Contractor Locatio

EPMNO. Date of Inspection Description of Activity


RFI N0 n

TINAT Review Test Report of CBR prior to asphalt paving Reference RFI of soil sampling:
PTJ-SGCP-CIV-41185 1403687081 3/19/2023
GGM PTJ-SGCP-CIV-38572

TINAT Aggregate base coarse (class-B) Re-conformation of materials sampling and testing
PTJ-SGCP-CIV-42885 1404092835 6/7/2023
GGM inspection (source:al-noaimi crusher) at TINAT GGM

TINAT
PTJ-SGCP-CIV-42886 1404092780 6/7/2023 Aggregate Base Course (class-B) Material Receiving Inspection AT TINAT GGM
GGM

Grade, elevation and surface preparation inspection of Aggregate Base Coarse (area
TINAT
PTJ-SGCP-CIV-42953 1404133035 6/14/2023 1) (2388 sqm area) N-2629845.268 E-342500.529 to N-2629846.027 E- 342431.768
GGM
for north west side of scraper area @ tinat ggm

Placement and compaction of Aggregate Base Coarse inspection (area 1) (2388 sqm
TINAT
PTJ-SGCP-CIV-42954 1404133029 6/14/2023 area) N-2629845.268 E-342500.529 to N-2629846.027 E- 342431.768 for north
GGM
west side of scraper area @ tinat ggm

Compaction testing inspection of Aggregate Base Coarse (area 1) (2388 sqm area) N-
TINAT
PTJ-SGCP-CIV-42955 1404133037 6/14/2023 2629845.268 E-342500.529 to N-2629846.027 E- 342431.768 for north west side of
GGM
scraper area @ tinat ggm

Review of test reports for Aggregate base coarse (class-B) Re-conformation of


TINAT
PTJ-SGCP-CIV-42972 1404139415 6/15/2023 materials sampling and testing inspection (source:al-noaimi crusher) at TINAT GGM
GGM
( Ref:RFI-42885)

Grade, elevation and surface preparation inspection of Aggregate Base Coarse (area
TINAT
PTJ-SGCP-CIV-42976 1404141722 6/17/2023 1) (2369.57 sqm area) N-2629845.265 E-342500.265 to N-2629811.840 E-
GGM
342572.016.for north east side of scraper area @ tinat ggm

Placement and compaction of Aggregate Base Coarse inspection (area 1) (2369.57


TINAT
PTJ-SGCP-CIV-42977 1404141775 6/17/2023 sqm area) N-2629845.265 E-342500.265 to N-2629811.840 E- 342572.016.for north
GGM
east side of scraper area @ tinat ggm

compaction testng inspection of Aggregate Base Coarse (area 1) (2369.57 sqm area)
TINAT
PTJ-SGCP-CIV-42978 1404141785 6/17/2023 N-2629845.265 E-342500.265 to N-2629811.840 E- 342572.016.for north east side
GGM
of scraper area @ tinat ggm

Grade, elevation and surface preparation inspection of Aggregate Base Coarse 1st
TINAT
PTJ-SGCP-CIV-43001 1404159729 6/20/2023 layer 150mm (area 1) 1228.00 sqm) as per survey reports/ highlighted drswing for
GGM
north east side of scraper area @ tinat ggm

Placement and compaction inspection of Aggregate Base Coarse 1st layer 150mm
TINAT
PTJ-SGCP-CIV-43002 1404159757 6/20/2023 (area 1) 1228.00 sqm) as per survey reports/ highlighted drswing for north east side
GGM
of scraper area @ tinat ggm

Compaction testing inspection of Aggregate Base Coarse 1st layer 150mm (area 1)
TINAT
PTJ-SGCP-CIV-43003 1404159767 6/20/2023 1228.00 sqm) as per survey reports/ highlighted drswing for north east side of
GGM
scraper area @ tinat ggm

Asphalt pavement prime coat inspection (MC-70) for (area 4690 sq.m)
TINAT (E:342572.191/N:2629844.527 to E:342572.016/N:629811.840 to
PTJ-SGCP-CIV-43010 1404163375 6/21/2023
GGM E:342431.710/N:2629811.894 to E:342431.768/N:2629846.027) from AL-
MAJWAL) south side at TINAT GGM

Asphalt Binder coarse (conventional class- b)receiving,placement and testing


TINAT inspection for (area 4690 sq.m) (E:342572.191/N:2629844.527 to
PTJ-SGCP-CIV-43032 1404178039 6/25/2023
GGM E:342572.016/N:629811.840 to E:342431.710/N:2629811.894 to
E:342431.768/N:2629846.027) from (RCC) south side at TINAT GGM

Grade, elevation and surface preparation inspection of Aggregate Base Coarse layer
TINAT (area 1) (2833.00 sqm) E-342572.103 N-2629908.874 to E-342572.226 N-
PTJ-SGCP-CIV-43048 1404188496 6/26/2023
GGM 2629847.175 to 342526.073 N-2629908.874 to E-342526.078 N- 2629847.626 for
east side of scraper area @ tinat ggm

Placement and compaction inspection of Aggregate Base Coarse layer (area 1)


TINAT (2833.00 sqm) E-342572.103 N-2629908.874 to E-342572.226 N-2629847.175 to
PTJ-SGCP-CIV-43049 1404188498 6/26/2023
GGM 342526.073 N-2629908.874 to E-342526.078 N- 2629847.626 for east side of
scraper area @ tinat ggm
Compaction testing inspection of Aggregate Base Coarse layer (area 1) (2833.00
TINAT sqm) E-342572.103 N-2629908.874 to E-342572.226 N-2629847.175 to
PTJ-SGCP-CIV-43050 1404188553 6/26/2023
GGM 342526.073 N-2629908.874 to E-342526.078 N- 2629847.626 for east side of
scraper area @ tinat ggm

Grade, elevation and surface preparation inspection of Aggregate Base Coarse 1st
TINAT layer 150mm (area 1) (1038.00 sqm) E-342499.337 N-2629888.247 to E-
PTJ-SGCP-CIV-43051 1404188539 6/26/2023
GGM 342469.405 N-2629888.248 to 342499.331N-2629922.941 to E-342469.401 N-
2629922.942 for north side of scraper area @ tinat ggm

Placement and compaction inspection of Aggregate Base Coarse 1st layer 150mm
TINAT (area 1) (1038.00 sqm) E-342499.337 N-2629888.247 to E-342469.405 N-
PTJ-SGCP-CIV-43052 1404188525 6/26/2023
GGM 2629888.248 to 342499.331N-2629922.941 to E-342469.401 N- 2629922.942 for
north side of scraper area @ tinat ggm

Compaction testing inspection of Aggregate Base Coarse 1st layer 150mm (area 1)
TINAT (1038.00 sqm) E-342499.337 N-2629888.247 to E-342469.405 N-2629888.248 to
PTJ-SGCP-CIV-43053 1404188526 6/26/2023
GGM 342499.331N-2629922.941 to E-342469.401 N- 2629922.942 for north side of
scraper area @ tinat ggm

