Professional Documents
Culture Documents
WE-0658758-Grounding System Design Calculation REV-01
WE-0658758-Grounding System Design Calculation REV-01
CERT'D
CHK'D
MAK
NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ISSUED FOR BASE DESIGN SUBMITTAL
AJEC
BY
01-12-2022
30-12-2022
DATE
Rev.
National Grid SA
No.
00
01
REVISIONS
DRAWN
BY: MH
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
DATE: 01-12-2022
CHECKED
BY: MAK
DATE: 01-12-2022
OPRG. DEPT
BY:
DATE:
ENG'G. DEPT.
BY:
DATE:
CERTIFIED
BY:
MAK
Scope :
NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The PTS-21WN371 requires providing a new grounding grid system for the project
Construction of ABHOUR (ABH) 380/110/13.8kV BSP.
Reference:
ISSUED FOR BASE DESIGN SUBMITTAL
Software used:
CDEGS
AJEC
BY
30-12-2022
DATE
National Grid SA
No.
00
01
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
DATE: 01-12-2022
DATE: 01-12-2022
Diameter of electrodes = 19mm
OPRG. DEPT Main Grid Conductor size = 240Sqmm bare tinned copper conductor.
BY:
Main Grid Spacing = 15 x 15 m
DATE:
DATE:
CERTIFIED
For other detail please refer CDEGS software report annexure attached.
BY:
MAK
NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The grounding conductor shall be SOFT DRAWN, TINNED STRANDED COPPER. The
required cross sectional area is calculated based on ANSI/IEEE std. 80 Eq.30
Formula for calculating the Cu conductor & is given by
If
ISSUED FOR BASE DESIGN SUBMITTAL
A mm2 =
IREVISED AS PER SEC COMMENT
TACP × 10 −4
K 0 + Tm
ln
tα ρ K +T
DESCRIPTION
c r r 0 a
Where,
tc = Maximum possible clearing. This shall be taken as 1.0 sec.
αr = Thermal coefficient of resistivity of the conductor material at the reference temperature
Tr
ρr = Resistivity of the ground conductor at the reference temperature Tr. in µΩ
TACP = Thermal capacity from the table 10-1 in J/cm3.˚C
Tm = Fusing temperature in ˚C.
AJEC
AJEC
BY
Ta = Ambient temperature in ˚C
01-12-2022
30-12-2022
k0 = 1/ α0 or k0 = (1/ αr) - Tr
DATE
63
A mm2 =
Rev.
National Grid SA
No.
00
01
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
DATE: 01-12-2022
CHECKED
BY: MAK
DATE: 01-12-2022
Hence select 240 mm2 as per the table 10-2 (TES-P-119.10 R1 page 15/48).
OPRG. DEPT
BY:
DATE:
ENG'G. DEPT.
BY:
DATE:
CERTIFIED
BY:
Conclusions:
CHK'D
MAK
As per attached report of CDEGS software following are the points to be noted.
NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Soil Characteristics:
• Results:
Maximum Maximum
Parameter Permissible Calculated Value. Conclusion
Touch(V) 664.2 41.83 Within the limit.
AJEC
BY
30-12-2022
DATE
National Grid SA
No.
00
01
REVISIONS
DRAWN
Attachments: CDEGS Report (Annexure - I)
BY: MH Summary of Field Measurement of Soil Resistivity (Annexure - II)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF
DATE: 01-12-2022
CHECKED
BY: MAK
DATE: 01-12-2022
OPRG. DEPT
BY:
DATE:
ENG'G. DEPT.
BY:
DATE:
CERTIFIED
BY:
==============================================
| Fault Clearing Time ( sec)| 0.500 |
+----------------------------+---------------+
| Decrement Factor | 1.052 |
| Fibrillation Current (amps)| 0.164 |
| Body Resistance (ohms)| 1000.00 |
==============================================
======================================
| | FAULT | |
| SURFACE | CLEARING TIME | |
| LAYER |-----------------| |
| RESIST- | 0.500 sec. | FOOT |
| IVITY |-----------------| RESIST-|
| (OHM-M) | STEP | TOUCH | ANCE: |
| | VOLTAGE| VOLTAGE| 1 FOOT |
| | (VOLTS)| (VOLTS)| (OHMS) |
======================================
| 3000.0| 2188.8| 664.2| 6516.2|
|---------+--------+--------+--------+
End of Report #1
Report #2:
SUBDIVISION
===========
Grand Total of Conductors After Subdivision.: 1262
End of Report #2
01-January-2023 11:19:54 AM
01-January-2023 11:21:21 AM
150 LEGEND
41.83
37.68
50
33.52
Y AXIS (METERS)
29.37
25.22
21.06
-50
16.91
12.76
8.60
4.45
-150
-150 -50 50 150
X AXIS (METERS)
Touch Voltage Magn. (Volts) [Wors]
01-January-2023 11:21:49 AM
40
Pr of ile Num ber 26 .
