DOLPHIN OFFSHORE ENTERPRISES (1) LTD.
ee
Pro
Clie TEC
@
CROSSINGS CONSTRUCTION AND FREE SPAN CORRECTION
PROCEDURE
FOR
CROSSINGS CONSTRUCTION
AND FREE SPAN CORRECTION
RSPPM PROJECT
(ONGC TENDER No. MR/OW/MM/RSPPM/10/2003)
CLIENT
IRANIAN OFFSHORE
ENGINEERING & CONSTRUCTION COMPANY
Incorporated ONGC comments, Letter
1
reference MFVRSPPM/OWC 10/2004 dated ~ ry 3K 19.08.2005
94.05.05
° rm 8k 14.04.2005
FOR CUENT REVIEW
REVISION DESCRIPTION PREPARED | APPROVED DATE
DISTRIBUTION SUMMARY: Copy No Issued To:
Bocument Ref OWS/I02i/0405/PROC, CO CONST & FS CORR. Revision =
Prepared By: LMendonca Page: Lofl3
‘Approved By: S. Kalkami Date: 11-08-2005DOLPHIN OFFSHORE ENTERPRISES (1) LTD. eS
dob Number | 0103/1021
Proc RSPPM
Gen > f0EC
CROSSINGS CONSTRUCTION AND FREE SPAN CORRECTION,
Incorporated ONGC comments, Leter
i 349811 | erence MRIRSPPMIOWC 51072004 dated | LM sk | 11.08.2008
040805,
us sk | 14042005
° : FOR CLIENT REVIEW
REVSION | paces DESCRIPTION REVISED | APPROVED | DATE
RECORD OF REVISIONS
Docume Re 1 ODAOALOWSTPROC. CO CONST BS CORR Ration 7 1
Prepieé By + LMendonsa rage: 20633
Approved By: S Kulkamt Dae: 11.08.2005Job Number: 0/08/1021
Project: RSPPM
Chest ORC
DOLPHIN OFFSHORE ENTERPRISES (I) LTD. e@
CROSSINGS CONSTRUCTION AND FREE SPAN CORRECTION
PURPOSE: To lay down procedures for Crossings construction and Free span
corrections.
SCOPE: Crossings construction and Free span corrections for newly laid
pipeline segments.
PROCEDURE: This procedure contains the following:
1. Introduction
2. Free Span Correction Procedures
2.1 Pre-installation Survey
2.2 Grout Bag Installation
2.3 Post Installation As Built Survey
3. Crossings Construction Procedures
3.1 Pre-installation Survey
3.2 Grout Bag Installation
3.3. Post installation As Built Survey
4, Grouting Operations
4. INTRODUCTION
Procedures contained herein are laid down as guidelines to carry out Crossings construction
and Free span corrections for the newly laid pipelines in the Mumbai High field for the
RSPPM project. Provailing site conditions may necessitate minor changes in the way the
operations are carried out. These amendments, if any, shall be carried out at the discretion of
the DOEL Diving Superintendent, in consultation with the onboard client representative.
Crossing construction and Free Span correction shall conform to Pipeline Design Criteria
Section 4A & 4B of ONGC spec 2015 rev 1, Max allowable tree span for a pipeline segment in
straight and curved sections shall be as per data given in AFC pipeline alignment sheets.
The envisaged work shall be performed by Dolphin Offshore Enterprises (India) Limited
(DOEL) from a suitable vessel (DP DSV Seamec-.)
Document Ref + ORS/ODLOAIST PROC. CO CONST & FS CORR Revision = 2
Prepared By: L- Mendonca Page: 30813
Approved By _:_$. Kulkarni Date__: 11.08200