect
8 Routine activity
9 Routine activity
10 Routine activity
1 Inspection
2 Inspection
3 Inspection
12.06.2022 C
4 Inspection
5 Routine activity
6 Routine activity
7 Reliability Improvement
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
7 Reliability Improvement
8 Shifting
9 Routine activity
10 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 13.06.2022 B Routine activity
6 Routine activity
7 Routine activity
8 Reliability Improvement
1 Inspection
2 Inspection
3 13.06.2022 C Inspection
4 Inspection
5 Routine activity
6 Routine activity
7 Reliability Improvement
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 14.06.2022 A Routine activity
6 Running Defect
7 Reliability Improvement
8 Shifting
9 Routine activity
10 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
14.06.2022 B
5 Routine activity
6 Routine activity
7 Routine activity
1 Inspection
2 Inspection
3 14.06.2022 C Inspection
4 Inspection
5 Routine activity
6 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
15.06.2022 A
6 Reliability Improvement
7 Reliability Improvement
8 New Project
9 Routine activity
10 Reliability Improvement
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
15.06.2022 B
6 Reliability Improvement
7 Reliability Improvement
8 Routine activity
1 Inspection
2 Inspection
15.06.2022 C
3 Inspection
4 Inspection
5 Routine activity
6 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 16.06.2022 A+G Inspection
5 Routine activity
6 Routine activity
7 Routine activity
8 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 16.06.2022 B Inspection
5 Routine activity
6 Reliability Improvement
7 Reliability Improvement
1 Inspection
2 Inspection
3 16.06.2022 C Inspection
4 Inspection
5 Routine activity
6 Routine activity
7 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 17.06.2022 B Inspection
5 Routine activity
6 Running Defect
7 Running Defect
1 Inspection
2 Inspection
17.06.2022 C
3 17.06.2022 C Inspection
4 Inspection
5 Routine activity
6 Routine activity
7 Routine activity
8 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
18.06.2022 A
6 Routine activity
7 Routine activity
8 Routine activity
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
18.06.2022 B
5 Routine activity
6 Running Defect
7 Running Defect
1 Inspection
2 Inspection
3 Inspection
4 Inspection
18.06.2022 C
5 Inspection
18.06.2022 C
6 Reliability Improvement
7 Routine activity
8 Routine activity
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
19.06.2022 A
5 Routine activity
6 Routine activity
7 Routine activity
8 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 19.06.2022 B Inspection
5 Routine activity
6 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 19.06.2022 C Inspection
19.06.2022 C
5 Inspection
6 Routine activity
7 Routine activity
8 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 20.06.2022 A Inspection
5 Routine activity
6 Running Defect
7 Running Defect
8 Running Defect
1 Inspection
2 Inspection
3 Inspection
20.06.2022 B
4 Inspection
5 Routine activity
6 Running Defect
7 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 20.06.2022 C Inspection
6 Routine activity
20.06.2022 C
7 Routine activity
8 Routine activity
9 Routine activity
10 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
21.06.2022 A
5 Routine activity
6 Running Defect
7 Running Defect
8 Running Defect
1 Inspection
2 Inspection
3 Inspection
21.06.2022 B
4 Inspection
5 Routine activity
6 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
21.06.2022 C
21.06.2022 C
5 Inspection
6 Routine activity
7 Routine activity
9 Routine activity
10 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Inspection
7 Routine activity
8 Routine activity
9 Routine activity
10 Routine activity
11 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
23.06.2022 A
6 Running Defect
7 Running Defect
8 Running Defect
1 Inspection
2 Inspection
3 Inspection
4 Inspection
6 Running Defect
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 23.06.2022 C Inspection
6 Routine activity
7 MM
8 Routine activity
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
6
24.06.2022 B
7 Running Defect
9 Running Defect
9 Running Defect
1 Inspection
2 Inspection
3 Inspection
4 Inspection
24.06.2022 C
5 Inspection
6 MM
7 Routine activity
8 Routine activity
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
6 Running Defect
7 Running Defect
8 Running Defect
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 25.06.2022 B Routine activity
6 Routine activity
7 Routine activity
25.06.2022 B
8 Routine activity
9 Routine activity
1 Inspection
2 Inspection
3 26.06.2022 A Inspection
4 Inspection
5 Routine activity
6
5S
7
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Inspection
26.06.2022 C
6 Breakdown
26.06.2022 C
7 Breakdown
8 Routine activity
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
27.06.2022 A