Pr of ile Num ber 27 .
Pr of ile Num ber 28 .
Pr of ile Num ber 29 .
Pr of ile Num ber 30 .
Pr of ile Num ber 31 .
Pr of ile Num ber 32 .
Pr of ile Num ber 33 .
Pr of ile Num ber 34 .
Pr of ile Num ber 35 .
Pr of ile Num ber 36 .
Pr of ile Num ber 37 .
Pr of ile Num ber 38 .
Pr of ile Num ber 39 .
Pr of ile Num ber 40 .
Pr of ile Num ber 41 .
Pr of ile Num ber 42 .
Pr of ile Num ber 43 .
Pr of ile Num ber 44 .
Pr of ile Num ber 45 .
Pr of ile Num ber 46 .
Pr of ile Num ber 47 .
Pr of ile Num ber 48 .
Pr of ile Num ber 49 .
Pr of ile Num ber 50 .
Pr of ile Num ber 51 .
Pr of ile Num ber 52 .
Pr of ile Num ber 53 .
Pr of ile Num ber 54 .
Pr of ile Num ber 55 .
Pr of ile Num ber 56 .
Pr of ile Num ber 57 .
Pr of ile Num ber 58 .
Pr of ile Num ber 59 .
Pr of ile Num ber 60 .
Pr of ile Num ber 61 .
Pr of ile Num ber 62 .
Pr of ile Num ber 63 .
Pr of ile Num ber 64 .
Pr of ile Num ber 65 .
Pr of ile Num ber 66 .
Pr of ile Num ber 67 .
Pr of ile Num ber 68 .
Pr of ile Num ber 69 .
Pr of ile Num ber 70 .
Pr of ile Num ber 71 .
Pr of ile Num ber 72 .
Pr of ile Num ber 73 .
Pr of ile Num ber 74 .
Pr of ile Num ber 75 .
Pr of ile Num ber 76 .
Pr of ile Num ber 77 .
Pr of ile Num ber 78 .
Pr of ile Num ber 79 .
Pr of ile Num ber 80 .
Pr of ile Num ber 81 .
Pr of ile Num ber 82 .
Pr of ile Num ber 83 .
Pr of ile Num ber 84 .
Pr of ile Num ber 85 .
Pr of ile Num ber 86 .
Pr of ile Num ber 87 .
Pr of ile Num ber 88 .
Pr of ile Num ber 89 .
Pr of ile Num ber 90 .
Pr of ile Num ber 91 .
Pr of ile Num ber 92 .
Pr of ile Num ber 93 .
Pr of ile Num ber 94 .
Pr of ile Num ber 95 .
30
Pr of ile Num ber 96 .
Pr of ile Num ber 97 .
Pr of ile Num ber 98 .
Pr of ile Num ber 99 .
Pr of ile Num ber 10 0 .
Pr of ile Num ber 10 1 .
Pr of ile Num ber 10 2 .
Pr of ile Num ber 10 3 .
Pr of ile Num ber 10 4 .
Pr of ile Num ber 10 5 .
Pr of ile Num ber 10 6 .
Pr of ile Num ber 10 7 .
Pr of ile Num ber 10 8 .
Pr of ile Num ber 10 9 .
Pr of ile Num ber 11 0 .
Pr of ile Num ber 11 1 .
Pr of ile Num ber 11 2 .
Pr of ile Num ber 11 3 .
Pr of ile Num ber 11 4 .
Pr of ile Num ber 11 5 .
Pr of ile Num ber 11 6 .
Pr of ile Num ber 11 7 .
Pr of ile Num ber 11 8 .
Pr of ile Num ber 11 9 .
Pr of ile Num ber 12 0 .
Pr of ile Num ber 12 1 .