Grade, elevation and surface preparation inspection of Aggregate Base Coarse 2nd
TINAT
PTJ-SGCP-CIV-43054 1404188516 7/2/2023 layer 80mm (area 1) (1228.00 sqm) E-342499.324 N-2629888.248 to E-342546.041
GGM
N-2629924.476 for north east side of scraper area @ tinat ggm

Placement and compaction inspection of Aggregate Base Coarse 2nd layer 80mm
TINAT
PTJ-SGCP-CIV-43055 1404188499 7/2/2023 (area 1) (1228.00 sqm) E-342499.324 N-2629888.248 to E-342546.041 N-
GGM
2629924.476 for north east side of scraper area @ tinat ggm

Compaction testing inspection of Aggregate Base Coarse 2nd layer 80mm (area 1)
TINAT
PTJ-SGCP-CIV-43056 1404188540 7/2/2023 (1228.00 sqm) E-342499.324 N-2629888.248 to E-342546.041 N-2629924.476 for
GGM
north east side of scraper area @ tinat ggm

Asphalt Binder coarse (conventional class- b)receiving,placement and testing


TINAT inspection for (area 4690 sq.m) (E:342572.191/N:2629844.527 to
PTJ-SGCP-CIV-43066 1404205771 7/2/2023
GGM E:342572.016/N:629811.840 to E:342431.710/N:2629811.894 to
E:342431.768/N:2629846.027) from (RCC) south side at TINAT GGM

Compaction testing inspection of Aggregate Base Coarse layer (area 1) (2833.00


TINAT sqm) E-342572.103 N-2629908.874 to E-342572.226 N-2629847.175 to
PTJ-SGCP-CIV-43068 1404210796 7/3/2023
GGM 342526.073 N-2629908.874 to E-342526.078 N- 2629847.626 for east side of
scraper area @ tinat ggm

Asphalt Binder coarse (conventional class- b)receiving,placement and testing inspection for (area 3854 sq.m)
PTJ-SGCP-CIV-43076 1404222446 5-Jul-23 TINAT GGM (E:342500.529/N:2629839.768 to E:342500.300/N:2629811.831 to E:342431.768/N:2629839.768 to
E:342431.710/N:2629811.894) from (RCC) south side at TINAT GGM

Asphalt pavement prime coat inspection (MC-70) for (area 4061 sq.m) (E:342572.103/N:2629908.874 to
E:342572.226/N:2629847.175 to E:342431.710/N:2629811.894 to E:342526.073/N:2629908.874/E-
PTJ-SGCP-CIV-43089 1404242531 9-Jul-23 Tinat GGM
342526.078 N-2629847.626 E-342499.324/N-2629888.248/E-342546.041/2629924.476 from AL-MAJWAL
east side at TINAT GGM

Asphalt binder coarse (conventional class-B) receiving,placementand testing


inspectionfor (area 2000 sq.m) (E:342572.103/N:2629908.874 to
TINAT
PTJ-SGCP-CIV-43114 1404255222 7/11/2023 E:342572.226/N:2629847.175 to E:342431.710/N:2629811.894 to
GGM
E:342526.073/N:2629908.874/E- 342526.078 N-2629847.626 from RCC east
side at TINAT GGM

Asphalt binder coarse (conventional class- B)(area 1000 sq.m) E-342499.324/N-


TINAT
PTJ-SGCP-CIV-43125 1404262119 7/12/2023 2629888.248/E-342546.041/2629924.476 from RCC east side and under plate
GGM
form at TINAT GGM

Grade,elevation and surfacepreparationinspection of Aggregate BaseCoarselayer


TINAT
PTJ-SGCP-CIV-43126 1404262147 7/13/2023 (area-1) (1908 sqm area) N- 2629911.586 E-342404.839 to N-2629941.135 E-
GGM
342492.305 for north side of Scraper area at tinat ggm

Placement and compaction inspection of Aggregate BaseCoarselayer (area-1) (1908


TINAT
PTJ-SGCP-CIV-43127 1404262164 7/13/2023 sqm area) N- 2629911.586 E-342404.839 to N-2629941.135 E-342492.305 for
GGM
north side of Scraper area at tinat ggm

Compaction testing inspection of Aggregate BaseCoarselayer (area-1) (1908 sqm


TINAT
PTJ-SGCP-CIV-43128 1404262183 7/13/2023 area) N- 2629911.586 E-342404.839 to N-2629941.135 E-342492.305 for north
GGM
side of Scraper area at tinat ggm

Asphalt Core density testing inspection of Binder Coarse (conventional class- B) for
TINAT (area 4690 Sq.m) area-A (E:342572.191/N:2629844.527 to
PTJ-SGCP-CIV-43132 1404262159 7/12/2023
GGM E:342572.016/N:2629811.840 to E:342431.710/N:2629811.894 to
E:342431.768/2629846.027 from (RCC) south side of scraper area at TINAT GGM

Asphalt binder coarse (conventional class- B) area-1(500 sqm area) E-


TINAT
PTJ-SGCP-CIV-43134 1404269695 7/13/2023 342499.324/N-2629888.248/E-342546.041/2629924.476 from RCC east side and
GGM
under plate form at TINAT GGM
Asphalt pavement prime coat inspection (MC-70) for (area-1) (1895 sqm area) N-
TINAT
PTJ-SGCP-CIV-43149 1404280184 7/15/2023 2629911.586 E-342404.839 to N-2629941.135 E-342492.305 for north side of
GGM
Scraper area at tinat ggm

Grade, elevation and surface preparation inspection of Aggregate Base Coarse 2nd
TINAT layer 80mm (area 1) (1038.00 sqm) E-342499.337 N-2629888.247 to E-342469.405
PTJ-SGCP-CIV-43177 1404296685 7/18/2023
GGM N-2629888.248 to 342499.331N-2629922.941 to E-342469.401 N- 2629922.942 for
scraper area AT tinat ggm

Placement and compaction inspection of Aggregate Base Coarse 2nd layer 80mm
TINAT (area 1) (1038.00 sqm) E-342499.337 N-2629888.247 to E-342469.405 N-
PTJ-SGCP-CIV-43178 1404296688 7/18/2023
GGM 2629888.248 to 342499.331N-2629922.941 to E-342469.401 N- 2629922.942 for
scraper area AT tinat ggm

Compaction testing inspection of Aggregate Base Coarse 2nd layer 80mm (area 1)
TINAT (1038.00 sqm) E-342499.337 N-2629888.247 to E-342469.405 N-2629888.248 to
PTJ-SGCP-CIV-43179 1404296689 7/18/2023
GGM 342499.331N-2629922.941 to E-342469.401 N- 2629922.942 scraper area at tinat
ggm

Grade, elevation and surface preparation inspection of Aggregate Base Coarse final
TINAT layer (area 1) (957.00 sqm) E-342446.321 N-2629848.507 to E-342470.902 N-
PTJ-SGCP-CIV-43204 1404310401 7/20/2023
GGM 2629865.470 to 342455.314 to N-2629900.064 to E-342467.508 N- 2629872.253
for scraper area at tinat ggm

