1. Code of Practice for Fire Safety in Building 2011 to be complied with. COLOUR INDICATION : LEGEND : 4.95
BIM REF 2-1234-18-A21-01
2. Design Manual Barrier Free Access 2008 to be complied with.
XX ROAD (OVER 15m WIDE) N FSD REF FP 8/
COLOUR RGB COLOUR MATERIAL / DESCRIPTION SFL (STRUCTURAL FLOOR LEVEL) XX道
Rev. Date Amendment Purpose
204,178,102 HARDCORE OR DRY FILL FFL (FINISHED FLOOR LEVEL)
4.0 4.2
ACCESSIBLE FACILITIES FOR 67214
255,63,0 BRICK D PERSONS WITH A DISABILITY A B
COMMENTARY
XX街
223,255,127 CONCRETE SLAB (LIGHTER WASH) AT ACCESSIBLE UNISEX TOLIET
1. GENERAL NOTES FOR SPECIFIC
PROVISIONS AND COMPLIANCE
0,76,38 CONCRETE (PLAIN OR REINFORCED) AU ACCESSIBLE URINAL
37821
36808
255,191,127 LIGHTWEIGHT PARTITION OW OPENABLE WINDOW
PLASTER OR CEMENT
204,204,102 IRRIGATION POINT
RENDERING
IMPERMEABLE / NON-ABSORBENT
255,127,223 EV CHARGING STATION
FLOOR OR WALL
0,63,255 DEMOLITION WORKS / DELETION OF APPROVED WORKS E NO PARKING SIGN BLOCK PLAN 1 : 500
N BOUNDARY COORDINATES
204,0,51 UNDERLINE FOR REVISION E EVA LAYOUT SIGN
Hong Kong 1980 Grid Coordination
255,164,25 ACCOUNTABLE DOMESTIC GFA FSI FIRE SERVICE INLET POINT E (m) N (m)
XX道 XX ROAD A 840,500.821 816,511.001
227,100,102 ACCOUNTABLE NON-DOMESTIC GFA CP CONTROL PANEL
XX街 XX STREET
A B B 840,499.808 816,578.208
DISREGARDED GFA NOT SUBJECT TO THE OVERALL CAP OF 10% C 840,463.000 816,578.208
191,0,255 a) CONCESSION ITEMS SPECIFIED IN PNAP APP-151
FE 4.5 kg CO2 FIRE EXTINGUISHER
SUBJECT SITE D 840,463.000 816,511.000
(OTHER THAN CARPARK, LOADING AND UNLOADING AREAS)
FEH 9.0 L H2O FIRE EXTINGUISHER
DISREGARDED GFA NOT SUBJECT TO THE OVERALL CAP OF 10%
222,184,135 D C
b) CARPARK, LOADING AND UNLOADING AREAS AND OTHERS XX街 XX STREET (12.8 m WIDE)
FH FIRE HYDRANT
DISREGARDED GFA SUBJECT TO THE OVERALL CAP OF 10%
30,144,255
a) CONCESSION ITEMS SPECIFIED IN PNAP APP-151
SB SAND BUCKET
DISREGARDED GFA SUBJECT TO THE OVERALL CAP OF 10%
144,214,236
b) OTHERS
FB FIRE BLANKET 14/2/2023 4:48
PROJECT
SFH STREET FIRE HYDRANT
BD SAMPLE -
FSAP FIRE SERVICES ACCESS POINT
PROPOSED 20-STOREY
F.S. SHUTTER RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
LOCATION PLAN 1 : 2000 DRAWING TITLE
SITE PLAN AND NOTES
(PNAP ADV-33)
26 C055 CALCULATIONS (5) A1 -
27 C056 CALCULATIONS (6) A1 -
Appendix A4
28 C057 CALCULATIONS (7) A1 -
29 C061 FIRE COMPARTMENT DIAGRAMS & CALCULATIONS (1) A1 -
30 C062 FIRE COMPARTMENT DIAGRAMS & CALCULATIONS (2) A1 -
31 C063 FIRE COMPARTMENT DIAGRAMS & CALCULATIONS (3) A1 -
SUSTAINABLE BUILDING DESIGN DEMONSTRATION
32 C071 A1 -
DIAGRAMS & CALCULATIONS
33 C072 GREENERY DIAGRAMS & CALCULATIONS A1 -
34 C073 E.V.A. PLAN DIAGRAMS & CALCULATIONS A1 -
BD REF 2/1234/18
BIM REF 2-1234-18-A21-01
STAGE II FSD REF FP 8/
Rev. Date Amendment Purpose
COMMENTARY
1. STANDARD DETAILS MIGHT BE PROVIDED
IN GBP BEFORE APPLICATION FOR
CONSENT FOR THE COMMENCEMENT OF
SUPERSTRUCTURE WORKS (STAGE II).
14/2/2023 4:05
PROJECT
BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
TYPICAL DETAILS
1 2 3 4 5
45000
570 735
822
SVI@HL FAN RM HR INACCESSIBLE VOID 5 5
602
D SV-B2-02
CAP : 0 P.
FE CWPR AL
BS-02 A032 A032
200
SVI@HL
760
L4 UP3R
1000
180
180
2x1.75m CAP : 0 P.
SV-B2-01
FH 2.745x1.7m
1080
1110
BS-01
1100
2150
D8 UP22R BS-02
FE UP18R 10,100 L FRESH 8,500 L FRESH
5,200 L
180
AL
WT WT
SML 100 2375 1100 SML FLUSHING WT
(RESIDENTIAL) (COMMERCIAL)
1100
(RESIDENTIAL)
EXIT
1100
M5
100
EXIT D6 D6 D8 D8 L5
1800
CL CL CL
D6
6m
180
AP AP AP
RESIDENTIAL <3
180
m
.45
2150
M4
200
LL CL CL CL 24
5790
=
1670
SML TD
8300
6300
L7 -3.900
1100
M3 D FH
2290
200 200 D6 1 2 3 4
180
100
2940 2560 200 2150 1600 2920
L6 FE
180
EXIT
1270
M2
PFWTPR
2150
D8
1790
100
CAP : 0 P.
RETAIL
200
M1 LL D8 FE -5.100
75
.08
HR
-5.100
2400
°
HR
200
180
D6
180
1 NO. FE O
2 NOS. SB O SURFACE CHANNEL WITH 1 NO. FE
D6
O HEAVY DUTY MATCHING COVER
C 2 NOS. SB
2000
HR OOO
200
EXIT 5 6
-3.950 RAMP UP -3.950
6000
-3.900 1:7 -3.900
18
0
00
11
32
5500
COMPARTMENT B2-A COMPARTMENT B2-A 14/2/2023 4:05
24
25
180
WITH FRR 240/240/240 WITH FRR 240/240/240
5
PROJECT
2
20
CARPARK DRIVEWAY
20
CARPARK DRIVEWAY
0
(MIN. HEADROOM 2.4m. H.) FH
2 NOS. SPR. PUMP
(MIN. HEADROOM 2.4m. H.) BD SAMPLE -
0
PROPOSED 20-STOREY
21
8
12
0
12500
SPR WTPR
0
-3.950 -3.950
31
10660
-3.900 L1 CAP : 0 P. FE
RESIDENTIAL BUILDING OVER
25
00
-3.900
0
11
D6
3-STOREY PODIUM AT TKO
IT
AL
8 7
EX
D8
A
UP S-0
3 NOS. SPR. JOCKEY PUMP
D6
6065
22 3
B
R
D CL
DRAWING TITLE
R
AP
0
20
H
BASEMENT 2 FLOOR PLAN
50
33600
CL
22
30
0
10
A032
35705
TD = 29.01m < 36m
RAMP UP
35
D6
31 1:100 (A1)
180
2 SCALE
1:8
EX
SML
I
A032
T
1100
EXIT
D8 D6
29
180
SPR PR D6 FH A003 -
1100
B
0°
CAP : 0 P.
.7
2000
50
AL SOURCE
225
1 NO. FE
2 NOS. SB BS-04
1100
HR O O O UP22R
D6
180
SML
TRS
90mm (W) x 40mm (H) space
1340
33 D6
for COMPANY LOGO
28
EXIT 10 9
180
EXIT TD = 47.95m < 48m
TD
200 180 675 180
8645
=
30
.29
12800
27
EXIT
m
<
36
6110
5500
m
CARPARK DRIVEWAY 90mm (W) x 60mm (H) space
(MIN. HEADROOM 2.4m. H.)
80
for AP/RSE/RGE's
.71 -3.950
°
-3.900 signature/ and stamp chop
26
25 24 23 22 21 20 19 18 17 16 15 14 13 12 11
FE
180
D8
EVCR
CAP : 0 P.
4920
1 2 3 4 5
45,000
1,250
D SV-B1-03 A032 A032
2,167
1,160
EXIT
SV-B2-02 D6 1x1.6m
180
200
AL -0.300 SVI@HL SVD
2x1.75m SVI@HL SVI@HL
SV-B1-03 SV-B1-02 SV-B2-01
SML 2x1.7m 2.745x1.7m
FH LFS
1,100
1,110
1,110
180
EXIT
2,150
BS-02 D6 EXIT
AL M LAV 1,100 180 5,290 180
180
5,002
DN18R UP27R
(MVAL)
160
BS-01
CLEANER'S
180
D6
2,520
200
IRR WTPR ROOM TD = 17.44m < 18m
1,100
DN22R
100
CAP : 0 P.
61 .0
705
D8
0°
2,900
SML
LFS
1,100
2,150
200
180
4,595
8,300
1,100
L7 -0.350 3.5 x 7.0 x 3.6 H
150
2,290
100
FH D6 LOADING / UNLOADING BAY
1,350 180
2,140
180 D AT -0.300 (RETAIL)
100
180
20
1,100
FH (MVAL) F LAV
0
HR EXIT SURFACE CHANNEL WITH
180
(MVAL) HEAVY DUTY MATCHING COVER
2,400
LFS O 1 NO. FE
2,150
180
D8
180
FE
100
O 2 NOS. SB
HR
RETAIL R 9,000
8,500
D6 O
SML LL
UP
1,660
1,100
AL
3,020
D8 SML -0.300 MP
100
200
RA 1:8
180
NOTIONAL PATH CONNECTING
180
16,551
1,990
1,240
2 NOS. SB
C SVI@HL
D6
UP27R PERMANENT FEATURE
HR O O O
180
D6
9,2
0
SV-B1-01
5
1.25x2.6m
180
EXIT
COMPARTMENT B1-A
1,100
WITH FRR 240/240/240 3.5 x 7.0 x 3.6 H
100 R 3,000 LOADING / UNLOADING BAY
CARPARK DRIVEWAY
200
1,350 3,600 1,460 1,100 2,150 1,700 2,572 (RETAIL)
180 660 200 200 (MIN. HEADROOM 3.6m. H.)
20
00
0
1,1
18
-0.350
0
SWITCH RM -0.300
25
CAP : 0 P.
14/2/2023 4:05
2,0
2,4
25
3,870
PROJECT
0
70
20
0
FE 3.5 x 7.0 x 3.6 H
0
18
0 FH
LOADING / UNLOADING BAY BD SAMPLE -
(RETAIL)
8
EX
PROPOSED 20-STOREY
2,1
1,2
D8
I
12,500
00
D6
L1 RESIDENTIAL BUILDING OVER
DN
18
180
22
25
0
0
L
BS
D6
1,1
D8
A
-0
UP
00
3
AL
27
180
D
R
1,715 4,920 DRAWING TITLE
0
20
18
FE
0
180
BASEMENT 1 FLOOR PLAN
50
33,600
2,2
D6
2,4
2 5
FLL
5,175
FE 2
-0.300 EVCR
0
10
A032
2,140
CAP : 0 P.
