This document provides a preventative maintenance record for an EOT crane. It outlines a monthly maintenance schedule that requires 2 hours and 2 skilled workers. The maintenance actions check for damage, proper operation of limit switches, emergency switches, collision prevention systems, electrical components, rope condition, and cleaning. Upon completion, the work is signed off by the maintenance worker and checker.
This document provides a preventative maintenance record for an EOT crane. It outlines a monthly maintenance schedule that requires 2 hours and 2 skilled workers. The maintenance actions check for damage, proper operation of limit switches, emergency switches, collision prevention systems, electrical components, rope condition, and cleaning. Upon completion, the work is signed off by the maintenance worker and checker.
This document provides a preventative maintenance record for an EOT crane. It outlines a monthly maintenance schedule that requires 2 hours and 2 skilled workers. The maintenance actions check for damage, proper operation of limit switches, emergency switches, collision prevention systems, electrical components, rope condition, and cleaning. Upon completion, the work is signed off by the maintenance worker and checker.
This document provides a preventative maintenance record for an EOT crane. It outlines a monthly maintenance schedule that requires 2 hours and 2 skilled workers. The maintenance actions check for damage, proper operation of limit switches, emergency switches, collision prevention systems, electrical components, rope condition, and cleaning. Upon completion, the work is signed off by the maintenance worker and checker.
NOIDA METRO RAIL CORPORATION LTD. No : RS/MW/GND/39
ROLLING STOCK DEPARTMENT Rev No: 00
PREVENTIVE MAINTENANCE RECORD DATE : Name of M&P: E.O.T CRANE SCHEDULE : Monthly
E.O.T CRANE Location:
Note: This Checklist for ‘Monthly’ Service Checks should be Capacity_____ applied to the Time period scheduled, since the last Service. Downtime Man Hours Skill Requirements 2 Hrs 2 Mechanical & Electrical Work Preparation 1. Safety Switch off the power supply prior to any maintenance and put UNDER MAINTENANCE Board on the panel, also switch off the CB of respective crane. Visually check operation of thrusters during hoist movement of EOT crane. 2. Tools and Equipments Required (a) Paint Brush (b) Torch (c) Spanners (d) Dust clothes (e) Sand papers (f) Safety Helmet (g) WD-40 (h) Grease (i) Lubrication Oil S. Equipment Maintenance Actions OK / Remarks No NOT OK CRANE BRIDGE 1 Main Girder Check for any Mechanical Damage. Check for any weld seems for cracks.
2 Limit Check operation for proper cut off.
switches CONTROL SYSTEM 3 Emergency Check operation of emergency switch. switch 4 Hoist limit Check operation of limit switches. switches Collision Move the crane to nearest crane and check prevention whether it stops or not upon reaching other system ( for crane. 5 WS cranes) Clean dirt accumulation on reflectors.
Check contactor & MCB for sparking,
change if required.
Check working of all push buttons in
pendant. 6 Check all overhead and platform lights are Power supply working, Check all buzzer/alarm system is working.
Check for any damage of stationary cable,
moving connection cable and pendant cable. Check UP/Down movement of hoist. 7 Operation Check cross movement of hoist. Check longitudinal movement of the crane. Check rope wire for any broken stand.
Check hook and hook safety latch for any
crack or damage. 8 Miscellaneou Air cleaning of crane bridge platform, cabin s etc.