Placement and compaction inspection of Aggregate Base Coarse final layer (area 1)
TINAT (957.00 sqm) E-342446.321 N-2629848.507 to E-342470.902 N-2629865.470 to
PTJ-SGCP-CIV-43205 1404310417 7/20/2023
GGM 342455.314 to N-2629900.064 to E-342467.508 N- 2629872.253 for scraper area
at tinat ggm

Compaction testing inspection of Aggregate Base Coarse final layer (area 1) (957.00
TINAT sqm) E-342446.321 N-2629848.507 to E-342470.902 N-2629865.470 to
PTJ-SGCP-CIV-43206 1404310430 7/20/2023
GGM 342455.314 to N-2629900.064 to E-342467.508 N- 2629872.253 for scraper area
at tinat ggm

Asphalt binder coarse (conventional class- B) area-1(1061 sqm area) E-


TINAT
PTJ-SGCP-CIV-43217 1404318244 7/22/2023 342499.324/N-2629888.248/E-342546.041/2629924.476 from RCC east side and
GGM
under plate form at TINAT GGM

Asphalt core density testing inspectionfor (area 3000 sq.m)


TINAT (E:342572.103/N:2629908.874 to E:342572.226/N:2629847.175 to
PTJ-SGCP-CIV-43218 1404318200 7/22/2023
GGM E:342431.710/N:2629811.894 to E:342526.073/N:2629908.874/E- 342526.078 N-
2629847.626 from RCC east side of scraper area at TINAT GGM

Grade, elevation and surface preparation inspection of Aggregate Base Coarse final
TINAT layer (area 1) (1788.00 sqm) E-342431.743 N-2629922.942 to E-342469.401 N-
PTJ-SGCP-CIV-43232 1404330703 7/24/2023
GGM 2629922.940 to 342431.641 to N-2629848.545 to E-342469.390 N- 2629872.253
for west side of scraper area at tinat ggm

Placement and compaction inspection of Aggregate Base Coarse final layer (area 1)
TINAT (1788.00 sqm) E-342431.743 N-2629922.942 to E-342469.401 N-2629922.940 to
PTJ-SGCP-CIV-43233 1404330618 7/24/2023
GGM 342431.641 to N-2629848.545 to E-342469.390 N- 2629872.253 for west side of
scraper area at tinat ggm

Compaction testing inspection of Aggregate Base Coarse final layer (area 1) (1788.00
TINAT sqm) E-342431.743 N-2629922.942 to E-342469.401 N-2629922.940 to
PTJ-SGCP-CIV-43234 1404330717 7/24/2023
GGM 342431.641 to N-2629848.545 to E-342469.390 N- 2629872.253 for west side of
scraper area at tinat ggm
Asphalt pavement prime coat inspection (MC-70) for (area 1) (2000.00 sqm) E-
342499.337 N-2629888.247 to E-342469.405 N-2629888.248 to 342499.331N-
TINAT 2629922.941 to E-342469.401 N- 2629922.942 E-342446.321 N-2629848.507 to E-
PTJ-SGCP-CIV-43247 1404334552 7/24/2023
GGM 342470.902 N-2629865.470 to E-342455.314 N-2629900.064 to E-342467.508 N-
2629872.253 for scraper area @ tinat ggm

Asphalt pavement prime coat inspection(MC-70)(area 1) (1788.00 sqm) E-


TINAT 342431.743 N-2629922.942 to E-342469.401 N-2629922.940 to 342431.641 to N-
PTJ-SGCP-CIV-43252 1404337354 7/25/2023
GGM 2629848.545 to E-342469.390 N- 2629872.253 for west side of scraper area at
tinat ggm

Asphalt binder coarse (conventional class- B) area-1(1061 sqm area) E-


TINAT
PTJ-SGCP-CIV-43256 1404342190 7/26/2023 342499.324/N-2629888.248/E-342546.041/2629924.476 from RCC east side and
GGM
under plate form at TINAT GGM

Asphalt Binder Coarse (conventional class-B) for (area-1) (1895 sqm area) N-
TINAT
PTJ-SGCP-CIV-43305 1404361265 7/29/2023 2629911.586 E-342404.839 to N-2629941.135 E-342492.305 for north west side of
GGM
Scraper area at TINAT GGM

Asphalt Binder Coarse (conventional class-B) for (area-1) (1908 sqm area) N-
TINAT
PTJ-SGCP-CIV-43341 1404378984 8/1/2023 2629911.586 E-342404.839 to N-2629941.135 E-342492.305 for north west side of
GGM
Scraper area at tinat ggm

Asphalt Binder Coarse (conventional class-B) for (area-1) (1908 sqm area) N-
TINAT
PTJ-SGCP-CIV-43367 1404399398 8/7/2023 2629911.586 E-342404.839 to N-2629941.135 E-342492.305 for north west side of
GGM
Scraper area at tinat ggm
Asphalt pavement prime coat inspection (MC-70) for (area-1) (1908 sqm area) N-
TINAT
PTJ-SGCP-CIV-43378 1404405451 8/6/2023 2629911.586 E-342404.839 to N-2629941.135 E-342492.305 for north side of
GGM
Scraper area at tinat ggm

Asphalt pavement prime coat inspection (MC-70) for (area 1) (2000.00 sqm) E-
342499.337 N-2629888.247 to E-342469.405 N-2629888.248 to 342499.331N-
TINAT 2629922.941 to E-342469.401 N- 2629922.942 E-342446.321 N-2629848.507 to E-
PTJ-SGCP-CIV-43379 1404405428 8/6/2023
GGM 342470.902 N-2629865.470 to E-342455.314 N-2629900.064 to E-342467.508 N-
2629872.253 for scraper area at tinat ggm

Asphalt pavement prime coat inspection(MC-70)(area 1) (1788.00 sqm) E-


TINAT 342431.743 N-2629922.942 to E-342469.401 N-2629922.940 to 342431.641 to N-
PTJ-SGCP-CIV-43380 1404405456 8/6/2023
GGM 2629848.545 to E-342469.390 N- 2629872.253 for west side of scraper area at
tinat ggm

Placement and compaction inspection of Aggregate Base Coarse prior to MC-70


TINAT (area-3) (1749.00.37 sqm Area) E- 342309.603 N-2629865.605 to E-342303.452 N-
PTJ-SGCP-CIV-43386 1404411843 8/7/2023
GGM 2629830.106 E-342257.757 N-262986.625 to E-342286.657 N-2629827.350 live
area west side at Tinat GGM

Compaction testing inspection of Aggregate Base Coarse prior to MC-70 (area-3)


TINAT (1749.00.37 sqm Area) E- 342309.603 N-2629865.605 to E-342303.452 N-
PTJ-SGCP-CIV-43387 1404411791 8/7/2023
GGM 2629830.106 E-342257.757 N-262986.625 to E-342286.657 N-2629827.350 live
area west side at Tinat GGM

Asphalt Binder Coarse (conventional class-B) for (area-1) (1019 sqm area) N-
TINAT
PTJ-SGCP-CIV-43410 1404424709 8/10/2023 2629911.586 E-342404.839 to N-2629941.135 E-342492.305 for north west side of
GGM
Scraper area at Tinat GGM