20
FSPR
0
TD
5
D6 D8
3
2,1
CAP : 0 P.
2,7
COMPARTMENT B1-B
=
00
33
I T
2 EX SCALE 1:100 (A1)
.98
180
m
A032 200 2,316 179 4,225 181 2,174 180 8,170 3.5 x 7.0 x 3.6 H 8,140
<3
25
(RESIDENTIAL)
180
A004 -
RAMP DN
RETAIL-B1 FH
1,145
B CAP : 189 P.
DN22R
1:8
AL SOURCE
180
-0.350 1 NO. FE
28,225
BS-04
-0.300 2 NOS. SB
1,100
HR O O O UP27R
180
90mm (W) x 40mm (H) space
1,340
D6
for COMPANY LOGO
180
EXIT HR
1,370
SML
0
20
2,360
EXIT
D6
990
EXIT
TRS TRS D6
37
R=3,000
12,800
200
16,765
00
6,0
90mm (W) x 60mm (H) space
for AP/RSE/RGE's
-0.350
signature/ and stamp chop
36
-0.300
0
20
6,000
R4
SURFACE CHANNEL WITH
HEAVY DUTY MATCHING COVER
35
TBE (NDOM)
CAP : 0 P.
200
D2
A
1,120
D6 PD
180
180
1,255
1,355
D6 D6
PROTECTED CORRIDOR
D C
21,950 200 10,700 1,500 3,055 200 8,270 8,140
1 2 3 4 5
45,000
COMMENTARY
9,600 9,600 12,300 13,500
N 1. TRAVEL DISTANCE FOR CRITICAL
SITUATION IS DEMONSTRATED.
2. AREA OF PLANT ROOM IS JUSTIFIED IN
1 SUPPORTING DOCUMENT.
A031 3. DESIGN IMPOSED LOADS ON FLOOR AND
Lp = 52.120m < 60 m DETAILS OF DROPPED KERB, STEPS AND
200 150 150 150 150 150 150 150 100 200 150 150 150 150 150 150 100 100
200 8,791 200 2,999 3,000 1,750 1,100 1,100 1,325 975 1,100 4,850 1,850 2,300 1,650 1,100 2,050 4,500 1,100 1,600 1,353 1,947 3,000 2,875 1,000 200 3,225 STAIRCASES WITH HANDRAILS, DOOR ON
ACCESSIBLE ROUTE INCLUDING
C
A EX 4.45 GB023 FRAMELESS GLASS DOOR AND
EX 4.45 EX 4.45
EX 4.45 AUTOMATIC MAIN ENTRANCE DOOR FOR
200
CSC CSC W/P M.L. AT H/L
200
1,138
D2 CSC CSC
1,560
866
D2 PD CSC PROVIDED IN GBP BEFORE APPLICATION
FSI
1,075
PD D14 FE 5 5
2,000
SVD FEH CMC
D14 D14
D
2,230
SVD FOR CONSENT FOR THE
200
D17 D14
A032 A032
1,100 150
150
SV-B2-02 EXIT SV-B1-03 SVD SVD
3,238
EXIT D14 WPT COMMENCEMENT OF SUPERSTRUCTURE
2x1.75m ST-03 L4 CSC 1x1.6m
150
EXIT
UP29R SPR CV SV-B1-02 SV-B2-01
GMC WORKS (STAGE II).
1,695
150
EXIT
2,150
TX-01
EXIT
D14 2x1.7m 2.745x1.7m
1,110
BS-01
UP29R
1,290
DN27R BS-02
AL AL 60 / AP
160
HR DN27R RSMRR
150
BS-05
CAP : 0 P.
200
DN27R
100
EXIT
1,100
D4
150
150
1,550
FH 4.450
350
L5
EXIT
EXIT 4.400
2,475
2,150
2,775
3,060
449
100
FH 650 3,300 150 1,100 2,775 1,950 1,000 2,000 1,500 2,745
8,300
6,300
L7
CSC
2,290
D
100
LL
4,997
1,100
FH L6
E
150
1,100
150
5,947
AB
4.400 D8
150 150
2,150
FH
150
E
IN
4,650
.L
100
HR
DG
TBE (DOM) FE
BL
3,000
CAP : 0 P.
HR
100
200
5,100 1,300 1,689 LL3,011
2,115
FSCR
3,100
180
1,240
D13 CAP : 0 P.
D8
100
C SVD
650
150
100
100
2,600
1,100
SV-B1-01 D4
HR
1.25x2.6m D3 EXIT
100
2,392
100
HR
3,353
200
EXIT
RETAIL-G5
4,210
CAP : 14 P.
2,703
3,010
200 1,100 6,639 100 12,761
1,580
20
150 4.450
0
0
18
D14 4.400 1 NO. FE
1,0
0
EXIT
80
100
100 1,400 200 7,900 100 2 NOS. SB
100
0
200
EXIT
EX 4.45
3,100
1,1
14/2/2023 4:05
22
B EXIT
RETAIL-G1 HR O O O
200
GB022
1,1
CAP : 41 P.
25
PROJECT
200
RETAIL-G3
0
2,0
D
0
4.450
20
CSC
CAP : 125 P. GB024 BD SAMPLE -
0
4.400
ST-01 FH 4.450
PROPOSED 20-STOREY
00
UP29R
2,1
1,1
5,207
12,500
4.400
00
0 RESIDENTIAL BUILDING OVER
4,850
20 L1
25
ENT
3-STOREY PODIUM AT TKO
0
A
ADJOINING LOT
R D DRAWING TITLE
H
7,305
GROUND FLOOR PLAN
33,600
200
200
DN S-0
27 3
B
7,098
CSC
R
37,421
2
150 1,100
1,100
EXIT
D14
A032
150
FLL
GREENERY AREA
(PLANTER W./ MIN.
200 1,650 150 11,048 150 5,133 100 2,519 100 1,400 200 SCALE 1:100 (A1)
150 1,600
SOIL D. 600mm) 2
EXIT
1,600
4.750 (TOS)
15,087
A032
4.150 D14 DRAWING NO. REV. NO.
200
OPEN SHOP FRONT
FSAP
200
FH ST-02
FH
A005 -
1,100
310
1,100
200
B UP29R
1,650
225
SOURCE
180
150
150
BS-04
1,100
EXIT
1,150
DN27R D14
CSC
EXIT
150 1,100
D14
CSC
200
HR
1,170 180
ARCADE-G1
180
90mm (W) x 40mm (H) space
ST-04
FH
1,300
CAP : 48 P. UP29R
PD
21,692
200 4,251 D2
for COMPANY LOGO
2,620
150
200
RAMP DN
HR
1,480
1:10
2,883
EXIT
1,150
D14
CSC
180
150
180
1,100 3,800 2,970 4,975 1,100 2,000
1,417 270
180 180 200 200 200
CSC
COMPARTMENT B1-A
12,800
EXIT
for AP/RSE/RGE's
OPEN SHOP FRONT
EX 4.45
3,200
EXIT
signature/ and stamp chop
8,630
CSC
7,360
RETAIL-G2 RETAIL-G4
3,503
CAP : 69 P. CAP : 58 P.
4.450 4.450
4.400 4.400
4,393
ENTRANCE
A
2,255
200
R4
EXIT EXIT
150
650
800
CSC
150
200
200
EX 4.45 SURFACE CHANNEL WITH CSC
1100
CSC HEAVY DUTY MATCHING COVER
EX 4.45 BLDG. LINE ABOVE 6 NOS. SPR. INLET
EX 4.45
D
200
A C
200 8,791 200 2,999 5,700 3,100 4,200 1,455 3,100 2,995 1,400 200 A021 8,000 3,000 5,785 3,100 3,510 2,100
200 200 100 180 150 200
1 EXISTING PAVEMENT 90mm (W) x 150mm (H) space
A031 RUN IN / OUT
for BD's approval stamp /
7,500
GROUND FLOOR PLAN certification of copies of
approved plans
NOTES : DRIVEWAY (PNAP ADM-10 APP A)
EX 5.1
1. IMPOSED LOAD FOR LIFT LOBBIES = 3.0 kpa (E.V.A.)
2. IMPOSED LOAD FOR E & M = 7.5 kpa MIN. HEADROOM 4.5m H.
HARD PAVED WITHSTAND 30 TONS
3. AUTOMATIC SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH THE L.P.C. RULES FOR
AUTOMATIC SPRINKLER INSTALLATIONS AND RELEVANT CIRCULAR LETTERS ISSUED BY THE HKFSD. X X STREET (12.8 WIDE) XX街 4.200
CENTRE LINE OF STREET
4. ARTIFICIAL LIGHTING TO BE PROVIDED FOR ALL STAIRCASES.
5. 150H. CONCRETE CURB TO E&M ROOMS TO BE PROVIDED AS INDICATED ON THE PLAN.
BD REF 2/1234/18
BIM REF 2-1234-18-A21-01
FSD REF FP 8/
Rev. Date Amendment Purpose
1 2 3 4 5
45000
200
B WORKS (STAGE II).
1215
824
1230
5 5
2533
100 1075
EXIT
D
200
A032 D4 A032
100
100
STO UP4R
2260
FPR (RRF)
710 1100
2150
1100
CAP : 0 P. LFS
1100
DN29R
1100
D4
100
HR
100
ST-03
HR
100
5962
TX-01
a SML
100
DN29R
100
100 1100 1350 1250 RETAIL-1F-5
1485
AU
1100
4775 200 1100 750 1100 100 3495 200
1575
UP27R
FH CAP : 34 P.
6285
F LAV 100 D8
200
6m D8
2250
FH
EXIT
1.5x1.5m SPACE
9.450 <3 (MVAL) M LAV
TD
2150
HR LFS 8m AT
5.5
100
9.400 (MVAL)
=1
=2
100
TD (MVAL)
100
FE
8300
6.5
L7
3m
2290
1100H REMOVABLE RAILING
D 100
100
1550
5575
<
D4
TX RM
1310
36m
200 200
1050
2150
4090
100
RETAIL-1F-1 FE CAP : 0 P.
100
100
D2
100
11585
1550
SML
100
9.450 CAP : 7 P.
RETAIL
HR
TD (a to b) = 17.80m < 18m
1100
1100
4775
OPEN SHOP FRONT
1100
EXIT
9.400 LL D2 EXIT AREA FOR HOISTING
100
150
2400
100 D4 EXIT
8650 2350 100 1100 3600
b
100
9.400 D4
8375
HR 1950 2300 7907 1550 2543 10675 7945
100 100 200 100 100 200
100
C
TD
31.6
109
(a
EXIT .63
5°
°
to
EXIT
ARCADE-1F 9.450
c)
4000
4°
132.7
=
CAP : 44 P. 9.400
30
.7
3m x 3m FLOOR OPENING
2m
WITH REMOVABLE
3740
<
CONCRETE COVER FOR
36
200 1225 100 2500 100 4825 PLANT ACCESS AND 2HR
m
OPEN SHOP FRONT
FRR BOARD
100
EXIT
100
EXIT
OPEN SHOP FRONT
10
0
100
D4
0
EXIT
18
14/2/2023 4:05
1200
D4
15 IT
200
E
50
X
SML
PROJECT
20
1100 200
0
3500
ST-01
BD SAMPLE -
70
D4
39
UP27R
21
6480
PROPOSED 20-STOREY
00
DN29R
12500
25
HR
L1
0
RESIDENTIAL BUILDING OVER
100
62
0
D4
10
5
3-STOREY PODIUM AT TKO
10
SML A
H
EXIT
2925
0
R
1100
EXIT
0
FIRST FLOOR PLAN
20
100 1150 1100 1200 100
33600
8560
100 150
100
EXIT 00
50
15
22
EXIT
100
2
0
10
1100
FH
D4 A032
0
1100
75
10
50
00 1
00
D4 SML
16
200 1100 1100 1200 100
200
100
1:100 (A1)
TR
SCALE
11
2 c
S
225 200
15
750
5
0
22
0
A032
10
50
D4
150
LI
11
00
150
P
SM
IT
1110
FH
A006 -
0
ST-04
L
15
A
B BO
UP27R DN29R
VE
150 540
24
D4 SOURCE
75
200
D4
4450
EXIT
1100
HR
°
D4
11
11
.
