Conveyance System Design
Conveyance System Design
6575mm/day
Overall efficiency, Ea;
Ea = Ec X Ed X Ef = 0.75 X 0.72 X 0.65 = 35.1%
𝐸𝑇𝑐
𝑈𝐺𝑊𝐷 =
𝐸𝑎
4.6575
= = 13.269𝑚𝑚/𝑑𝑎𝑦
0.351
1mm/day = 0.116L/s/Ha
13.269mm/day = =1.539L/s/Ha
𝑈𝐺𝑊𝐷 𝑋 𝐴
𝑆𝑊𝑅 = ℎ 𝑑
𝑋
24 7
1.539 𝑋 278
𝑆𝑊𝑅 = = 1197.958 𝐿/𝑠𝑒𝑐
10 6
24 𝑋 7
1000 L/s = 1 M3/s
1197.958 L/s = 1.198M3/s
(𝐸𝑊𝐿 − 𝐸𝐻)
𝑆𝑜 = 𝐿 𝑋 100 = 0.05%
Canal shape
B
fb
d D
b
-1-
Canal design
Q= AV
2 1
3𝑥 𝑆2
𝑉= 𝑛
2 1
3𝑥 𝑆2
𝑄= 𝑛
A = d (2 +zd)
P = b + 2d√1+Z2
-2-
Z=2
A = d (2 +2d) =0.649 (2+ (2x0.649)) = 2.14m
P = b + 2d√5 = 2 + (2x0.649x√5) = 4.9m
2.14
𝑅= = = 0.437𝑚
𝑃 4.9
Section properties
From excel, the properties of the adequate section are as follows;
4.596
0.2
0.649 0.849
-3-
Free board, fb = 0.3d or 0.2m
0.3 X 0.649 = 0.195m
Therefore we choose 0.2m since it is the highest
D= Fb + d = 0.2 + 0.649 = 0.849m
Velocity of flow in the canal, V;
2 1
3𝑥 𝑆2
𝑉= 𝑛
1
0.576𝑥 0.05%2
𝑉= 0.023 = 0.560𝑚/𝑠
𝑉
𝐹𝑟 =
√𝑔𝑦
0.560
𝐹𝑟 = √9.81 𝑋 0.649 = 0.22
𝑉 3𝑥 𝑆2
𝑃 = 𝑛
Ap = D (2 +2D) = 0.849 (2+(2 X 0.849)) =3.14m
Pp = b + 2D√5 = 2 + (2 X 0.849 X √5) = 5.797m
3.14 = 0.542
𝑅𝑝 = =
𝑃𝑝 5.797
Therefore;
2 1
𝑉 0.5423 𝑥 0.05%2
𝑃 = 0.023 = 0.646𝑚/𝑠
Qp = Ap X Vp = 3.14 X 0.646 = 2.028m/s
-4-
SECONDARY CANALS
Secondary canal serving the 74Ha block (A)- Keith Kitungo
Area designed for below = 74 Ha block within the total area
Crop to be planted: Potatoes
1mm/day = 0.116L/s/Ha
13.269mm/day = =1.539L/s/Ha
-5-
-6-