Placement and compaction inspection of Aggregate Base Coarse prior to MC-70 (area-
TINAT 4) (1330 sqm area) N- 2629927.439 E-342294.224 N-2629927.439 E-342298.824,N-
PTJ-SGCP-CIV-43414 1404430408 8/10/2023
GGM 2629796.648 E- 342330.630,N-2629801.248 E- 342330.630 for west side of Live
area at Tinat GGM

Compaction testing inspection of Aggregate Base Coarse prior to MC-70 (area-4)


(1330 sqm area) N- 2629927.439 E-342294.224 N-2629927.439 E-342298.824,N-
TINAT
PTJ-SGCP-CIV-43415 1404430372 8/12/2023 2629796.648 E- 342330.630,N-2629801.248 E- 342330.630 for west side of Live
GGM
area at Tinat GGM

Asphalt Binder Coarse (conventional class-B) for (area 1) (957.64 sqm) E-


TINAT 342431.743 N-2629922.942 to E-342469.401 N-2629922.940 to 342431.641 to N-
PTJ-SGCP-CIV-43421 1404430379 8/12/2023
GGM 2629848.545 to E-342469.390 N- 2629872.253 for west side of scraper area at
tinat ggm

Placement and compaction inspection of Aggregate Base Coarse for petrol road
TINAT (884.00 sqm) E-342312.320 N-2629798.948 to E-342385.522 N-2629802.996 to E-
PTJ-SGCP-CIV-43424 1404445234 8/13/2023
GGM 342580.631 to N-2629938.583 to E-342413.396 N- 2629948.705 E-342382.674 N-
2629937.539 for around tinat ggm

Compaction testing inspection of Aggregate Base Coarse for petrol road (884.00
sqm) E-342312.320 N-2629798.948 to E-342385.522 N-2629802.996 to E-
TINAT
PTJ-SGCP-CIV-43425 1404445231 8/13/2023 342580.631 to N-2629938.583 to E-342413.396 N- 2629948.705 E-342382.674 N-
GGM
2629937.539 for petrol road around tinat ggm

Placement and compaction inspection of aggregate Base Coarse (area-1) (1800 sqm
TINAT area) N-2629908.824 E-342572.103 to N-2629922.949 E-342492.607 to N-
PTJ-SGCP-CIV-43441 1404463067 8/16/2023
GGM 2629941.143 E-342492.367 to N-2629941.077 E-3425972.227 for north east side of
Scraper area at tinat ggm

Compaction testing inspection of aggregate Base Coarse (area-1) (1800 sqm area) N-
TINAT 2629908.824 E-342572.103 to N-2629922.949 E-342492.607 to N-2629941.143 E-
PTJ-SGCP-CIV-43442 1404463101 8/16/2023
GGM 342492.367 to N-2629941.077 E-3425972.227 for north east side of Scraper area
at tinat ggm

Placement and compaction inspection aggregate Base Coarse for asphalt road (area-
TINAT 4) behind main gate (710 sqm area) N-2629811.648 E-342316.053 N-2629801.248 E-
PTJ-SGCP-CIV-43443 1404468215 8/17/2023
GGM 342316.053,N-2629801.248 E- 342267.691,N-2629811.648 E- 342267.691 for
south side of Live area at tinat ggm

Compaction testing inspection of aggregate Base Coarse for asphalt road (area-4)
TINAT behind main gate (710 sqm area) N-2629811.648 E-342316.053 N-2629801.248 E-
PTJ-SGCP-CIV-43444 1404468202 8/17/2023
GGM 342316.053,N-2629801.248 E- 342267.691,N-2629811.648 E- 342267.691 for
south side of Live area at tinat ggm

Asphalt core density testing inspection for (area-1) ( 2461 sqm area) N- 2629911.586
TINAT
PTJ-SGCP-CIV-43472 1404482071 8/20/2023 E-342404.839 to N-2629941.135 E-342492.305 for north side and east side of
GGM
Scraper area at tinat ggm

Placement and compaction inspection aggregate Base Coarse for SHF area (area-1)
(2020 sqm area) N-2629888.019 E-342468.00 to N-2629847.508 E-342525.960 to
TINAT
PTJ-SGCP-CIV-43479 1404493427 8/22/2023 N-2629848.098 E- 342470.968 to N-2629866.000 E- 342470.968 to N-2629866
GGM
.000 E-342468.000 to N-2629888.000 E-342526.000 for 04 nos. SHF area of
scraper earth at tinat ggm
Compaction testing inspection of aggregate Base Coarse for SHF area (area-1) (2020
sqm area) N-2629888.019 E-342468.00 to N-2629847.508 E-342525.960 to N-
TINAT
PTJ-SGCP-CIV-43480 1404493444 8/22/2023 2629848.098 E- 342470.968 to N-2629866.000 E- 342470.968 to N-2629866 .000
GGM
E-342468.000 to N-2629888.000 E-342526.000 for 04 nos. SHF area of scraper
area at tinat ggm
Asphalt Binder Coarse (conventional class-B) for area-1(1061 sqm area) E-
TINAT
PTJ-SGCP-CIV-43503 1404523944 8/27/2023 342499.324/N-2629888.248/E-342546.041/2629924.476 from RCC east side and
GGM
under plate form at TINAT GGM

TINAT Asphalt pavement primecoat repair only inspection of (area 1) (2785.00 sqm) for
PTJ-SGCP-CIV-43504 1404529896 8/28/2023
GGM scraper area at tinat ggm

Asphalt pavement prime coat inspection (MC-70) for (area-1) (2588 sqm area) N-
TINAT 2629908.824 E-342572.103 to N-2629922.949 E-342492.607 to N-2629941.143 E-
PTJ-SGCP-CIV-43535 1404573887 9/4/2023
GGM 342492.367 to N-2629941.077 E-3425972.227 for north east side of Scraper area
at tinat ggm

Asphalt Binder Coarse(conventional class-B) for (1200.00 sqm) E-342446.321 N-


TINAT
PTJ-SGCP-CIV-43536 1404573898 9/4/2023 2629848.507 to E-342470.902 N-2629865.470 to 342455.314 to N-2629900.064 to
GGM
E-342467.508 N- 2629872.253 for scraper area at tinat ggm

Asphalt BinderCoarse (conventionalclass-B) (area-1) (2588 sqm area) N-


TINAT 2629908.824 E-342572.103 to N-2629922.949 E-342492.607 to N-2629941.143 E-
PTJ-SGCP-CIV-43554 1404591672 9/6/2023
GGM 342492.367 to N-2629941.077 E-3425972.227 for north east side of Scraper area
at tinat ggm

Asphalt pavement prime coat inspection MC-70 for SHF area (area-1) (2020 sqm
area) N-2629888.019 E-342468.00 to N-2629847.508 E-342525.960 to N-
TINAT
PTJ-SGCP-CIV-43561 1404611809 9/10/2023 2629848.098 E- 342470.968 to N-2629866.000 E- 342470.968 to N-2629866 .000
GGM
E-342468.000 to N-2629888.000 E-342526.000 for 04 nos. SHF area of scraper
area at tinat ggm

