Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

WENZHOU ECOTEC ENERGY EQUIPMENT CO.

,LTD
701 Digital Mansion Xincheng Avenue Lucheng Wenzhou, Zhejiang, China

Content

1、Introduction………………………………………………………………………2
1.1Purpose ………………………………………………………… … ……2
1.2Composing…………………………………………………………………2
2、Electronic parts…………………………………………………………………3
2.1Main board……………………………………………………………… …3
2.1.1Connection of main board……………………… ……………… … 4
3.1Power board…………………………………………………………………5
3.1.1Connection of power board………………………………………… …5
4.1Display board……………………………………………………………7
4.1.1Connection of display board……………………………………………7
5.1Keyboard……………………………………………………………………8
5.1.1Connection of keyboard…………………………………………………8
6.1Transformer…………………………………………………………………9
3、Connection of dispenser……………………………………………………10

4、Maintainence……………………………………………………………………11

4. 1Maintanence flowsheet of electronics…………………………… …11


4. 2Error code…………………………………………………………………12
4.3Examples……………………………………………………………… …13

1
WENZHOU ECOTEC ENERGY EQUIPMENT CO.,LTD
701 Digital Mansion Xincheng Avenue Lucheng Wenzhou, Zhejiang, China

1.1 Purpose

The purpose of this manual is to introduce the structure of

electronic controller, method of maintanence and examples of

breakdown

Elctronic controller is a system to control the electric and

electronic in order measure the amount of sale and flow of oil

1.2Composing

Electronic is composed by the below parts:

1.Main board

2.Supply board

3.Display board

4.Keyboard

5.Transformer suit

This operation manual including the drawing of circuit, connection

drawing of wires, assembling drwaing, flow drawing of repairment,

error code introduction, examples of repairment etc.


2
WENZHOU ECOTEC ENERGY EQUIPMENT CO.,LTD
701 Digital Mansion Xincheng Avenue Lucheng Wenzhou, Zhejiang, China

2.Electronic component
2.1Mian board

S.N Name Description


1 DC External battery
2 DisplayBoard1 Display port 1
3 DisplayBoard2 Display port 2
4 KeyBoard1 Keyboard port 1
5 KeyBoard2 Keyboard port 2
6 Printer1 Printer port 1
7 Printer2 Printer port 2
8 RS485 RS485 port
9 QDJDF Signal control output of motor, solenoid valve
10 Counter1 Counter port 1
11 Counter2 Counter port 2
12 Gun1 Nozzle switch port 1
13 Gun2 Nozzle switch port 2
14 Sensor1 Pulser port 1
15 Sensor2 Pulser port 2
16 Power1 Power port for nozzle switch and pulser
17 Power2 Display board and power supply board

3
WENZHOU ECOTEC ENERGY EQUIPMENT CO.,LTD
701 Digital Mansion Xincheng Avenue Lucheng Wenzhou, Zhejiang, China
2.1.1 Connection of Power supply board

DC—External port for battery RS485—Communication port 1


pin1=VBATO Pin1=A
pin2=blank Pin2= blank
pin3= GND Pin3=B
pin4= blank
DisplayBoard1 DisplayBoard2 Display port
pin1=GND Pin2=GND Pin3=XS- Pin4= XS-
Pin5=DP-LD.n Pin6= DP-LD.n Pin7= DP-CLK.n Pin8= DP-CLK.n
Pin9=LCD.n-EN Pin10= DP-DAT.n Pin11=VCC Pin12=VCC
Pin13= XS+ Pin14= XS+
Printer1、 Printer2— Keyboard port Keyboard1\Keyboard2-Keyboard port
pin1= blank Pin2 blank pin1= XS+ Pin2= XS+
Pin3= Printer.n-TX Pin4= blank Pin3= XS- Pin4= XS-
Pin5=VSS Pin6= blank Pin5=YS.n Pin6= KEY_CLK.n
Pin7= blank Pin8= blank Pin7= blank Pin8=KEY_DATA1
Pin9= blank pin10= blank Pin9=KEY_RD.n pin10=SC.n
Pin11=VCC pin12=RDIS
Pin13=KEY_COM.n pin14=GND
pin8=FWJ.n pin16=GND
QDJDF— Signal control output of motor, Sensor1、 Sensor2— Pulser port
solenoid valve
Pin1=VDD(8V) Pin2= BigValve2 pin1=VDD(5V)
Pin3=motor2 Pin4= SmallValve2 pin2=A
Pin5=BigValve1 Pin6=motor1 pin3=B
Pin7=SmallValve1 Pin8=VDD(5V) pin4=VSS
Gun1、 Gun2 nozzle switch port Counter1\ Counter2-Counter port
pin1=VSS pin1= CounterOut.n
pin2=KG pin2= VSS
pin3=12V
Power1-Power port for nozzle switch and Power2— Power port for Display and
pulser main board
Pin1=VSS pin1=GND Pin2=VDD
Pin3=VSS Pin3= VDD Pin4= VDD
Pin5=VSS Pin5=XS+ Pin6= XS+
Pin2=12V Pin7= XS+ Pin8= blank
Pin4=12V Pin9=XS- pin10==XS-
Pin6=12V Pin11=GND pin12=GND

