Agenda
• Overview UPS Schematic Mimic Diagram
• System Features
• System Components
• User Operating
• Lithium-Ion Battery Solution
• Escalation

Schneider Electric Critical Power & Cooling Services –Oct 2009


Overview UPS Mimic Diagram

Schneider Electric Critical Power & Cooling Services –Oct 2009


System Features
GALXY 7000

Schneider Electric Critical Power & Cooling Services –Oct 2009


System Components

Schneider Electric Critical Power & Cooling Services –Oct 2009


System Components (Display)

Schneider Electric Critical Power & Cooling Services –Oct 2009


System Features (Display)

Schneider Electric Critical Power & Cooling Services –Oct 2009


System Features (Display)

Schneider Electric Critical Power & Cooling Services –Oct 2009


UPS : Startup From Maintenance Bypass Operation

Note: The above procedure should be carry out by trained and authorized person.

Schneider Electric Critical Power & Cooling Services –Oct 2009


UPS: Startup from Maintenance Bypass Operation

Note: The above procedure should be carry out by trained and authorized person.

Schneider Electric Critical Power & Cooling Services –Oct 2009


UPS: Shutdown from Normal Operation to Maintenance
Bypass Operation

Note: The above procedure should be carry out by trained and authorized person.

Schneider Electric Critical Power & Cooling Services –Oct 2009


UPS: Shutdown from Normal Operation to Maintenance
Bypass Operation

Note: The above procedure should be carry out by trained and authorized person.

Schneider Electric Critical Power & Cooling Services –Oct 2009


Lithium-Ion Battery Solution

Prepared by Benedict Lim

All content in this presentation is protected – © 2008 American Power Conversion Corporation
Schneider Electric’s LIB Solution
A modular solution accomodating a wider range of needs

Customer Trainig Manual


For LIB Solutions
Switch Gear &
Rack BMS

SMPS &
System BMS From 1-32 racks
13 or 17
depending on power
per rack and backup time
1 Gateway (System BMS)
Cell Module per system
(1U, fit in one of the LIB racks)
(8 cells)

LIB Rack
(W600xD650xH2100mm)

Confidential Property of Schneider Electric | Page 14

Schneider Electric Critical Power & Cooling Services –Oct 2009


7. Rack System
■ Basic unit is Rack system
- Battery System is configured by for parallel expansion
Main Path Cable

P+ P- Main Path Cable is connected to the UPS


B+ B-

Switch Gear Main Path Cable

SMPS Assy, System BMS

67Ah Cell

8S Plastic Module
+Integrated BMS
Rack Fuse

Schneider Electric Critical Power & Cooling Services –Oct 2009


Turn ON/OFF Power to BMS
Before Isolating the power to the LIB BMS, turn off or trip the Battery breaker on the desired rack as shown below.

In order shutdown the Battery BMS, he 2 AC supplies shown below must be disconnected/powered off. Vice Versa, the AC supplies have to
be connected/powered on to turn on the battery BMS as well as providing the voltage needed for the undervoltage coil in the battery breaker
to operate (reset & turn on).

Schneider Electric Critical Power & Cooling Services –Oct 2009


The AC supplies to the BMS can be cut off via isolating the corresponding
fuses at the input and output side as shown in the picture below.
Battery System Operation

The battery system for a UPS is designed to be always on. The UPS and the critical load must be set up
so that the battery systems maximum allowable voltage and current are not exceeded.

Indicator LED
Four indicator LED s on the front of the Switchgear Assembly in each rack displays the status of the
battery system per string. Table 2-1 shows each LED s color and the battery status indicated.
System Reset

To reset the battery system; e.g. after a major fault or minor alarm, press the “reset button” on the front of the SMPS. This will reset all fault &
alarms on the system and return the system to normal status.

Schneider Electric Critical Power & Cooling Services –Oct 2009


Escalation

● CALL SCHNEIDER ELECTRIC ITB HOTLINE @


OFFICE HOUR: 1800 6221 639

AFTER OFFICE HOUR:1800 6221 640

Information require
UPS Serial No: xxx
Customer Infor: xxx

Schneider Electric Critical Power & Cooling Services –Oct 2009


Q&A:

Thank you.

Schneider Electric Critical Power & Cooling Services –Oct 2009