Professional Documents
Culture Documents
KPI Construction
KPI Construction
KPI Construction
KPI
1 # Procedural audits
2 # Quotes accepted for major construction projects
3 # Requests for time extension submitted
4 #unapproved change orders
5 % Building material re-used on site
6 % Complaints received that were followed by an onsite check
7 % Construction sites or locations with reoccurring complaints
8 % Cost predictability at construction
9 % Cost predictability at design and construction
10 % Cost predictability at design
11 % costs to rectify defects in the maintenance period
12 % Man hours spent for punch items
13 % Proactive inspections that identified violations
14 % Quality control tests passed
15 % Time predictability for design and construction
16 % Project budget variance
17 # Conflicts arising during the project
18 % Project issues addressed ratio
19 % Project or program budget spent on training
20 % Overdue project tasks
21 $ Cost avoidance savings
22 # Earned man-hours
23 # Time per project task
24 % Time spent as planned
25 % Successful projects
26 % Progress reports submitted as planned
27 % Requirements changed during project execution
28 % Stakeholders satisfied with the accuracy of the project feasibility study
29 % Aborted projects
30 % Proposed changes without impact analysis
31 % Time for construction
32 % Construction cost in use
33 % Cost of construction
34 % Civic construction projects completed early or on time
35 % Active capital projects in construction phase on schedule
36 # Construction related incidents, injuries and fatalities reported
37 $ Committed costs
38 % Construction design scope specifications completely met
39 % Project cost contingency
40 # Quality issues found in constructions ready for use
41 % Cost predictability at construction due to client change orders
42 % Time predictability at construction due to client change orders
43 % Order value variance from original contract value
44 % Existing building re-used
45 % Construction project value represented by punch list items
46 # Days to complete first plan review
47 % Jobs professionally certified in compliance with local regulations
48 % Construction sites proactively checked for compliance with permit conditions
49 # General construction contractors
50 # House construction contractor
51 # Nonresidential building construction contractors
52 # Road and bridge construction contractors
53 # Construction trade services contractors
54 # Building structure services contractor
55 # Non-building construction contractor
56 % Concrete waste
57 # Engineering Change Order Cycle Time
58 $ Transportation cost/ precast concrete panel
59 # Concrete needed/precast concrete panel (kg)
60 # Precast concrete grease interceptors
61 # Precast concrete lift stations
62 # Pipes produced
63 # Utility values produced
64 # Sound walls/barriers
65 # Retaining wall system produced
66 # Prestressed bridge components
67 # Prestressed structural building elements
68 # Quarry Land Used (HA)
69 # Quarry Extraction (ton)
70 # Raw Material Contamination (g/ton)
71 # Recycled Materials Used (ton)
72 # New repair and maintenance projects commissioned
73 # Defects
74 % Profitable projects
75 $ Estimate at completion (EAC)
76 # Cost performance index (CPI)
77 # Schedule performance index (SPI)
78 # Schedule Cost index (SCI)
79 # Schedule Variance
80 # To complete schedule performance index (TSPI)
81 $ Cost variance
82 # To complete performance index (TCPI)
83 % Projects link with business objective
84 % Budget allocated for new initiatives
مؤشر االداء الرئيسي رابط النموذج
عدد المراجعات لالجراءات
عروض أسعار مقبولة لمشاريع البناء الرئيسية
عدد طلبات امتداد الوقت المقدمة
عدد اوامر التغيير التي لم يتم اعتمادها
نسبة خامات البناء التي يعاد استخدامها في المواقع
نسبة المواقع التي يتم متابعة الشكاوى فيها
%نسبة المواقع التي تتكرر فيها الشكاوى
الدقة في التنبؤ بالتكلفة اثناء التنفيذ
الدقة في التنبؤ بالتكلفة اثناء التصميم والتنفيذ
الدقة في التنبؤ بالتكلفة اثناء التصميم
تكلفة اصالح العيوب في فترة الصيانة
%نسبة ساعات العمل للبنود التي عليها مالحظات
نسبة الفحص االستباقي الذي حدد مخالفات
نسبة القبول للمنتجات اثناء االختبار
دقة التنبؤ للجدول الزمني اثناء مرحلتي التصميم والتنفيذ
نسبة االختالف عن موازنة المشروعات
عدد المشكالت بين فريق العمل
نسبة مشاكل التنفيذ التي تم حلها
نسبة موازنة التدريب من موازنة المشروع
نسبة االنشطة المتأخرة
قيمة التكلفة التي تم توفيرها
عدد ساعات العمل المكتسبة
متوسط زمن النشاط
نسبة وقت التنفيذ مثل المخطط
نسبة المشروعات الناجحة
نسبة تقارير االداء المقدمة فعال مقارنة بالمخطط
نسبة المتطلبات التي تم تغييرها اثناء التنفيذ
نسبة المعنيين الراضيين بدقة دراسة الجدوى