4
WENZHOU ECOTEC ENERGY EQUIPMENT CO.,LTD
701 Digital Mansion Xincheng Avenue Lucheng Wenzhou, Zhejiang, China
3.1Power board

S.N. Name Description


1 JXDZ Externail binding post
2 ZDYSC Power port for main board and display board
3 AI Control port for motor
4 +12V 12V output port
5 CDJDF Control port for motor switch
6 BYQSC Power output of transformer

5
WENZHOU ECOTEC ENERGY EQUIPMENT CO.,LTD
701 Digital Mansion Xincheng Avenue Lucheng Wenzhou, Zhejiang, China
3.1.1Connection drawing of power board

+12V—12V output por BYQSC— Power output of transformer


pin1=VSS pin1=AC(14V) pin6= AC(7V)
pin2=VSS pin2= AC(14V) pin7= AC(7V)
pin3=VDD(12V) pin3= AC(17V) pin8= AC(7V)
pin4=VDD(12V) pin4= AC(17V) pin9= AC(7V)
pin5= AC(7V) pin10= AC(7V)

JXDZ ZDYSC
pin1=AC220(L) Pin2=AC220(N) pin1=VCC(ZJ8V) pin6=
V2-(SGND)
Pin3=Blank Pin4= ComValve2(N) pin2= VCC (ZJ8V) pin7=
V2-(SGND)
Pin5=SmallValve2(F1) Pin5=BigValve2(F2) pin3=V2+(XS8V) pin8=
V1-(GND)
Pin6=ComValve1(N) Pin7=SmallValve1(F3) pin4= V2+(XS8V) pin9=
V1-(GND)
Pin8=BigValve1(F4) pin5= V2+(XS8V)
AI CDJDF
pin1=blank pin5=VDD(8V) pin1= Bigvalvel1 pin5=
Smallvalvel2
pin2=blank pin6=VDD(8V) pin2=Smallvalvel1 pin6=motor2
pin3=motor2 pin3=motor1 pin7=VCC(5V)
pin4=motor1 pin4= Bigvalvel2 pin8=VDD(8V)

6
WENZHOU ECOTEC ENERGY EQUIPMENT CO.,LTD
701 Digital Mansion Xincheng Avenue Lucheng Wenzhou, Zhejiang, China
4.1Display board

S.N. Name Description


1 J1 Display Port
1 J2 Display Port

7
WENZHOU ECOTEC ENERGY EQUIPMENT CO.,LTD
701 Digital Mansion Xincheng Avenue Lucheng Wenzhou, Zhejiang, China
4.1.1Wiring of display board

J1— Wiring of display board


pin1=VLED pin5=CLOCK
pin2=blank pin6=LATCH
pin3=VCC_IN pin7=SGND
pin4=DATA pin8=GND
J2— Wiring of display board
pin1=GND Pin2=GND Pin3=SGND Pin4=SGND
Pin5=LATCH Pin6=LATCH Pin7=CLOCK Pin8=CLOCK
Pin9= blank Pin10= DATA Pin11=VCC_IN Pin12=VCC_IN
Pin13=VLED Pin14=VLED

5.1Keyboard

S.N Name Description


1 J1 CPU Port

8
WENZHOU ECOTEC ENERGY EQUIPMENT CO.,LTD
701 Digital Mansion Xincheng Avenue Lucheng Wenzhou, Zhejiang, China
5.1.1Wiring of keyboard

J1—Port for main board


pin1= VLED(8V) pin9=SC
pin2= VLED(8V) pin10=SR
pin3=XGND pin11=VCC
pin4=XGND pin12=FX
pin5=BM pin13=COM
pin6=CK pin14=GND
pin7=SZ pin15=FW
pin8=SJ pin16=GND

6.1Transformer

S.N, Description
1 Power for main board(AC17V)
2 Power for nozzle switch and pulser(AC15V)
3 LED power(AC7V)
4 Power input of transformer(AC220V)

