Application of Reliability-Centered Stochastic Approach and FMECA To Conditional Maintenance Electric Power Plants in China
Application of Reliability-Centered Stochastic Approach and FMECA To Conditional Maintenance Electric Power Plants in China
Abstract -- In a competitive supply-side power market, disassembly and reinstallation may bring unwanted
conditional maintenance can help the generation utilities to abrasion to some precision machine and shorten their total
reduce cost and gain more profit. In this paper, life-span. Under the power market, generation utilities are
Reliability-Centered Maintenance (RCM) analytical method is expected to improve the usability and reliability of
adopted. The reliability-basedmathematical model for predicting
the failures of the subsystems and components in the power plant machines by the most efficient measures; therefore their
is established, and the failure mechanism is studied. Software is maintenance plan should meet the requirement of
developed to simulate the failures evolution and forecast their encountering the smallest number of contingencies and
tendency. Based on the above and further ranking the keeping maintenance cost as low as possible. Thus.
weightiness of equipment whose status to he observed by Conditional Maintenance can be used effectively in the
FMECA (Failure Mode Effects & Criticality Analysis), the generation utilities to help attain such a target.
power plant manager may choose appropriate condition Since the 1930’s, the evolution of maintenance can
monitoring and failure diagnosis apparatus for caving out be traced through three phases [ I , 21. Its first stage is the
Conditional Maintenance. At the end of this paper, some Break Maintenance; then it was changed to Fixed-time
suggestions on the reformation of equipment maintenance plan
and pattem in China are proposed. In this paper, practical Maintenance as the industry was developed. Recently the
research on four 200 MW generation units of Junliangcheng new pattem of Conditional Maintenance (CM) is under
Power Plant in China is implemented. The results show that it intensive research. Conditional Maintenance, also called
can effciently help decreasing the cost on maintenance and as Predictive Maintenance, is a maintenance pattem based
hence improve the total benefit. on the principles and technologies of condition monitoring
and failure diagnosis. By taking the historical and present
K q m r d s - Conditional Maintenance, Reliability-Centered operation status of certain equipment into account,
Maintenance (RCM), FMECA (Failure Mode Effects& Criticality analyzing and estimating system-wide and
Analysis), maintenance plan, maintenance panem
comprehensively, it can detect the interior status of the
equipment, find out the characteristics of the flaws,
I. INTRODUCTION forecast the growing tendency of the hidden failure, and
propose suggestions on prevention and supervision. It
Under the ongoing reformation of the electric supply would thereby postpone the traditional preventive
industry in China, generation utilities have been separated
maintenance, enhance the equipment usability, decrease
from the power grid companies, and they must bid to gain the standby equipment in the power plant and hence
more allowed generating power into the power market. increase the profit. Here we must point out that because
Faced with the competition on the power-supply-side, the
the purchase, installation and operation of condition
generation utilities would devote more work on the focus
monitoring and failure diagnosis apparatus would need
of reducing cost and gaining the hest benefit while considerable cost, therefore only when the benefit by
operating safely and reliably. implementing CM is larger than the cost, the manager of a
In the past, the guideline of ‘give priority to power plant would likely decide to carry it out.
preventing failures, and perform fixed-time maintenance
according to the schedule’ is executed in the Chinese 11. METHODOLOGY
electric supply industry. The equipment maintenance is
performed- -routinely according io planned schedule.
In this paper, Reliability-Centered Maintenance
However, for some equipment with high manufacturing (RCM) analysis method is adopted. Firstly, statistical data
technology, fixed-time maintenance is redundant and may is analyzed, the reliability-based mathematical model for
have over-maintenance; while for some others, it cannot
predicting the failures of the subsystems and components
meet their requirement of continuous safe operation and
in the power plant is established, and the failure
may have under-maintenance. In addition, the fixed-time
mechanism is studied. Then software is developed to
simulate the failures evolution and forecast their tendency.
The software may also give suggestions on the equipment
Cheng Yun,T. S. Chung, C. W.Yu and C. Y. Chung arc with Dcpt.
management, maintenance management and standby
of Electrical Engineeing, the Hong Kong Polytechnic University, Hung components management. Based on the above and further
Hom Kowlmrr Hons Kmg (4 y d w g e @ & u ~ ranking the weightiness of equipment whose status to he
cctschun@plp.edu.&cccwyu@ po1yu.edu.k cccychun@polp.edu.hk). observed by FMECA (Failure Mode Effects & Criticality
Zeng Ming is with School of Business and Administration, North
~ E l ~ c P o w a U ~ v a s l ~ B e i ~ l n g ~ ( c n a i l : z c n g r u n g b ~ l Analysis),
63.~). the power plant manager and operator may
Sun Xin is with Anhui Electnc Power Company, Hcfci, Anhui, choose appropriate condition monitoring and failure
China (c-mail: sumin5306@163,cam) diagnosis apparatus as the hardware to carry out
Conditional Maintenance. At the end of this paper, some
0-7803-8237-4/04/$17.0002004IEEE
463
2004 IEEE Intemational Conference on Electric Utility Deregulation, Restructuring and Power Technologies (DRPT2004) April 2004 Hong Kong
e 41
A. Mathematical Model and Computer Process
For Weibull distribution, the failure density function
The electrical system is special and complicated, in
which the generation supply, transmission, distribution
and consumption of electrical power must take place
simultaneously. In this paper, to concentrate on the
maintenance issues in the power plant, the following
assumptions are made: The transfer grid between the
power source and the load is absolutely reliable. In other Secondly, Tpis the most possible time that failure
words, there is no contingency or over-load in the transfer may take place on equipment. Mathematically, T, is the
grid, and the voltage level at the sink area is not less than value o f t when f(t) gets its maximum value, i.e. solution
the lower voltage limit.