نسبة المشروعات الملغاة
نسبة التغييرات المقترحة من غير تحليل التأثير
نسبة تغير زمن المشروع عن تقدير عام سابق
نسبة تكلفة التشغيل والصيانة مقارنة بتكلفة االنشاء والتصميم
نسبة تغير تكلفة المشروع عن تقدير عام سابق
نسبة المشروعات المدنية التي تنتهي في الوقت او قبله
نسبة المشروعات الكبيرة قيد التنفيذ المحققة للجدول الزمني
عدد المواقع التي بها حوادث او اصابات او تلفيات لمعدات
التكلفة الملزمين بها في المستقبل
نسبة مواصفات التصميم االنشائي المتوافقة كليا
نسبة التكلفة االحتياطية للمشروع
No. KPI
49 # General construction contractors
50 # House construction contractor
51 # Nonresidential building construction contractors
52 # Road and bridge construction contractors
53 # Construction trade services contractors
54 # Building structure services contractor
55 # Non-building construction contractor
% Independent contractors
$ Cost rate of contractors
# Length of contractor assignment
مؤشر االداء الرئيسي رابط النموذج
No. KPI
28 % Stakeholders satisfied with the accuracy of the project feasibility study
% Key stakeholders satisfied with suppliers
% Projects meeting stakeholder expectations
# Stakeholder Satisfaction Index
# Strategic stakeholders satisfaction index (# SSSI)
مؤشر االداء الرئيسي رابط النموذج
نسبة المعنيين الراضيين بدقة دراسة الجدوى
No. KPI رابط النموذج مؤشر االداء الرئيسي
38 % Construction design scope specifications completely met سبة مواصفات التصميم االنشائي المتوافقة كليا
% Projects with scope changes
No. KPI
26 % Progress reports submitted as planned
% Overdue project status reports
% Progress reports submitted
% Reports submitted on-time
% Accurate financial reports
# Monthly finance reports to CEO reports ratio
% Timely production of management reports
% Change reports produced on schedule
# Claims reported
# Report processing time
# Sustainability reports
# Internal reports to members
# Final reports requiring revision
# Customer reported problems in the first 90 days of an application deployment
رابط النموذج مؤشر االداء الرئيسي
نسبة تقارير االداء المقدمة فعال مقارنة بالمخطط
pplication deployment
No. KPI رابط النموذج مؤشر االداء الرئيسي
22 # Earned man-hours عدد ساعات العمل المكتسبة
$ Estimate at completion (EAC)
# Cost performance index (CPI)
# Schedule performance index (SPI)
# Schedule Cost index (SCI)
# Schedule Variance
# To complete schedule performance index (TSPI)
$ Cost variance
# To complete performance index (TCPI)
No. KPI رابط النموذج مؤشر االداء الرئيسي
18 % Project issues addressed ratio نسبة مشاكل التنفيذ التي تم حلها
No. KPI رابط النموذج مؤشر االداء الرئيسي
17 # Conflicts arising during the project عدد المشكالت بين فريق العمل
% Conflicts positively resolved during the project
47 % Jobs professionally certified in compliance with local regulations
No. KPI
1 % Complaints received that were followed by an onsite check
2 % Construction sites or locations with reoccurring complaints
3 % Successful projects
4 % Aborted projects
5 % Civic construction projects completed early or on time
6 % Active capital projects in construction phase on schedule
7 # Construction related incidents, injuries and fatalities reported
8 % Construction sites proactively checked for compliance with permit conditions
9 # New repair and maintenance projects commissioned
10 % Profitable projects
11 % Projects link with business objective
12 % Budget allocated for new initiatives
13 % Strategic business initiatives driven by IT
14 % Time spent on new projects development
15 % Projects on time
16 % Projects on budget
17 # Projects per project manager
18 # Project managers to staff ratio
19 # FTEs assigned per project
20 % Understaffed projects
21 % Projects prioritized according to business needs
22 # Project managers experience in the field
23 $ Project deviation from planned budget
24 $ Project budget size
25 % Projects with scope changes
26 % Project cost predictability
27 % Completion cost of best in class projects
28 % Projects rejected
29 % Projects without a business case
30 % Projects with at least one milestone missed
31 % Projects with insufficient resources
32 % Aborted projects
33 # Project break even time
34 % Projects that completed quality assurance review
35 % Projects completed on time and on budget
36 % Projects in control
37 % Completed projects compliant to quality specifications
38 % High risk projects
39 % Projects with risk assessment overview
40 # Project approval time
41 # Project duration
42 # Project schedule deviation
43 % Completion time of best in class project
44 % Active running projects on time, on budget and according to specifications
45 $ Profit per project
46 % Project budget overruns rate