9
WENZHOU ECOTEC ENERGY EQUIPMENT CO.,LTD
701 Digital Mansion Xincheng Avenue Lucheng Wenzhou, Zhejiang, China

3、 Wiring of whole electronic controller

display board display board

5 VSS
A1 9 Y0
B1 4
8 Z0 Communiction
Z0 3 Connection
Y0 7 B1
2
6 A1
1 VCC

g1 b1 black
pulser 1

r w1

Main board

nozzle 1

nozzle switch

b1
mechanical electromagnetic r1
counter 1

w1 w2 r r2 g3 y4 y2

r b

brown1 brown2 b g2 g1 y3 y1

r
r
SSR

red

L
blue

N
PE
r b

blue
MOTER OUT MOTER POWER
L

green

red
N

black
r
U

r
b
power board MOTER
N

w1
b1
g1
w1
N

w2
VALVE OUT

brown1
brown2 g1 g2
solenoid valve
blue small valve
Vs

green big valve


AC220V INPUT

Vb
AC220V OUT

transformer
filter yellow
and green

10
4. Maintanence
4.1 Flowsheet of maintanence
S TART

Can the keyboard and display board be displayed?


Yes
No Can the keyboard be operated?
Do the 220V or380V alternating No Yes Pick up the nozzle or press start
voltage input properly? Exchange the mainboard key can start the motor? No
No Yes Yes is the motor indicator light
Is the fuse on the Ok? can come out the oil on the mainboard bright?
Yes powerboard fusing? No if open the nozzle ? Yes No
Exchange the fuse No Exchange the keyboard Ye s No exchange the mainboard
Ecchange the powerboard
check the transmit is the solenoid valve
electricity wire and opened ? is the SSR of control
eliminate the fault Yes motor properly? No
have the display board No Yes Exchange the SSR
eliminate the fault displayed figure?
is the three-phase power
the machine is the valve indicator light of control motor properly?
Yes No parts and pipeline on the mainboard bright?
is measure exactly? have fault Yes No Yes No
No is pulser turning exchange thepowerboard Is the motor properly?
exchange the mainboard normally? exchange the mainboard Check the
Yes No ok? No transmit
o k? No exchange electricity wire
No maintain or drive organ have solenoid valve have fault the motor and eliminate
Exchange the pulser exchange the fault the pulser

11
WENZHOU ECOTEC ENERGY EQUIPMENT CO.,LTD
701 Digital Mansion Xincheng Avenue Lucheng Wenzhou, Zhejiang, China

4.2 E
Error code Information cue Processing method

E01 No pulser or pulser error Change pulser

There is no gas-filling trade after opened the gas


E02 Automatic recovery
dispenser for 60 seconds
There is no gas-filling trade during the gas dispenser
E03 Automatic recovery
for 60 seconds
Clear electronic general
E05 The electronic flow rate general total is full
total
Clear electronic general
E06 The electronic sales general total is full
total
No electromagnetism counter or Change electromagnetism
E07
electromagnetism counter error counter

E08 Weak quantity of electricity for battery Change battery

E12 One gas-filling sales to the maximum Automatic recovery

E13 One gas-filling flow rate to the maximum Automatic recovery

One nozzle keyboard key on the set position(just for


E15 Turn the key to Inject
two nozzle)
Setting the number of times for gas-filling, after reached Ravel out the number of
E16
the setting number, it will lock the machine times setting

E17 Setting forbid to gas-filling Ravel out the forbid setting

E18 ID card communication difficult

Amend the ratio


E20 Ratio coefficient error
coefficient
Amend the density
E21 Error density value
value

12
WENZHOU ECOTEC ENERGY EQUIPMENT CO.,LTD
701 Digital Mansion Xincheng Avenue Lucheng Wenzhou, Zhejiang, China

4.3 Troubleshoot

S.N. Sympton Maintainence


1. Check the connection of pulser port
1 Filling without digital running 2. Change a new pulser
3. Change main board
1. Change the nozzle switch
2. Change SSR
Lift the nozzle while motor
2 3. Change motor
don’t work
4. Change power board
5. Change main board
1. Flow meter blocked, change flow meter
2. Pump defect, change pump
3 No oil out while motor work 3. Solenoid defect, change solenoid
4. SSR defect, change SSR
5. Change main board
1. Change the nozzle switch
4 After filling, can not stop fillling 2. SSR defect, change SSR
3. change main board
No display on the display 1. Power board defect, change
5
board and keyboard 2. change main board
1. Check connection of keyboard
Display board work, while
6 2. Change keyboard
keyboard problem
3. Change main board
1. Flow meter attrition, change flow meter
7 Lose accuracy 2. Make calibration
3. Change the pulser
1. Check connection of display board, or
8 Keyboard work, no display change
2. change main board
1. Adjust the turn off value of solenoid
valve
Filling by preset while no
9 2. Change solenoid valve
turnoff value of solenoid valve
3. SSR defect, change SSR
4. Change main board
1. Key defect, change the key
10 Parement setup error
2. Change main board
1. Keyboard problem
11 No re-display 2. Main board problem
3. No battery

13

You might also like