6 Routine activity
7 Routine activity
8 Routine activity
9 Running Defect
1 Inspection
2 Inspection
3 Inspection
27.06.2022 B
4 Inspection
5 Routine activity
6 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Inspection
27.06.2022 C
6 27.06.2022 C Routine activity
7 Routine activity
8 Routine activity
9 Routine activity
10 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
7 Running Defect
8 Running Defect
9 Routine activity
10
11 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
7 Routine activity
8 Running Defect
9 Routine activity
10 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
28.06.2022 C
5 Inspection
6 Routine activity
7 Routine activity
8 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
6 Routine activity
29.06.2022 A
7 Running Defect
8 Routine activity
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
29.06.2022 B
6 Running Defect
7 Routine activity
8 Routine activity
9 Running Defect
1 Inspection
2 Inspection
3 Inspection
4 Inspection
29.06.2022 C
5 Inspection
6 Routine activity
7 Routine activity
8 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
5 Routine activity
30.06.2022 A
30.06.2022 A
6 Running Defect
7 Routine activity
9 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
30.06.2022 B
5 Routine activity
6 Running Defect
7 Routine activity
8 Routine activity
1 Inspection
2 Inspection
3 Inspection
4 Inspection
30.06.2022 C
5 Inspection
6 Routine activity
7 Routine activity
8 Routine activity
Job Description
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnomalties,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Blower house sump area new dewatering pump current measured as per mech team instruction.
Power cable for hydrojet machine laying done from blower pdb to tb-2 ground floor.PDb side
connection done.loto fix on feeder.
3-phase hydraulic pump connection done at boiler-2 welding socket.
Boiler-2 PT-212A,PT-214A , PT 216A signal not found.24v not came.So pt-212a & pt-214A fuse tb
open and pt-216a field cable disconnected from tb.Further work to be done in shutdown.
TRT sync. Done at 2:15pm.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnomalties,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Blower House Sump Dewatering Pump Current Measured Found Taken Average 9Amp.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnomalties,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler BFP Pump Vibration And ID/FD Fan temp not showing found For bfp pump vibration found its
lan cable was loose same was tighten.for fan temp data check field side found temp shwing ok in
scanner but not showing in hmi same was checking in progress.
Boiler#02 TE-202,203,204 Temperature not showing ok.field side checked found ok.problem in plc
side found its range change in program same was made normal.after that reading shhowing ok.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TRT barring gear motor and POP LOTO normalised and direction checked.
after barring started spped ot showing in hmi so again all 3 speed sensor set and checked after in
barring. RPM show proper.
Blower house hydrojet machine cable removed and blower PDB door closed.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
TRT all field JB cover with silastic and cable dressing done.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler 2 and 3 4 nos of shutoff valve rseting done.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.
TRT FDA status checked and report sent.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
1)Boiler-2 Ft-201 water flow-as per operation team flow showing less compare to b-1&3.
Boiler-2 Ft-202 steam flow-As per operation team flow showing higher compare to b-1&3.
Ceid engineer calibration done as per engineer trasmitter side ok .flushing is done.Now kept in
observation.As per operation team after flushing ft-201 is now ok.
TB-2 hotewell RC valve Lv-502 trouble shooting done.also valve cleaning done. Valve trial taken with
operation team.now working ok.
Boiler-2 ng line mov 260m motor meggar done.winding resistance found open.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler#02 206B Air control valve troubleshooting done.found pilot relay Faulty same was replaced and
Positioner calibration done after that valve trial taken working ok as per command.feedback
transmitter installed and feedback set as per command.valve taken in line by operation team.
Boiler#01 ID/FD Fan temperature not showing in hmi same was checked in field found its transmitter
24v supply mcb was tripped same was made on after that temperature showing ok.
Boiler#02 LL#01 Shutoff Valve Going Into Monitoring Valve Reset Done.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler 2 and 3 4 nos of shutoff valve rseting done.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.
TRT FDA status checked and report sent.