47 % Transformation initiatives where to-be state is defined
48 # Changes per project
49 # Issues raised per project
50 # Risks identified per project
51 # Active projects
52 % Projects that never get materialized
53 % Projects related to business
رابط النموذج
No. KPI رابط النموذج مؤشر االداء الرئيسي
4 #unapproved change orders عدد اوامر التغيير التي لم يتم اعتمادها
27 % Requirements changed during project execution نسبة المتطلبات التي تم تغييرها اثناء التنفيذ
30 % Proposed changes without impact analysis نسبة التغييرات المقترحة من غير تحليل التأثير
43 % Order value variance from original contract value
57 # Engineering Change Order Cycle Time
% Cost predictability at construction due to project manager change orders
% Cost predictability at construction due to client change orders
% Time predictability at construction due to client change orders
% Time predictability at construction due to project manager change orders
No. KPI مؤشر االداء الرئيسي
# Contract variations
% Retention rate of active contracts
$ Contract payments
$ Activated contract renewals
$ Contract terminated billed value with contractors
% Contracts reviewed
# Contract complaints
% Claims recovery rate
$ Transaction cost with new service providers
% Contracts awarded through competitive tendering process
% Contracts due to expire in the next X days
$ Contract renewals value uplift
$ Contract per client
$ Contract
# Contract negotiation time
% Contracts completion on-time
$ Penalty payments for contract failures
# Contract time to completion
% Contract penalties
% Contracts that fail to deliver direct agreements
$ Estimated value of contract extension
% Requirements contracts
# Contract reports
$ Bid and proposal costs
% Contracts filled without error
رابط النموذج
No. KPI مؤشر االداء الرئيسي
1 # Quotes accepted for major construction projects
2 % Key suppliers accounting for 80% of spending
3 $ Negotiated cost reduction savings
4 # Requisition, purchase order, or invoice transaction volume
5 % Local suppliers
6 # Sales orders filled per FTE
7 # Sales orders filled per unit time
8 % Goods purchased from certified suppliers
9 % Procurement requests satisfied by preferred suppliers
10 % Procurements in compliance with standing procurement policies
11 # Receipts processed per full working hour
12 % Active suppliers that are certified
13 % Key suppliers regularly visited
14 % Supplier on-time delivery
15 % Raw material conformance
16 % Transactions handled by the purchasing department
17 $ Purchase dollars spent per active supplier
18 $ Purchase operating expense per active supplier
19 % Non-contract purchases
20 $ Material acquisition cost
21 % Purchase spend from sales revenue
22 % Purchase operating expense from sales
23 $ Purchase spend per purchasing employee
24 % Purchase spend controlled by purchasing
25 # Purchase orders
26 % Purchase spend offshore
27 % Purchase spend onshore
28 % Cost avoidance savings in procurement
29 % Active suppliers who are e-Procurement enabled
30 % Cost reduction savings in procurement
31 % Purchase spend via e-Auctions
32 % Purchase spend via procurement cards
33 % Purchase spend via strategic alliances
34 % Purchase spend with diversity suppliers
35 % Inactive suppliers
36 % Procurement return on investment
37 % Invoice accuracy
38 % Purchase spend under management
39 $ Purchase order value
40 $ Purchase price variance
41 # Purchase order cycle time
42 # Days to pay
43 % Customer invoices past due
44 # Customers past due
45 % Vendor invoices past due
46 % Vendors on hold
47 # Vendor invoices due today
48 # Customer invoices due today
49 $ Warehouse cost per order
50 # Planned purchase orders
51 % Purchase orders not sent
52 % Unconfirmed purchase orders
53 # Approved purchase requisitions released
54 # Requests for quote
55 % Purchase return
56 $ Invoiced purchase amount
57 % Delayed purchases
58 % Pending purchase order invoices
59 % Purchase amount rate
60 # Procurement training hours per employee
61 % Purchase spend aggregated through corporate contracts
62 # Load handling time
63 % Invoices received electronically
64 $ Purchase spend per supplier
65 % Company invoices paid electronically
66 $ Invoice value
67 % Undisputed supplier invoices paid within 30 days
68 # Suppliers managed by purchasing employee
69 % Supplier purchase orders in full
70 % Supplier rejections
71 $ Variable cost of placing orders with supplier
72 % Returned to suppliers
73 % Perfect purchase order rate
74 $ Activity-based cost of acquiring materials and services
75 % Relationships established with certified suppliers
76 # Value added suppliers
77 # Rating of supplier performance