Pr of ile Num ber 12 2 .
Pr of ile Num ber 12 3 .
Pr of ile Num ber 12 4 .
Pr of ile Num ber 12 5 .
Pr of ile Num ber 12 6 .
Pr of ile Num ber 12 7 .
Pr of ile Num ber 12 8 .
Pr of ile Num ber 12 9 .
Pr of ile Num ber 13 0 .
Pr of ile Num ber 13 1 .
Pr of ile Num ber 13 2 .
Pr of ile Num ber 13 3 .
Pr of ile Num ber 13 4 .
Pr of ile Num ber 13 5 .
Pr of ile Num ber 13 6 .
Pr of ile Num ber 13 7 .
Pr of ile Num ber 13 8 .
Pr of ile Num ber 13 9 .
Pr of ile Num ber 14 0 .
Pr of ile Num ber 14 1 .
Pr of ile Num ber 14 2 .
Pr of ile Num ber 14 3 .
Pr of ile Num ber 14 4 .
Pr of ile Num ber 14 5 .
Pr of ile Num ber 14 6 .
Pr of ile Num ber 14 7 .
Pr of ile Num ber 14 8 .
Pr of ile Num ber 14 9 .
Pr of ile Num ber 15 0 .
Pr of ile Num ber 15 1 .
Pr of ile Num ber 15 2 .
Pr of ile Num ber 15 3 .
Pr of ile Num ber 15 4 .
Pr of ile Num ber 15 5 .
Pr of ile Num ber 15 6 .
Pr of ile Num ber 15 7 .
Pr of ile Num ber 15 8 .
Pr of ile Num ber 15 9 .
Touch Voltage Magn. (Volts) [Wors]
20
Pr of ile Num ber 16 6 .
Pr of ile Num ber 16 7 .
Pr of ile Num ber 16 8 .
Pr of ile Num ber 16 9 .
Pr of ile Num ber 17 0 .
Pr of ile Num ber 17 1 .
Pr of ile Num ber 17 2 .
Pr of ile Num ber 17 3 .
Pr of ile Num ber 17 4 .
Pr of ile Num ber 17 5 .
Pr of ile Num ber 17 6 .
Pr of ile Num ber 17 7 .
Pr of ile Num ber 17 8 .
Pr of ile Num ber 17 9 .
Pr of ile Num ber 18 0 .
Pr of ile Num ber 18 1 .
Pr of ile Num ber 18 2 .
Pr of ile Num ber 18 3 .
Pr of ile Num ber 18 4 .
Pr of ile Num ber 18 5 .
Pr of ile Num ber 18 6 .
Pr of ile Num ber 18 7 .
Pr of ile Num ber 18 8 .
Pr of ile Num ber 18 9 .
Pr of ile Num ber 19 0 .
Pr of ile Num ber 19 1 .
Pr of ile Num ber 19 2 .
Pr of ile Num ber 19 3 .
Pr of ile Num ber 19 4 .
Pr of ile Num ber 19 5 .
Pr of ile Num ber 19 6 .
Pr of ile Num ber 19 7 .
Pr of ile Num ber 19 8 .
Pr of ile Num ber 19 9 .
Pr of ile Num ber 20 0 .
Pr of ile Num ber 20 1 .
Pr of ile Num ber 20 2 .
Pr of ile Num ber 20 3 .
Pr of ile Num ber 20 4 .
Pr of ile Num ber 20 5 .
Pr of ile Num ber 20 6 .
Pr of ile Num ber 20 7 .
Pr of ile Num ber 20 8 .
Pr of ile Num ber 20 9 .
Pr of ile Num ber 21 0 .
Pr of ile Num ber 21 1 .
Pr of ile Num ber 21 2 .
Pr of ile Num ber 21 3 .
Pr of ile Num ber 21 4 .
Pr of ile Num ber 21 5 .
Pr of ile Num ber 21 6 .
Pr of ile Num ber 21 7 .
Pr of ile Num ber 21 8 .
Pr of ile Num ber 21 9 .
Pr of ile Num ber 22 0 .
Pr of ile Num ber 22 1 .
Pr of ile Num ber 22 2 .
Pr of ile Num ber 22 3 .
Pr of ile Num ber 22 4 .
Pr of ile Num ber 22 5 .
Pr of ile Num ber 22 6 .
