PENGUJIAN SONDIR

Titik No. : S. 01 Tanggal : 27 - 08 - 2023


Proyek : Pembangunan Diuji Oleh : PARIMIN, ST
Lokasi : Sanggata Dihitung Oleh : Yudi P, ST M Eng
Cuaca : Cerah M.a.t. : -

Bacaan Manometer Tegangan


Kedalaman Pertama Kedua Hambatan Hambatan Hambatan Jumlah Rasio
M1 M2 Konus Setempat Lekat Hambatan Geseken
M1.C0 (M2-M1).C1 HL = (M2-M1)C2.L/I Lekat
JHL = ΣHL (%)
(m) (Kg/Cm2) (Kg/Cm2) (Kg/Cm2) (Kg/Cm2) (Kg/Cm2) (Kg/Cm2)
0.00 0 0 0.00 0.00 0.00 0.00 0.00
20.00 5 7 5.06 0.13 2.62 2.62 2.59
40.00 5 7 5.06 0.13 2.62 5.24 2.59
60.00 7 10 7.08 0.20 3.93 9.18 2.78
80.00 7 10 7.08 0.20 3.93 13.11 2.78
1.00 7 10 7.08 0.20 3.93 17.04 2.78
20.00 5 7 5.06 0.13 2.62 19.67 2.59
40.00 5 7 5.06 0.13 2.62 22.29 2.59
60.00 6 8 6.07 0.13 2.62 24.91 2.16
80.00 6 8 6.07 0.13 2.62 27.53 2.16
2.00 7 10 7.08 0.20 3.93 31.47 2.78
20.00 7 10 7.08 0.20 3.93 35.40 2.78
40.00 4 6 4.05 0.13 2.62 38.02 3.24
60.00 4 6 4.05 0.13 2.62 40.64 3.24
80.00 3 5 3.03 0.13 2.62 43.27 4.32
3.00 3 5 3.03 0.13 2.62 45.89 4.32
20.00 2 3 2.02 0.07 1.31 47.20 3.24
40.00 2 3 2.02 0.07 1.31 48.51 3.24
60.00 3 5 3.03 0.13 2.62 51.13 4.32
80.00 3 5 3.03 0.13 2.62 53.76 4.32
4.00 3 5 3.03 0.13 2.62 56.38 4.32
20.00 5 7 5.06 0.13 2.62 59.00 2.59
40.00 5 7 5.06 0.13 2.62 61.62 2.59
60.00 6 8 6.07 0.13 2.62 64.24 2.16
80.00 6 8 6.07 0.13 2.62 66.87 2.16
5.00 7 10 7.08 0.20 3.93 70.80 2.78
20.00 7 10 7.08 0.20 3.93 74.73 2.78
40.00 30 40 30.34 0.66 13.11 87.84 2.16
60.00 20 25 20.23 0.33 6.56 94.40 1.62
80.00 40 50 40.45 0.66 13.11 107.51 1.62
6.00 40 50 40.45 0.66 13.11 120.62 1.62
20.00 60 70 60.68 0.66 13.11 133.73 1.08
40.00 30 40 30.34 0.66 13.11 146.84 2.16
60.00 30 40 30.34 0.66 13.11 159.96 2.16
80.00 10 15 10.11 0.33 6.56 166.51 3.24
7.00 10 15 10.11 0.33 6.56 173.07 3.24
20.00 10 15 10.11 0.33 6.56 179.62 3.24
40.00 15 20 15.17 0.33 6.56 186.18 2.16
60.00 15 20 15.17 0.33 6.56 192.73 2.16
80.00 20 25 20.23 0.33 6.56 199.29 1.62
8.00 20 25 20.23 0.33 6.56 205.84 1.62
20.00 15 20 15.17 0.33 6.56 212.40 2.16
40.00 15 20 15.17 0.33 6.56 218.96 2.16
60.00 20 25 20.23 0.33 6.56 225.51 1.62
80.00 20 25 20.23 0.33 6.56 232.07 1.62
9.00 25 30 25.28 0.33 6.56 238.62 1.30
20.00 25 30 25.28 0.33 6.56 245.18 1.30
40.00 20 25 20.23 0.33 6.56 251.73 1.62
60.00 20 25 20.23 0.33 6.56 258.29 1.62
80.00 30 40 30.34 0.66 13.11 271.40 2.16
10.00 30 40 30.34 0.66 13.11 284.51 2.16
20.00 25 30 25.28 0.33 6.56 291.07 1.30
40.00 25 30 25.28 0.33 6.56 297.62 1.30
60.00 30 40 30.34 0.66 13.11 310.73 2.16
80.00 30 40 30.34 0.66 13.11 323.84 2.16
11.00 40 50 40.45 0.66 13.11 336.96 1.62
20.00 40 50 40.45 0.66 13.11 350.07 1.62
40.00 35 45 35.40 0.66 13.11 363.18 1.85
60.00 35 45 35.40 0.66 13.11 376.29 1.85
80.00 40 50 40.45 0.66 13.11 389.40 1.62

DATA. 01
Titik No. : S. 01 Tanggal : 27 - 08 - 2023
Proyek : Pembangunan Diuji Oleh : PARIMIN, ST
Lokasi : Sanggata Dihitung Oleh : Yudi P, ST M Eng
Cuaca : Cerah M.a.t. : -

