10 Dimensions of BIM

BIM COURSE

10/16/2023

Assignment 1

Rawan Ghanem
BIRD'S NEST STADIUM

The Beijing National Stadium at


the Olympic Green – also known
as the ‘Bird’s Nest’ – hosted the
opening and closing ceremonies of
the Summer and Winter Olympics
in China in August 2008 and
February 2022. The stadium has a
total capacity of 91,000 seats. BIM
Technology was used in the
detailing and workshop design of
the most complex and challenging
parts of the steel structure

PAGE 2
THE PROCESS

3D USED IN BIRD'S NEST STADIUM


The enormous weight of the roof was not simply constructed and calculated
without the 3D Modeling: BIM allowed for the creation of a detailed 3D model of
the stadium, enabling architects and engineers to visualize and analyze the
structure from various angles.

4D USED IN BIRD'S NEST 6D USED IN BIRD'S NEST


STADIUM STADIUM

Clash Detection: BIM facilitated Energy Analysis: BIM technology


clash detection, which helped was used to analyze the energy
identify any conflicts or clashes performance of the stadium,
between different building elements including factors such as lighting,
or systems before construction ventilation, and insulation. This
began. This allowed for early helped optimize energy efficiency
resolution of issues and minimized and reduce operational costs.
rework

PAGE 3
7D USED IN BIRD'S NEST 8D USED IN BIRD'S NEST
STADIUM STADIUM
Structural Analysis: BIM enabled Construction Sequencing: BIM
structural analysis of the stadium's allowed for the creation of a virtual
complex geometry, ensuring that it construction sequence, enabling
could withstand various loads and project teams to plan and coordinate
forces while maintaining structural construction activities more
integrity. effectively. This helped streamline
construction processes and improve
overall project efficiency..

9D USED IN BIRD'S NEST 10D USED IN BIRD'S NEST


STADIUM STADIUM
It is expected that the use of BIM
helped achieve the environmental 10D BIM has the promise of
sustainability target, for example, providing a complete vision for asset
coordinate the waste produced and management (during the design,
use in filtration and recycles construction and maintenance
rainwater that helps keep the facility phases). Therefore, it can be used to
and its surroundings clean and cool align the financial, commercial,
for the Olympics and beyond. environmental, health and safety,
risk analysis sectors

PAGE 4
PAGE 5