Al-Kashaf Est.

ABOUT US

1
Al-Kashaf Est.

Quality Plan
Project Quality plan will be submitted for projects as per Aramco-SABIC Standards
• Contents of Quality plan, 1.
SCOPE
2. APPLICABLE DOCUMENTS
3. TERMS AND DEFINITIONS
4. Quality Policy & Quality Program
5. Project Organization Chart
6. Project Quality Management Over View
7. QA/QC CV's
8. Inspection Test Plan (ITP)
9. Document Control
10. Al Kashaf General Work Flow Procedure
11. Material Control & Material Preservation Procedure
12. Measuring & Test Equipment Control
13. Detailed Inspection Handling Procedure
14. Method Of Statements (MOS)
15. Control Of Non-Conformance & Corrective Action
16. Reporting
17. Field Procurement Procedure
18. Audit Procedure
19. Disposition & Control Of Field Engineering Changes
20. Procedure Of Disposition Of Surveillance Reports
21. Document Turn Over Procedure
22. Supplier Evaluation Procedure
23. Inspection Forms & Check Lists.

2
Al-Kashaf Est.

EHSS Policy And Procedures

AL KASHAF STRICTLY FOLLOWS CLIENT EHSS PROCEDURES


AL KASHAF HSE Mannual and procedures will be implemented
(For other basic Industries),

HSE - 0209-01- AL KASHAF INCIDENT REPORT PROCEDURE


HSE - 0209-02- AL KASHAF PPE ISSUED SHEET
HSE - 0209-03 TOOL BOX TALK ATTENDENCE SHEET
HSE - 0209-04- AL KASHAF Manhour Safety Report
HSE - 0209-05- AL KASHAF NCR Form
HSE - 0209-06- AL KASHAF LOTO
HSE - 0209-07- AL KASHAF Observation Report
HSE - 0209-08- AL KASHAF Near Miss Report
HSE - 0209-09- AL KASHAF Orientation Attence sheet
HSE - 0209-10- REFRESHER SAFETY ORIENTATION PROGRAM SHEET
HSE - 0209-11- MANAGEMENT SAFETY REVIEW REPORT
HSE - 0209-12- AL KASHAF SAFETY SKILL MATRIX SHEET
HSE - 0209-12- AL KASHAF Daily Safety Report
HSE - 0209-13- AL KASHAF Weekly Man hours Report
HSE - 0209-14- AL KASHAF Daily , Weekly Work Permit Report

3
Al-Kashaf Est.

4
Al-Kashaf Est.

5
Al-Kashaf Est.

General Manager

Construction Manager Manager-Engineering &


Business Development

Operations Project Finance Technical Sales


Procurement Engineering
Manager Manager Manager Support Manager

QA/QC Project Accounts Bid Sales Workshop


Secretary Support
Manager Engineer Officer Engineer Manager

Admin
Supervisors Secretary Secretary Outsourcing Co-ordinator AUTOCADD
Manager

Document Manpower Equipment


Foreman
Control & Resources & Transport

6
Al-Kashaf Est.

SWCC

Dumat Al Jandal

7
Al-Kashaf Est.

our services

    

 

8
Al-Kashaf Est.

9
Al-Kashaf Est.

Client: Dumat Al Jandal Wind Farm


Location: Al Jouf
Project: Turnkey Project: construction of complete North & South IPP substation building
Period: May 2023 till continue

10
Al-Kashaf Est.

Client: Dumat Al Jandal Wind Farm


Location: Al Jouf
Project: Turnkey Project: construction of complete storage Yard
Period: May 2023 till continue

11
Al-Kashaf Est.

Client: Larsen & Toubro Limited Construction


Location: Maaden Mansourah Massarah Gold
Project : Civil Finishing work Block Plaster Paint False Ceiling Floor Tile Interlock
Brick Kerbstone Floor Expoxy paint Coating And Sport Facility
Period : 2021 Oct 2023

12
Al-Kashaf Est.

Client: Air Liquid (Aramco Injection Plant)


Location: Dammam – Quarraya
Project: Electrical Work, Turn Around Shutdown
Period: Jan 2021 – Feb 2021

13
Al-Kashaf Est.

Client: Sinopec (SWCC Yanbu plant)


Location: Yanbu
Project: Cable Tray Installation, Cable Pulling, Termination & Testing
Period: Jan 2021 – Mar 2021

14
Al-Kashaf Est.

Client: Sinopec (SWCC Phase 2)


Location: Yanbu
Project: Asphalt Road & Water Proofing
Period: Jan 2021 – June 2021

15
Al-Kashaf Est.

Client: Larsen & Toubro


Location: Jeddah
Repdo Round 2 300MW Jeddah Solar Project
Project: Turnkey Project: Construct Visitor Building & Security Control Building
Period: Feb 2022 – Dec 2022

16
Al-Kashaf Est.

Client: Metso Outotac


Location: Mansourah Massarah Gold Project IK
Project: Colling Tower Repairing & Installation
Period: Jan 2022 – Feb 2022

17
Al-Kashaf Est.

Client: Larsen & Toubro Limited


Location: Repdo Round 2 - Jeddah 300 MW
Project: Trackers Installation - PVH-Arctech
Period: Feb 2022 – Jane 2023

18
Al-Kashaf Est.

Client: National Petrochemical Industrial Co.


Location: Yanbu
Project: Supply Material; Mechanical Fitting, Pipes, Flanges, Valve & Fastener.
Period: 2021 till continue

19
Al-Kashaf Est.

20
Al-Kashaf Est.

Area of Expertise
Cathodic Protection System
Cable Installation & Termination
Panel Board Installation
Network/ Instrument Installation

21
Al-Kashaf Est.

22
23
24
Al-Kashaf Est.

25
Al-Kashaf Est.

26
Al-Kashaf Est.

Yusuf Bin Ahmad Kanoo Bulding,


3rd Floor, Al Faisaliyah,
Jeddah 23441
Kingdom of Saudi Arabia
Tel: +966 12 391 7755
info@kashafgroup.com
www.kashafgroup.com

You might also like