Asphalt pavement prime coat inspection MC-70 for Asphalt road (area-4) (850 sqm
Tinat area) N- 2629927.439 E-342294.224 N-2629927.439 E-342298.824,N- 2629796.648
PTJ-SGCP-CIV-43587 1404619514 9/11/2023
GGM E- 342330.630,N-2629801.248 E- 342330.630 for west side of Live area at Tinat
GGM

Asphalt BinderCoarse(conventional class-B) (area-1) (800 sqm area) N-


Tinat
PTJ-SGCP-CIV-43588 1404619480 9/11/2023 2629922.949 E-342492.607 to N-2629941.143 E-342492.367 to N-2629941.077 E-
GGM
3425972.227 for north east side of Scraper area at tinat ggm

Asphalt Binder Coarse (conventional class-B) for SHF area (area-1) (2020 sqm area)
TINAT N-2629888.019 E-342468.00 to N-2629847.508 E-342525.960 to N-2629848.098
PTJ-SGCP-CIV-43612 1404633637 9/13/2023
GGM E- 342470.968 to N-2629866.000 E- 342470.968 to N-2629866 .000 E-342468.000
to N-2629888.000 E-342526.000 for 04 nos. SHF area for scraper area at tinat ggm

Placement and compaction inspection of Aggregate Base Coarse (area-3)


TINAT (1749.00.37 sqm Area) E- 342309.603 N-2629865.605 to E-342303.452 N-
PTJ-SGCP-CIV-43625 1404649146 9/16/2023
GGM 2629830.106 E-342257.757 N-262986.625 to E-342286.657 N-2629827.350 live
area west side at Tinat GGM

Compaction testing inspection of Aggregate Base Coarse (area-3) (1749.00.37 sqm


TINAT Area) E- 342309.603 N-2629865.605 to E-342303.452 N-2629830.106 E-
PTJ-SGCP-CIV-43626 1404649139 9/16/2023
GGM 342257.757 N-262986.625 to E-342286.657 N-2629827.350 live area west side at
Tinat GGM

Asphalt pavement prime coat inspection MC-70 for priorto Asphalt (area-3)
Tinat (1749.00.37 sqm Area) E- 342309.603 N-2629865.605 to E-342303.452 N-
PTJ-SGCP-CIV-43633 1404664504 9/18/2023
GGM 2629830.106 E-342257.757 N-262986.625 to E-342286.657 N-2629827.350 near
security building at Tinat GGM

Asphalt pavement prime coat inspection MC-70 for Asphalt road (area-4) (850 sqm
Tinat area) N- 2629927.439 E-342294.224 N-2629927.439 E-342298.824,N- 2629796.648
PTJ-SGCP-CIV-43634 1404664505 9/18/2023
GGM E- 342330.630,N-2629801.248 E- 342330.630 for west side of Live area at Tinat
GGM

Asphalt Binder Coarse (conventional class-B) for SHF area (area-1) (400 sqm area) N-
TINAT 2629866 .000 E-342468.000 to N-2629888.000 E-342526.000 for 02 nos.SHF area
PTJ-SGCP-CIV-43636 1404664513 9/18/2023
GGM for scraper area at tinat ggm

Asphalt Binder Coarse (conventional class-B) for Asphalt road (area-4) (850 sqm
TINAT area) N- 2629927.439 E-342294.224 N-2629927.439 E-342298.824,N- 2629796.648
PTJ-SGCP-CIV-43638 1404670036 9/19/2023
GGM E- 342330.630,N-2629801.248 E- 342330.630 for west side of Live area at Tinat
GGM

Asphalt pavement prime coat inspection MC-70 for asphalt road (area-4) behind
TINAT main gate (1200 sqm area) N-2629811.648 E-342316.053 N-2629801.248 E-
PTJ-SGCP-CIV-43652 1404671178 9/19/2023
GGM 342316.053,N-2629801.248 E- 342267.691,N-2629811.648 E- 342267.691 for
south side of Live area at tinat ggm

Asphalt Binder Coarse (conventional class-B) for asphalt road (area-4) behind main
TINAT gate (1200 sqm area) N-2629811.648 E-342316.053 N-2629801.248 E-
PTJ-SGCP-CIV-43671 1404703242 9/25/2023
GGM 342316.053,N-2629801.248 E- 342267.691,N-2629811.648 E- 342267.691 from
RCC south side of Live area at tinat ggm

Asphalt BinderCoarse (conventional class-B) (area-3) (1749.00.37 sqm Area) E-


TINAT 342309.603 N-2629865.605 to E-342303.452 N-2629830.106 E-342257.757 N-
PTJ-SGCP-CIV-43679 1404717608 9/27/2023
GGM 262986.625 to E-342286.657 N-2629827.350 north side of security building at
Tinat GGM
Asphalt core density testing inspection for (area-1,3 & 4) ( 12468 sqm area) N-
2629811.648 E-342316.053 to N-2629801.248 E-342316.053 N-2629801.248 E-
TINAT
PTJ-SGCP-CIV-43685 1404732487 9/30/2023 342267.691 N-2629811.648 E-342267.691 N-2629921.155 E-342526.094 N-
GGM
2629922.919 E-342424.974 N-2629884.668 E-342485.515 N-2629855 046 E-
342506.346 for under SHF area And petrol road and building area at tinat ggm
Placement and compaction inspection of Aggregate Base Coarse (area-2)
(2000.00sqm Area) E- 342404.399 N-2629910.006 to E-342403 N-2629882.026 E-
TINAT
PTJ-SGCP-CIV-43686 1404743954 10/1/2023 342366.909 N-2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-
GGM
2629919.764 to E-342328.507 N- 2629810.577 to E-342434.731 N-2629811.648
live area trenches and piperack asphalt cutting area at Tinat GGM
Compaction testing inspection of Aggregate Base Coarse (area-2) (2000.00sqm Area)
E- 342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
TINAT
PTJ-SGCP-CIV-43687 1404743889 10/1/2023 2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-2629919.764 to E-
GGM
342328.507 N- 2629810.577 to E-342434.731 N-2629811.648 live area trenches
and piperack asphalt cutting area at Tinat GGM
Asphalt pavement prime coat inspection MC-70 for (area-2) (2000.00sqm Area) E-
342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
TINAT
PTJ-SGCP-CIV-43699 1404760298 10/4/2023 2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-2629919.764 to E-
GGM
342328.507 N- 2629810.577 to E-342434.731 N-2629811.648 live area trenches
and piperack asphalt cutting area at Tinat GGM

Asphalt Binder Coarse (conventional class-B) (area-3) (150.00 sqm Area) E-


TINAT
PTJ-SGCP-CIV-43704 1404763504 10/7/2023 342263.987 N-2629865.748 to E-342292.312 N-2629865.736 north side of
GGM
security building at Tinat GGM

