Format-3 Details of Road Safety Signborad DT 04.07.2023

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

vuqyXud&14

As on May-2023
Nos. of Road Safety Sign Board
Mandatory/ Cautionary Infromatory No. of No. of No. of No. of No. of No. of Zebra No. of
Regulatory Signbaord i.r.o Signbaord Signbaord i.r.o Signbaord i.r.o Signbaord crossing Sign Signbaord
Project completion
Hospital i.r.o School Village Awadi/ Market i.r.o on NHs i.r.o Speed
S.No. PIU Name Project Name /Package NH date which is under
Area Accedent Limit
implementation Remarks
Prone Area

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Pkg-I from EPE to Shamli section of
1 709B 44 398 206 9 32 24 6 22 102 69 Completed
NH-709B
Pkg-II from Shamli to Saharanpur
2 709B 171 776 145 2 11 16 16 4 197 54 Mar-23
section of NH-709B
Meerut-Haryana Border via Baghpat of Project under
3 334B 12 10 8 4 44 6 18 6 0 2 Completed construction. Sign
PIU- Baghpat Nh-334B
boards had been
Panipat to Shamli section of NH-709AD installed at blackspot
4 709AD 139 1050 102 4 5 16 4 2 24 14 Dec-22
Pkg I locations/construction
5 Shamli Muzaffarnagar Pkg II 709AD 123 433 579 3 6 56 4 4 42 24 Apr-2023 sites.
Meerut-Haryana Border via Shamli of
6 709A 35 27 25 0 0 0 0 0 9 40 Jan-2023
NH-709A

4/6 laning of (Aligarh –Kanpur Section )


Naviganj - Mitrasenpur section of NH-
91 from Km 289.000 to Km 356.000
7 91 116 1180 513 2 32 28 - - 55 77 31-Oct-23
Package-IV (Kannauj District) in the
State of Uttar Pradesh under
Bharatmala Pariyojana
PIU Kannuaj
4/6 laning of (Aligarh –Kanpur
Section ) Mitrasenpur – Kanpur section
of NH-91 from Km 356.000 to Km
8 91 300 765 166 3 10 4 2 0 0 75 16-Aug-23
414.000 Package-V (Kanpur district) in
the State of Uttar Pradesh under
Bharatmala Pariyojana.

Two laning with paved shoulders of


Bareilly-Sitarganj section of NH-74
from Km. 254.820 to Km 329.280 in the 74 21 31 16 0 16 82 0 47 63 35 -
State of Uttrakhand & Uttar Pradesh,
Under NHDP Phase

Improvement and Up-gradation of


Bareilly Existing Road to 4–lane with Paved
Shoulder from Km 229.070 to 260.800,
731 80 20 16 0 0 0 0 25 5 80 22-10-2024 -
End of Hardoi District to Lucknow of
NH 731 (Pkg-IV) on EPC basis in the
state of Uttar Pradesh

Balance Work of Four laning of


Bareilly-Sitapur Section of NH-24 from
10 24 265 380 132 3 19 58 60 126 6/30/2023 -
Km 262.000 to 419.540 in the state of
Uttar Pradesh-

Independent Engineer Services for


Operation & Maintenance of Jhansi- 11 18 23 40 28 30 Project running Under
11 27 121 119 74 0 Completed
Orai section Stretch of NH-25 (NEW OMT Basis
NH-27) KM 90.300 to KM 225.713

Design, Construction, Development,


inance, Operation & Maintenance of
km 0.000 to km 49.700 of NH-26 (New
Project under O&M
12 NH-44) in the state of UP under North- 44 14 170 104 1 1 16 0 0 44 12 11.06.2010
stage
South corridor (NHDP Phase-II) on BOT
PIU- Jhansi (Annuity) Basis Package No.
NS-1/BOT/UP-2
Nos. of Road Safety Sign Board
Mandatory/ Cautionary Infromatory No. of No. of No. of No. of No. of No. of Zebra No. of
Regulatory Signbaord i.r.o Signbaord Signbaord i.r.o Signbaord i.r.o Signbaord crossing Sign Signbaord
Project completion
Hospital i.r.o School Village Awadi/ Market i.r.o on NHs i.r.o Speed
S.No. PIU Name Project Name /Package NH date which is under
Area Accedent Limit
implementation Remarks
Prone Area