52
SML
00
R
HR
28
24040
UP
15
0
-0
2
90mm (W) x 40mm (H) space
6m
29
R ST
<3
DN
FH for COMPANY LOGO
0m
150
10
6.7
6.
7 1100 1400
SM
=2
8° D4
150 225 100
L
TD
D4
RETAIL-1F-3
18665
RETAIL-1F-4
15190
EX
9.450 9.450
9.400
m
9.400
12600
9.400
7
9.6
TD
TD
for AP/RSE/RGE's
=1
18130 100 14920 100 15025
9.8
signature/ and stamp chop
9m
10660
<3
6m
A
1350
1350
200
200
1100
2400 30750 100 14150 875 3245 200
200 200
D C
1
A031
90mm (W) x 150mm (H) space
for BD's approval stamp /
FIRST FLOOR PLAN certification of copies of
approved plans
NOTES : (PNAP ADM-10 APP A)
1. IMPOSED LOAD FOR LIFT LOBBIES = 3.0 kpa
2. IMPOSED LOAD FOR E & M = 7.5 kpa
3. AUTOMATIC SPRINKLER SYSTEM TO BE PROVIDED IN ACCORDANCE WITH THE L.P.C. RULES FOR
AUTOMATIC SPRINKLER INSTALLATIONS AND RELEVANT CIRCULAR LETTERS ISSUED BY THE HKFSD.
4. ARTIFICIAL LIGHTING TO BE PROVIDED FOR ALL STAIRCASES.
5. MECHANICAL VENTILATION AND ARTIFICIAL LIGHTING TO BE PROVIDED TO
ACCESSIBLE UNISEX TOLIET AT , MALE LAVATORY & FEMALE LAVATORY.
6. 150H. CONCRETE CURB TO E&M ROOMS TO BE PROVIDED AS INDICATED ON THE PLAN
BD REF 2/1234/18
BIM REF 2-1234-18-A21-01
FSD REF FP 8/
Rev. Date Amendment Purpose
1 2 3 4 5
45000
COMMENTARY
9600 9600 12300 13500
N 1. TRAVEL DISTANCE FOR CRITICAL
SITUATION IS DEMONSTRATED.
2. AREA OF PLANT ROOM IS JUSTIFIED IN
1 SUPPORTING DOCUMENT.
A031 3. DESIGN IMPOSED LOADS ON FLOOR AND
DETAILS OF WATERCLOSET CUBICLE AND
200 6050 150 1100 2700 1250 150 1100 150 3425 200 1825 150 2300 150 22675 200 8145 200
URINAL FOR PERSONS WITH A DISABILITY
MIGHT BE PROVIDED IN GBP BEFORE
A GB 1100H FROM TOS
WPRML TOP VENT OF
STAIRCASE ST-03 @H/L APPLICATION FOR CONSENT FOR THE
COMMENCEMENT OF SUPERSTRUCTURE
B WORKS (STAGE II).
200
ST-03
FH PD
1185
D2
1185
DN27R
EXIT
GB 1100H FROM TOS D4
GREENERY AREA GB 1100H FROM TOS 5 5
D
150
(PLANTER W/ MIN. SOIL D. 600mm) A032 A032
200
L4
2495
14.450 TOS
150
1100
SML
D4 GREENERY AREA 13.850
150
NC
2150
(P W./ MIN. SOIL D.
IN OR
NA
MA L F
TE
600mm)
LC
400 1100
150 2300 100 1400 1250 150 14.450 TOS
D4
150
13.850 150H RC CURB
100
L5 FROM TOS
4475
EXIT GREENERY AREA
(PLANTER W/ MIN. SOIL D. 600mm)
2150
EXIT
14.450 TOS
8300
13.850
LANDSCAPE GARDEN
2700
GREENERY AREA
14.050
100
(PLANTER W/ MIN.
SOIL D. 600mm) CSC L6
13.850
150
150H RC CURB 150H RC CURB
7460
14.450 TOS
2150
FROM TOS FROM TOS
A
13.850
TP
EXIT
15388
EXIT
CSC
200
RRF
CL LANDSCAPE GARDEN
OUTDOOR SWMP T/A 14.050
CAP : 22 P.
C 14.050 WL
13.850
150H RC CURB
FROM TOS
12.850 FFL
EXIT
EXIT
CSC
12.900
3150 7850 5075 200 1825 200 2200 200 5100 200 4000 200 6700 200 3275 3200 200 7945 200
8560
LANDCAPE AREA
45.00°
2830
14.450 TOS
CLA 13.850 < 36m
POOL DECK 28.84m
5
TD =
79
14.050
14/2/2023 4:05
150
13.850
10
TP
PROJECT
00
20
20
D2
0
150H RC CURB ELR ACPR
FROM TOS
CAP : 0 P. CAP : 0 P.
BD SAMPLE -
0
FE
10
PROPOSED 20-STOREY
21
WPRML
14.050
00
CS 14.050
12500
4150
EX
67
WPRML TOP VENT OF C
CSC L1 13.850
RESIDENTIAL BUILDING OVER
IT
25
200
FOOT
14
200 200 FALL 100 13.850
CSC 150 100 100
0
1900
BATH 2050 3375 1567 100 750 1279 900 1434 STAIRCASE ST-04 @H/L
1:21 D4
200
FE
1500
55
0
10
0
A
20
0
50
150
17
200
D D2 DRAWING TITLE
14.00 WL
1870
3400
150
ST-01 D2
GREENERY SECOND FLOOR PLAN
2000
EXIT
1100
100
33600
13.95
0
DN27R D4 D4
20
AREA PD
1750
SML
22
1:21
D2
100
0
5
5
( P W/ MIN SOIL
22
2
150
D. 600mm) EXIT
HR
4305
CSC
21
A032
750
D2
100
PD
0
FE
00
150
10
CSC TRS TRS
150
D4
10
2224 100
1720
00
4260
EXIT
1 2 3 4 5 6 7 8 1:100 (A1)
1100
0
14.050 FFL SCALE
18
1890
D4 D4
EX
2 13.850 SFL TRS
150
TDR@HL
I
D
T
4
A032 MAIN SWITCH
21
100
L2
0
DRAWING NO. REV. NO.
0
0 ST-04 FE D2 RM (DOM)
10
1100
00
DN27R
20
CAP : 0 P.
AT A007 -
21
0
D4
4740
100
B (MVAL)
11 IT
ST-01
E
SML
00
13.850
200
X
SWITCH RM
1100
3175
UP36R
1.5x1.5m SPACE L3 D4 SOURCE
20
CAP : 0 P.
SM
0
D4
L
1640
100
4490
D4 EXIT
PD D2 STO 1
100
R
36
CAP : 1 P.
LOUNGE AREA 1 RRF LOUNGE AREA 2
UP
100
2275
ST-02
90mm (W) x 40mm (H) space
HR
DN
OCO
R
13.850
for COMPANY LOGO
20
(MVAL) (MVAL) FH
00
CAP : 3 P.
11
FH
150
EXIT
3660
14.050
5
22
00
13.850
13
3650 100 2050 100 1500 100 1742 100 2158 1500 2720 6730 2592 4033 100 1100 1100 1100 150 2450 100 5225 1200 100 6200 200
2100
150 225
SH D2
6050
SH
100
SH EXIT EXIT EXIT
200
12800
COVERED
SH AREA
TP
SH
A
GYM MFXR
6750
RT CAP : 20 P. RT
CAP : 11 P.
ICOF 14.050 COF
14.050
4350
8360
A
200
200
TP
A LCL
P P
1500
1500
200
200
1 2 3 4 5
45,000
COMMENTARY
9,600 9,600 12,300 13,500
T-1 N 1. PRESCRIBED WINDOWS ADOPTING
CRITICAL UNOBSTRUCTED VISION AREA
T-F FOR EACH TOWER UNDER PNAP APP-130
IS DEMONSTRATED.
T-2
1,
2. LAYOUT OF SUNKEN SLAB MIGHT BE
90
0
PROVIDED IN DRAINAGE PLAN.
WINDOW FACING TO STREET 3. DESIGN IMPOSED LOADS ON FLOOR AND
T-E 0 DETAILS OF OPENABLE WINDOWS MIGHT
A 55
3, 15,578 200 31,020 200 BE PROVIDED IN GBP BEFORE
4,
25
APPLICATION FOR CONSENT FOR THE
0
T-3
B COMMENCEMENT OF SUPERSTRUCTURE
200
RT
T-D 0
CW
WORKS (STAGE II)
55
UP
150H. RC. CURB 5 5
2,
CW
D FROM FFL
BR
A032 A032
0
1
T-C 10
1, CW
2,
LC AIN
CE
C 19.9 700
L F TE
97
M
4 RT
O 00
R AN
25
OR N A
FO N
5
F
L TE ICOF
A033 ,9
BR
LC AIN
19
12
NC
2
A
.
M
M 18.300
E
BR
T-B 18.100
GB
0 D32
90
A~
CW
* M MV
FA
7,626
BA
2,
I@
B A AL
(
L
=
H/
TH )
12
L
COF
FA
.2
D32
4,
I@
7m
MB
* B MA
80
H/
19.900
8,300
AT VL
<
L
(
0
24
H )
T-A 19.700
UP
T-5
m
1
BA
5
L
82 LL 150H. RC. CURB
GB
2, A@
U
FL
LC AIN
TR
L F TE
M
CW
LI
RT
V
OR NA
12,785
KI
/D
CW
T
IN
C 9.90 00
NC
O 0
M
2,
T-6
E
1 .7
F
BR
65
19
*B AV D2
200
FA
(M
AT L)
I
@
RT H
H/
LI
2
2,400 CL
1,054
L
V
D32
BA
/D
COF
BR
D2
L
T-7
IN
2,
B
GB
19.900
22
C 19.700
5
B D2
O
O
D2
KI
BR
KI
T
T
1
B
A~
42
D2 D32
*B AV
,1
=
(M
AT L)
50.0
LI
25
26
7
4,
V
H
.7
52
/D
3
0°
LI
0m
CW
V
IN
D2
5
/D
BR
<
T-8
10
48
IN
,3
m
*B AV
PD
PD
50.0
69
(M
0° AT L)
59,100
D2
LI
H
/D
D32 D2 RT
14/2/2023 4:05
IN B
D2
B
O
COF T-9
200
200
2,
KI
150H. RC. CURB PROJECT
22
GB F
5
L
19.700
BD SAMPLE -
AI
A033
@
H/
KI
L
IT
2,955
T
PROPOSED 20-STOREY
*B AV
TH
9
D2
12,500
(M
AT L)
NG
CW
2,
T-10
V
H
L F TE
LE
GB
*B VA
/D
65
M
OR NA
(M
AT L)
NE
C
IN
BA
/6
0
LA H
3-STOREY PODIUM AT TKO
0]
D2
L
DR (FOR
.P
NC
.0
IZ A
-1
D19
B
D32 MAINTENANCE
E
FA
R
R
50
TL
GB
200
HO
I@
D2 D ACCESS ONLY)
1.
