Procedure For Crossings Construction and Free Span Correction

You might also like

Download as pdf
Download as pdf
You are on page 1of 50
DOLPHIN OFFSHORE ENTERPRISES (1) LTD. ee Pro Clie TEC @ CROSSINGS CONSTRUCTION AND FREE SPAN CORRECTION PROCEDURE FOR CROSSINGS CONSTRUCTION AND FREE SPAN CORRECTION RSPPM PROJECT (ONGC TENDER No. MR/OW/MM/RSPPM/10/2003) CLIENT IRANIAN OFFSHORE ENGINEERING & CONSTRUCTION COMPANY Incorporated ONGC comments, Letter 1 reference MFVRSPPM/OWC 10/2004 dated ~ ry 3K 19.08.2005 94.05.05 ° rm 8k 14.04.2005 FOR CUENT REVIEW REVISION DESCRIPTION PREPARED | APPROVED DATE DISTRIBUTION SUMMARY: Copy No Issued To: Bocument Ref OWS/I02i/0405/PROC, CO CONST & FS CORR. Revision = Prepared By: LMendonca Page: Lofl3 ‘Approved By: S. Kalkami Date: 11-08-2005 DOLPHIN OFFSHORE ENTERPRISES (1) LTD. eS dob Number | 0103/1021 Proc RSPPM Gen > f0EC CROSSINGS CONSTRUCTION AND FREE SPAN CORRECTION, Incorporated ONGC comments, Leter i 349811 | erence MRIRSPPMIOWC 51072004 dated | LM sk | 11.08.2008 040805, us sk | 14042005 ° : FOR CLIENT REVIEW REVSION | paces DESCRIPTION REVISED | APPROVED | DATE RECORD OF REVISIONS Docume Re 1 ODAOALOWSTPROC. CO CONST BS CORR Ration 7 1 Prepieé By + LMendonsa rage: 20633 Approved By: S Kulkamt Dae: 11.08.2005 Job Number: 0/08/1021 Project: RSPPM Chest ORC DOLPHIN OFFSHORE ENTERPRISES (I) LTD. e@ CROSSINGS CONSTRUCTION AND FREE SPAN CORRECTION PURPOSE: To lay down procedures for Crossings construction and Free span corrections. SCOPE: Crossings construction and Free span corrections for newly laid pipeline segments. PROCEDURE: This procedure contains the following: 1. Introduction 2. Free Span Correction Procedures 2.1 Pre-installation Survey 2.2 Grout Bag Installation 2.3 Post Installation As Built Survey 3. Crossings Construction Procedures 3.1 Pre-installation Survey 3.2 Grout Bag Installation 3.3. Post installation As Built Survey 4, Grouting Operations 4. INTRODUCTION Procedures contained herein are laid down as guidelines to carry out Crossings construction and Free span corrections for the newly laid pipelines in the Mumbai High field for the RSPPM project. Provailing site conditions may necessitate minor changes in the way the operations are carried out. These amendments, if any, shall be carried out at the discretion of the DOEL Diving Superintendent, in consultation with the onboard client representative. Crossing construction and Free Span correction shall conform to Pipeline Design Criteria Section 4A & 4B of ONGC spec 2015 rev 1, Max allowable tree span for a pipeline segment in straight and curved sections shall be as per data given in AFC pipeline alignment sheets. The envisaged work shall be performed by Dolphin Offshore Enterprises (India) Limited (DOEL) from a suitable vessel (DP DSV Seamec-.) Document Ref + ORS/ODLOAIST PROC. CO CONST & FS CORR Revision = 2 Prepared By: L- Mendonca Page: 30813 Approved By _:_$. Kulkarni Date__: 11.08200

You might also like