PIU- Jhansi

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Design, Construction, Development,


inance, Operation & Maintenance of
km 49.700 to km 99.005 of NH-26 (New
Project under O&M
13 NH-44) in the state of UP under North- 44 16 174 110 2 3 38 0 12 62 16 31.07.2010
stage
South corridor (NHDP Phase-II) on BOT
(Annuity) Basis Package No.
NS-1/BOT/UP-3

02 Laning with Paved Shoulders of Agra


to Aligarh Section of NH-93 fom km
0.000 to km 79.000 in the state of
14 Uttar Pradesh on DBFOT Basis under 93/509 208 271 324 6 23 134 0 13 36 35 - Completed
NHDP Phase IVA

6 Laning of Agra to Etawah Bypass


Section of NH-2 from km 199.600 to km
PIU Agra 323.525 under NHDP Phase V in the
15 state of Uttar Pradesh to be executed 2/19 180 1200 210 6 15 65 2 10 0 40 Completed
on BOT (Toll) mode

New Four Lane Agra Bypass section


from km. 0.00 to km. 32.800
16 connecting km. 176.80 of NH-2 to km. - 18 10 38 0 3 20 6 4 0 12 Completed
13.03 of NH-3 in the state of Uttar
Pradesh.

4/6 laining of Ghaziabad – Aligarh


Project is under six
17 section of NH-91 from KM 23.600 to KM 91 960 130 52 0 0 0 0 20 0 0 -
laning
149.900
Aligarh- Kanpur Section of NH-91 from
PCC issued on
18 Km. 140.200 to 186.000 (Aligarh - 91 24 612 219 2 9 42 2 0 80 23 -
16.05.2023
Bhadwas Pkg-1)

PIU Aligarh Aligarh- Kanpur Section of NH-91 from PCOD issue on dt.
19 Km. 186.000 to Km. 229.000 91 423 99 30 0 19 34 0 0 50 77 - 12/06/2021 and CC
(Bhadwas-Kalyanpur Pkg-2) issued on 06.01.2022.

PCC issued on date


Aligarh- Kanpur Section of NH-91 from
25.10.2021 and CC
20 Km. 229+000 to Km. 289+000 91 11 544 3 0 6 31 0 0 22 44 -
issued w.e.f.
(Kalyanpur - Naviganj Pkg-3)
31.03.2022.
4-laning of Meerut-Bulandsahar Section
of NH-235 (New NH-334) from km
8.800 (Design Chainage 8.800) to km
66.482 (Design Chainage 73.512) (total
21 length 61.19 km excluding existing NH-235 118 600 240 5 21 81 0 8 135 34 Completed -
3.522 km Hapur Bypass) in the State of
Uttar Pradesh
PIU Meerut

Meerut Muzaffarnagar section from


Km. 52.250 to km. 130.560 of NH 58
22 NH-58 204 276 377 8 23 47 0 23 72 18 Completed -
(Meerut-Muzaffarnagar Section) in the
state of Uttar Pradesh

6-laning Project of Etawah (Km.


323.475) to Chakeri (Km.
483.687)Kanpur Section of NH-2 (New 2 326 236 366 24 32 250 15 50 220 40 30.11.2016
NH-19) on DBFOT basis Under NHDP
Phase V.
Nos. of Road Safety Sign Board
Mandatory/ Cautionary Infromatory No. of No. of No. of No. of No. of No. of Zebra No. of
Regulatory Signbaord i.r.o Signbaord Signbaord i.r.o Signbaord i.r.o Signbaord crossing Sign Signbaord
Project completion
Hospital i.r.o School Village Awadi/ Market i.r.o on NHs i.r.o Speed
S.No. PIU Name Project Name /Package NH date which is under
Area Accedent Limit
implementation Remarks
Prone Area