Drawing Made ready for TRT inlet & outlet goggle valve.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI and OTI
readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
TRT ilnet goggle valve motor removing work in progress.all foundation bolt made open and control JB bolt 2 out
of made hole my drill and open. Further work in progress.
material repaired from CEId put in in store.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TRT Inlet Goggle Valve Control JB 2 LN Key Bolt Open And Motor Connection Removed And Tagging
Done.After That Overall Valve Cover By Tarpoline.
Float Switch Install At Blower House Sump And Dewatering Pump ON/OFF Operation Check Found
Working Ok.
TRT Stroke Checking SOP Pasted in control room and inlet/outlet goggle valve Drawing pasted in
feeder.
Boiler Temperature Gun Cell Was Dead Same Was Replaced Now Temperation Gun Working
Ok.Handover To Operation Department.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.
TRT FDA status checked and report sent.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI and OTI
readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler #02 NG line east MOV260M motor removed from the motor. And moved to PRDS floor.
3 nos handlamp, 2nos 230V extesnion board ,1 nos of LED are removed from the Boiler 2.
1 nos of 230V extesnion board, 2nos of 24V handlamp removed from the blower house.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Energy Consumption Report Sent To BF Electrical.
Boiler PLC room DATA aggrigator PC was not working,so PC cleaning done.RAM,hard-disk
connections checked and again tried to turn ON but found PC turns ON and automatically
restarted.So hard-disk of another PC connected and found that PC turned ON and worked OK.So
found that original Hard-disk of data aggrigator PC is faulty.Further work under progress.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler-1 OS#1 PC was slow to operate.So PC Restarted And Program Activated,working Ok.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler#02 PT-203 PLC Panel To Field JB Cable Laying In Progress Now Prds Floor To Boiler#02 Field
Plc JB Cable Laying Done.PRDS Floor To PLC Room Laying Work In Progress.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Boiler#02 PT-203 PLC Panel -Cable laying done from prds floor to plc panel.Also tagging done.
Boiler-1 ground floor area indsutrial board given for mech. Work.
Spare ID/FD filter set cleaning done.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,
WTI and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler house and blower house Lighting timer timing setting done.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler#03 L#04 New Shutoff Valve Limit Switch Installing Work In Progress.
2 MVA Trafo Room#2 Housekeeping Done.
MPCB And Channel Arragned For Blower House sump Dewatering Motor PUMP On/Off Operation
Required To Oparation Team Matarial Arranged Now MPCB To Be Installed.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Boiler#03 L#04 New Shutoff Valve feedback transmitter installed.Valve trial taken with operation
team.Valve working ok.also open/close feedback shown in hmi.
Domestic board connetion removed from trt.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler#01 IL#02,IL#04
Boiler#02 L#01,IL#04
Boiler#03 L#01,L#02,IL#04
BF Shutoff Valve Reset Done
Turbo Blower#01 AI RTD (RI-4) Faulty Module Replaced By New AI RTD(RI-4) Module (331-7PF01-
0AB0)
Spare Total 8 RTDs Connection Done In TB#01&TB#02 plc Panels (RI-4) Module For Journal Bearing
blower And Turbine before And After temperature Monitoring Trial.
Single Phase Industrial Board Connetion Given Between Boiler#01&02
Blower House Sump Motor DOL Starter Mounted And MPCB Mounted Cabels Termination Done.Trial
Taken Working Ok.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Boiler#02 L#01,IL#01,IL#04
Boiler#03 IL#03
BF Shutoff Valve Reset Done
As per operation team blower house sump area dewatering current measured.R-9.0A,Y-8.3A,B-9.2A.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB-1 journal bearing rtd -- From field jb to plc panel Cable laying work done.Total 4run laid.
TB-1 & TB-2 JOURNAL BEARING RTD'S added in HMI.
TB-1 ES PC BLOWER & STATOR CONTROL page not open.Troubleshooting done.Now both page are
working.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Started making PPT for Turbo blower tripping logic change.
Boiler And Blower UPS Status checked.
Boiler-3 IL-2 305a Bfg control valve mech. Found jamed.So actuator removed.Positioner and feedback
transmitter connection removed.Further mech. Work under progress.
Hydrojett m/c power cable shifted from blower pdb to tb-1 ground floor.
FSSS-1 ,2 & 3 spare cpu made ready and kept in plc room.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
Boiler 2 East side main BF gas valve actuator trial taken after giving direct air. Actuator working ok.