FA
D DRAWING TITLE
TR
.
H/
)+
I@
CT
S
L
BA
R
F
H/
(A
RT
(3
RE P
SM
L
C1 = 261.507 m2 D THIRD FLOOR PLAN
.00
0
= [8033,600
LL
,08
1,900
D
20
RE ICOF
8,460
R
BA
EX
10
DI
08 /6 ) -
UI
C
L
LC AIN
I
0. 0 F
ME
4,
=1 60.5 0(R
Q D4
F. O
L F TE
M
18.300
RE
D2
E.
O
80
OR NA
NS
F.
FA
.0
H.
E.
W
R
I@
m.
18.100
I
D2
RT
0
.
*B AV
M
ON
=
H/
GB
C
EL
(M
200
T-11
AT L)
L
NC
CW
R 50
BR
D2
C 19.9 7 00
E
20 .000
R
EF
C
O 00
.0
D4
20 LL
ER
F
D32
L2 1:100 (A1)
19
BR
2,3
TO
SCALE
LI
GB
DOG HOUSE FOR
V
00
4/F
/D
MAINTENANCE
2R
FA
BA
IN
UP
I@
ACCESS
L
DRAWING NO. REV. NO.
H/
O
2,
T-12
FA
97
IT
150H. RC. CURB
-
I@
L3 A011
5
H/
FROM FFL
L
DR 1
B
15,796
B
ST
36
LC AIN
R
EX
-0
BA
DR (FOR
*B AV
L F TE
M
I
SOURCE
R
L
T
18
(M
AT L)
D4
OR NA
200
MAINTENANCE D2
UP
GB
H
ACCESS ONLY) D19 D2
200 14,686 200 25,889 200 7,300 200 3,245 200
SM
N
PD
D32
L
CE
150H. RC. CURB *B AV 150H. RC. CURB
PD
D2
LI
(M
D4 AT L)
5
V
FROM FFL
4,
H
/D
25
IN
R
18
0
T-13
UP
RT
ST 6 R
O
RT
-0
DN
CW
2
KI
D32
3
COF
T
ICOF
B
A~
for COMPANY LOGO
5,300
O
BR
19.900
C
KI
LI
2
18.300
6
T
V
19.700 T-14
24
/D
18.100 D2
1,
.5
IN
D2
0m
90
D2
BR
<
10
0
LI
48
*B AV
V
PD
BR
m
(M
AT L)
/D
A
~B
1
H RT 150H. RC CURB
IN
150H RC CURB
=
FROM FFL
12
D2 COF
.2
U
TR
7
19.900
m
D32
200
B D32
<
MB
12,800
19.700
24
* B MA
D2 D2
m
AT VL
(
UP
3
H )
D2
O
1
BL
11
A033
GB F
D32
/D
FROM FFL
* M MV
KI
for AP/RSE/RGE's
O
AI
T
IN
BA AL
(
KI
@
CW
BA
H/
TH )
L
L
12
MAINTENANCE
D32 *B AV
M
ACCESS
L/L
(M
AT L)
BR
RT
H A@
GB
FL COF ICOF
A 18.300
8,450
19.900
FA
CW
18.100
I@
CE
BA
H/
19.700 N
OR NA
L
L
L F TE
LC AIN 4
6,050
FA
M
BA
I@
A033
BR
L
H/
L
1
GB
A
BR
UP
LC AIN
RT
L F TE
M
MB
OR N A
CW
19.900
E
19.700
200
200
DOG HOUSE FOR
MAINTENANCE
ACCESS
D C
WINDOW FACING TO STREET 90mm (W) x 150mm (H) space
THIRD FLOOR PLAN for BD's approval stamp /
7,500
COMMENTARY
40% OF THE PERIMETER OF THE
T-1 BALCONY & UTILITY PLATFORM STAGE II N 1. AREA CALCULATION FOR PRESCRIBED
WINDOWS FOR CRITICAL SITUATIONS IS
T-F LOCATION : FLAT 1 ~ BALCONY DEMONSTRATED.
TOTAL PERIMETER : (1.450 + 1.379) x 2
: 5.658 m 2. LAYOUT OF SUNKEN SLAB MIGHT BE
T-2
1,
40% OF LENGTH : 2.263 m PROVIDED IN DRAINAGE PLAN.
90
50 PROVIDED LENGTH : 2.829 m > 2.263 m
0
1,4 3. DESIGN IMPOSED LOADS ON FLOOR AND
0 LOCATION : FLAT 1 ~ UTILITY PLATFORM
20 DETAILS OF OPENABLE WINDOWS MIGHT
TOTAL PERIMETER : (1.000 + 1.500) x 2
T-E 0
60 100 BE PROVIDED IN GBP BEFORE
0
: 5.000 m
A
55
40% OF LENGTH : 2.000 m APPLICATION FOR CONSENT FOR THE
4,
00
3,
1,5
25
PROVIDED LENGTH : 2.500 m > 2.000 m
COMMENCEMENT OF SUPERSTRUCTURE
0
0
20 T-3
B
MB
WORKS (STAGE II).
1,0
00
0
T-D 10
4. AREA CALCULATIONS FOR PRESCRIBED
UP
5 5
55
WINDOWS FOR CRITICAL SITUATIONS
BR
2,
75 A032 A032
1
2,9
0
25
T-C MIGHT BE PROVIDED IN GBP BEFORE
10
,9
CW
1,
APPLICATION FOR CONSENT FOR THE
12
0
2,1
4 10
0
COMMENCEMENT OF SUPERSTRUCTURE
0
A033 0
BR
20
CW
WORKS (STAGE II).
2
M
0
75
5
BR
T-B 1,5
7,
GB
0 D32
FA
2,1
77
CW
* M MV
90
I@
0 0
BA
00
15 10
5
H/
B AL
(
L
2,
1,0
L
AT )
0 0 /L
MB
00
H
1,5
FA
H
AC
75
I@ D32 25
I@
2,3
MB
PF
* B MA
FA
H/
AT VL
L
0
(
0
H )
T-A 1,4
T-5
UP
2,7
BA
0 75 0
20
50
15
5
L
LL 0
82
90
GB
A@ 50
20
U
0
15
FL 10 1,4
0
TR
2,
0
90 75
1
CW
LI
V
10
5
0
KI
/D
42
10
00
0
3,0
IN
0 2,1
00
25
2,
2,1
75 65 150
M
3,5 T-6
0
65
BR
2,3
CW
D2
5
0 0
0
0
15 *B AV
75 5
1,4
FA
(M
AT L)
10
75
I @
45
0
H
1,
H/L
LI
2
50 75
75
AC
V
D32
1,1
1,5 D2
PF
BA
/D
2,1
BR
00
80
0
T-7
2,
L
IN
0
2,1
GB
0
10
22
30 75
50
0
5
00 5
1,5
75
1,2 ,22
5
D2 1
B
0
75
O
O
D2
25
00
10
KI
0
BR
KI 100
0
90 3
T
1,9
00
20
1 2,1
42
25
1,1
0
75 0 1,1
10
2,2
D32
0
D2
,1
*B AV
00
0 00
0
15
10
0
00
(M
25
1,1
AT L)
10 4
4,
0
LI
0
7
2,1
0
V
H
0
52
10
/D
1,7
3
LI
0
CW
75
2,7
5
V
00
75
IN
15
0 00 D2
00
/D
BR
2,1 T-8
1,5
IN
25
2,1
75
5 *B AV
P
PD
72
50
2,4
(M
AT L)
90
D2
LI
0
8 DIN B
75
10
75 10
0
0
V
H
0
0 75
15
/
D2
30
1,4
0 40
0
10
0
D2
FL
10
B
0
A
O
1,7
T-9
10
2,
10
KI
75
0
0
1,1
22
50 0 PROJECT
T
GB
2,1
00
3,3 D32
50
5
1,1
BA
3
1,4
0
L
BD SAMPLE -
0
10
25
3,0
O 00
75 A033
0
79
0
00
FA
KI
6
1
IT
T
I@
PROPOSED 20-STOREY
1,7
0
*B AV
15
9
D2
H/L
(M
AT L)
5
2,
LI
AC
1,3
CW
1,9
T-10
V
H
0
PF
RESIDENTIAL BUILDING OVER
W H
65
79
75
2
*B VA
/D
2,
L1
5
M
GB
50
10
75
(M
AT L)
0
C
IN
1,4
0
BA
1,3
D2
L
75
0
7 5
B
D32
2,3
0
FA 9
15
1,3
R
A
FL
TL
5
GB
FA
1,3
I@
D2
75
DRAWING TITLE
A
20
AC
TR 50
I@
7
H/L
D
0
S
PF
H/L
2,1
R
BA
50
8
SM
L
10 60
0
75
2,1
0
R
BA
1,3
EX
00
C
L
96
4,
I
75
T
0
D4 50
2,1
FE
80
FL
D2
1,4
50
A
FA
H.
10
W
1,1
0
R
I@
25
0
D2
30
*B AV
M
0
2,2
0
H/
GB
0
0
C
EL
(M
T-11
AT L)
L
0
1,3
LIF
0
BR
D2
H
7
R
9
22
2,1
D4
5
LO
25
5
D32
CW
BB
1:100 (A1)
77
BR
0 SCALE
LI
4 DIN
45
2,1
1
L2
GB
Y
V
1,
AC
00
/
75
20
PF
FA
BA
0
2,1
I@
L
DRAWING NO. REV. NO.
