Billy F.

Silangit
Curriculum Vitae
EXPERIENCE
PT. Indah Kiat Pulp & Paper (APP Sinarmas)
✓ Production Foreman Jul 2018 – Aug 2020
Take Steps To Solve Problem In The Workplace, Determine
Quickly & Responsively To Problems Both In Production Machine,
Production Process, & Personal Internal Problems Of Subordinates.

✓ Quality Control Technician Aug 2020 – Oct 2021


Plan, Coordinate, & Monitoring All Quality Control Activities
During Production, Both The Raw Material Used, The Work
Processes Carried Out, As Well As Output Of Each Sub-Process To
PROFILE Ensure The Consistency Of Product Quality Produces According To
Predetermined Standard.
Place, Date Birth : Serang, Dec 31th 1993
PT. Prima Honeycomb International (ADR Group)
KTP Address : Perumnas Ciracas
✓ Quality Control Staff Nov 2021 – Mar 2022
Indah Blok A/189 RT 3 Controlling & Carrying Out Repairs For Defective Products,
RW 8 Serang, Banten Evaluating Products With New Model Or New Trials, Ensuring
Products Sent To The Market According To Standard Regulations,
Domicile Address : Jalan Raya Pakis 1 No.9 And Following Up On Market Complaints By Conducting
Investigations And Analysis For Quality Improvement.
Perumahan Meadow
Green Lippo Cikarang, PT. Omron Manufacturing Of Indonesia
Cikarang Selatan, Kab. ✓ Production Leader Injection Nov 2022 – Nov 2023
Bekasi Maintain Process & Product Quality Meet Specification, Maintain
Daily Output & Production Time To Meet The Production Line, Make
Daily Schedule & Arrange Layout Line By Following Production
CONTACT Line, & Maintain Work Environment In Accordance 5S/5R.
Project Improvement : Reduce Disposal (Defect) Product
With Schedulling Preventive Polish & Maintenance Die &
Phone : 0878235016104
Training Abnormality Handling To Operator Machine.
Email : billyjameslampard@yahoo.com
billyjameslampard@gmail.com
EDUCATION
SKILL FORMAL

Software Jenderal Achmad Yani Of University


SPSS Statistic  ✓ Major : Industrial Engineering 2012 - 2017
AutoCad  ✓ IPK : 3.15
Microsoft Office 
Language NON FORMAL
Indonesia  1. Training AutoCad (Score : B)
English  2. TOEFL At UNJANI LANGUAGE CENTER (Score : 463)
Soft Skill 3. Proficiency In English At Pare English Course (Score : B+)
Analysis Data  4. Student Internship For Make A Thesis In Quality Department
Problem Solving  PT. Pudak Scientific (Feb – April 2016)

Teamwork 
Communication 
PROJECT BACKGROUND ANALYSIS IMPROVEMENT ACTIVITY
Disposal Can’t Achieve Target (0,75%) Item : Machine (Die) Item : Man ITEM : MACHINE (PLANNING PREVENTIVE POLISH DIE)
IDEAL Preventive Polish Ideal 3,13 – 3,55 Hour
DISPOSAL THERMOSETTING
Why 1 : Burr Always Stick To The Die Why 1 : Lack Abnormality Handling PREVENTIVE POLISH DIE AFTER
DEC 22 – MAR 23 150 20%
Why 2 : The Gas Trap In Area Insert Why 2 : No Information From 18%

Number Of Events
8.000 4,00% Operator 16% 15%
100 14%

Ratio
6.000 3,00% Why 3 : Insert Core Worn Out
2,86% 2,89% Why 3 : Lack Of Awareness 9% 9% 10%
2,54% 8% 8% 7% 7%
2,41% 50
4.000 2,00% 5%
Why 4 : No Procedur Maintenance 3%
Why 4 : Operator Low Skill
2.000 1,00% 0 0%
0,75% 0,75% 0,75% 0,75% 29 - 95 - 155 - 218 - 281 - 344 - 407 - 470 - 533 - 596 -
Why 5 : Operator Doesn’t Not Know
Why 5 : No Training About 91 154 217 280 343 406 469 532 595 658
- 0,00% So What Can Be Done is Polish Die
Dec 22 Jan 23 Feb 23 Mar 23 Abnormality Handling To Operator Interval Shot Of Events
Why 6 : No Planning Maintenance
Disposal Target Actual Schedulling Why 6 : WGS / OPL Incompleted
Highest Number Of Events On Shot 470 – 532
SS Type Biggest Ratio Of Product Disposal Convert To Time (Hours)
ITEM : MAN
RATIO DISPOSAL CASE SS : Cycle Time / Shot : 24 sec
TRAINING TO OPERATOR STEP TO HANDLING ABNORMALITY
THERMOSETTING Preventive Polish Ideal :
SS Z VN L G7L LY 01 Take Product From Conveyor & Do Inspect Product By Bottom Limit = (24 x 470) : 3.600 = 3,13 Hour
26,20%
25,22%

Paying Attention To The Following Points :


24,65%

Top Limit = (24 x 532) : 3.600 = 3,55 Hour


22,96%
22,74%

22,69%

22,28%

21,47%
20,94%

20,64%
20,49%
19,57%
19,55%
18,26%

15,85%
14,39%

13,79%
13,72%

12,78%

RESULT OF IMPROVEMENT
10,76%

RESULT IMPROVEMENT CASE SS


4,40%
3,05%

2,06%
1,54%

If You Find NG Part, Then Do :


02 A. Stop Machine
$1.600 0,90%
$1.400 BEFORE 0,78%0,75% 0,80%
DEC 22 JAN 23 FEB 23 MAR 23 0,70%
B. Report To Technician / Leader $1.200 0,68%
0,60%
C. Carry Out Repairs According To Technician / Leader $1.000
0,50%
SS Case Biggest Instructions. If NG Shortmold, Polish Die According To $800
0,38%0,37% 0,40% 0,40%
Rejection (77%) The Schedule That Has Been Made. $600 0,31% 0,30%
0,30%
Claim $400 0,25%0,22%
D. Separate The Product Beforehand. Check Each Part 0,20%
Problem Box Backwards Until You Find OK Part Box. $200 0,10%
COV
ER E. Separate Products Contamined With NG Products $- 0,00%
SS Dec Jan Feb Mar Apr May Jun Jul 23 Agt Sep
Then Place Them In The Pending Area.
23% 22 23 23 23 23 23 23 23 23
CAS F. Make A Selection On Pending Products. Make Sure
E SS The Product Is Separated / Discarded. Disposal Ratio
77%
Shortmold 03 If It’s Good, Validate The Product With A QC
Reduce Ratio Disposal From Mar – Sep 0,56%
Member Before Masspro Returns.