Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 9

CANDIDATE’S DECLARATION

I hereby declare that the work, which is being presented in the Industrial training report, in
partial fulfillment of “Bachelor of Technology” in the Department of Electrical Engineering
and submitted to the Department of Electrical Engineering, Arya College of Engineering and
IT, Jaipur, (Raj.), Rajasthan Technical University, Kota is a record of my own training &
investigations carried under the Guidance of JAIPUR METRO RAIL CORPORATION,
JAIPUR.

I have not submitted the matter presented in this report anywhere for the award of any other
Degree.

Prerna Srivastava
Electrical Engineering
Roll No: 22EAREE208
Arya College of Engineering and IT, Jaipur

i
ACKNOWLEDGEMENT

It is my great privilege to express sincere gratitude & thanks to my supervisor


Er. Avtar Singh, Assistant Professor of Electrical Engineering, ACEIT, Jaipur for his
valuable guidance during each and every phase of this work. The stimulating and thought-
provoking discussion with him has been of immense use and I thank him for his interest and
energy that was committed to the training work progress report and for allowing me a wide
academic freedom.

I am pleased to acknowledge Prof. (Dr.) Arun Arya, Principal Arya College of Engineering
and IT, Jaipur, who gave me this opportunity with important guidelines regarding various
points to be taken during the whole of my work.

I extend my thanks to all members of the Department of electrical engineering especially


Prof. Prabhat Kumar, Head of Department, with his diverse nature of the faculties that has
constituted the strength of the department. Many thanks to my colleagues for sharing and
supporting me during my work progress.

I express my gratitude to JAIPUR METRO RAIL CORPORATION, Jaipur for being


joyful during all sorts of inconvenience hardship during my involvement in this work. I
thank them for patience and close co-operation during my work.

I am indebted to my parents for their eternal support and everlasting blessings. I gratefully
acknowledge the inspiration and unflagging support of my parents.

Last but not the least; I am thankful to the almighty for bringing this bright day in my life.

Prerna Srivastava
Roll No.: 22EAREE208
B.Tech ( EE )
ACEIT,Jaipur

ii
TABLE OF CONTENT
Candidate’s Declaration i
Acknowledgment ii
Table of Content iii
List of Figure vi
List of Tables vii
Glossary of Abbreviation viii
Abstract 01

Chapter 1 INTRODUCTION 02

1.1 Overview

1.2 RTU

1.2.1 Specification of RTU

1.2.2 Parts of RTU

1.2.3 Types of Electronic Cards in RTU

1.2.4 Communication System

Chapter 2 POWER SUPPLY INSTALLATION

2.1 Gas Insulated Switchgear (GIS)

2.1.2 Specification

2.1.2 Protection of GIS

2.1.3 Protection on AT

2.2 Transformers

2.2.1 Auxiliary Transformer

2.2.2 Traction Transformer

iii
2.3 Neutral Grounding Resistance (NGR)

2.4 TSS (Traction Sub-Station)

2.5 AMS (Auxiliary Main Substation)

Chapter 3 OVER HEAD EQUIPMENT

3.1 Introduction

3.2 Cantilever Assembly Rail Corridor

3.2.1 Cantilever

3.3 Underground OHE

3.4 Jumper

3.4.1 Types of Jumper

3.5 Drop Arm

3.6 Stagger

3.7 Overlap

3.8 Switching Station (SS)

3.9 Automatic Tension Device (ATD)

3.9.1 GAS Type ATD

3.9.2 PULLEY Type ATD

3.10 Insulator

3.11 Booster Transformer

3.12 Interrupter

iv
3.13 Isolator

3.14 Neutral Section

3.14.1 Types of Neutral Section

Chapter 4 LIFT AND ESCALATOR

4.1 Introduction

4.2 Lift Specification

4.3 Maintenance Access Panel (MAP)

4.4 Power Supplies

4.4.1 Car Operating Panel (COP)

4.4.2 Lift Component

4.4.3 Main Control Cabinet

4.5 Safety and Special Features

4.6 Rescue in Lift

4.7 Escalator

4.8 Parts of Escalator

4.9 Escalator Terminology

4.10 Safety in an Escalator

4.10.1 Bottom Safety

4.10.2 Top Safety

4.10.3 Middle Safety

v
4.11 Rescue in an Escalator

4.11.1 Rescue Process

Chapter 5 E & M SYSTEM

5.1 Introduction

5.2 Underground System

5.2.1 Main Distribution Board (MDB)

5.3 Fire Fighting System

5.3.1 Fire Alarm Control Panel (FACP)

5.3.2 Manual Control Panel (MCP)

5.3.3 Flasher

5.3.4 Smoke Detector

5.3.5 Heat Detector

5.3.6 Multi Sensor Detector

5.3.7 Hooter

5.4 Fire Suppression System

5.4.1 Fire Hydrant

5.4.2 Fire Extinguisher

5.5 Fire Sprinkler

5.6 Gas Flooding

5.7 Fire Buckets

vi
5.8 Station Pump Room

5.9 Diesel Generator (DG)

5.9.1 Diesel Engine

5.10 Auto Mains Failure (AMF)

5.11 Tunnel Ventilation System (TVS)

5.12 Reverse Osmosis (RO)

LIST OF FIGURES
Fig. No TITLE Page No.
1.1 Remote Terminal Unit (RTU)
1.2 Electronic Cards in RTU
2.1 Gas Insulated Switchgear
2.2 Auxiliary Transformer
2.3 33 KV to AMS
2.4 25 KV to TSS
2.5 Neutral Grounding Resistance
3.1 Cantilever Assembly
3.2 Gas Type ATD
3.3 Pulley Type ATD
3.4 Neutral Section
4.1 Lift
4.2 Car Operating Panel
4.3 Concourse to Ground Lift
4.4 Escalator
4.5 Parts of Escalator

vii
5.1 Manual Call Point
5.2 Flasher
5.3 Smoke Detector
5.4 Heat Detector
5.5 Multi Sensor Detector
5.6 Hooter
5.7 Fire Sprinkler
5.8 Gas Flooding System
5.9 Fire Buckets
5.10 Tunnel Ventilation System
5.11 Reverse Osmosis (RO)

LIST OF TABLES
Tab. No TITLE Page No.
2.1 Specification GIS
2.2 Auxiliary Transformer Specification
2.3 Specification NGR
4.1 Lift Specification
5.1 Fire Extinguisher
5.2 Station Pump Room

viii
GLOSSARY OF ABBREVIATION

LA Lightning Arrestor

SCADA Supervisory Control and Data Acquisition

SCR Station Control Room

PT Potential Transformer

CT Current Transformer

SF6 Sulfur Hexafluoride

CB Circuit Breaker

RTU Remote Terminal Unit

TVS Tunnel Ventilation System

ECS Environmental Control System

ix

You might also like