1,3
H/L
2,
2,1
0
O
10
7
5
97
50
T-12
0
FA
0
IT
-
I@
20
A012
5
75
75
2,1
H/L
20
L3
0
ST
0
1,7
B
FH
10
-0
75
EX
2
BA
20
*B AV
2,3
I
SOURCE
R
L
0
(M
18
AT L)
D4
10
50
D2
UP
GB
0
D2
H
50
2,7
1,1
1,4
SM
5
5
1,1
2
0
0
PD
D32 3,5
0
L
10
00
*B AV
PD
D2
0
10
LI
(M
D4 AT L)
4,
0 75
V
H
/D
25
22
5
10
0
IN
1,3
R
0
0
0
18
75 10
T-13
7
2,7
UP
5
ST 18R
50
90
O
0
-0
DN
75
2
CW
0
80
KI
1
0
5
D32 10 5
T
,32
B
75
for COMPANY LOGO
O
75
BR
2
1,9
KI
75
0
LI
2
1,7
40 25
6 DIN
25
0
T
V
FH 10 1,2
0
T-14
1,
D2 0
00 30 D2 75
90
10
2,1
3,3
0
2,1
2,1
10
0
D2 90
0
75
0
0
BR
0
0
10 DIN
0
0 ,10
LI
1,1
75
1,1
*B AV 10 1
V
PD
00
00
BR
75
(M
AT L)
/
10
75
0
75
1
H 40
00
10
2,1
0
1,5
0
10
5
D2
1,4
1,1
0
50
2,1
U
2,3
00
TR
2,7
00
00
5
10
0
10 75
0
D32 2,
MB
75
50
20
* B MA
D2 D2 D32 1,4
1,1
0
1,5
10
50
AT VL
0 75
(
15
25
0
0
1,5 0
UP
3
H )
D2 20
2,1
10
1
BL
11
0
KI
A033 0
GB FA
50
10
B
IV
30 0
T
1,4 60 100
0
D32
1,1
/D
* M MV
KI 3,00
00
3,0
75
0
for AP/RSE/RGE's
00
5 1,2
T 0
0
IN
3,3
I@
BA AL
0
00
(
KI
BA
77
1,5
H/L
TH )
10
1
75
L
12 DIN
0 0
90
V
20
1,3
1,9
/
10
79
25
75
0
0 0
15 10
30
D32 *B AV
M
0
(M
75
AT L)
BR
15
L/L
0
0 00 H A@
GB
AC
2,4
1,4
5 2,1 FL 5
PF
00
1,3
7
2,9
2,2
2,1
96
25
00
15
FA
CW
I@ 1,37
BA
75
5
72
H/L 9
0
75
10
1,0
0
15 4
0
0
0
FA
2,1
20
BA
2,1
I@
A033
55
0
BR
L
H/L
00
0
0
5
1
GB
1,5
1,3
10
79
0
15
AC
M
P
BR
20
UP
F
00
0
79
1,5
6
MB
CW
25
00
0
1,4
1,7
0
75
15
30
0
0
90
5
42
D 0
C
2,7
75 65 150
5 0
0
15
0
30
COMMENTARY
T-1 N 1. DESIGN IMPOSED LOADS ON FLOOR
MIGHT BE PROVIDED IN GBP BEFORE
T-F APPLICATION FOR CONSENT FOR THE
COMMENCEMENT OF SUPERSTRUCTURE
T-2
WORKS (STAGE II).
19
00
T-E
50
A
35
42
50
T-3
B
T-D
5 5
T/ .9 0
79
50
UP 0
A032 A032
T/ 80
25
CW .42
T-C
@
5
@ CW
.42
80
T/
29
5
4
75
00
5
A033
11
92
12
T-B
T/
CW 0.42
@
T/ 80
00
CW .42
8
@
29
5
5
48
T/ 9.90
T/ .90
00
BA 0
7
79
UP 0
15
T-A
L
0
T-5
25
28
5
@ CW
.42
80
T/
51
T/ 80
7
5
CW .42
T-6
26
50
5
T/ 9.90
BA 0
7
T-7
L
18
22
0
00
25
T/ BAL
76
79.900
80.425
RT
T/ 80
FLAT ROOF
42
CW .42
@
65
12
PRPW 1100H FROM FFL
80.200
40
5
45
5
80.000
25
18
T-8
R.C. PARAPET
LC /A
T
L
18
0
15
T-9
54
T/ 9.90 180
22
PROJECT
11
BA 0
7
00
25
L
20
0
3
25
0
A033 BD SAMPLE -
15
0
EGR
15
PROPOSED 20-STOREY
50
00
80.200
10
11
T-10
26
22
RESIDENTIAL BUILDING OVER
0
0
5 15
80.150 MCL
18
32
50
50
T/
T/ 9.90
65
34
CW 0.42
18
@
80.000 LFS
BA 0
7
8
L
5
21
D16 DRAWING TITLE
0
18
0
0
20
0
35
T/ 9.90
50 00
35
D2
MAIN ROOF PLAN
T/ 9.9 0
17 1
BA 0
EX
SC
BA 0
7
L
25
I
PD
L
50
0
ELR
22
D4
48
00
21
0
H.
34
75
10
00
D2
R
43
0
10
75
T-11
15
D2
0
50
T/
15
0
00
20
D4
77
CW 0.42
W
@
18
5
P
LFS
22
8
FH
1:100 (A1)
RM
SCALE
5
1
-0 R
0
L
11
95
10
5
ST 18
20
TO
00
10
DN
21
0
50
00
0
00
20
29
N
T-12
21
0
T
A013 -
95
10
75
LFS
10
T/ 9.90
0
0
0
BA 0
7
0
EX
20
RT
SC
L
I T
21
33
11
FLAT ROOF
10
00
SOURCE
75
00
0
D4
11 5
00
22
80.200
20
80.000
11
22
0
25
5
00
D4 = R K G
11
18
HT TE N IN
42
0
IG WA TA SH
R
20
HE FF. ER LU
50
UP
T-13
E AT L F
0
0
20
15
90mm (W) x 40mm (H) space
M
ST 18 R
W 800
1.5
DN
-0
CL
7
2
33
AP D16
T/
75
CW 0.42
@
= R K G
HT TE N IN
8
CL
IG WA TA SH
FE
56
FH
T-14
90
HE FF. E R LU
19
E AT L F
AP
M
W 00
00
1.5
70
78
11
CL CL
62
AP
0 0
CL CL
20
0
AP
K
W E 0L
PFWTPR
18
HT TE N
IG W A T A
0
FR 10
E AT SH
CL
R
15
M
HE FF. ER
1.5
80.200
0
18
43
=
CL
75
80.150 MCL
T/ .90
3
79
UP 0
37
80.000
90mm (W) x 60mm (H) space
50
T/ 9.90 80
A033
K
W RE 0 L
BA 0
7 1
HT T N
IG WA TA
F 10
L
EF AT SH
=1 R
for AP/RSE/RGE's
15
T/
HE F. R
E
.5
E
CW 0.42
@
8
20
15
5
0
32
6
5
LC / A
18
T
L
T/ 80
T/ 9.90
CW .42
@
0
T/ 80
BA 0
7
18
18
CW .42
0
L
@
T/ 9.9 0 80
BA 0
7 51
5
12
45
19
5
4
A033
0
18
T/ .90
79
UP 0
T/ 80
CW .42
@
D C
COMMENTARY
N 1. DESIGN IMPOSED LOADS ON FLOOR
MIGHT BE PROVIDED IN GBP BEFORE
APPLICATION FOR CONSENT FOR THE
COMMENCEMENT OF SUPERSTRUCTURE
WORKS (STAGE II).
B
5 5
A032 A032
4
A033
T-E T-4
T-D
50
25
T-C
48
00
T-5
00
11
75
93
T-B
00
15
0 T-6
15
0
29
26
50
75
T-A T-7
48
25
22
LC /A
28
66
25
T
L
00
300H. RC. CURB
14/2/2023 4:05
0
15
0
45
PROJECT
23
3
0
BD SAMPLE -
15
87
15
RT
0
A033
15
5
45
15
FLAT ROOF PROPOSED 20-STOREY
25
30
T-8
11
11
83.600
0
RESIDENTIAL BUILDING OVER
0
83.500
0
45
15
20
3-STOREY PODIUM AT TKO
25
0
TD S
18
R
S
T-9
75
DRAWING TITLE
22
UPPER ROOF 1 FLOOR PLAN
25
15
20
0
0
L
15
H
0
(UR1F)
L@
MIN. 0.15s.m.
RM
WIRE MESH
P
LMR
W
T-10
41
LIFT SHAFT
26
00
83.550 VENT
50
83.500
15
SCALE 1:100 (A1)
0
10
TD S
18
R
0
75
H
R
15
A014 -
0
10
48
0
FH
TD S
00
R
S
T-11 SOURCE
W TA
34
P IR
0
S
R
31
25
15
20 2
RM C
75
DN T-0
L SE
S
TO
A
0
P ST-
15
0
10
VE 02
D4
15
N @
20
T
0
0
D7
O HL
30
L
F
50
11
33
D4
L
5
TD
22
L
LC
57
50
00
0
11
15
RT
FLAT ROOF
83.600
15
0
83.500
0
90mm (W) x 60mm (H) space
15
A033
0
45
for AP/RSE/RGE's
0
0
15
75
19
4
A033
0
15
D C
COMMENTARY
N 1. DESIGN IMPOSED LOADS ON FLOOR
MIGHT BE PROVIDED IN GBP BEFORE
APPLICATION FOR CONSENT FOR THE
COMMENCEMENT OF SUPERSTRUCTURE
WORKS (STAGE II).
B
5 5
A032 A032
4
A033
T-E
T-D
50
25
T-C T-6
00
11
00 75
T-7
22
29 93
25
T-B
14/2/2023 4:05
0
15
PROJECT
89 525
3
15
BD SAMPLE -
25
T-A
75
4
0
00
A033
42
28
PROPOSED 20-STOREY
T-8
RESIDENTIAL BUILDING OVER
45
25
0 3-STOREY PODIUM AT TKO
15
22
25
00
15
0
(UR2F)
0
15
57
11
0
1:100 (A1)
15
RT SCALE
0
15
15
0
TOP ROOF
DRAWING NO. REV. NO.
87.450
28
87.350
A015 -
00
00
42
SOURCE
15
0
0
15
SS TRAP DOOR
(W PAD LOCK)
90mm (W) x 40mm (H) space
57
25
25
0
15
3
A033 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
signature/ and stamp chop
4
A033
D C
3850
LCL LCL COMMENTARY
7350
83.500 83.500 1. DETAILS OF OPENABLE WINDOWS MIGHT
UR1F BE PROVIDED IN GBP BEFORE
APPLICATION FOR CONSENT FOR THE
COMMENCEMENT OF SUPERSTRUCTURE
3500
WORKS (STAGE II).
77.000
22F
3000
74.000
21F
3000
71.000
20F
3000
MB CW CW MB
ACPF WITH ACPF WITH ACPF WITH
68.000 METAL GRILLE GB GB METAL GRILLE GB GB GB METAL GRILLE
19F
@ 3000 x 13 STOREYS = 39000
14/2/2023 4:05
PROJECT
75050
29.000
6F
SCALE 1:100 (A1)
3000
26.000 A021 -
5F SOURCE
3000
MB CW CW MB
23.000
ACPF WITH
METAL GRILLE GB GB
ACPF WITH
METAL GRILLE GB GB GB
ACPF WITH
METAL GRILLE 90mm (W) x 40mm (H) space
4F
for COMPANY LOGO
3000
DR (FOR
MAINTENANCE
ACCESS ONLY)
150H RC CURB
FROM FFL
20.000
19.700 19.700
3F
2100
LCL
CL
LCL 90mm (W) x 60mm (H) space
17.900 18.100 18.100 18.100 for AP/RSE/RGE's
T.P. signature/ and stamp chop
4050
DR (FOR
MAINTENANCE
ACCESS ONLY)
150H RC CURB
FROM FFL
2F
4450
GW
150H RC CURB
9.400 FROM FFL
4.950 GW GW
3850
300H. R.C.
CURB COMMENTARY
LCL LCL 1. DETAILS OF OPENABLE WINDOWS MIGHT
7350
83.500 83.494 BE PROVIDED IN GBP BEFORE
APPLICATION FOR CONSENT FOR THE
UR1F
COMMENCEMENT OF SUPERSTRUCTURE
R.C. PARAPET 1500H. WORKS (STAGE II).