1 2 3 4 5 6 7 8 9 10 11 12 13 14
Six Laning of Chakeri-Allahabad
Section of NH-2 from km. 483.687 to
km. 628.753. (Design length 145.066 Improved with
Km.) in the State of Uttar Pradesh 2 174 2113 783 3 67 204 50 VUP/LVUP/FO 162 130 Expected 14.08.2023
under NHDP Phase-V on Hybrid Annuity /ES
Mode

Kanpur Two laning with Paved shoulders of


Kanpur to Kabrai Section of NH-86 86/ new
96 514 74 24 80 76 56 18 40 112 Completed
from 7.430 to km.130.100 in the state 34
of Uttar Pradesh on DBFOT Toll Basis

Design, Engineering, Construction,


Development, Finance, Operation and
Maintenance of Km.220.00 to
Km.255.00 on Orai-Bhognipur section
on National Highways no. 25(NH-25) 25 292 117 158 1 7 35 8 26 19 17 Completed
and Km 421.20 to Km.449.00 on
Bhognipur-Barah section on natonal
Highways no. 2(NH-2) in the state of
Uttar Pradesh on BOT (Annuity) Basis
Nos. of Road Safety Sign Board
Mandatory/ Cautionary Infromatory No. of No. of No. of No. of No. of No. of Zebra No. of
Regulatory Signbaord i.r.o Signbaord Signbaord i.r.o Signbaord i.r.o Signbaord crossing Sign Signbaord
Project completion
Hospital i.r.o School Village Awadi/ Market i.r.o on NHs i.r.o Speed
S.No. PIU Name Project Name /Package NH date which is under
Area Accedent Limit
implementation Remarks
Prone Area

1 2 3 4 5 6 7 8 9 10 11 12 13 14
27 Moradabad-Bareilly Section of NH-24 24 24 146 587 216 14 31 71 177 30 65 39 -

Six Laning of Hapur Bypass to


Moradabad Section including Hapur
PIU-
28 Bypass From Km 50.000 (Design Ch. Km 24 655 802 544 8 11 44 NA 4 2 56 Under Construction
Moradabad
50.000) to Km 148.277 (Design Ch.
Km149.867) of NH-24

2-LPS Aligarh-Moradabad Section of


29 509 369 1370 627 26 103 628 18 15 44 65 Completed -
NH-509
Lucknow-Sitapur Road (From
30 Lucknow NH-24 21 84 182 4 4 39 7 4 5 12 -
Km.488.270 to Km. 413.200)
Lucknow-Raebareli Road (From12.700
31 Lucknow NH-24B 238 783 271 14 26 138 5 15 72 -
to Km.82.700)
Lucknow -Kanpur Road (From Km.
32 Lucknow NH-25 1071 309 85 11 71 32 0 6 6 32 -
11.005 to Km.75.500)
Lucknow-Ayodhya Road (From Km.
33 Lucknow NH-28 1725 424 120 6 77 99 0 7 13 108 -
8.000 to Km. 137.970)

Lucknow Bypass Road (Shaheed Path)


34 Lucknow NH-56A&B 162 20 84 0 0 18 0 0 0 12 -
(From Km. 0.000 to Km. 22.850)

Jarwal to Bahrich Bypass (From NH-28C


35 Lucknow 194 332 122 24 46 6 6 3 5 12 -
Km.42.546 to Km.93.037) Pkg-2

Bahraich Bypass to Rupadiha Section NH-28C


36 Lucknow 155 427 278 4 20 7 27 4 2 6 -
( From Km.99.000 to Km.152.847) Pkg-3

Lucknow –Sultanpur Road


37 Lucknow NH-56 1029 304 102 23 39 87 18 26 64 12 -
(From Km.11.500 to Km. 138.925)

NH-28 4-Lane Bypass Starting from KM


17.600 of MDR-77C and terminating at
KM 15.650 of NH-28 (bypass
38 Lucknow CH.From79.516/79.000 to Ring Road 87 18 72 4 3 26 0 0 13 4 -
94.457/93.473 total length of 14.707
km.)
Lucknow Ring Road Pkg-3B

Total (W) 10221 17274 8144 452 898 2518 336 545 1698 1662
Total (E) 2627 11487 2426 195 600 1312 347 183 731 551
G. Total 12848 28761 10570 647 1498 3830 683 728 2429 2213