Pr of ile Num ber 22 7 .
Pr of ile Num ber 22 8 .
Pr of ile Num ber 22 9 .
Pr of ile Num ber 23 0 .
Pr of ile Num ber 23 1 .
Pr of ile Num ber 23 2 .
Pr of ile Num ber 23 3 .
Pr of ile Num ber 23 4 .
10
Pr of ile Num ber 23 5 .
Pr of ile Num ber 23 6 .
Pr of ile Num ber 23 7 .
Pr of ile Num ber 23 8 .
Pr of ile Num ber 23 9 .
Pr of ile Num ber 24 0 .
Pr of ile Num ber 24 1 .
Pr of ile Num ber 24 2 .
Pr of ile Num ber 24 3 .
Pr of ile Num ber 24 4 .
Pr of ile Num ber 24 5 .
Pr of ile Num ber 24 6 .
Pr of ile Num ber 24 7 .
Pr of ile Num ber 24 8 .
Pr of ile Num ber 24 9 .
Pr of ile Num ber 25 0 .
Pr of ile Num ber 25 1 .
Pr of ile Num ber 25 2 .
Pr of ile Num ber 25 3 .
Pr of ile Num ber 25 4 .
Pr of ile Num ber 25 5 .
Pr of ile Num ber 25 6 .
Pr of ile Num ber 25 7 .
Pr of ile Num ber 25 8 .
Pr of ile Num ber 25 9 .
Pr of ile Num ber 26 0 .
Pr of ile Num ber 26 1 .
Pr of ile Num ber 26 2 .
Pr of ile Num ber 26 3 .
Pr of ile Num ber 26 4 .
Pr of ile Num ber 26 5 .
Pr of ile Num ber 26 6 .
Pr of ile Num ber 26 7 .
Pr of ile Num ber 26 8 .
Pr of ile Num ber 26 9 .
Pr of ile Num ber 27 0 .
Pr of ile Num ber 27 1 .
Pr of ile Num ber 27 2 .
Pr of ile Num ber 27 3 .
Pr of ile Num ber 27 4 .
Pr of ile Num ber 27 5 .
Pr of ile Num ber 27 6 .
Pr of ile Num ber 27 7 .
Pr of ile Num ber 27 8 .
Pr of ile Num ber 27 9 .
Pr of ile Num ber 28 0 .
Pr of ile Num ber 28 1 .
Pr of ile Num ber 28 2 .
0
0 50 100 150 ABHOUR 380kV BSP
01-January-2023 11:22:09 AM
150 LEGEND
6.66
5.99
50
5.33
Y AXIS (METERS)
4.66
4.00
3.33
-50
2.66
2.00
1.33
0.67
-150
-150 -50 50 150
X AXIS (METERS)
Gradient Step Voltage Magn. (V/M)
01-January-2023 11:22:24 AM
6.0
Pr of ile Num ber 36 .
Pr of ile Num ber 37 .
Pr of ile Num ber 38 .
Pr of ile Num ber 39 .
Pr of ile Num ber 40 .
Pr of ile Num ber 41 .
Pr of ile Num ber 42 .
Pr of ile Num ber 43 .
Pr of ile Num ber 44 .
Pr of ile Num ber 45 .
Pr of ile Num ber 46 .
Pr of ile Num ber 47 .
Pr of ile Num ber 48 .
Pr of ile Num ber 49 .
Pr of ile Num ber 50 .
Pr of ile Num ber 51 .
Pr of ile Num ber 52 .
Pr of ile Num ber 53 .
Pr of ile Num ber 54 .
Pr of ile Num ber 55 .
Pr of ile Num ber 56 .
Pr of ile Num ber 57 .
Pr of ile Num ber 58 .
Pr of ile Num ber 59 .
Pr of ile Num ber 60 .
Pr of ile Num ber 61 .
Pr of ile Num ber 62 .
Pr of ile Num ber 63 .
Pr of ile Num ber 64 .
Pr of ile Num ber 65 .
Pr of ile Num ber 66 .
Pr of ile Num ber 67 .
Pr of ile Num ber 68 .
Pr of ile Num ber 69 .
Pr of ile Num ber 70 .
Pr of ile Num ber 71 .
Pr of ile Num ber 72 .
Pr of ile Num ber 73 .
Pr of ile Num ber 74 .