FROM FFL
3500
80.000 (mPD) 80.000
BUILDING HEIGHT RF
RESTRICTION (BHR)
3000
77.000
22F
3000
74.000
21F
3000
71.000
20F
3000
CW CW
MB GB GB GB
19F
@ 3000 x 13 STOREYS = 39000
14/2/2023 4:05
PROJECT
REPEATED 6/F - 18/F = 13 STOREYS BD SAMPLE -
75050
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
TOWER ELEVATION B
29.000 B.L. B.L.
6F
CW CW
MB GB GB GB
MAINTENANCE
ACCESS ONLY)
150H. R.C. CURB
FROM FFL
20.000
19.694
3F LCL FOR
MAINTENANCE
2100
LCL LCL
90mm (W) x 60mm (H) space
17.900 18.094
for AP/RSE/RGE's
T.P.
signature/ and stamp chop
VOID VOID
GB 1100H
4050
FROM TOS
150H. R.C. CURB
FROM FFL
13.850 13.844
2F
4450
GW GW
9.400
1F
90mm (W) x 150mm (H) space
for BD's approval stamp /
SVO certification of copies of
5000
approved plans
GW GW
(PNAP ADM-10 APP A)
VOID
4.950
MEAN STREET LEVEL (MSL) 4.400
GF
8300 12500 12800
-7.100 33600
ELEVATION B
BD REF 2/1234/18
300H RC CURB BIM REF 2-1234-18-A21-01
87.350 87.350
FSD REF FP 8/
UR2F B.L.
Rev. Date Amendment Purpose
3850
WPRML COMMENTARY
LCL 300H RC CURB LCL
1. DETAILS OF OPENABLE WINDOWS MIGHT
7350
83.500 83.500 BE PROVIDED IN GBP BEFORE
UR1F WPRML APPLICATION FOR CONSENT FOR THE
COMMENCEMENT OF SUPERSTRUCTURE
RC PRPW 1500H. RC PRPW 1500H. WORKS (STAGE II).
FROM FFL FROM FFL
3500
77.000
22F
3000
74.000
21F
3000
71.000
20F
3000
CW CW CW
MB
ACPF WITH
GB GB GB
68.000 METAL GRILLE
19F
@ 3000 x 13 STOREYS = 39000
14/2/2023 4:05
PROJECT
REPEATED 6/F - 18/F = 13 STOREYS BD SAMPLE -
75050
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
TOWER ELEVATION C
29.000 B.L.
6F
SCALE 1:100 (A1)
3000
26.000 A023 -
5F SOURCE
3000
CW CW CW
MB
23.000
ACPF WITH
METAL GRILLE GB GB GB 90mm (W) x 40mm (H) space
4F
for COMPANY LOGO
3000
150H RC CURB
20.000
19.700
3F
150H RC CURB
2100
LCL LCL
LCL LCL LCL 90mm (W) x 60mm (H) space
17.900 18.100 18.100
WPRML
for AP/RSE/RGE's
T.P. WPRML LCL FOR signature/ and stamp chop
MAINTENANCE
VOID
GW
GB 1100H FROM FFL
4050
13.850 13.850
2F GW
4450
GW GW
9.400
1F 90mm (W) x 150mm (H) space
for BD's approval stamp /
SVO
GW certification of copies of
SVO SVO SVO
approved plans
5000
3850
COMMENTARY
300H RC CURB
1. DETAILS OF OPENABLE WINDOWS MIGHT
7350
83.500 83.500 BE PROVIDED IN GBP BEFORE
APPLICATION FOR CONSENT FOR THE
UR1F WPRML
COMMENCEMENT OF SUPERSTRUCTURE
RC PRPW 1500H. WORKS (STAGE II).
FROM FFL
3500
80.000 (mPD) 80.000
BUILDING HEIGHT RF
RESTRICTION (BHR)
3000
77.000
22F
3000
74.000
21F
3000
71.000
3000 20F
CW CW CW CW
MB MB
ACPF WITH
68.000 GB GB GB METAL GRILLE
19F
@ 3000 x 13 STOREYS = 39000
14/2/2023 4:05
PROJECT
BD SAMPLE -
REPEATED 6/F - 18/F = 13 STOREYS
75050
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
TOWER ELEVATION D
29.000 B.L. B.L.
6F
CW CW CW CW
MB MB
23.000 GB GB GB
90mm (W) x 40mm (H) space
4F for COMPANY LOGO
3000
150H RC CURB
20.000
19.700
3F
150H RC CURB
2100
2F
4450
GW GW GW
9.400
1F
90mm (W) x 150mm (H) space
for BD's approval stamp /
certification of copies of
5000
approved plans
GW GW GW
(PNAP ADM-10 APP A)
4.950
MEAN STREET LEVEL (MSL) 4.400
GF
12800 12500 8300
-7.100 33600
ELEVATION D
BD REF 2/1234/18
BIM REF 2-1234-18-A21-01
FSD REF FP 8/
Rev. Date Amendment Purpose
B.L. B.L.
ELR FLAT
20.000 COF
20.000 BAL COF
19.750 19.750
3F 19.550
2100
ICOF RC TRANSFER PLATE ICOF
18.300 18.100 18.300
17.900 18.100
T.P.
4050
LANDSCAPE LOUNGE
GARDEN CORR AREA 1 CORR GYM
PD 14/2/2023 4:05
13.850 13.850 14.050
PROJECT
2F
BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
4450
1F
A031 -
ARCADE
MAIN SOURCE
4.950 ENTRANCE
FSCR
MEAN STREET LEVEL (MSL) 4.400 PD
GF
90mm (W) x 40mm (H) space
for COMPANY LOGO
4700
INACCESSIBLE RETAIL
-0.300 VOID
B1F
90mm (W) x 60mm (H) space
for AP/RSE/RGE's
3600
-5.700
SECTION 1-1
BD REF 2/1234/18
BIM REF 2-1234-18-A21-01
FSD REF FP 8/
Rev. Date Amendment Purpose
B.L.
FLAT LL
20.000
COF
3F
2100
T.P.
4050
LFS EXIT
PD RRF
CORR
ICOF
MAIN SWITCH ROOM RRF 14/2/2023 4:05
13.850 13.850
2F PROJECT
LIFT BD SAMPLE -
PIT
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
4450
A032 -
ARCADE CORR.
GW RETAIL FLL
4.950 SOURCE
MEAN STREET LEVEL (MSL) 4.400
GF
INACC-
CARPARK ESSIBLE
-0.300 EVCR DRIVEWAY FSPR VOID RETAIL FLL RETAIL
B1F
CAR RAMP
for AP/RSE/RGE's
WT signature/ and stamp chop
CARPARK INACCESSIBLE VOID CARPARK CARPARK
-3.900 DRIVEWAY DRIVEWAY FLL DRIVEWAY
B2F
SECTION 2-2
BD REF 2/1234/18
T-A T-B T-C T-D T-E T-F T-14 T-13 T-12 T-11 T-10 T-9 T-8 T-7 T-6 T-5 T-3 T-2 T-1 BIM REF 2-1234-18-A21-01
3850
SML LMR FLAT ROOF
83.500 SML LMR 83.500 83.500
3500
ST-02
FLAT ROOF
EXIT FLAT ROOF PD EGR FLAT ROOF
80.000 ST 80.200 80.000 T/ BAL 80.000
RF RF
ST-02
3000
3000
EXIT ST
CW CW
RS& LIV /
EXIT
LFS LL LIV / DIN BAL MBR BATH BATH UTR LIV / DIN LIV / DIN BATH LIV / DIN MRC BATH LIV / DIN BATH DIN LIV / DIN BR MBR
77.000 ST 77.000
22F 22F
3000
3000
74.000 74.000
21F 21F
ST-02
3000
3000
EXIT ST
CW CW
RS& LIV /
EXIT
LFS LL LIV / DIN BAL MBR BATH BATH UTR LIV / DIN LIV / DIN BATH LIV / DIN MRC BATH LIV / DIN BATH DIN LIV / DIN BR MBR
71.000 ST 71.000
20F 20F
3000
3000
14/2/2023 4:05
PROJECT
68.000 68.000 BD SAMPLE -
19F 19F PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
TOWER SECTION 3-3 & 4-4
A033 -
@ 3000 x 13 STOREYS = 39000
SOURCE
REPEATED 6/F - 18/F REPEATED 6/F - 18/F 90mm (W) x 40mm (H) space
= 13 STOREYS = 13 STOREYS for COMPANY LOGO
29.000 29.000
6F 6F
ST-02
3000
3000
EXIT ST
CW CW
RS& LIV /
EXIT
LFS LL LIV / DIN BAL MBR BATH BATH UTR LIV / DIN LIV / DIN BATH LIV / DIN MRC BATH LIV / DIN BATH DIN LIV / DIN BR MBR
26.000 ST 26.000
5F 5F
90mm (W) x 150mm (H) space
3000
3000
3000
CW CW
RS& LIV /
EXIT MBR BATH BATH UTR LIV / DIN LIV / DIN BATH LIV / DIN EXIT ST
LFS LL LIV / DIN BAL MRC BATH LIV / DIN BATH DIN LIV / DIN BR MBR
20.000 COF ST 20.000
3F 19.550 3F
2100
2100
ICOF
ICOF
17.900 18.100 17.900
T.P. T.P.
498.749 9974.980
10299.852
10263.453 10263.453
4149.609
4149.609
2.85
10299.852 617.991
10299.852 257.496 4,149.609 / 2,507.73 1.654
10299.852 36.399
10263.453
715.319
166.035
4149.609
10263.453
4149.609
14413.602
4.093
10263.453 X 5 % 513.173
1.654
513.173 166.035
5.747
17/3/2023 7:50
PROJECT
BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
CALCULATIONS
SCALE N.T.S.(A1)
DRAWING NO. REV. NO.
C041 -
SOURCE
STAGE II
COMMENTARY
1. NON-ACCOUNTABLE GROSS FLOOR AREA
OF MANDATORY FEATURE OR ESSENTIAL
PLANT ROOM AREA MIGHT BE PROVIDED
IN GBP BEFORE APPLICATION FOR
CONSENT FOR THE COMMENCEMENT OF
SUPERSTRUCTURE WORKS (STAGE II).
513.173 513.173
36.399 36.399
17/3/2023 12:12
PROJECT
BD SAMPLE -
5408.729 893.844
PROPOSED 20-STOREY
10263.453 RESIDENTIAL BUILDING OVER
4149.609 3-STOREY PODIUM AT TKO
8.709% 0.854%
DRAWING TITLE
SCHEDULE
5408.729 893.844
10263.453
8.709%
SCALE N.T.S.(A1)
DRAWING NO. REV. NO.
C042 -
SOURCE
513.173 36.399
1 2 3 4
X2-3
C STAGE II
5 6
32
12500
31
X2-2 8 7
33600
30
34
B X2-6
33
28
10 9
12800
27
XC-1
26
25 24 23 22 21 20 19 18 17 16 15 14 13 12 11
X2-1
A
14/2/2023 4:06
PROJECT
D C BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
CALCULATIONS (1)
DOMESTIC & NON- DOMESTIC G.F.A. DIAGRAM OF B2/F
SV-B1-02
X21-11
SV-B2-01
NON ACCOUNTABLE (NOT SUBJECT TO 10% CONCESSION CAP) : for COMPANY LOGO
SV-B1-03
X34-12
STAGE II
12500
XC-11
33600
N-A1
X2-12
X2-13
B
12800
37
DETAILED BREAKDOWN OF GFA CALCULATION OF B1/F 90mm (W) x 150mm (H) space
for BD's approval stamp /
36
certification of copies of
approved plans
35
A
X1-11
X21-13 (PNAP ADM-10 APP A)
D C
ACCOUNTABLE :
A DOMESTIC GFA (INCLUDING 4.725 S.M. LIFT SHAFT AREA FOR L1) = 70.943 S.M. COMMENTARY
N-A22
B 1. DETAILED BREAKDOWN OF GROSS
X21-22 X21-27 X21-28 FLOOR AREA (GFA) CALCULATIONS MIGHT
D SV-B2-02 X21-25
SV-B1-03
X2-26 X2-22 X2-23
X2-24
X21-24 X21-21
BE PROVIDED IN GBP BEFORE
X2-25 SV-B1-02 SV-B2-01 NON-DOMESTIC GFA = 1,415.101 S.M.