Asphalt Binder Coarse(conventional class-B) (area-2) (2000.00sqm Area) E-


342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
TINAT
PTJ-SGCP-CIV-43706 1404767315 10/5/2023 2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-2629919.764 to E-
GGM
342328.507 N- 2629810.577 to E-342434.731 N-2629811.648 live area trenches
and piperack asphalt cutting area at Tinat GGM
Placement and compaction inspection of Aggregate Base Coarse(area-3) (1219 sqm
area) N- 2629824.928 E-342257.686 to N-2629827.350 E E-342286.657 to N-
TINAT
PTJ-SGCP-CIV-43720 1404804738 10/11/2023 2629829.902 E- 342303.452 to N-2629830.377 E-343318.304 to N-2629811.648 E-
GGM
342317.867 to N-2629811.650 E-342258.067 for south side of security building
Live area at tinat ggm
Compaction testing inspection of Aggregate Base Coarse for (area-3) (1219 sqm area)
N- 2629824.928 E-342257.686 to N-2629827.350 E E-342286.657 to N-
TINAT
PTJ-SGCP-CIV-43721 1404804745 10/11/2023 2629829.902 E- 342303.452 to N-2629830.377 E-343318.304 to N-2629811.648 E-
GGM
342317.867 to N-2629811.650 E-342258.067 for south side of security building
Live area at tinat ggm
Asphalt Binder Coarse(conventional class-B) (area-2) (800.00sqm Area) E-
342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
TINAT
PTJ-SGCP-CIV-43726 1404806105 10/12/2023 2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-2629919.764 to E-
GGM
342328.507 N- 2629810.577 to E-342434.731 N-2629811.648 live area trenches
and piperack asphalt cutting area at Tinat GGM
Asphalt pavement prime coat inspection MC-70 for (area-3) (1219 sqm area) N-
2629824.928 E-342257.686 to N-2629827.350 E E-342286.657 to N- 2629829.902
TINAT
PTJ-SGCP-CIV-43735 1404820093 10/14/2023 E- 342303.452 to N-2629830.377 E-343318.304 to N-2629811.648 E-342317.867
GGM
to N-2629811.650 E-342258.067 for south side of security building Live area at
tinat ggm
Asphalt Binder Coarse(conventional class-B) (area-2) (1200.00sqm Area) E-
342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
TINAT
PTJ-SGCP-CIV-43740 1404829065 10/16/2023 2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-2629919.764 to E-
GGM
342328.507 N- 2629810.577 to E-342434.731 N-2629811.648 live area trenches
and piperack asphalt cutting area at Tinat GGM
Asphalt Binder Coarse (conventional class-B)(area-3) (1219 sqm area) N-
2629824.928 E-342257.686 to N-2629827.350 E E-342286.657 to N- 2629829.902
TINAT
PTJ-SGCP-CIV-43743 1404842303 10/17/2023 E- 342303.452 to N-2629830.377 E-343318.304 to N-2629811.648 E-342317.867
GGM
to N-2629811.650 E-342258.067 for south side of security building Live area at
tinat ggm

Asphalt pavement tack coat inspection (RC-250) for area-1 (4690 sq.m area)
TINAT (E:342572.191/N:2629844.527 to E:342572.016/N:629811.840 to
PTJ-SGCP-CIV-43766 1404887387 10/23/2023
GGM E:342431.710/N:2629811.894 to E:342431.768/N:2629846.027) from AL-
MAJWAL) south side at TINAT GGM

Asphalt wearing course (conventional class-B) inspection for area-1 (4690 sq.m area)
TINAT (E:342572.191/N:2629844.527 to E:342572.016/N:629811.840 to
PTJ-SGCP-CIV-43768 1404887352 10/23/2023
GGM E:342431.710/N:2629811.894 to E:342431.768/N:2629846.027) from (RCC) south
side at TINAT GGM

Asphalt Binder Coarse (conventional class-B) for(area-3) (819 sqm area) N-


2629824.928 E-342257.686 to N-2629827.350 E E-342286.657 to N- 2629829.902
TINAT
PTJ-SGCP-CIV-43770 1404887390 10/23/2023 E- 342303.452 to N-2629830.377 E-343318.304 to N-2629811.648 E-342317.867
GGM
to N-2629811.650 E-342258.067 for south side of security building Live area at
tinat ggm
Asphalt Binder Coarse (conventional class-B) for (area-3) (819 sqm area) N-
2629824.928 E-342257.686 to N-2629827.350 E E-342286.657 to N- 2629829.902
TINAT
PTJ-SGCP-CIV-43774 1404907420 10/26/2023 E- 342303.452 to N-2629830.377 E-343318.304 to N-2629811.648 E-342317.867
GGM
to N-2629811.650 E-342258.067 form (RCC) south side of security building Live
area at tinat ggm
Asphalt BinderCoarse(conventional class-B) (area-2) (1200.00sqm Area) E-
342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
TINAT
PTJ-SGCP-CIV-43783 1404920410 10/28/2023 2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-2629919.764 to E-
GGM
342328.507 N- 2629810.577 to E-342434.731 N-2629811.648 live area trenches
and piperack asphalt cutting area at Tinat GGM

Asphalt wearing course (conventional class-B) inspection for (area-3) (2968.00.sqm


TINAT Area) E- 342309.603 N-2629865.605 to E-342303.452 N-2629830.106 E-
PTJ-SGCP-CIV-43785 1404925275 10/29/2023
GGM 342257.757 N-262986.625 to E-342286.657 N-2629827.350 near security building
at Tinat GGM
Asphalt pavement tack coat inspection RC-250 for (area-3) (2968 sqm Area) E-
TINAT
PTJ-SGCP-CIV-43786 1404925285 10/29/2023 342309.603 N-2629865.605 to E-342303.452 N-2629830.106 E-342257.757 N-
GGM
262986.625 to E-342286.657 N-2629827.350 near security building at Tinat GGM

Asphalt wearing course (conventional clsss -B) for Asphalt road and parking area
TINAT (area-4) (2000 sqm area) N- 2629927.439 E-342294.224 N-2629927.439 E-
PTJ-SGCP-CIV-43790 1404932433 10/31/2023
GGM 342298.824,N- 2629796.648 E- 342330.630,N-2629801.248 E- 342330.630 for
west side of Live area at Tinat GGM

Asphalt pavement tack coat inspection RC-250 for Asphalt road and parking area
TINAT (area-4) (2000 sqm area) N- 2629927.439 E-342294.224 N-2629927.439 E-
PTJ-SGCP-CIV-43791 1404932378 10/31/2023
GGM 342298.824,N- 2629796.648 E- 342330.630,N-2629801.248 E- 342330.630 for
west side of Live area at Tinat GGM