Boiler 1 L2 BF gas shutt off vlave was going in monitoring so SOV and actuator servecing done and
trial taken. Now working ok.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler HT< panel room a,d blower MCC room vaccum cleaning done.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
1 nos extension board connection was given near TRT blade flusing tank for mechanical work but it's
MCB was tripping.Checked and found that Connection was loose so same was made tight.After that
no tripping occurred.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Sound was coming in LP dosing pump 1 so motor removed from the pump and checked. After trial of
motor, no sound come from motor. Found pump shaft unbalanced so mechanical will attend it.
TB#01 turbine and blower journal bearing RTD cable lugging done in field side in PLc side and
marking done.
PT 316A and PT317A boiler 3 layed cable lugging PLc and field side.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler 1 IL2 BF gas actuator found seal leakge so move to store and seal replacement work in
progress.
FT 208A and B flushing done. Now showing proper reading. FT 108A and B troubleshoting work in
progress.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB-1 blower side and turbine side journal bearings RTD cables lugging and connection done in field
side JB.tagging done.all readings are showing in HMI except before turbine RTD(TIA-205B).So
resistance checked,it's resistance was showing 50kohm.All JBs covered with tarpaulin.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler Cabel Cellar Round Taken.Both Exhaust Fan Found Off So Made On.
TB#01&TB#02 Both New Vacuum Pump Current Measured As Per Operation Team Requirement.
Boiler IL2 BF gas control valve 305A actuator seal replacement done.
Blower house EOP battery bank testing done by CEID team. After CEID team report 4 nos of battery
found faulty so 4 battery byapssed in battery bank and out put voltage checked. Found 246VDC.
BF data not show in Boiler so Data aggricator PC made restart.then showing data.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler-3 L3 air control valve(FIC-310B) feedback was not showing as per command but physically
valve was working ok.Checked and found that coupling shaft of feedback transmitter was loose.SO
same made tight.After that found valve working ok.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler, Blower & TRT PLC Spare Modules Inventory Done And All Data Noted. All Modules
Separated As Per Its Location And Tagging Done.
TRT FDA status checked and report sent.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler-1 top floor lighting was tripping.So checked all connected old 70W fixtures disconnected.after that MCB made
ON.but after some time again tripped.further to be checked.
Boiler-3 top floor lighting troubleshooting done.all connected old 70W fixtures disconnected.after that
found no tripping happened.
Boiler-3 tL-3 BF gas shut-off valve was gone in monitoring,so same made reset.
Boiler-3 IL-2 air control valve (FIC-305B) actuator calibration done after seal replacement,working
ok.Actuator mounting pending due to mechanical manpower unavailability.
Boiler-3 IL-2 air control valve (FIC-305B) actuator calibration done after seal replacement,working
ok.Actuator mounting pending due to mechanical manpower unavailability.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
Boiler 2 IL4 & Boiler 3 IL3 BF gas Shut-off valve was gone to monitoring.so same made reset.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler#03 Lower Layer And Uper Layer Main Line NG Shutoff Valves Was Not Working Same Was
Troubleshooting Done Found in FSSS Panel Its Feedback Relay Supply MCB Was Faulty.New MCB
Installed.And All Burners Valves Power Supply Restored.
Boiler#03 all manually open valves put in auto trial taken working ok.all burners taken in line by
operation. L#04 pilot valve not working same was troubleshooting done.After That working ok.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler-3 IL-2 305b air control valve founs seal leakage.So new seal changing work and actuator
servicing done.Further work under progress.
1no of industrial board connection removed near Tb-1 turbine floor and shifted to instrument repair
room.
Boiler-3 IL-3 , Boiler-2 IL-1,IL-4 bf shutoff valve resetting done as per operation team instruction.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Boiler 1 IL4 & Boiler 3 L1 BF gas Shut-off valve was gone to monitoring.so same made reset.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
Boiler PLC room and HT room 1 no AC found off. Made feeder supply on in PDB now all Ac are on
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
Boiler-1 il-2 105, Boiler-2 l1,il-4 bfg shutoff valve reseting done.
Boiler-1 L-2 109 bfg shutoff valve not operating from hmi.Found problem in sov.So sov servicing done
after trial taken valve working ok.
Boiler-3 IL-2 fic 305-b air control vave after seal replacement calibration done.Inform to boiler
operation team for moutning.