APPLICATION FOR CONSENT FOR THE
X1-21 COMMENCEMENT OF SUPERSTRUCTURE
WORKS (STAGE II).
8,300
X21-23
CAR PARK AND LOADING / UNLOADING AREA EXCLUDING
N-A21 PUBLIC TRANSPORT TERMINUS
12,500
B
X34-22
XC-21
X21-26
12,800
DOMESTIC G.F.A. (INCLUDING 4.725 S.M. LIFT SHAFT AREA FOR L1) = 23.055 S.M.
A
B 90mm (W) x 40mm (H) space
D X15-31
NON-DOMESTIC G.F.A. = 1,693.067 S.M.
for COMPANY LOGO
1.5x1.5m SPACE
NON ACCOUNTABLE (SUBJECT TO 10% CONCESSION CAP) :
D-A32
8,300
N-A31
STAGE II
B
12,800
D C
ACCOUNTABLE:
A DOMESTIC G.F.A. (INCLUDING 13.535 S.M. LIFT SHAFT AREA FOR L1, L2 & L3) = 230.874 S.M. COMMENTARY
X21-43
B 1. DETAILED BREAKDOWN OF GROSS
FLOOR AREA (GFA) CALCULATIONS MIGHT
D NON ACCOUNTABLE (SUBJECT TO 10% CONCESSION CAP): BE PROVIDED IN GBP BEFORE
APPLICATION FOR CONSENT FOR THE
COMMENCEMENT OF SUPERSTRUCTURE
RESIDENTS' RECREATIONAL FACILITIES = 647.777 S.M. WORKS (STAGE II).
X16-44
8,300
X16-42
NON ACCOUNTABLE (NOT SUBJECT TO 10% CONCESSION CAP):
X16-41
12,500
X2-42 X3-41
X16-43 STAGE II
L1
33,600
D-A41
X21-41
X21-42
L2
X15-42
X2-43
B
L3
1.5x1.5m SPACE
X2-41
X21-44
X14-41
X15-41
12,800
A
14/2/2023 4:06
DETAILED BREAKDOWN OF GFA CALCULATION OF 2/F
PROJECT
D C BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
CALCULATIONS (3)
DOMESTIC & NON- DOMESTIC G.F.A. DIAGRAM OF 2/F
T-2 SOURCE
A T-E
0
4,
BAL/UP
(INCLUDING 13.535 S.M. LIFT SHAFT AREA FOR L1, L2 & L3)
25
T-3 B
0
T-C
2,
,9
BAL/UP
BALCONY AND UTILITY PLATFORM = 1.188 S.M. X 20 STOREYS = 23.760 S.M.
T-B
7,
BA
5
2,
BA
5
X2
AT
2, ,22
1
T-6
65 5
2
0
BA
T-7
FL
AT
L
2
X2
,1 25 25
W
1
25
for AP/RSE/RGE's
FL
T-8
FL
AT
AT
3
7
1-
X2
7-W
(OTHER THAN CAR PARK AND LOADING / UNLOADING AREA signature/ and stamp chop
1-2
2
FL
T-9
AT
2,
T-10
X2
X2
FL
65
8-2
-3
AT
8-W
BA
0
X3
L
4-
1
X2
X2
1
1-
1-
(L
4
3
1)
BA
4,
BA
X1
L
L
-1
STAGE II
80
X2
T-11 TOTAL DOMESTIC G.F.A. = TOTAL FLAT AREA + COMMON AREA + TOTAL LIFT SHAFT AREA
-2
0
X2
-1
Z1
X3
FL
AT
2,
4
(L
T-12
2)
BA
97
X2
L
8-
X3
5
5
4-3
(L
BA
3)
L
X2
X2
4,
1-
FL
1-
5
AT
6
25
T-13
5
T-14
FL
AT
FL
6
AT
X2
10
1-
7
1,
90
0
FL
AT
UP
11
BA
L
FL
12
W
1
8-3
L
certification of copies of
12
BA
-W
L
12
1
W-
approved plans
2
UP
D C
19
T-F NON ACCOUNTABLE (NOT SUBJECT TO 10% CONCESSION CAP) :
00
T-2
50
42
35
T-3 B 1. DETAILED BREAKDOWN OF GROSS
50
T-D FLOOR AREA (GFA) CALCULATIONS MIGHT
0
T-C
5
5
25
92
BE PROVIDED IN GBP BEFORE
29
11 00 12
75
APPLICATION FOR CONSENT FOR THE
T-B
00 STAGE II COMMENCEMENT OF SUPERSTRUCTURE
29
48
T-A T-5
00
25
28
T-6
26
50
T-7
22
25
42 52
12 5
4
T-8
5
DETAILED BREAKDOWN OF
T-9 GFA CALCULATION OF ROOF FLOOR
22
25
X2-1
T-10
26
50
48
X2-2
T-11
00
T-12
29
75
42
T-13
50
T-14
X2-3
19
00
14/2/2023 4:06
PROJECT
D C BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
CALCULATIONS (4)
DOMESTIC G.F.A. DIAGRAM OF ROOF FLOOR
C054 -
UPPER ROOF 1
N SOURCE
NON ACCOUNTABLE (NOT SUBJECT TO 10% CONCESSION CAP) :
T-D
T-C
00
48
00
00 5
for AP/RSE/RGE's
29 937
T-B T-6
26
T-A T-7
25
22
28
25
DETAILED BREAKDOWN OF
23 452
87 5
T-9
22
25
X2-4 T-10
26
50
48
T-11
00
D C
A COMMENTARY
B 1. USABLE FLOOR AREA / USABLE FLOOR
SPACE DIAGRAM MIGHT BE PROVIDED IN
D SV-B2-02
SV-B1-03
C SV-B1-01
12500
33600
RETAIL-B1
S-B1-01
B
12800
37
36
35
A
14/2/2023 4:06
PROJECT
D C BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
CALCULATIONS (5)
UFA CALCULATION DIAGRAM OF B1/F
A
B 90mm (W) x 40mm (H) space
D SV-B2-02 SV-B1-03
RETAIL-G1
S-GF-05 for AP/RSE/RGE's
S-GF-01 signature/ and stamp chop
RETAIL-G3
S-GF-03
12500
33600
B
ARCADE-G1
A-GF-01
12800
D C
A COMMENTARY
B 1. USABLE FLOOR AREA / USABLE FLOOR
SPACE DIAGRAM MIGHT BE PROVIDED IN
D GBP BEFORE APPLICATION FOR CONSENT
RETAIL-1F-5
FOR THE COMMENCEMENT OF
S-1F-05
SUPERSTRUCTURE WORKS (STAGE II).
1.5x1.5m SPACE
8300
RETAIL-1F-1
RETAIL-1F-6
S-1F-01
S-1F-06
C ARCADE-1F
A-1F-01
12500
33600
RETAIL-1F-3 RETAIL-1F-4
RETAIL-1F-2
S-1F-03 S-1F-04
S-1F-02
12800
A
14/2/2023 4:06
PROJECT
D C BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
CALCULATIONS (6)
UFA CALCULATION DIAGRAM OF 1/F
A
B 90mm (W) x 40mm (H) space
D for COMPANY LOGO
8300
OUTDOOR SWMP
C R-U5
90mm (W) x 60mm (H) space
for AP/RSE/RGE's
signature/ and stamp chop
12500
33600
B 1.5x1.5m SPACE
STO 1
LOUNGE AREA 1 LOUNGE AREA 2
R-U11
R-U2 R-U1
OCO
R-U21
12800
D C
19
T-F
00
T-2
A T-E COMMENTARY
50
42
35
T-3 B
50
1. USABLE FLOOR AREA / USABLE FLOOR
T-D SPACE DIAGRAM FOR TYPICAL FLOORS
50
T-C
5
25
92
BR
OF TOWER MIGHT BE PROVIDED IN GBP
1
11 00 12
BEFORE APPLICATION FOR CONSENT FOR
MB
T-B
BR
R
77
00 THE COMMENCEMENT OF
75
29
UT
LIV
1
R
KIT
/D
T-6
26
IN
MB
50
R
BR
2
LIV
T-7
22
/D
IN
25
O
O
KIT
42 452
KIT
BR
1
12 5
7
LIV
5
T-8
3
LIV
/D
/D
IN
BR
IN
8
LIV
T-9
/D
22
O
KIT
IN
25
O
O
KIT
KIT
T-10
26
9
LIV
50
/D
IN
BR
48
00
T-11
BR
LIV
4
/D
29
T-12
BR
IN
O
75
KIT
42
5
LIV
T-13
50
/D
IN
O
KIT
T-14
BR
BR
6
LIV
O
2
KIT
/D
IN
10
LIV
19
/D
BR
IN
00
UT
R
O
KIT
11
LIV
/D
KIT
O
IN
KIT
12
LIV
/D
MB
IN
R
BR
1
MB
R
14/2/2023 4:06
PROJECT
D C BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
CALCULATIONS (7)
UFA & UFS CALCULATION DIAGRAM OF 3/F ~ 22/F (20 STOREYS)
9917
C057 -
A A 2275
SOURCE
B B
5383
90mm (W) x 40mm (H) space
for COMPANY LOGO
2390
4357
21646
S1-L OS-1
1.5x1.5m SPACE
25692
14150
NON-DOMESTIC SITE COVERAGE AREA CALCULATION OPEN SPACE AREA CALCULATION DOMESTIC SITE COVERAGE AREA CALCULATION
(15m ABOVE GROUND LEVEL) NO. AREA NAME NO. AREA NAME
NO. AREA NAME 3F OS-1 715.319 OPEN SPACE 3F S2-L 685.553 DOMESTIC SC
2F S1-L 1,837.404 NON-DOMESTIC SC 715.319 m² 685.553 m²
1,837.404 m²
NON-DOMESTIC SITE COVERAGE CALCULATIONS DIAGRAM AT 2F ( NOT EXCEEDING 15M ) OPEN SPACE & DOMESTIC SITE COVERAGE CALCULATIONS DIAGRAM AT 3F
BD REF 2/1234/18
BIM REF 2-1234-18-A21-01
1 2 3 4 5 FSD REF FP 8/
45000
9600 9600 12300 13500 N Rev. Date Amendment Purpose
A
B
D 8300 SV-B2-02
SV-B2-01
1 2 3 4
C 32
5 6
12500
31
F-B2-2 8 7
33600
30
29
34
33
28
10 9
12800
F-B2-1
27
26
25 24 23 22 21 20 19 18 17 16 15 14 13 12 11
A
14/2/2023 4:06
PROJECT
D C BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
FIRE COMPARTMENT DIAGRAMS &
CALCULATIONS (1)
FIRE COMPARTMENT DIAGRAM OF B2/F
A
B 90mm (W) x 40mm (H) space
D SV-B2-02
SV-B1-03
F-B1-2
C SV-B1-01 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
signature/ and stamp chop
12500
33600
F-B1-11 F-B1-1
B
F-B2-3
12800
37
certification of copies of
approved plans
35
D C
A
B
D 8300 SV-B2-02 SV-B1-03
SV-B1-02 SV-B2-01
C SV-B1-01
F-GF-2
12500
33600
B
F-B1-3
12800
F-GF-1
F-GF-3
A
14/2/2023 4:06
PROJECT
D C BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
FIRE COMPARTMENT DIAGRAMS &
CALCULATIONS (2)
FIRE COMPARTMENT DIAGRAM OF G/F
A
B 90mm (W) x 40mm (H) space
D for COMPANY LOGO
1.5x1.5m SPACE
8300
F-1F-1
B
12800
D C
A
B
D 8300
C
12500
33600
F-2F-1
B 1.5x1.5m SPACE
12800
A
14/2/2023 4:06
PROJECT
D C BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
FIRE COMPARTMENT DIAGRAMS &
CALCULATIONS (3)
FIRE COMPARTMENT DIAGRAM OF 2/F
C063 -
SOURCE
N N
14/2/2023 4:06
PROJECT
BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
3-STOREY PODIUM AT TKO
DRAWING TITLE
D C D C SUSTAINABLE BUILDING DESIGN
7.5m
DEMONSTRATION DIAGRAMS &
CALCULATIONS
12.8m WIDE
X X 街 X X STREET X X 街 X X STREET
STREET CENTRE LINE SCALE 1:200 (A1)
DRAWING NO. REV. NO.
