NATIONAL HIGHWAYS AUTHORITY OF INDIA Regional Office - UP (West) Detail of Junctions with NH/SH/MDR/ODR for SCCoRS
As on Aug-2023
Sl. NH No. Junctions with If not improved Junctions Safety measures for these junctions Remarks ( Project
No. NH/SH/MDR/ODR Target with Completed/Ongoing)
(Major Junction completion date village
(nos) road Already improved Under Target
PIU (Minor (Nos) Implementation completion
Junction) date
(nos)
Major Minor
junction Junction
1
Rehabilitation and Upgradation from 2
lane to 4 lane of NH Stretch under
Bharatmala Pariyojna for Unnao-Lalganj
91 Nov-23 72 71 60 32 Nov-23 Project is under Construction
Section of NH 31 (old NH 232A) on Hybrid
Annuity Mode in the state of Uttar
Pradesh Design Chainage 0.000 to 70.000

2
6-laning Project of Etawah (Km. 323.475)
to Chakeri (Km. 483.687)Kanpur Section
16 NA 230 16 230 - NA Completed
of NH-2 (New NH-19) on DBFOT basis
Under NHDP Phase V.

3
Six Laning of Chakeri-Allahabad Section
of NH-2 from km. 483.687 to km.
628.753. (Design length 145.066 Km.) in
3 14.08.2023 97 3 97 - NA Completed
the State of Uttar Pradesh under NHDP Kanpur
Phase-V on Hybrid Annuity Mode

4 Two laning with Paved shoulders of


Kanpur to Kabrai Section of NH-86 from
5 NA 92 5 92 - NA Project Complete under O&M
7.430 to km.130.100 in the state of Uttar
Pradesh on DBFOT Toll Basis
5 Design, Engineering, Construction,
Development, Finance, Operation and
Maintenance of Km.220.00 to Km.255.00
on Orai-Bhognipur section on National
Highways no. 25(NH-25) and Km 421.20 to 5 NA 50 5 50 - NA Project completed under O&M
Km.449.00 on Bhognipur-Barah section
on natonal Highways no. 2(NH-2) in the
state of Uttar Pradesh on BOT (Annuity)
Basis

7 2 Laning with Paved Shoulder of Agra -


Aligarh Section from Km. 00.00 to Km.
79.00 of NH-93 in the State of U.P. on - NA 22 - 22 - NA Completed
BOT (Toll) mode under NHDP Phase IV-A.

Agra
8 Six Laning of Agra - Etawah Bypass section
from Km. 199.660 to Km. 323.525 of NH-2
in the State of U.P. to be executed on 10 Project Completed 154 10 154 - - Project Completed
BOT (Toll) mode under NHDP Phase - V.

9 4-laning of Meerut-Muzaffarnahar section


from Km. 52.250 to km. 130.580 of NH- 12 NA 57 12 57 - NA Project Completed
58.
Sl. NH No. Junctions with If not improved Junctions Safety measures for these junctions Remarks ( Project
No. NH/SH/MDR/ODR Target with Completed/Ongoing)
(Major Junction completion date village
(nos) road Already improved Under Target
PIU (Minor (Nos) Implementation completion
Junction) date
(nos)
Major Minor
junction Junction
10 4-Laning of Meerut – Bulandshahar Section
of NH- 235 in the state of Uttar- Pradesh
(New NH-334) on HAM mode. 11 - 66 11 66 - NA Project Completed

Meerut

4-Laning of Meerut Najibabad Section


11 from km. 11.500 to km 39.250 and km 15 NA 60 8 18 49 Nov.-'23 Ongoing
79.500 to Km. 105.700.

Operation & Maintenance of Jhansi-Orai


section Stretch of NH-25 (NEW NH-27)
KM 90.300 (New Km. 1380.300) to KM
13 12 nil 54 12 54 - nil Project Running Under OMT
225.713 (New Km. 1515.713) (Total
Length 135.413 KM) in the State of Uttar
Pradesh on OMT Basis
14 Design, Construction, Development,
inance, Operation & Maintenance of km
0.000 to km 49.700 of NH-26 (New NH-44)
in the state of UP under North-South 9 N/A 0 9 0 - N/A Project under O&M Stage
corridor (NHDP Phase-II) on BOT (Annuity) Jhansi
Basis Package No. NS-1/BOT/UP-2

15 Design, Construction, Development,


inance, Operation & Maintenance of km
49.700 to km 99.005 of NH-26 (New NH-
44) in the state of UP under North-South 8 N/A 12 8 12 - N/A Project under O&M Stage
corridor (NHDP Phase-II) on BOT (Annuity)
Basis Package No. NS-1/BOT/UP-3

16 Moradabad-Bareilly Expressway Ltd


14 Completed 68 14 68 - Completed Completed

17 2-LPS Aligarh-Moradabad Section of NH-


20 NA 177 20 177 - NA Completed
509
18 Six Laning of Hapur Bypass to Moradabad Moradabad 6 Completed 18 6 17 Mar-24 Ongoing strrtch of wildlife section
Section including Hapur Bypass From Km from 94+365 to 106+950
50.000 (Design Ch. Km 50.000) to Km 1
148.277 (Design Ch. Km149.867) of NH-24
(New NH -9)