TRT Power Oil Pump-1 & 2 loto given for mech. Work.
Boiler-3 trench area dewatering pump checked.Taking current R-3a,Y-2.7,B-3.2a.OLR setting-5a.
2nos of 24v hand lamp shifted from trt to blower house.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
1)Boiler#03 303A NG Control Valve Troubleshooting Done Now Working Ok.Found Its pilot Relay Was
Faulty And Positioner 0 Setting Was Disturb Same Was pilot relay replaced And Positioner calibration
done.trial taken valve working ok.Handover To Operation Team.
2)Actuator Shaft Lubrication Done.
TRT Power oil Pump 1&2 Loto Normal After Mechanical work completed Trial Taken Working Ok.
POP#01 Current R-20.09 Y-19.37 B-19.99
POP#02 Current R-19.30 Y-18.17 B-18.56.
Boiler#01 ID/FD Fan Temp Not Showing In HMI..Same Was Troublshooting Done.Found Its TT 24v
Supply MCB Was Trip.Same Was Made On Now Temperature Showing Ok.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
Boiler-1 il-2 105, Boiler-2 l1,il-4 bfg shutoff valve reseting done.
Boiler-3 IL-2 fic 305-b air control valve actuaor installed.After that put in auto valve operated up to
20%.After 20% valve operated up to 40% as per command when 50% command given valve suddenly
operated with jerk up to 70% and then again stopped at 40%.So further checking under progress.
As per Blast furnace engineer blower house turbine cooling water FT-2115 calibration done by ceid
team.
1Nof of domestic board connection removed from tb-2 ground floor and shifted to instrument repair
room.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
PT-108A&B Both FT Reverse Air Flushing Done.and FT Flushing And Venting Done.after That main shut
Boiler#01 Furnace Camera mcb Was Trip field side check found camera side main input socket and
plug was burn.
Boiler OS Client PC Running Slow Restart And Project Activated Working Normal.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
TB#01 and TB#02 Antisurge valve inspection is done , no Abnormalities found.
HT panel room,LT mcc's , PLC room AC working condition checked.
Routine round taken in All area.
Boiler And Blower UPS Status checked.
Trt outlet sealpot valve not working as per operation engineer. Found mech. Valve jammed.So mech . Valve free n open at
tht time no air coming in control valve .so control valve manualy open but still water not came from valve. After air header
valve open control valve working from sov.inform to mech. Team for further checking of line chokeup. Also found control
vale main air line header valve found off.So valve made on.
Boiler-2 trench area dewatering pump not working as per operation team.Found main power supply off.So supply
nomalised now wrking ok.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Boiler#03 L#01 IV-304 Pilot Valve Feedback Was Not Showing In HMI Troubleshooting Done.Found
Both Limit Switches Are Disturbed From Its Position Same Was Properly Setting Done.After that trial
taken found both open/close feedback showing ok in hmi.
Auxilliary and Substation Transformer Routine inspection done. Checked for any abnormalities,WTI
and OTI readings Conservator tank oil level noted down. Exhaust fan running status cheaked.
