Professional Documents
Culture Documents
R07 HC3D02 MML 02 XX DWG Ci 55106
R07 HC3D02 MML 02 XX DWG Ci 55106
R07 HC3D02 MML 02 XX DWG Ci 55106
.50
1. All dimensions are in meters unless otherwise stated.
+4
CL-03
0
Ø160 HDPE
+5.00
+5.0
2. Coordinates are following UTM Zone WGS84-37N system.
00
1.50%
+4.
IL 4.07
0
3. This drawing to be read in conjunction with master plan,
.1
+5
IL 3.28 VILLA-03
IL=3.2540 roads, architectural, landscape and MEP drawings.
0.64.m³
+2.80
30
+4. +4.
VILLA 3-04 4. Contractor to liaise with the all building connection with
MEP drawing.
PE IL=3.16 IL 3.91 IL=3.81 5. Cleanouts shall be provided in storm water network at
0 HD CL-03
6 suitable location to the approval of the engineer.
Ø1
IL 3.37 0% 6. Access shaft shall be located at high ground level above
1.5
geocell.
+5.00
1.16.m³ 7. The roof outlets shall be connected to the storm water
network at minimum 0.75% of slope.
+4
PE
.0
CL-03 0 HD
0
SUITE 2-03
0
+5.00 .1
IL 2.97 +5 8. Geocell overflow should be located at lowest contour.
Ø16 IL=2.85
+3
%
0
+5.50
CL-03
+5.1
+2.70
+2.80
10. Contractor to refer design report appendices A.3 i.e. flood
+5.00
analysis results of 1 in 100+20% CC return period &
IL=3.83
4UNITS_1K1Q2A-01 update grading in co-ordination with Landscape
+5.0
N1
+6.0
Consultant/Engineer In charge, to avoid flooding for the
+5.5
IL 2.57
+5.0
0
+4.5
+3.50
1.97.m³ areas shown in the Flood analysis results.
0
0
0
+3.40
IL=3.86
+5.10
+3.30
1.53.m³
+4.90
+5.00
IL=2.46
50
VILLA-03
.
+4
CL-06
VILLA-01 N1
+5
.
00
+4.00
IL 3.88 +3.50
00
+ 5.
IL=1.66
IL=1.86 IL 1.71 +2.80
+3.00 Revision Notes:
50
+4.50 4. .70 1. Added annotations for the geocells.
VILLA-03
+
0.61.m³ +2.80
+2
CL-07
+2.70
2. Geocells added for LPG Yard, Water Sport Centre &
CL-07
0
+4.0
Heat Cool Pump Room.
3. Inverts and networks are updated to resolve clash with
.80
50
+2
+3.
building structures and waste water network.
.70
1.92.m³ VILLA-03
+2
+4
00
.0 0
4. Invert levels and pipe diameter are provided into
+3.
0
90
+4.5
IL=3.36
+4.50
+2 .
0
+5.0
.7
80
3.18.m³
+2
IL=2.16 0.66.m³
.
+4.50
+2
+5.5
0
IL=2.66
IL 3.51
VILLA 1-01
HDPE
0
+3.00 .9
0.42.m³ VILLA-03 CL-04 +3
1.50%
0
+2.8
+3.50 IL 2.36 IL 2.95
.00
0
+3.30
+2.9
+3.4
+2.70
IL 2.75
+4
Ø160
0
+4.00
0
1
1.12.m³ IL=2.86 +4.00
+4.
+3.50 0.72.m³ +3.90
+4.00 +3.00
IL 2.31
+3.50 IL 2.16 0 +2.80
1.75.m³ IL=2.93
.1
0
0.57.m³
+3
+4
.2
+3
IL=2.16
10
+4
.50
.0
IL=2.86
.00
+3.00
.
+2.6
0
+4
0 0
+4
+4.0
+3.00
.80
IL=1.66 +3
.90
+2
3 UNITS 1 TYPE 2 _01 IL=2.06
+4.00
0
+2.8
+2.60
CL-04
1SUITE 1 UNIT-02
.00
.0 0 +3
+5 CL-07 .50
CL-03
+2
+4
3.92.m³ IL=2.86 IL=1.86
.4
+4.0
0
VILLA 3-03 0
+3
+3.
6.10.m³ 0 5
.5
0
+4.5
0
+3.00 +3.00
N1 20/03/2023 ISSUED FOR CONSTRUCTION NT
+2.70
0
IL 1.93
+3.9
0
+2.9
+4.0
+4.10
N0 21/12/2022 ISSUED FOR CONSTRUCTION NT
+2.8
VILLA-01
0
0
IL=3.01 0.61.m³ 70
0.47.m³ + 2. Rev. Date Reason For Issue Chk
0.8
0
.0
+2
+4
+3
.5
0 +2
.8
0
IL 1.95
CONSTRUCTION DOCUMENTS
0
+5.0
0
+4
.0
+3
.50
Key Plan HW1
.00
+5.0 +4.00 +5
+4
0
0
.0
.5
+4
0
.00
0
+4
+3.0
IL=1.96 +4.5
0 +4
.0
0
+3.50 HC2
HW2
CL-02 +4.0
0 IL 1.73
+3.00
+
+3.00
PE
0
0 3.3 Program 4
2.76%
+4.
00
0.69.m³ .5 +
%
CL-05 +4
+3
0 Undergoing
.4
0 HD
+3
.4
+2.70
1.50
0
Coordination
+3.50
+2.80
+2.90
.00
+5.00
HC1
+4
IL 1.72
.50
Makkah
Ø16
CL-03
+3
IL=1.66
70
IL 2.52
+2.
+3.40 HW4
+4
.0
IL=1.50 N
0
.80
HE1
50
0.71.m³
+2
.70
.
+4
+2
4UNITS_4K-01 IL 2.65
.0
0 IL 1.81
+4
IL 1.75
+3.60
Legend
+3.6
0.70.m³
0
1.17.m³
+2.8
+3.40
0
0
Proposed Geocell
+4.50
+4.00
+3
IL 1.87 CL-03
.5
+4
0
.0 0
IL=1.66 Proposed 160mm OD HDPE
FOR CONTINUATION SEE SHEET NO. 05
+3.5
0
+3.50
Perforated Pipe
+3.00
Proposed Clean Out Shaft
SUITE 2-01
+2
0
0
.8
.7
.80
+2
+2
Proposed Access Shaft
.00
+2
.50
+4
.70
+3
0
Bioswale
.8
+2
CL-05 CL-02
N1 1.54m³
0
Bioswale Volume
.7
+2
IL=2.36
Ø160 HDPE
+2.90
1.00%
1.51.m³ 0.58.m³
0
+3.5
+2.80 .90
+4.0
0
.00
+4.5
+2
+3 .50
+4
.00
+3
.00
+3
5.36.m³
IL=1.65
2.03.m³
+2.8
0
+3.00
.80
+3
+2
+2.9
.00
.80
+2 .70
+2
0
+2
.6
+3
.50
+3.50 AOR/EOR
IL 1.90
+4
.0
IL 1.93 CL-06
0
.8
+2 0
+3
.5
+3
.50
. 00
+3
N1
0
.8
+2
Ø160 HDPE
+3
.0 0
Design Consultant
1.50%
+2
. 80
+2
.70 IL=1.70 +3
.00
Festival Tower
+3.0
+3.5 0 .00 .7
0
Dubai Festival City
0 +4 +2
+4.0
0
Dubai, UAE
50
+3.
T +971 (0)4 206 9111
dubai@mottmac.com www.mottmac.com
+2.80
Executive Architect/ AOR
Licence number - 1010348048
+2.70
+2.50
Riyadh11481,KSA King Abdul Aziz
District,Salah Al Din Al Ayobi Road
T +966 11 477 8384
+2.00
F +966 11 477 9793
Riyadh@khatibalami.com www.khatibalami.com
+1.70
Signature/Design Architect
+1.30
Client
+0.50
+0.30
+0.00
Project
SHURA
PROGRAM 07
HOTEL CENTRAL 03
-0.60
Drawing Title
Sheet 06 of 06
Model File Reference
R07-HC3D02-MML-02-XX-MOD-CI-55002
Makkah
Drawn By Checked By Approved By
AA NT FS
N
Project No Issue Date Scale at ISO A0
1:250
0 12.5m 25m
R07-HC3D02-MML-02-XX-DWG-CI-55106 N1
C:\Users\GAI103735\DC\ACCDocs\The Red Sea Development Company\R07 Shura Central Hotel 01-03\Program 07\01_WIP\HC3\HC3_08_CI-Civil &
Infrastructure\Drawings\R07-HC3D02-MML-02-XX-DWG-CI-55106.dwg Apr 12, 2023 - 8:50PM GAI103735