Asphalt wearing course(conventionalclass-B) for (area-2) (1000.00sqm Area) E-


342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
TINAT
PTJ-SGCP-CIV-43793 1404946942 11/2/2023 2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-2629919.764 to E-
GGM
342328.507 N- 2629810.577 to E-342434.731 N-2629811.648 live area trenches
and piperack asphalt cutting area at Tinat GGM
Asphalt pavement tack coat inspection RC-250 for (area-2) (2000.00sqm Area) E-
342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
TINAT
PTJ-SGCP-CIV-43794 1404946969 11/2/2023 2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-2629919.764 to E-
GGM
342328.507 N- 2629810.577 to E-342434.731 N-2629811.648 live area trenches
and piperack asphalt cutting area at Tinat GGM
Asphalt wearing course (conventional class-B) (area-1) (3721.65 sqm Area) E-
342572.103 N-2629908.874 to E-342546.043 to N-2629908.871 to E-342546.041
TINAT
PTJ-SGCP-CIV-43797 1404964186 11/4/2023 to N-2629924.476 to E-342572.209 to N-2629941.045 to E-342416.423 N-
GGM
2629941.185 to E-342396.440 N- 2629918.951 to E-342404.836 N-2629911.526
from (RCC) north side of scraper area at Tinat GGM
Asphalt pavement tack coat inspection RC-250 for (area-1) (3721.65 sqm Area) E-
342572.103 N-2629908.874 to E-342546.043 to N-2629908.871 to E-342546.041
TINAT
PTJ-SGCP-CIV-43798 1404964194 11/4/2023 to N-2629924.476 to E-342572.209 to N-2629941.045 to E-342416.423 N-
GGM
2629941.185 to E-342396.440 N- 2629918.951 to E-342404.836 N-2629911.526
from (AL-MAJWAL) north side of scraper area at Tinat GGM
Asphalt core density testing inspection for wearing course only (area-1,3 and 4)
(8589.00 sqm Area) E- 342309.603 N-2629865.605 to E-342303.452 N-
TINAT 2629830.106 E-342257.757 N-262986.625 to E-342286.657 N-2629827.350 E-
PTJ-SGCP-CIV-43799 1404970814 11/6/2023
GGM 342309.500 N-2629865.861 E-342261.339 N-2629805.625 E-342257.686 N-
2629824.928 E-352309.554 N-2629842.095 E-342294.224 N-2629927.439 E-
342298.824 N-2629927.439 E-342330.630 N-2629796.648 E-342330.630 N-
Asphalt wearing course(conventionalclass-B) for (area-2) (700.00sqm Area) E-
342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
TINAT
PTJ-SGCP-CIV-43807 1404970906 11/7/2023 2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-2629919.764 to E-
GGM
342328.507 N- 2629810.577 to E-342434.731 N-2629811.648 live area trenches
and piperack asphalt cutting area at Tinat GGM
Asphalt pavement tack coat inspection RC-250 for (area-2) (1000.00sqm Area) E-
342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
TINAT
PTJ-SGCP-CIV-43808 1404970913 11/7/2023 2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-2629919.764 to E-
GGM
342328.507 N- 2629810.577 to E-342434.731 N-2629811.648 live area trenches
and piperack asphalt cutting area at Tinat GGM
Asphalt wearing course (conventional class-B) (area-1) (3721.65 sqm Area) E-
342572.103 N-2629908.874 to E-342546.043 to N-2629908.871 to E-342546.041
TINAT
PTJ-SGCP-CIV-43811 1404990356 11/9/2023 to N-2629924.476 to E-342572.209 to N-2629941.045 to E-342416.423 N-
GGM
2629941.185 to E-342396.440 N- 2629918.951 to E-342404.836 N-2629911.526
from (RCC) north side of scraper area at Tinat GGM
Asphalt pavement tack coat inspection RC-250 for (area-1) (3721.65 sqm Area) E-
342572.103 N-2629908.874 to E-342546.043 to N-2629908.871 to E-342546.041
TINAT
PTJ-SGCP-CIV-43812 1404990357 11/9/2023 to N-2629924.476 to E-342572.209 to N-2629941.045 to E-342416.423 N-
GGM
2629941.185 to E-342396.440 N- 2629918.951 to E-342404.836 N-2629911.526
from (AL-MAJWAL) north side of scraper area at Tinat GGM
Asphalt wearing course(conventionalclass-B) for (area-2) (300.00sqm Area) E-
342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
TINAT
PTJ-SGCP-CIV-43814 1405004075 11/11/2023 2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-2629919.764 to E-
GGM
342328.507 N- 2629810.577 to E-342434.731 N-2629811.648 live area trenches
and piperack asphalt cutting area at Tinat GGM
Asphalt pavement tack coat inspection RC-250 for (area-2) (300.00sqm Area) E-
342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
TINAT
PTJ-SGCP-CIV-43815 1405004093 11/11/2023 2629877.748 to E-342394.902 N-2629919.776 E-342318.940 N-2629919.764 to E-
GGM
342328.507 N- 2629810.577 to E-342434.731 N-2629811.648 live area trenches
and piperack asphalt cutting area at Tinat GGM
Asphalt wearing course (conventional class-B) (area-1) (3000.45 sqm Area) E-
342572.103 N-2629908.874 to E-342546.043 to N-2629908.871 to E-342546.041
TINAT
PTJ-SGCP-CIV-43817 1405011958 11/12/2023 to N-2629924.476 to E-342572.209 to N-2629941.045 to E-342416.423 N-
GGM
2629941.185 to E-342396.440 N- 2629918.951 to E-342404.836 N-2629911.526
from (RCC) north side of scraper area at Tinat GGM
Asphalt pavement tack coat inspection RC-250 for (area-1) (3000.45 sqm Area) E-
342572.103 N-2629908.874 to E-342546.043 to N-2629908.871 to E-342546.041
TINAT
PTJ-SGCP-CIV-43818 1405011959 11/12/2023 to N-2629924.476 to E-342572.209 to N-2629941.045 to E-342416.423 N-
GGM
2629941.185 to E-342396.440 N- 2629918.951 to E-342404.836 N-2629911.526
from (AL-MAJWAL) north side of scraper area at Tinat GGM
Asphalt core density testing inspection binder course and wering course for (area-2
& 3) (2500.00sqm Area) E- 342404.399 N-2629910.006 to E-342403 N-
TINAT 2629882.026 E-342366.909 N-2629877.748 to E-342394.902 N-2629919.776 E-
PTJ-SGCP-CIV-43822 1405023950 11/12/2023
GGM 342318.940 N-2629919.764 to E-342328.507 N- 2629810.577 to E-342434.731 N-
2629811.648 south side of security building and live area trenches and piperack
asphalt cutting area at Tinat GGM
Asphalt wearing course(conventional class -B) (area-1) (1200.68 sqm Area) E-
TINAT 342572.103 N-2629908.874 to E-342534.294 to N-2629908.871 to E-342572.209
PTJ-SGCP-CIV-43830 1405029522 11/15/2023
GGM to N-2629941.045 E-342532.331 N-2629941.233 E-342533.391 N-2629924.472 to
from (RCC) north east side of scraper area at Tinat GGM
Asphalt pavement tack coat inspection RC-250 for (area-1) (1200.68 sqm Area) E-
TINAT 342572.103 N-2629908.874 to E-342534.294 to N-2629908.871 to E-342572.209
PTJ-SGCP-CIV-43831 1405029607 11/15/2023
GGM to N-2629941.045 E-342532.331 N-2629941.233 E-342533.391 N-2629924.472 to
from (AL-MAJWAL) north side of scraper area at Tinat GGM