Completed
Completed
Completed 3001768288
Completed
Completed
Completed
Completed
Bhushan
Completed
Completed 3001768473
Completed 3001768474
Completed
Completed
Completed
Santanu
Completed
Completed
Completed
Completed 3001768578
Completed
Completed
Completed
Completed
Completed
Completed
Completed Bhushan
Completed
In Progress
Completed
Completed
Completed
Completed
Completed
Completed
Milan
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Anand
Completed
Completed
Completed
under progress
Completed
Completed
Completed
Completed
Milan
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Anand
Completed
Anand
Completed
Completed
Completed
Completed
Completed
Completed
Completed 3001771222
Bhushan
Completed 3001771223
Completed 3001771224
Completed 3001771225
Completed 3001771227
Completed
Completed
Completed
Completed
Completed Santanu
Completed
Completed 3001771378
Completed
Completed
Completed
Completed
Completed
Milan
inprogress
Completed
Completed
Completed
Completed
Completed
Completed Bhushan
Completed
Completed
Completed
Completed
Completed
Completed
Completed Santanu
Completed
Completed 3001771859
Completed
Completed
Completed
Completed
Completed 3001771957
Milan
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed 3001772258
Santanu
Santanu
Completed
Completed
Completed
Completed
Completed
Completed
Santanu
Completed
Completed
Completed 3001772602
Completed 3001772603
Completed
Completed
Completed
Completed
Completed
Completed
Completed 3001772760
Completed 3001772764
In Progress
Completed
Completed
Completed
Completed
Completed Anand
Completed 3001772995
Completed 3001772996
Completed 3001772997
Completed
Completed
Completed Santanu
Completed
Completed
Completed 3001773032
Completed 3001773031
Completed
Completed
Completed
Completed
Completed Bhushan
Completed
Completed
In Progress
Completed
Completed
Completed
Completed
Completed
Completed
Anand
Completed
Completed
Completed
Completed
Completed
Completed Santanu
Completed
Completed
Completed 3001773420
Completed
Completed
Completed
Completed
Completed
Bhushan
Completed 3001773628
Completed 3001773613
Completed
Completed
Completed 3001773625
Completed
Completed
Completed
Completed
Completed
Anand
Completed 3001773628
Completed 3001773613
Completed
Completed
Completed
Milan
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed Anand
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed Bhushan
Completed
Completed 3001774313
Completed
Completed
Completed
Completed Santanu
Completed
Completed
Completed 3001774440
Completed
Completed
Completed
Completed Milan
Completed
Completed 3001774684
Completed 3001774683
Completed
Completed
Santanu
Completed Santanu
Completed
Completed
Completed
Completed 3001774826
Completed 3001774825
Completed
Completed
Completed
Completed
Completed
Anand
Completed
Completed 3001774970
Completed 3001774973
Completed 3001774974
Completed
Completed
Completed
Completed
Milan
Completed
Completed
3001775168
Completed
Completed
Completed
Completed
Completed
Bhushan
Completed
Bhushan
Completed 3001775229
Completed 3001775228
Completed
Completed 3001775227
Completed
Completed
Completed
Completed
Milan
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed Santanu
Completed
Completed 3001775624
Completed
Completed
Completed
Completed Bhushan
Bhushan
Completed
Completed
Completed
Completed 3001775697
Completed
Completed
Completed
Completed Milan
Completed
Completed 3001775834
Completed
Completed
Completed
Completed
Completed
Santanu
Completed
Completed
Completed 3001776033
Completed 3001776075
Completed
Completed
Completed
Completed
Completed Bhushan
Completed
Bhushan
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Milan
Completed
Completed 3003195767
in progress
in progress
Completed
Completed
Completed
Santanu
Completed
Completed
Completed 3001776533
Completed
Completed
Completed
Completed
Bhushan
Bhushan
Completed
Completed
Completed 3001776596
Completed
Completed 3001776594
Completed
Completed
Completed
Completed
Completed
Completed Bhushan
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Milan
Completed
Completed 3001777205
Completed
Completed
Completed
Completed
Completed
Completed Santanu
Completed 3001777489
Completed
Completed
Completed
Completed
Completed Bhushan
Completed
Completed 3001777642
Completed
Completed 3001777639
Completed
Completed
Completed
Completed
Completed
Completed
Santanu
3001778012
Completed
Completed 3001778039
Completed 3001778001
Completed 3001778001
Completed
Completed
Completed
Completed
Bhushan
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed Milan
Completed
Completed 3001778269
Completed
Completed
Completed
Completed
Completed
Completed
Completed Santanu
Completed
Completed 3001778597
Santanu
Completed 3001778596
Completed 3001778595
Completed
Completed
Completed Milan
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Bhushan
Completed
Bhushan
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Anand
Completed 3001779333
Completed 3001779334
Completed 3001779337
Completed 3001779339
Completed
Completed
Completed
Santanu
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Milan
Completed Milan
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed 3001779703
Completed 3001779705
Completed 3001779707
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed 3001779966
Completed 3001779967
Completed
Completed 3001779968
Completed
Completed
Completed
Completed
Milan
Completed
Completed
Completed
Completed 3001780122
Completed
Completed
Completed
Completed
Completed
Completed
Anand
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Bhushan
In Progress
Completed
Completed
In Progress
Completed
Completed
Completed
Completed
Santanu
Completed
Completed
Completed
Completed 3001780796
Completed
Completed
Completed
Completed
Completed
Anand
Anand
Completed 3001780957
Completed
Completed
Completed
Completed
Completed
Completed
Bhushan
Completed
Completed 3001781177
Completed 3001781178
Completed 3001781179
Completed
Completed
Completed
Completed
Santanu
Completed
Completed
Completed
Completed 3001781224
Technician
Sagar(A) Vivek(G)
CEIDTech vaibhav(B)
NA
vivek(B)
NA
Vivek(A)
NA
Vaibhav(A)
Vaibhav(A)
Sagar(B)
NA
Vivek(A)
Sagar(B)
NA
Vaibhav(A) Vivek(G)
NA
NA
NA
Vaibhav(A),Vivek(G)
CEID Tech.