78 $ Life cycle cost (LCC)
79 # Amortization period in months
80 # Asset turnover
81 # Days to execute purchase orders
82 # Local suppliers attending quarterly procurement workshops
83 % Product section based on National Essential Medicine List (NEML)
84 % Emergency purchase orders
85 % Strategic suppliers with MSS
86 # Capability rating given to key suppliers/distributors
87 % New suppliers/distributors with rating above 80 at start-up
88 % Product availability
89 # Strategic supplier QA Rating
90 % Forecast Error (MAPE-SKU)
91 % Strategic volume multi-sourced
92 % Procured products registered in-country
93 % Commitment to established procurement plan
94 % Contracts issued as framework contracts
95 % International reference price paid
96 % Justified complaints regarding invoicing
97 # Average duration to solve complaints related to invoicing
98 # Complaints regarding invoicing
99 % Product order compliance
100 % Emergency orders
101 % Products or services purchased locally
رابط النموذج
No. KPI
3 # Requests for time extension submitted
13 % Man hours spent for punch items
16 % Time predictability for design and construction
20 % Overdue project tasks
23 # Time per project task
24 % Time spent as planned
31 % Time for construction
42 % Time predictability at construction due to client change orders
46 # Days to complete first plan review
مؤشر االداء الرئيسي رابط النموذج
عدد طلبات امتداد الوقت المقدمة
%نسبة ساعات العمل للبنود التي عليها مالحظات
دقة التنبؤ للجدول الزمني اثناء مرحلتي التصميم والتنفيذ
نسبة االنشطة المتأخرة
متوسط زمن النشاط
نسبة وقت التنفيذ مثل المخطط
نسبة تغير زمن المشروع عن تقدير عام سابق
No. KPI
8 % Cost predictability at construction
9 % Cost predictability at design and construction
11 % Cost predictability at design
12 % costs to rectify defects in the maintenance period
16 % Project budget variance
19 % Project or program budget spent on training
21 $ Cost avoidance savings
32 % Construction cost in use
33 % Cost of construction
37 $ Committed costs
39 % Project cost contingency
41 % Cost predictability at construction due to client change orders
58 $ Transportation cost/ precast concrete panel
مؤشر االداء الرئيسي رابط النموذج
الدقة في التنبؤ بالتكلفة اثناء التنفيذ
الدقة في التنبؤ بالتكلفة اثناء التصميم والتنفيذ
الدقة في التنبؤ بالتكلفة اثناء التصميم
تكلفة اصالح العيوب في فترة الصيانة
نسبة االختالف عن موازنة المشروعات
نسبة موازنة التدريب من موازنة المشروع
قيمة التكلفة التي تم توفيرها
نسبة تكلفة التشغيل والصيانة مقارنة بتكلفة االنشاء والتصميم
نسبة تغير تكلفة المشروع عن تقدير عام سابق
التكلفة الملزمين بها في المستقبل
نسبة التكلفة االحتياطية للمشروع
No. KPI
13 % Man hours spent for punch items
45 % Construction project value represented by punch list items
% Punch list items completion
مؤشر االداء الرئيسي رابط النموذج
%نسبة ساعات العمل للبنود التي عليها مالحظات
No. KPI رابط النموذج مؤشر االداء الرئيسي
5 % Building material re-used on site نسبة خامات البناء التي يعاد استخدامها في المواقع
44 % Existing building re-used
56 % Concrete waste
59 # Concrete needed/precast concrete panel (kg)
60 # Precast concrete grease interceptors
61 # Precast concrete lift stations
62 # Pipes produced
63 # Utility values produced
64 # Sound walls/barriers
65 # Retaining wall system produced
66 # Prestressed bridge components
67 # Prestressed structural building elements
68 # Quarry Land Used (HA)
69 # Quarry Extraction (ton)
70 # Raw Material Contamination (g/ton)
71 # Recycled Materials Used (ton)
No. KPI
1 # Procedural audits
2 # Quality issues found in constructions ready for use
3 % Quality control tests passed
4 % Proactive inspections that identified violations
5 # Quality issues found in constructions ready for use
6 # Defects
7 % Quality defects
8 % Outdated equipment still in use
9 # Failure rate
10 # Regression testing
11 # Breakdowns
12 % Defects per million opportunities (DPMO)
13 $ Cost of poor quality (COPQ)
14 % Final products which do not meet quality criteria
15 # Piece variance
16 # Production rejects
17 % Production losses
18 # Production lead time
19 $ Price of non-conformance
20 % Hazardous operational waste
21 # Time spent performing preventive maintenance (PM) work
22 # Working stock
23 # Decoupling stock
24 $ Maintenance, repair and operating supplies (MRO)
25 % Scrap rate
26 # Waste per product
27 % Processes under statistical control
28 % Production delays due to raw material shortage
29 % Work in progress days
30 % Production uptime
31 # Duration of quality control inspections
32 % Quality assurance processes that need 'Improvement Measures'
مؤشر االداء الرئيسي رابط النموذج
عدد المراجعات لالجراءات