Asphalt wearing course(conventional class -B) (area-1) (1200.68 sqm Area) E-


TINAT 342572.103 N-2629908.874 to E-342534.294 to N-2629908.871 to E-342572.209
PTJ-SGCP-CIV-43833 1405057821 11/16/2023
GGM to N-2629941.045 E-342532.331 N-2629941.233 E-342533.391 N-2629924.472 to
from (RCC) north east side of scraper area at Tinat GGM

Asphalt pavement tack coat inspection RC-250 for (area-1) (1200.68 sqm Area) E-
TINAT 342572.103 N-2629908.874 to E-342534.294 to N-2629908.871 to E-342572.209
PTJ-SGCP-CIV-43834 1405057854 11/16/2023
GGM to N-2629941.045 E-342532.331 N-2629941.233 E-342533.391 N-2629924.472 to
from (AL-MAJWAL) north side of scraper area at Tinat GGM

Asphalt wearing course(conventional class -B) (area-1) (1278.00 sqm Area) E-


TINAT 342454.026 N-2629916.861 to E-342455.026 to N-2629904.830 to E-342526.347
PTJ-SGCP-CIV-43836 1405067566 11/20/2023
GGM to N-2629922.948 E-342526.079 N-2629904.811 from (AL-MAJWAL) north side of
scraper area at Tinat GGM

Asphalt pavement tack coat inspection RC-250 for (area-1) (1278.00 sqm Area) E-
TINAT 342454.026 N-2629916.861 to E-342455.026 to N-2629904.830 to E-342526.347
PTJ-SGCP-CIV-43837 1405067557 11/20/2023
GGM to N-2629922.948 E-342526.079 N-2629904.811 from (AL-MAJWAL) north side of
scraper area at Tinat GGM

Asphalt wearing course(conventional class -B) (area-1) (1000.00 sqm Area) E-


TINAT 342454.026 N-2629916.861 to E-342455.026 to N-2629904.830 to E-342526.347
PTJ-SGCP-CIV-43839 1405095561 11/22/2023
GGM to N-2629922.948 E-342526.079 N-2629904.811 from (AL-MAJWAL) north side of
scraper area at Tinat GGM

Asphalt pavement tack coat inspection RC-250 for (area-1) (1000.00 sqm Area) E-
TINAT 342454.026 N-2629916.861 to E-342455.026 to N-2629904.830 to E-342526.347
PTJ-SGCP-CIV-43840 1405095663 11/22/2023
GGM to N-2629922.948 E-342526.079 N-2629904.811 from (AL-MAJWAL) north side of
scraper area at Tinat GGM

TINAT Review Test Report for Core density of Asphalt Binder Coarse (conventional class-B)
PTJ-SGCP-CIV-43841 1405095647 11/21/2023
GGM Reference RFI # PTJ-SGCP-CIV-43132,43218 at tinat ggm asphalt area

TINAT Review Test Report for Core density of Asphalt Binder Coarse (conventional class-B)
PTJ-SGCP-CIV-43842 1405095628 11/21/2023
GGM Reference RFI # PTJ-SGCP-CIV-43472,43685 at tinat ggm asphalt area

Asphalt wearing course(conventional class -B) (area-1) (500.00 sqm Area) E-


TINAT 342454.026 N-2629916.861 to E-342455.026 to N-2629904.830 to E-342526.347
PTJ-SGCP-CIV-43844 1405112607 11/23/2023
GGM to N-2629922.948 E-342526.079 N-2629904.811 from (AL-MAJWAL) north side of
scraper area at Tinat GGM

Asphalt pavement tack coat inspection RC-250 for (area-1) (500.00 sqm Area) E-
TINAT 342454.026 N-2629916.861 to E-342455.026 to N-2629904.830 to E-342526.347
PTJ-SGCP-CIV-43845 1405112626 11/23/2023
GGM to N-2629922.948 E-342526.079 N-2629904.811 from (AL-MAJWAL) north side of
scraper area at Tinat GGM

Asphalt core density testing inspection of wering course for (area- 1) (5571.80 sqm
TINAT Area) E- 342404.836 N-2629911.520 to E-342416.423 N-2629941.185 to E-
PTJ-SGCP-CIV-43846 1405142738 11/27/2023
GGM 342572.209 N-2629941.045 to E-342572.150 N-2629907.521 north side of scraper
area at Tinat GGM

TINAT Asphalt wearing Coarse (conventional class-b) Receiving placement and testing
PTJ-SGCP-CIV-43848 1405151189 11/29/2023
GGM inspection for repairing/rectification work (RCC) at tinat GGM

TINAT Asphalt pavement tack coat inspection RC-250 for repairing/rectification work
PTJ-SGCP-CIV-43849 1405151233 11/29/2023
GGM (RCC) at tinat GGM

Review Test Report of Core density of Asphalt Binder Course and wering course
TINAT
PTJ-SGCP-CIV-43855 1405295410 12/18/2023 (conventional class-B) Reference RFI # PTJ-SGCP-CIV-43822 for tinat ggm asphalt
GGM
area.

TINAT Review Test Report of Core density of Asphalt wearing Coarse (conventional class-B)
PTJ-SGCP-CIV-43856 1405295412 12/18/2023
GGM Reference RFI # PTJ-SGCP-CIV-43799,43846 for tinat ggm asphalt area

Asphalt paving final inspection for wearing course of Area -1 (10329.665 sqm.area )
N- 2629927.439 E-342294.224 N-2629927.439 E-342298.824,N- 2629796.648 E-
TINAT
PTJ-SGCP-CIV-43863 1405309158 12/18/2023 342330.630,N-2629801.248 E- 342330.630 E- 342404.836 N-2629911.520 to E-
GGM
342416.423 N-2629941.185 to E-342572.209 N-2629941.045 to E-342572.150 N-
2629907.521 For screper area at tinat GGM

Asphalt paving final inspection for wearing course of Area -2 (2258.00 sqm. area E-
TINAT 342404.399 N-2629910.006 to E-342403 N-2629882.026 E-342366.909 N-
PTJ-SGCP-CIV-43864 1405309188 12/18/2023
GGM 2629877.748 to E-342394.902 N-2629919.776 for trench and pipe rack foundatiion
asphalt cutting area at tinat GGM
Asphalt paving final inspection for wearing course of Area -3 (2197.714 sqm. Area)
TINAT E- 342309.603 N-2629865.605 to E-342303.452 N-2629830.106 E-342257.757 N-
PTJ-SGCP-CIV-43865 1405309226 12/18/2023
GGM 262986.625 to E-342286.657 N-2629827.350 for around safety building area at
tinat GGM

Asphalt paving final inspection for wearing course of Area -4 (2292.000 sqm area) E-
TINAT 342294.219 N-2629927.471 to E-342298.819 N-2629927.471 E-342330.442 N-
PTJ-SGCP-CIV-43866 1405309182 12/18/2023
GGM 26229810.375 to E-342330.626 N-2629796.680 for asphalt road and parking area
at tinat GGM

You might also like