Sagar(B) Vivek(G)
NA
Vaibhav(A),Vivek(G)
Sagar(B),Vivek(G)
N.A
Vaibhav(A),Vivek(G)
sagar(B),Vivek(G)
N.A
Vaibhav(A),Vivek(G)
Vivek(B),CEID Tech
N.A
vivek(B)
N.A
N.A
Vaibhav(A) Vivek(B)
SAGAR(B)
N.A
N.A
vaibhav(A)
Sagar(B)
N.A
N.A
Sagar(A) vivek(G)
Vaibhav(B) Vivek(G)
N.A
N.A
Sagar(A) vivek(G)
Vaibhav(B) Vivek(G)
N.A
N.A
N.A
Sagar(A)
Vivek(B)
N.A
Vivek(B)
N.A
Sagar(A)
Vivek(B)
Vivek(B)
Sagar(A)
N.A
N.A
Vivek(A)
Vaibhav(B)
N.A
N.A
Sagar(B) Vivek(G)
Sagar(B) Vivek(G)
N.A
N.A
Vaibhav(A) Vivek(G)
Vaibhav(A) Vivek(G)
Sagar(B) Vivek(G)
N.A
BBT boiler_E&I Pending Jo
Sr. No.
High priority
Boiler OS3 PC not suitable for operation. Working
1 very slow & hang many times during operation.
( emergency operation not possible with this HMI)
2 All 3 boilers furnace camera not working
FT108A and 108B equilising valve made closed checked flow not BLR-1 & 2 ID&FD FAN TRIPPING HOOTER IS NOT ACTI
showing zero.also bf gas main valve whwn closed its show ZERO and #
id/fd TRIP CONDITION IT IS RUNNING.
open its show 16000 nm3 flow.
PRDS-2 CONTROL VALVE NOT WORKING SINCE LONG
#
calibration required. CARD NOT AVAILBLE)
# DM Water totalizer (boiler side) req to add shiftwise
FACE PLATE SHOULD BE CHANGE IN ALL BFP's RECIRC
#
MOV AND DISCHARGE
All 3 boiler's LINEwater
steam & feed MOV.( M-215range
totalizer TO M- 22t
req
#
stuck 48000 T
# steam totalizer range req to increased. (FT - 003) Val
# DM Water totalizer range req. to increased. Value stu
PRDS steam totalizer not working. also range req. to
#
stuck 16500 T
Other pending list Status
& TE:- PT 116B, TE-113A, TE-116A all req to
CPU Status(Healthy or
Sl.No Area PLC Panel Description PLC CPU Battery status
NOT,Master/slave)
Username: Administrator
BLOWER
Username: engineer
Username: Administrator
Username: engineer
Username: Administrator
Username: Administrator
Blower CR Vacuum Pump/TRT Opn
5 Windows XP HP compaq HPd220MT (PT794PA) Password: delta123#
BOILER
Username: Administrator
Username: Administrator
Username: engineer
Username: Administrator
Username: engineer
4 Boiler ES/OS Siemens AG Simatic Rack PC 547B Password: delta123#
Username: Administrator
5 Boiler OS1 HP compaq Elite 8300 CMT PC Password: master(*&(
Username: Engineer
6 Boiler OS2 Siemens AG Simatic Rack PC 547B Password: delta123#
7 Boiler OS3 Client PC HP AMD HPdx5150MT Password: Master(*&(
Motor/BFP RTD & Vib. Username: Administrator
8 Boiler EM & Temp. Monitoring System HP AMD HPdx5150MT Password: master(*&(
Sr. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Job Description Area
1000688171
1000688172
1000688179
1000688176
1000688177
100688178
1000688179
1000688180
1000688183
1000688185
1000688186