Dart+ Coastal Project Progress Meeting 26.01.2022
Dart+ Coastal Project Progress Meeting 26.01.2022
• Client Relationship
o Revising our meeting schedule
o Lines of Communication
• Commercial
• Tracksmart
• Risk Managment
DART+ Coastal – Team Org Chart
Coastal North Programme
File: Design Team Org Chart Jan22.pdf Location: \\global\europe\Dublin\jobs\279000\279933-00\Internal WIP\ZM_ProjectMgmt\Org charts\Arup\
10
BEMU – B1 & B4
B1 Stabling Rd
B4 Depot Modifications:
B1 Stabling Rd:
• Awaiting survey data
B4 Depot Modifications:
• Awaiting IE response to RFIs
B1 Stabling Rd:
• Change Notice 26 (KK drafted 23rd Dec – has anything happened with this?)
• Early Warning - Quality of and information within Murphy’s survey is insufficient for Pway Design to progress
B4 Depot Modifications:
• IE slow response to RFIs
Key Risks
• Substation location conclusion delays – lack of IE clarity on option criteria
• Risks with ESBN ability to provide required supplies
South SET
Key Activities in Upcoming Period
• Conclusion of change notice to progress optioneering approach for OHLE feeder network
• Close out Phase 2 documents (uncertainties on FRS compliance)
Key Risks
• Uncertainties around IE decisions on options for feeder network and redundancy
• Eliminate uncertainties regarding exact signalling capacity
BEMU SET
Key Activities in Upcoming Period
• Build on final service level confirmation and issued documents
• Continuing engagement with ABB, Toshiba, Siemens for Energy Storage system
• Establish further details on the substation modular packages from suppliers
• Establish dimensions of individual structures within site compound
• GI coordination for OCR design
• Survey data for cable routes and UTX
• Technical queries for Alstom for track/train interface
Key Risks
• Alstom interface is becoming a significant risk due to the absence of any requirements in their supply for this interface
RO / EIAR
Key Activities in Upcoming Period
• PC1 Northern Line – TBC pending approval of the Phase 2 Feasibility Working Cost Estimate.
• DART+ Coastal South – Finalise PC strategy for the SL.
• Continue meetings with local authorities for DART+ Coastal North and for DART+ Coastal South and BEMU
Key Risks
• One of main risks on project is around delay associated with the PC and in RO determination
• Very tight programme, with dependency on design freeze dates being met to enable RO submission on time
Commercial
Now almost 3 months in to working to our new budgets – from 1st November.
Internal reporting against these budgets.
Finalised package owners.
Package owners will receive timesheet summaries for review from this week.
Package owners will receive update on costs to date per package V’s budget from end Jan.
Delivery
PMO Delivery Mgt Delivery Mgt Design Other PMO Design Other
Management
PC Survey Mgt
Procurement & Sandymount Procurement & Environmental SET Civils Environmental Environmental
Cost Mgt Cost Mgt
(285049-25)
(285050-02) (285050-34) (285050-33) (285049-34) (285051-02) (285051-05) (285051-52)
Environmental Safety
Railway Order Operations Bray Turnback PSDP
(285049-27) (285050-06) (285050-36)
Surveys (285050-
(285049-36)
Ardanuy Assurance Civils (285051-55)
39) (285051-07)
Safety
Arup Surveys PC Surveys
(285050-08)
Ardanuy
(285050-43) Assurance Corderoy Ardanuy
(285049-38)
Geotechnical Geotechnical
Investigation Investigation Corderoy
(285050-10) (285050-44)
PACKAGE OWNERS
PC Surveys
Corderoy
(285050-31)
Gillian Sisk Tony Sumner Chris Cox Roland Bourke Darragh Beirne
Ardanuy Clodagh O’
Ian Anderson Alex Leung Alexander Leung Juli Crowley
Donovan
Kayleigh
Stuart Haden Ronan Travers John Briody Tom Honnywill
Corderoy Komarnyckyj
Commercial
150
125 125 132 130
120 119 121
100 103 107
93
80 76 80 82
70 70 68 64 63
50 60 60 59
50 43
39 38 38
21 26 26 25
91 91 11
0 160 18 1 6 6 5
Tuesday 1 June Thursday 1 Sunday 1 Wednesday 1 Friday 1 Monday 1 Wednesday 1 Saturday 1
2021 July 2021 August 2021 September October 2021 November December 2021 January 2022
2021 2021