After gathering enough data of certain equipment o f t for-
df(t) = 0
failures, the data distribution histogram can be drawn, dt
from which the failure density can be obtained. By
comparing it with various typical curves of failure density
functions, the distribution style of the failure can be
I
estimated. Analysis on the concerned data by this method
shows that the failure time distribution of the generation
equipment tallies with the dual-parameter Weibull
Therefore, T, = [
to(m-l)
]
-
m
-t,
distribution, the reliability function of which is
Then To can be determined. Under certain
R ( ~=) e$ and the failure distribution function is believable degrke a, the interval [T,, +CO] within which
failure on equipment may take place is the left side
I
percentum believable section. In other words, for a
F ( t ) = 1 -er." , where m is shape parameter and to is constant 9 here &<I, if it is true that
scale parameter. The confirmation check by adopting pT < < a , then &, +m] is called as the left
Weibull probability paper indicates the following {4- -
infomation: 1. ne ~i~~ of ~ ~(TTF)i and thel side
~ percenhm
~ believable
~ section with believable degree of a.
Total Time of Repair (TTR) are in accordance with the In the Software developed by this research, the believable
dual-parameter Weibull distribution; 2. Estimation value degree0 o may be chosen from three selections: Q = 70 %,
of the two Weibull parameters, m and to for certain 85 %, or 95 % (which one to be chosen is up to practical
equipment can be obtained by the distribution figure. requirement and is determined by the software users).
Maximum Likelihood Method is further used to compute
more accurate value of the two Weibull parameters. At last
the estimated results of the parameters are validated by the I
x2 test method. hence T, = [t: - t o In a. -t, ,
Software for CM is then developed in this research.
It has three main functions, namely the single-step The equipment reliability is composed of both
prediction, multi-step prediction and making suggestions inherence and usage reliability. In general, to the
for the equipment management, maintenance management generation equipment, the inherence reliability is the main
and standby components management. factor, which is the general characteristic of one type
In the data analysis and computing algorithm of the equipment and is determined by the design, materials and
software, several reliability indexes are used, such as the the manufacture technology. On the other hand, the usage
reliability level, the remaining reliability level Rs(t), the reliability is the specialty of certain equipment that is
failure density function f(t), the most possible failure time shaped by influence of outside conditions, i.e., various
Tp. the left side percenhun believable section [T4, + m], weather, environment, operation role, dissimilar failures
the failure ratio, average life-span, etc. occurred on different individual, dissimilar operation by
different inspector, etc. during the installation, debugging,
I) Single-Step Prediction operation and maintenance process [3,4]. Hence for
special equipment, it has both the common inherence of
The focus of whole prediction and suggestion its kind and its own individuality.
process is the failure event prediction algorithm, which In the calculation of the reliability indexes, the
means to evaluate the most possible failure time T, and individuality of equipment is involved by considering its
the lower limit of left side percentum believable section historical running conditions such as the failure times and
464
2004 IEEE International Conference on Electric Utility Deregulation, Reshucturing and Power Technologies (DRPT2004) April 2004 Hong Kong
465
2004 TEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies (DRPT2004)April 2004 Hong Kong
111. CONCLUSIONS
466
2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies (DRPT2004) April 2004 Hong Kong
IV. ACKNOWLEDGEMENTS
V. REFERENCES
[ I ] Maintenance Managcmcnt Workstation Applications, EPRI
Technoloo Rwien., Dec.1995
[2] Zeng Ming, Application of Conditional Maintenance in Thhcrmo
Power Plant, Chino ElecryicPowes Vol. 31, 1998,66-68
[ 3 ] R.Guo, C.E. Love, Statistical Analysis far Agc Model of Impcrfcctly
repaircd Systems, Quoliy ond Reliability En@neerinz hremalional,
Yo1.8, 1992, 133.146
[4] R . Guo, C.E. Love, Simulation Strategies to Identify thc Failurc
Paramctcrs of Repairable Systems undcr thc lntluencc of Gcncral Rcpair,
Qualig and Reliability Engineeying hremationo1,Vol.IO, 1994,37-47
[ 5 ] Moycs, A., et al. Combining design and opcratianal knowlcdge to
enhance generator plant diagnostics, PNC IEE Cm5 on Generalion,
Transmission and Disbiburion, May 1996,300 -304