Bacaan Manometer Tegangan


Kedalaman Pertama Kedua Hambatan Hambatan Hambatan Jumlah Rasio
M1 M2 Konus Setempat Lekat Hambatan Geseken
M1.C0 (M2-M1).C1 HL = (M2-M1)C2.L/I Lekat
JHL = ΣHL (%)
(m) (Kg/Cm2) (Kg/Cm2) (Kg/Cm2) (Kg/Cm2) (Kg/Cm2) (Kg/Cm2)
12.00 40 50 40.45 0.66 13.11 402.51 1.62
20.00 30 40 30.34 0.66 13.11 415.62 2.16
40.00 30 40 30.34 0.66 13.11 428.73 2.16
60.00 45 55 45.51 0.66 13.11 441.84 1.44
80.00 45 55 45.51 0.66 13.11 454.96 1.44
13.00 50 60 50.57 0.66 13.11 468.07 1.30
20.00 50 60 50.57 0.66 13.11 481.18 1.30
40.00 45 55 45.51 0.66 13.11 494.29 1.44
60.00 45 55 45.51 0.66 13.11 507.40 1.44
80.00 40 50 40.45 0.66 13.11 520.51 1.62
14.00 40 50 40.45 0.66 13.11 533.62 1.62
20.00 35 45 35.40 0.66 13.11 546.73 1.85
40.00 35 45 35.40 0.66 13.11 559.84 1.85
60.00 40 50 40.45 0.66 13.11 572.96 1.62
80.00 40 50 40.45 0.66 13.11 586.07 1.62
15.00 50 60 50.57 0.66 13.11 599.18 1.30
20.00 50 60 50.57 0.66 13.11 612.29 1.30
40.00 45 55 45.51 0.66 13.11 625.40 1.44
60.00 45 55 45.51 0.66 13.11 638.51 1.44
80.00 50 60 50.57 0.66 13.11 651.62 1.30
16.00 50 60 50.57 0.66 13.11 664.73 1.30
20.00 55 65 55.62 0.66 13.11 677.84 1.18
40.00 55 65 55.62 0.66 13.11 690.96 1.18
60.00 60 70 60.68 0.66 13.11 704.07 1.08
80.00 60 70 60.68 0.66 13.11 717.18 1.08
17.00 50 60 50.57 0.66 13.11 730.29 1.30
20.00 50 60 50.57 0.66 13.11 743.40 1.30
40.00 55 65 55.62 0.66 13.11 756.51 1.18
60.00 55 65 55.62 0.66 13.11 769.62 1.18
80.00 50 60 50.57 0.66 13.11 782.73 1.30
18.00 50 60 50.57 0.66 13.11 795.84 1.30
20.00 40 50 40.45 0.66 13.11 808.96 1.62
40.00 40 50 40.45 0.66 13.11 822.07 1.62
60.00 50 60 50.57 0.66 13.11 835.18 1.30
80.00 50 60 50.57 0.66 13.11 848.29 1.30
19.00 60 70 60.68 0.66 13.11 861.40 1.08
20.00 60 70 60.68 0.66 13.11 874.51 1.08
40.00 65 75 65.73 0.66 13.11 887.62 1.00
60.00 65 75 65.73 0.66 13.11 900.73 1.00
80.00 70 80 70.79 0.66 13.11 913.84 0.93
20.00 70 80 70.79 0.66 13.11 926.96 0.93
20.00 100 110 101.13 0.66 13.11 940.07 0.65
40.00 200 220 202.26 1.31 26.22 966.29 0.65
60.00 250 280 252.83 1.97 39.33 1,005.62 0.78
80.00
21.00
20.00
40.00
60.00
80.00
22.00
20.00
40.00
60.00
80.00
23.00
20.00
40.00
60.00
80.00
24.00

DATA. 01
Titik No. : S. 01 Tanggal : 27 - 08 - 2023
Proyek : Pembangunan Diuji Oleh : PARIMIN, ST
Lokasi : Sanggata Dihitung Oleh : Yudi P, ST M Eng
Cuaca : Cerah M.a.t. : -

Bacaan Manometer Tegangan


Kedalaman Pertama Kedua Hambatan Hambatan Hambatan Jumlah Rasio
M1 M2 Konus Setempat Lekat Hambatan Geseken
M1.C0 (M2-M1).C1 HL = (M2-M1)C2.L/I Lekat
JHL = ΣHL (%)
(m) (Kg/Cm2) (Kg/Cm2) (Kg/Cm2) (Kg/Cm2) (Kg/Cm2) (Kg/Cm2)
20.00
40.00
60.00
80.00
25.00
20.00
40.00
60.00
80.00
26.00
20.00
40.00
60.00
80.00
27.00
20.00
40.00
60.00
80.00
28.00
20.00
40.00
60.00
80.00
29.00
20.00
40.00
60.00
80.00
30.00

Catatan :
Dp = Diameter piston = 3,56 cm
Dk = Diameter Konus = 3,54 cm
Ds = Diameter Selimut = 3,58 cm
L = Panjang bacaan = 20 cm
I = Panjang selimut = 13,50 cm
Co. = (Dp/Dk)2 = 1,0113
C1. = Dp2/4Ds.I) = 0,0656
C2 = (Dp2/4.Ds) = 0,8850

DATA. 01