On-siteDesignModification RequestSheet

Serial Number: TL-SWEPDI-KDPE-DE-002

THANG LONG 2x300MW THERMAL POWER PLANT PROJECT


Adjust wiring 接线调整 Volume SECONDARY WIRING DIAGRAM OF G-T
Issue UNIT 发变组二次线
Name
TERMINAL BLOCK WIRING DIAGRAM
OF G-T UNIT 发变组二次接线安装图
SECONDARY WIRING DIAGRAM OF
500kV BREAKER 500kV 断路器二次线
TERMINAL BLOCK WIRING DIAGRAM
OF 500kV BREAKER 500kV 断路器二次
接线安装图
Volume 50-F416S-D0607 REV.B
To KDPE 50-F416S-D0803 REV.B
No.
50-F416S-D0606 REV.B
50-F416S-D0802 REV.B

CC Date 29th-Apr-2017
Subject: Adjust wiring 接线调整
Causes:
Improve and perfect the hard-wired interlock according to owner's comments.
根据业主意见,修改硬接线闭锁。
Description: Submitted by:
Add hard-wired interlock on 500kV switchyard, relevant to attach □ OWNER
1/7~7/7. □ KDPE
Implementation of this design modification may cause possible □ SWEPDI
security risks, relevant constructor should pay attention to the safety □ CTESI
for construction and operation and strictly abided by the safety □
regulations.

增加 500kV 升压站硬接线闭锁,见附图 1/7~7/7。


本设计变更在实施时可能会产生安全风险,请相关单位做好相应的安全
技术防范措施。

Prepared Checked Approved


/Date /Date /Date
SWEPDI/CTESI’s Comments:

KDPE’s Comments:

FICHTNER’s Comments:

OWNER’s Comments: