Rakesh Resume 3.2yrs

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Last Updated on 18th December 2023

Rakesh Roushan
Rrs199702@gmail.com | 8084506440 | Bengaluru

EDUCATION PROFILE
GRADUATION
C V RAMAN COLLEGE OF • I have been working as a design engineer for almost 3.2 years and i have ex-
ENGINEERING perience with CDC, synthesis, and RTL design. My objective is to apply for the
Electronics and required role at your firm using my skills in a way that will allow me to venture
outside of my comfort cone for the success of the company
telecommunication Engineering
CGPA: 7.69
may 2018 EMPLOYMENT HISTORY
Bhubaneswer
ON CHIP SPACE SEMICONDUCTORS PRIVATE LIMITED
INTERMEDIATE |VLSI DESIGN ENGINEER|
DAV KAPILDEV PUB SCHOOL DEC 2021 - Till Date, Bengaluru,India
PERCENTAGE: 66.4
2013 PROJECTS
Jharkhand Project 3
|Client Qualcomm|
SKILLS 6NM Block level implementation (Synthesis and STA)
•Synthesis Inst Count:- 1.3M, Macro:- 8, Freq 650MHz
Jan 2023 – till now
•Clock Domain Crossing • Ownership of Synthesis LEC and STA.
•Static Timing Analysis • Writing the constraints based on the clocks in the design.
• Experience in conformal LEC due to preserving hierarchical module
•Lint
due to rtl2map failing.
•LEC • The close interaction with RTL Designer there was some modification
in the RTL which was showing in the synthesis stage.
•Verilog
• Analysing and cleaning timing violations on Prime time.
•Tcl(Programming Language)
Project 2
| Client Qualcomm |
TOOLS/APPLICATIONS
28NM Block level implementation (Synthesis and STA)
•Spyglass Lint Inst Count:- 39 k, Macro:- 34, Freq 833 MHz
DEC 2021 – NOV 2022
•Spyglass CDC
• Lint checks for whole IP by using Spyglass lint tool.
•Design Compiler • Exposure in integration for IP level.
•Prime Time • File list generation and Compile checks.
• Witten synthesis SDC constraints.
•Conformal • Analysis of STA timing report.
VALSYNE TECHNOLOGIES PRIVATE LIMITED
|RTL DESIGN ENGINEER|
oct 2020 - NOV 2021, Bengaluru,India
Project 3
| Client Qualcomm |
(Clock domain Crossing and Lint)
OCT 2020 – NOV 2021
• Performed Quality checks (LINT and CDC) using Spyglass
• Wrote the CDC constraints and Debug the CDC and Lint violations

You might also like