Ghaziabad-Aligarh Section of NH-91 from


20 Km. 23.600 to 149.900
15 NA 111 15 111 - - Completed

Aligarh
Sl. NH No. Junctions with If not improved Junctions Safety measures for these junctions Remarks ( Project
No. NH/SH/MDR/ODR Target with Completed/Ongoing)
(Major Junction completion date village
(nos) road Already improved Under Target
PIU (Minor (Nos) Implementation completion
Junction) date
(nos)
Major Minor
junction Junction

Aligarh- Kanpur Section of NH-91 from


21 Km. 140.200 to 186.000 (Aligarh -Bhadwas - NA 30 - 30 - - Completed
Pkg-1)
Aligarh
Aligarh- Kanpur Section of NH-91 from
22 Km. 186.000 to Km. 229.000 (Bhadwas- - NA 27 27 - - Completed
Kalyanpur Pkg-2)
Aligarh- Kanpur Section of NH-91 from
23 Km. 229+000 to Km. 289+000 (Kalyanpur - - NA 33 - 33 - Completed
Naviganj Pkg-3)

Improvement and Up-gradation of Existing


Road to 4-Lane with Paved Shoulders from
Km. 175.080 to Km. 229.070, End of
2 30.04.2024 51 1 20 32 Dec.-2023 Ongoing Project
Hardoi Bypass to End of Hardoi District of
NH-731 (Pkg-lll) on Hybrid Annuity Mode
in the state of Uttar Pradesh

Improvement and Up-gradation of


Existing Road to 4–lane with Paved
Shoulder from Km 229.070 to 260.800,
End of Hardoi District to Lucknow of NH 1 25-09-2023 44 1 12 32 25-09-2023 Ongoing Project
731 (Pkg-IV) on EPC basis in the state of
Uttar Pradesh

Improvement and Up-Gradation of


Existing Road to 2/4 - Lane with Paved Bareilly
Shoulder from Km. 40.000 to Km. 88.750,
3 2/2/2025 97 2 14 84 2/2/2025 Ongoing project
start of Khutar Bypass to start of
Shahjahanpur Bypass of NH-731 (Pkg-1st)
in the state of Uttar Pradesh

Balance Work of Four laning of Bareilly-


Sitapur Section of NH-24 from Km 262.000 25 160 25 160 - - -
to 419.540 in the state of Uttar Pradesh-

Two laning with paved shoulders of


Bareilly-Sitarganj section of NH-74 from
Km. 254.820 to Km 329.280 in the State
of Uttrakhand & Uttar Pradesh, Under 1 - 88 1 88 - Completed
NHDP Phase-lV on the Engeneering
Procurement and Construction (EPC)
mode.

26
EPE Corssing - Start of Shamli Bypass
section 0f NH-709B, Pkg-I
4 - 81 4 81 - - Completed

27
Shamli Bypass to Saharanpur Section of
NH709B, Pkg-II
4 - 75 4 75 - - Completed

Baghpat
Sl. NH No. Junctions with If not improved Junctions Safety measures for these junctions Remarks ( Project
No. NH/SH/MDR/ODR Target with Completed/Ongoing)
(Major Junction completion date village
(nos) road Already improved Under Target
PIU (Minor (Nos) Implementation completion
Junction) date
(nos)
Major Minor
junction Junction
28 Meerut - Haryana Broder via Baghpat NH
334B Baghpat 4 - 72 4 72 - - Completed

29 Bidoli (HR/UP Border) – Shamli-Meerut


1 Jan-23 90 1 71 19 Oct.-2023 Under Implemetation
30 Panipat – Shamli 14 - 31 13 31 1 - Completed
31 Shamli – Muzaffarnagar 14 Apr-23 43 7 25 25 June.-2023 Under Implemetation
32 Muzaffarnagar-Miranpur pkg 3 3 Mar-23 58 3 28 30 Nov.-2023 Under Implemetation
33 Bijnor-Kotwali pkg 4 2 Mar-23 60 2 30 30 Nov.-2023 Under Implemetation

Aligarh to Kanpur Section of NH-91 Pkg.- - 0 18 - 18 Completed Ongoing


34 IV
-

Kannauj

Aligarh to Kanpur Section of NH-91 Pkg.-V 0 - 35 0 35 Completed -


35 -

36 NH-28C Pkg-1 7 - 96 7 96 - -
37 NH-28C Pkg-2 2 - 185 2 185 - -
38 NH-28C Pkg 3 4 - 121 4 121 - - Completed
39 NH-24B 8 - 132 8 132 - - Completed
40 NH-25 10 - 40 10 40 - - Completed
41 NH-56 A & B 0 - 0 0 0 - - Completed
42 NH-28 Lucknow 13 - 60 13 60 - - Completed
43 NH-24 5 - 0 4 0 1 - Completed
44 NH-56 LKO-SLN 14 - 109 14 109 - - Completed
45 LRR- Pkg 3B 4 - 41 4 41 - - Completed
46 LRR- Pkg 3A 1 - 38 1 38 - - Completed
47 LRR- Pkg 2 0 30.08.2023 97 0 22 75 Oct-22 Ongoing
48 LRR- Pkg-1 1 06.08.2023 62 1 42 20 Aug-23 Ongoing

RO-UP (W) 399 3414 361 3021 431


RO-UP (E) 186 1481 172 1069 426
G.Total (W+E) 585 - 4895 533 4090 857