CARPARK SHADE STRUCTURE

SINGLE SPAN CANTILEVER TUBULAR FRAMED SHADE HDPE FABRIC ROOF


LOADINGS Sub: 6.0M span X 3M BAYS shade
Structural Data:
Span c/c 6.0 m
Height of pole "L" 3.4 m
Column Dim. (Assumed) 150 x150 x 5 mm 4
Eaves height of shaded Frame 2.6 m 2
Pitch of Shade 0.4 m pitch
Bay Width ( C/c of poles) 3.0 m L 3
1 SPAN c/c
Member Properties: (assumed)
DIMENTION Thickness eaves ht
1 Main Pole 150x150mm 5 mm
2 Pyramid memb Pipe D=2” 3 mm
3 Chord 100x100mm 3 mm Section
4 Boom Tie 100x100mm 3 mm
PYRAMID Members

Loadings
Dead loads:
Self wt of members By design program
Wt of fabric (0.83Kg/sq.m) 0.0168 kn/m on main frame
Wt of fabric on pyramid member 0.011 kn/m bay width
Wt of fabric on lateral ties 0.008 kn/m Chord
Wind loads: & 20 %Air permeability
Basic Wind Speed " V" Km/hr 100 28.0 m/sec
Vs = V x S1 x S2 x S3 = 22.4 m/sec
S1 = 1
S2* = 0.8 * Class B (horiz dim < 50m & ht < 5m
S3 = 1
Dynamic
Wind = 0.308 Kn/sq.m

Wind Pressure Coefficients Cp


Roof Angle 8.276 O

Cp +ve (Down ward)


all values of  Cp = 0.37 Considered for down load
Cpe wind angle 0 deg PLAN

all values of  Cpe = -1.16873 for =0,Cp = -0.67 Table -14 BS 6399 Part-2
for =1,Cp = -1.2 (Pressure co-efficients for DuePitched roo
Wind force on Frame (F = Cp x q x Bay width ) *0.8 -- (20% AIR PERMEABLE)

(Down ward) +ve force on main 0.146 Kn/m


Vehicle ht "h1"= 2.2 m' considered
Dowm force on pyramid memb 0.10 Kn/m
shade - clear ht "h2"= 2.34 m' from ff level
Dowm force on lateral tie 0.07 Kn/m
 h1/h2 0.941
(UP ward) -ve force on main fra -0.460 Kn/m
UP force on pyramid memb = -0.31 Kn/m
UP force on lateral tie = -0.21 Kn/m

DESIGN BY ENG. HESHAM ALHELALEE.


CARPARK SHADE STRUCTURE

Frictional Drag = 0.015 Kn/m on frame


Horizontal force on column = 0.044 Kn/m

Cfn = 1.2 * Dx Vs = 4.1< 6 m2 /sec - Sub critical flow


K= 0.73 for L/D ratio = 18.18