Pr of ile Num ber 75 .
Pr of ile Num ber 76 .
Pr of ile Num ber 77 .
Pr of ile Num ber 78 .
Pr of ile Num ber 79 .
Pr of ile Num ber 80 .
Pr of ile Num ber 81 .
Pr of ile Num ber 82 .
Pr of ile Num ber 83 .
Pr of ile Num ber 84 .
Pr of ile Num ber 85 .
Pr of ile Num ber 86 .
Pr of ile Num ber 87 .
Pr of ile Num ber 88 .
Pr of ile Num ber 89 .
Pr of ile Num ber 90 .
Pr of ile Num ber 91 .
Pr of ile Num ber 92 .
Pr of ile Num ber 93 .
Pr of ile Num ber 94 .
Pr of ile Num ber 95 .
Pr of ile Num ber 96 .
Pr of ile Num ber 97 .
Pr of ile Num ber 98 .
Pr of ile Num ber 99 .
Pr of ile Num ber 10 0 .
Pr of ile Num ber 10 1 .
Pr of ile Num ber 10 2 .
4.5
Pr of ile Num ber 10 3 .
Pr of ile Num ber 10 4 .
Pr of ile Num ber 10 5 .
Pr of ile Num ber 10 6 .
Pr of ile Num ber 10 7 .
Pr of ile Num ber 10 8 .
Pr of ile Num ber 10 9 .
Pr of ile Num ber 11 0 .
Pr of ile Num ber 11 1 .
Pr of ile Num ber 11 2 .
Pr of ile Num ber 11 3 .
Pr of ile Num ber 11 4 .
Pr of ile Num ber 11 5 .
Pr of ile Num ber 11 6 .
Pr of ile Num ber 11 7 .
Pr of ile Num ber 11 8 .
Pr of ile Num ber 11 9 .
Pr of ile Num ber 12 0 .
Pr of ile Num ber 12 1 .
Pr of ile Num ber 12 2 .
Pr of ile Num ber 12 3 .
Pr of ile Num ber 12 4 .
Pr of ile Num ber 12 5 .
Pr of ile Num ber 12 6 .
Pr of ile Num ber 12 7 .
Pr of ile Num ber 12 8 .
Pr of ile Num ber 12 9 .
Pr of ile Num ber 13 0 .
Pr of ile Num ber 13 1 .
Pr of ile Num ber 13 2 .
Pr of ile Num ber 13 3 .
Pr of ile Num ber 13 4 .
Pr of ile Num ber 13 5 .
Pr of ile Num ber 13 6 .
Pr of ile Num ber 13 7 .
Pr of ile Num ber 13 8 .
Pr of ile Num ber 13 9 .
Pr of ile Num ber 14 0 .
Pr of ile Num ber 14 1 .
Pr of ile Num ber 14 2 .
Pr of ile Num ber 14 3 .
Pr of ile Num ber 14 4 .
Pr of ile Num ber 14 5 .
Pr of ile Num ber 14 6 .
Pr of ile Num ber 14 7 .
Pr of ile Num ber 14 8 .
Pr of ile Num ber 14 9 .
Pr of ile Num ber 15 0 .
Pr of ile Num ber 15 1 .
Pr of ile Num ber 15 2 .
Pr of ile Num ber 15 3 .
Pr of ile Num ber 15 4 .
Pr of ile Num ber 15 5 .
Pr of ile Num ber 15 6 .
Pr of ile Num ber 15 7 .
Pr of ile Num ber 15 8 .
Pr of ile Num ber 15 9 .
Gradient Step Voltage Magn. (V/M)
3.0
Pr of ile Num ber 17 0 .
Pr of ile Num ber 17 1 .
Pr of ile Num ber 17 2 .
Pr of ile Num ber 17 3 .
Pr of ile Num ber 17 4 .
Pr of ile Num ber 17 5 .
Pr of ile Num ber 17 6 .
Pr of ile Num ber 17 7 .
Pr of ile Num ber 17 8 .
Pr of ile Num ber 17 9 .
Pr of ile Num ber 18 0 .
Pr of ile Num ber 18 1 .
Pr of ile Num ber 18 2 .
Pr of ile Num ber 18 3 .
Pr of ile Num ber 18 4 .
Pr of ile Num ber 18 5 .
Pr of ile Num ber 18 6 .
