MPS 239 NN - MV Sartika Baruna
MPS 239 NN - MV Sartika Baruna
Action taken :
1 Provide technicians to calibration 15 PPM meter on board
2 Checking and ensuring the performance of the PPM meter unit, calibrations
3 Checking and ensuring the performance of the display monitor PPM meter
4 Check and ensure the condition of the alarm 1 dan alarm 2 switch in PPM meter unit
5 Record calibration results, make certificates and reports
6 Install it back into the ship and terminate its cable
7 Perform commissioning tests
Notes:
1 the job is only to calibrate the PPM meter unit
2 does not include repairs to the electrical control system and mechanics of the Oily water separator system
3 Excludes spare parts and installation costs
4 does not include transportation and accommodation costs
Action taken :
1 Provide technicians to calibration 40 PPM monitor on board
2 Checking and ensuring the performance of the PPM meter unit, calibrations
3 Checking and ensuring the performance of the display monitor PPM meter
4 Check and ensure the condition of the alarm 1 dan alarm 2 switch in PPM meter unit
5 Record calibration results, make certificates and reports
6 Install it back into the ship and terminate its cable
7 Perform commissioning tests
Notes:
1 the job is only to calibrate the PPM meter unit
2 does not include repairs to the electrical control system and mechanics of the Oily water separator system
3 Excludes spare parts and installation costs
4 does not include transportation and accommodation costs
TOTAL Rp 12.000.000
Term & Condition
Term of Payment –DP 30% and 70% cash after the work is completed .
PO shall be issued by client prior start to work
Price Not Include Material
Price With IDR
Est Job 4-5 Days
Validity of Quote – Price stated in the quote estimate shall unless renewed, automatically expire
30 Days from the date of this quote and is, by notice, subject to change at anytime.
Cancelation – If any happened cancellation of order we will charge 20% after drawing approval,
70% after Major component purchased and 100% when equipment is assembled.
Other – all out of the range of, please advise for advance.
Thanks
Prepared by –
Budianto Asjik D