Turn Your SUCCESS STORY

Waste Gas
Into Power

Oil & Gas

At A Glance

Application:
Remote Oil Field Installation:
2 X OP16-3A
Output:
May 2005
Electricity: 3.6 MWel
Thermal Energy: 6 MWth for Hot Water Boiler Location:
Tedinskoe field, Northern Russia
Benefits:
12 Million Nm3 /Year of Waste Gas Turned Customer:
Into Clean Heat & Power Lukoil Sever LLC

The Challenge The Solution


Severneftegasprom is the daughter company of The OP16 is an all-radial single shaft turbine aimed
Gazprom that operates the heading part of North at reliable power generation applications. The com-
Stream 1 pipeline system. North Stream 1 is one of pressor impeller and turbine wheel are placed
the largest pipeline system and supply gas to the back to back, which allows the rotor shaft hous-
Northern Europe. In these conditions the main chal- ing to be cantilevered with all bearings in the tur-
lenge was to provide reliable and uninterruptable bine’s cold end. No lubricating oil is needed in the
power to general gas treatment equipment of the hot section of the turbine, which means lubricating
Gas field as well as to the living camp. oil consumption is negligible. It has a turbine wheel
of single-stage radial configuration resulting in a
The Results more compact, shorter and robust gas turbine with
good fuel flexibility. One of the reasons OPRA tur-
Two 1.8 MW OP16 gas turbine gensets use well-
bines were selected was their ability to burn well-
head gas to supply 1.8 MWe each continuously at
head gas (associated gas) – raw natural gas from
base load output. They are attached to hot-water
the oil well. The turbines are running successfully
boilers providing 3 MW each in thermal energy for
on the sour gas, which has a Sulphur content of
site heating, process operations and oil line trace
3%. The OP16 can run on different types of asso-
heating services. The gas turbines operated for six
ciated gas, which has many forms – such as having
years before scheduled overhaul, building up an im-
high or low calorific values, or high or low Sulphur
pressive performance record. They each achieved
content. To achieve 48 000 hours running on clean
48 000 hours’ running time, working constantly, al-
natural gas would be very good but to achieve it
though 40 000 hours is the recommended period
burning such a high Sulphur fuel must be a record.
between overhauls.

48,000 -40 oC
hrs 35 oC

Longest Operation Operating in


Before Major Overhaul Temperature Range

Get in Touch With Us


+31 (0)74 245 2121
OPRA Turbines, Haaksbergerstraat 71, opraturbines.com
7554 PA HENGELO, THE NETHERLANDS sales@opra.nl

OPRA’s Mission: To Drive The World’s Energy Transition

You might also like