Pr of ile Num ber 18 7 .
Pr of ile Num ber 18 8 .
Pr of ile Num ber 18 9 .
Pr of ile Num ber 19 0 .
Pr of ile Num ber 19 1 .
Pr of ile Num ber 19 2 .
Pr of ile Num ber 19 3 .
Pr of ile Num ber 19 4 .
Pr of ile Num ber 19 5 .
Pr of ile Num ber 19 6 .
Pr of ile Num ber 19 7 .
Pr of ile Num ber 19 8 .
Pr of ile Num ber 19 9 .
Pr of ile Num ber 20 0 .
Pr of ile Num ber 20 1 .
Pr of ile Num ber 20 2 .
Pr of ile Num ber 20 3 .
Pr of ile Num ber 20 4 .
Pr of ile Num ber 20 5 .
Pr of ile Num ber 20 6 .
Pr of ile Num ber 20 7 .
Pr of ile Num ber 20 8 .
Pr of ile Num ber 20 9 .
Pr of ile Num ber 21 0 .
Pr of ile Num ber 21 1 .
Pr of ile Num ber 21 2 .
Pr of ile Num ber 21 3 .
Pr of ile Num ber 21 4 .
Pr of ile Num ber 21 5 .
Pr of ile Num ber 21 6 .
Pr of ile Num ber 21 7 .
Pr of ile Num ber 21 8 .
Pr of ile Num ber 21 9 .
Pr of ile Num ber 22 0 .
Pr of ile Num ber 22 1 .
Pr of ile Num ber 22 2 .
Pr of ile Num ber 22 3 .
Pr of ile Num ber 22 4 .
Pr of ile Num ber 22 5 .
Pr of ile Num ber 22 6 .
Pr of ile Num ber 22 7 .
Pr of ile Num ber 22 8 .
Pr of ile Num ber 22 9 .
Pr of ile Num ber 23 0 .
Pr of ile Num ber 23 1 .
Pr of ile Num ber 23 2 .
Pr of ile Num ber 23 3 .
Pr of ile Num ber 23 4 .
Pr of ile Num ber 23 5 .
Pr of ile Num ber 23 6 .
1.5
Pr of ile Num ber 23 7 .
Pr of ile Num ber 23 8 .
Pr of ile Num ber 23 9 .
Pr of ile Num ber 24 0 .
Pr of ile Num ber 24 1 .
Pr of ile Num ber 24 2 .
Pr of ile Num ber 24 3 .
Pr of ile Num ber 24 4 .
Pr of ile Num ber 24 5 .
Pr of ile Num ber 24 6 .
Pr of ile Num ber 24 7 .
Pr of ile Num ber 24 8 .
Pr of ile Num ber 24 9 .
Pr of ile Num ber 25 0 .
Pr of ile Num ber 25 1 .
Pr of ile Num ber 25 2 .
Pr of ile Num ber 25 3 .
Pr of ile Num ber 25 4 .
Pr of ile Num ber 25 5 .
Pr of ile Num ber 25 6 .
Pr of ile Num ber 25 7 .
Pr of ile Num ber 25 8 .
Pr of ile Num ber 25 9 .
Pr of ile Num ber 26 0 .
Pr of ile Num ber 26 1 .
Pr of ile Num ber 26 2 .
Pr of ile Num ber 26 3 .
Pr of ile Num ber 26 4 .
Pr of ile Num ber 26 5 .
Pr of ile Num ber 26 6 .
Pr of ile Num ber 26 7 .
Pr of ile Num ber 26 8 .
Pr of ile Num ber 26 9 .
Pr of ile Num ber 27 0 .
Pr of ile Num ber 27 1 .
Pr of ile Num ber 27 2 .
Pr of ile Num ber 27 3 .
Pr of ile Num ber 27 4 .
Pr of ile Num ber 27 5 .
Pr of ile Num ber 27 6 .
Pr of ile Num ber 27 7 .
Pr of ile Num ber 27 8 .
Pr of ile Num ber 27 9 .
Pr of ile Num ber 28 0 .
Pr of ile Num ber 28 1 .
Pr of ile Num ber 28 2 .
0.0
0 50 100 150 ABHOUR 380kV BSP
·- ,. ,
1..,,...:,_l;,..,[il, ..-_' _.
. : .-_.. ( I ; .,l .
• If