Professional Documents
Culture Documents
Front Elevation
Front Elevation
8000
2950 5050
A B C
FF-2 1893
PLAIN CEMENT NOTE: THIS FACE
D2 FIN. PAINTED EXTRUDED AT 1 INCH
3 FROM THE GROOVED FIN.
W2 GROOVED CEM.
FIN. PAINTED CONC. CANOPY
1800
PRENATAL ROOM PWD TOILET W4 ROOF APEX
2500
1200
1200
FF-3
FF-1 WF-3
WF-1
D3
TOP OF BEAM
5000
5000
2" x 3" TUBULAR #40
1.5" Ø STAINLESS
BUSINESS AREA
4550
FF-1
D3 STEEL PIPE #40
6950
6950
WF-1
X ELEV. = 400mm
W3 X
2950
CONSULTATION
3350
FF-1
W5 /TREATMENT RM. WF-1
800
NGL.
WAITING AREA
1950
1950
400
ELEV. = 400mm
2525
FF-2
WF-2
1 FRONT ELEVATION
SCALE: 1:100 MTS
3 2 1
1200
MARK DESCRIPTION LOCATION TOP OF BEAM
JALOUSIE WINDOW
60cm X 60cm GLAZED TILE CONSULTAION AREA, BUSINESS
4550
FF-1
FLOOR FIN. AREA & PRENATAL ROOM
2950
60cm X 60cm UNGLAZED TILE
FF-2 EXIT & WAITING AREA
FLOOR FIN.
30cm X 30cm UNGLAZED TILE
FF-3 PWD TOILET FIN. FLR. LINE
FLOOR FIN.
NGL.
SEMI-GLOSS LATEX PAINT ON
400
WF-1 INTERIOR WALL
PLAIN CEM. PLASTER FINISH
PROJECT TITLE: PREPARED BY: CHECKED BY: CONCURRED BY: APPROVED BY: SHEET CONTENT: SHEET NO.
Republci of the Philippines
Province of Biliran
Municipality of Maripipi
CONSTRUCTION OF BRGY.
HEALTH STATION
JOENYL FERNAND C. CAINGCOY ENGR. LOU STANLEY I. PULVERA MARY GRACE R. LLEVER, MD. HON. JOSEPH C. CAINGCOY, RPsy. Ph.D.
·
·
·
FLOOR PLAN
SCHEDULE OF FLOOR & WALL FIN.
FRONT ELEVATION
A
OFFICE OF THE MUNICIPAL ENGINEER
LOCATION: BRGY. VIGA MARIPIPI, BILIRAN DRAFTSMAN DESIGNATE MUNICIPAL ENGINEER MHO MUNICIPAL MAYOR
· LEFT SIDE ELEVATION
2