MEP WORKS ITEM

ELECTRICAL
MATERIAL CODE / DESCRIPTION QTY
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
18
19
20
18 21
8 22
LI 23
GNILIEC 24

AC
).F.F( 7 9 9
19
LI 20 LI PO
LI

GNILIEC
).F.N( LEGEND & ABBRB:

10
3
3
2
21 15
14
LI
LI

4 4
16
2 A.A
6 REVISED FOR APPROVAL I.D
I.D I.D

A.SABER
1 5 REVISED FOR APPROVAL MJI I.D A.SABER
22 23 4 REVISED FOR APPROVAL M.ATEF I.D
I.D I.D

A.SABER
6 3 REVISED FOR INFORMATION A.ELG I.D A.SABER
LI 2 REVISED FOR INFORMATION MJI I.D
I.D I.D

A.SABER
REVISED FOR INFORMATION MJI I.D A.SABER
1

24 0 ISSUED FOR INFORMATION MJI I.D


I.D

A.SABER
11 12
12 PO PO
PO
PO
14
PO
13 5
PO LI

F.F.L
84

SECTION-1
INTERNAL ELEVATION
Alfanar Building Systems Factory

STUDIES & DESIGN SERVICES FOR PROJECTS OF NORTH


RIYADH LAND AND THE MINISTRY OF FINANCE LAND IN
MURCIA-2 - RIYADH
PROJECT
VILLA TYPE-C NORMAL

SUBMITTAL NO. : M2PO-FNR-SHD-MEP-01-Rev.11

2201-CMG20-So15MEP
SECTION-B GENERAL NOTES:
SECTION-A 1. ALL MEP PIPES SHALL BE CLOSED BY PVC TAPE.
2. ALL WATER SUPPLY PIPES SHALL BE TESTED 2201-CMG20-So15MEP
AT 10 BAR PRESSURE FOR 12 HOURS