Professional Documents
Culture Documents
Spreadsheets BD
Spreadsheets BD
The JAE
31/10/2022
Phone: +1(403)2033945
Group Real
Estate REF - 2022/10/30003
Blessing.Diejomaoh@edu.sait.ca
Agriculture
Johnny Renovation
300 unt 4 Edgar Industrial Close
403-200-5301
JonnyPavement@gmail.com
DESCRIPTION
Items
Construction Items Quantity Cost per 1 Total Cost
Job Logistics (Fuel, Paper work, meals) - 1 $720.00 $720.00
Foundation Concrete Re-inforcement Portland Cement 150 $110.00 $16,500.00
Coarse Gravel (bags) 20 $150.00 $3,000.00
Fine Sand (bags) 12 $310.00 $3,720.00
Wood form for Concrete and Foundation Construction Plywood 6 $377.00 $2,262.00
Timber 11 $122.00 $1,342.00
Lumber 17 $88.00 $1,496.00
Box of Nails 2 $90.00 $180.00
Can of glue 1 $65.00 $65.00
Door/Window Installation Window 4 $960.00 $3,840.00
Door 2 $575.00 $1,150.00
Insulation Water proof sound insulator 9 $65.00 $585.00
Side Sheathing Fire-proof Side Sheathing 44 $110.00 $4,840.00
Roof Repair Box of Roofing Sheets 15 $220.00 $3,300.00
Electrical/ Light Repair and Rewiring Switches 19 $20.00 $380.00
Roll of Wire 7 $92.00 $644.00
Electrical Outlet 10 $18.50 $185.00
Labour Breakdown
Equipment Rental $2,990.00 $2,990.00
Foundation Concrete Re-inforcement $1,380.00 $1,380.00
Wood form for Concrete and Foundation Construction $1,260.00 $1,260.00
Door/Window Installation $800.00 $800.00
Insulation $680.00 $680.00
Side Sheathing $2,235.00 $2,235.00
Roof Repair $3,000.00 $3,000.00
Electrical/ Light Repair and Rewiring $450.00 $450.00
Miscellenous
Site Garbabe removal and Recycling $550.00 $550.00
SUBTOTAL $57,554.00
DISCOUNT $2,000.00
SUBTOTAL LESS DISCOUNT $55,554.00 if condition applied here
TAX RATE 5%
TOTAL TAX $2,777.70
SHIPPING/HANDLING $0.00
Construction
The JAE Group of Companies
20, Edgar Industrial Close, Red Deer, AB
Blessing.Diejomaoh@edu.sait.ca
Agriculture
Customer
Johnny Renovation
300 unt 4 Edgar Industrial Close
403-200-5301
JonnyPavement@gmail.com
DESCRIPTION
Labour Breakdown
Equipment Rental Other
Foundation Concrete Re-inforcement Labour
Wood form for Concrete and Foundation Construction Labour
Door/Window Installation Labour
Insulation Labour
Side Sheathing Labour
Roof Repair Labour
Electrical/ Light Repair and Rewiring Labour
Miscellenous
Site Garbabe removal and Recycling
Average Cost and Expenditure
Maximum Cost and Expenditure
Minimum Cost and Expenditure
Total
of Companies
e, Red Deer, AB
Budget Breakdown
h@edu.sait.ca 31-Oct-22
SUBTOTAL $14,615.05
DISCOUNT $2,000.00
SUBTOTAL LESS DISCOUNT $12,615.05 if condition applied here
Corperate TAX RATE 8%
$16,000.00
$14,000.00
$12,000.00
$10,000.00
$8,000.00
Expenditure
$6,000.00
$4,000.00
$2,000.00
$0.00
t on n n g r
en tio tio in ai
em cti lla la th ep
rc s tru st
a su hea of
R
fo n In S
-in Co In
de Ro
Re on do
w Si
te ti in
re da
nc un /W
o F o or
n
C d Do
tio an
da te
un re
Fo onc
rC
fo
rm
fo
d
oo
W
Job Type
Material cost Comparison
$25,000.00
$20,000.00
$15,000.00
$10,000.00
Material Cost
$5,000.00
$0.00
t on n n ng r
en tio tio hi ai
m cti la la at ep
ce tru ta
l su e R
or ns s In Sh of
-in
f
Co In
de Ro
Re n
do
w Si
te a tio in
re nd /W
nc ou or
Co d
F Do
n an
tio te
da re
un nc
Fo Co
r
fo
rm
fo
d
oo
W
Job Type
Blessing Diejomaoh
Expenditure
15257
4215
3330
480
3780
1800
790
Results
Expenditure
4215
Job Type
Foundation Concrete Re-inforcement
Wood form for Concrete and Foundation Cons
Door/Window Installation
Insulation
Side Sheathing
Roof Repair
Electrical/ Light Repair and Rewiring
Job Typ
Wood form for Concrete and Foundation Construction
Result
Total Cost Expenditure
5345 4215