Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

C

B1-B2 A/E
D

R1

R1

R1
G
R1

F1/F2 H I P
M

R1

L F1 F2

H B2 FICHTNER Consulting Engineers (India)


Private Limited
VENDOR DOCUMENT REVIEW STATUS

o Action - 1 Approved
o Action - 2 Approved except as noted. Revise and

B1 o
resubmit for final approval
Action - 3 Returned with Comments. Revise and resubmit

I o
for reiew / approval

N
Action - 4 Not approved. Revise and resubmit for review
o
D o
o
Action - 5 Retained for Information, Reference & Records
Action - 6 Returned without review
Action - 7 Documents reviewed only against our previous
comments and other revisions highlighted and
identified by the Contractor/Vendor

o Action - 8 Reviewed
Review/Approval of document for the general compliance with the
Contract does not constitute a blanket approval of the content of
document.The Vendor / Contractor is responsible for correctness of
design and details. Approval of document does not relieve the
Vendor / Contractor of his responsibility in carrying out the work

C correctly and fulfilling the complete requirements of the contract,


stated or implied, nor does it limit the Purchaser's rights under the
Contract.
FI Letter Ref. No. Date:
1117155/CHHABRA/JSP/ME/0038 22-08-2023

SSM
Signature Initials:

E2 E1
A

R1
G

FGD SYSTEM PACKAGE FOR 2 X 660 MW


CHHABRA SUPER CRITICAL THERMAL POWER PROJECT
OF RRVUNL - CHHABRA, RAJASTHAN, INDIA.

NOZZLES ORIENTATION HOLD G. A DRAWINGS FOR TANKS


( Slurry tank, Filtrate tank & Water tank )
TO BE DEFINED BY JSP G. A. DRAWING OF SLURRY STORAGE TANK

CSCTPP-JSP-001-ME-FGD-DE-0022 1

2268.MV.0003 SHEET: 1 OF 8

You might also like