C071 -
SOURCE
BUILDING SETBACK DIAGRAM BUILDING SEPARATION DIAGRAM 90mm (W) x 60mm (H) space
for AP/RSE/RGE's
signature/ and stamp chop
45000
9600 9600 12300 13500 N
A
B
G3 G5
G2
8300
G4
G6
12500
G1
33600
1.5x1.5m SPACE
12800
14/2/2023 4:06
PROJECT
BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
D C 3-STOREY PODIUM AT TKO
DRAWING TITLE
GREENERY DIAGRAMS &
CALCULATIONS
10m
CENTRE LINE OF STREET
52126
A LENGTH OF PERIMETER WALL FOR PODIUM
B LENGTH OF THE FACADE FOR PODIUM SERVED BY EVA
SV-B2-02 SV-B1-03
SV-B1-02 SV-B2-01
SV-B1-01
21646
X X 街 X X STREET
36581
14150
800
800
10m
14/2/2023 4:06
E PROJECT
D 13400 17250 E 18027 3443 C BD SAMPLE -
PROPOSED 20-STOREY
RESIDENTIAL BUILDING OVER
X X 街 X X STREET 3-STOREY PODIUM AT TKO
DRAWING TITLE
E.V.A. PLAN DIAGRAMS &
CALCULATIONS
EVA PLAN OF GF
X X 道 X X ROAD LEGEND :
SCALE 1:200 (A1)
EMERGENCY VEHICULAR ACCESS (EVA)
DRAWING NO. REV. NO.
WITHSTAND LOADING 30000 KG
N
HARD PAVE WIDTH - OPERATION ≥ 6M ; FOR PASSAGE ≥ 4.5M
GRADIENT - OPERATION ≤ 1 : 10 ; FOR PASSAGE ≤ 1 : 6
C073 -
OVERALL HEADROOM MIN. 4.5M SOURCE
50
14
SITE BOUNDARY
91 0
90
90
90
10m
0
7
0
A
14 00
10
37
67
30
08
25 50
12 24
31
46
5
22
05
14
50
13
14
50
97
14
0
60
33
for AP/RSE/RGE's
X X 街 X X STREET
signature/ and stamp chop
45
50
52
14
10
25
30
50
50
50
37
14
33
20 104
96
75 6
50
37
13
7 9
19
29
31
13
46
79
50
50
14
14
50
30
30
14
75
0
60
08
59
71
19
14
00
96
7
50
14
84
50
14
00
certification of copies of
24
24
63
30
approved plans
75
13
75
79
67
10m
75
79
19 104 9
67
29 6
19 104
2 6
20
25 50
75
12 24
20
D
25 50
C
75
12 24
5
30
22
50
5
30
50
22
50
14
50
14
0
10
X X 街 X X STREET
60
25
0
10
60
25
COMMENTARY
1. VENTILATION DUCTS AND SIGN SHOWING,
DIRECTION, INFORMATION AND
PROVISIONS FOR PERSONS WITH
DISABILITY (PwD) MIGHT BE PROVIDED IN
GBP BEFORE APPLICATION FOR
OCCUPATION PERMIT / TEMPORARY
OCCUPATION PERMIT (STAGE III).
3/3/2023 17:58
PROJECT
SAMPLE
DRAWING TITLE
SCALE - (A1)
DRAWING NO. REV. NO.
SOURCE
COMMENTARY
1. FIRE DAMPERS MIGHT BE PROVIDED IN
GBP BEFORE APPLICATION FOR
OCCUPATION PERMIT / TEMPORARY
OCCUPATION PERMIT (STAGE III).
23/3/2023 10:51
PROJECT
SAMPLE
DRAWING TITLE
SCALE (A1)
DRAWING NO. REV. NO.
SOURCE
1 2 3 4 5 COMMENTARY
45,000 1. ASSISTIVE PROVISIONS FOR PERSONS
WITH A DISABILITY MIGHT BE PROVIDED
9,600 9,600 12,300 13,500
N IN GBP BEFORE APPLICATION FOR
OCCUPATION PERMIT / TEMPORARY
OCCUPATION PERMIT (STAGE III).
1
A031
Lp = 52.120m < 60 m
200 150 150 150 150 150 150 150 100 200 150 150 150 150 150 150 100 100
200 8,791 200 2,999 3,000 1,750 1,100 1,100 1,325 975 1,100 4,850 1,850 2,300 1,650 1,100 2,050 4,500 1,100 1,600 1,353 1,947 3,000 2,875 1,000 200 3,225
C
A EX 4.45 GB023
EX 4.45 EX 4.45
EX 4.45
200
CSC CSC W/P M.L. AT H/L
200
1,138
D2 CSC CSC
1,560
866
D2 PD CSC
FSI
1,075
PD D14 FE 5 5
2,000
SVD FEH CMC
D14 D14
D
2,230
SVD
200
D17 D14
A032 A032
1,100 150
150
SV-B2-02 EXIT SV-B1-03 SVD SVD
3,238
EXIT D14 WPT
2x1.75m ST-03 L4 CSC 1x1.6m
150
EXIT
UP29R SPR CV GMC SV-B1-02 SV-B2-01
1,695
150
EXIT
2,150
TX-01
EXIT
D14 2x1.7m 2.745x1.7m
1,110
BS-01
1,290
UP29R
DN27R BS-02
AL AL 60 / AP
160
HR DN27R RSMRR
150
BS-05
CAP : 0 P.
200
DN27R
EXIT
100
1,100
D4
150
150
1,550
FH 4.450
350
L5
EXIT
EXIT 4.400
2,475
2,150
2,775
3,060
449
100
FH 650 3,300 150 1,100 2,775 1,950 1,000 2,000 1,500 2,745
8,300
6,300
L7
CSC
2,290
D
100
LL
4,997
1,100
FH L6
E
150
1,100
150
5,947
AB
4.400 D8
2,150
FH 150 150
E
150
IN
4,650
.L
100
HR
DG
TBE (DOM) FE
BL
3,000
CAP : 0 P.
HR
100
200
5,100 1,300 1,689 LL3,011
2,115
FSCR
3,100
180
1,240
D13 CAP : 0 P.
D8
100
C SVD
650
150
100
100
2,600
1,100
SV-B1-01 D4
HR
1.25x2.6m D3 EXIT
100
2,392
100
HR
3,353
200
EXIT
RETAIL-G5
4,210
CAP : 14 P.
2,703
3,010
200 1,100 6,639 100 12,761
1,580
20
150 4.450 17/3/2023 12:11
0
0
18
D14 4.400 1 NO. FE
1,0
0
EXIT PROJECT
80
100 1,400 200 7,900 100
100
2 NOS. SB
100
0
200
3,100
EXIT
EX 4.45
1,1
22
B EXIT
RETAIL-G1 HR O O O
5
BD SAMPLE -
200
GB022
1,1
CAP : 41 P.
25
200
RETAIL-G3
0
2,0
D PROPOSED 20-STOREY
0
4.450
20
CSC
CAP : 125 P. GB024
0
ST-01 4.400
FH 4.450 RESIDENTIAL BUILDING OVER
00
UP29R
2,1
1,1
3-STOREY PODIUM AT TKO
5,207
12,500
4.400
00
0
L1
4,850
20
25
ENT DRAWING TITLE
0
A
ADJOINING LOT
R D
ASSISTIVE PROVISIONS FOR
H
PERSONS WITH DISABILITY
7,305
33,600
200
200
DN S-0
B
27 3
7,098
CSC
R
37,421
2
150 1,100
1,100
EXIT
D14
A032 SCALE (A1)
150
FLL
GREENERY AREA
(PLANTER W./ MIN.
200 1,650 150 11,048 150 5,133 100 2,519 100 1,400 200 DRAWING NO. REV. NO.
150 1,600
SOIL D. 600mm) 2
EXIT
1,600
4.750 (TOS)
15,087
A032
4.150 D14
200
FSAP
FH ST-02 SOURCE
FH
1,100
310
1,100
200
B UP29R
1,650
225
180
150
150
BS-04
1,100
EXIT
1,150
DN27R D14
90mm (W) x 40mm (H) space
CSC
EXIT
1,100
D14
CSC
200
HR
1,170 180
ARCADE-G1
180
ST-04
FH
150
1,300
CAP : 48 P. UP29R
PD
21,692
200 4,251 D2
2,620
150
200
RAMP DN
HR
1,480
1:10
2,883
EXIT
1,150
D14
CSC
180
150
180
1,100 3,800 2,970 4,975 1,100 2,000
1,417 270
180 180 200 200 200
CSC
COMPARTMENT B1-A
12,800
EXIT
EX 4.45
3,200
EXIT
8,630
CSC
7,360
RETAIL-G2 RETAIL-G4
3,503
CAP : 69 P. CAP : 58 P.
4.450 SERVICE 4.450
4.400 COUNTER 4.400
4,393
ENTRANCE
A
2,255
200
R4
EXIT EXIT
150
650
800
CSC
150
200
200
EX 4.45 SURFACE CHANNEL WITH CSC
1100
CSC HEAVY DUTY MATCHING COVER
EX 4.45 BLDG. LINE ABOVE 6 NOS. SPR. INLET
EX 4.45
D
200
A C
200 8,791 200 2,999 5,700 3,100 4,200 1,455 3,100 2,995 1,400 200 A021 8,000 3,000 5,785 3,100 3,510 2,100
90mm (W) x 150mm (H) space
200 200
1
100 180 150
EXISTING PAVEMENT
200 for BD's approval stamp /
A031 RUN IN / OUT certification of copies of
GROUND FLOOR PLAN
7,500
approved plans
(PNAP ADM-10 APP A)
SERVICE PUBLIC INFORMATION SERVICE COUNTER WITH ASSITIVE
DRIVEWAY
COUNTER
LISTENING SYSTEM (E.V.A.)
MIN. HEADROOM 4.5m H.
HARD PAVED WITHSTAND 30 TONS
INITIAL ACCESS FOR PwD X X STREET (12.8 WIDE) XX街 CENTRE LINE OF STREET